National Aluminium Company Limited-NALCO has published Overhauling Of Rotating Equipments Of Boiler And Auxiliary Area Of Unit-1 To 10 . . Submission Date for this Tender is 06-07-2020. Packaging Tubes and Label Tenders in CPP, NALCO, ANGUL Odisha. Bidders can get complete Tender details and download the document.
Name of Work: OVERHAULING OF ROTATING EQUIPMENTS OF BOILER & AUXILIARY AREA OF UNIT#1 TO #10. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | I.D. Fan cleaning & Impeller inspection, as per scope of work. | 28 | Lumpsum per Equipment | |
2 | 2 | I.D. Fan Bearing assy inspection & clean, as per scope of work. | 56 | NO | |
3 | 3 | I.D. Fan Bearing assy replacement, as per scope of work. | 5 | NO | |
4 | 4 | I.D. Fan Gear/disc coupling assy servici, as per scope of work. | 40 | NO | |
5 | 5 | I.D. Fan Gear/disc coupling assy Replace, as per scope of work. | 12 | NO | |
6 | 6 | I.D. Fan Alignment checking of Coupling, as per scope of work. | 2 | NO | |
7 | 7 | I.D. Fan Alignment of Vioth Coupling to, as per scope of work. | 28 | NO | |
8 | 8 | I.D. Fan Alignment of vioth coupling to, as per scope of work. | 14 | NO | |
9 | 9 | I.D. Fan Scoop tube assy servicing, as per scope of work. | 8 | NO | |
10 | 10 | I.D. Fan Vioth coupling assy oil replace, as per scope of work. | 8 | NO | |
11 | 11 | I.D. Fan Vioth coupling assy servicing, as per scope of work. | 8 | NO | |
12 | 12 | Servicing of Lub oil system of ID Fan, as per scope of work. | 28 | Lumpsum per Equipment | |
13 | 13 | Replacement & oh of Gear Pump assy, as per scope of work. | 5 | NO | |
14 | 14 | PA Fan Bearing assy inspection & cleanin, as per scope of work. | 52 | NO | |
15 | 15 | PA Fan Bearing assy replacement, as per scope of work. | 8 | NO | |
16 | 16 | PA Fan coupling assy replacement and all, as per scope of work. | 16 | NO | |
17 | 17 | Servicing of Lub oil system of PA fan, as per scope of work. | 28 | Lumpsum per Equipment | |
18 | 18 | Replacement of Rotor assy.of PA fan, as per scope of work. | 1 | Lumpsum per Equipment | |
19 | 19 | PA Fan internal inspection & cleaning, as per scope of work. | 28 | Lumpsum per Equipment | |
20 | 20 | Lub oil system servicing of FD fan, as per scope of work. | 28 | Lumpsum per Equipment | |
21 | 21 | F.D. Fan internal cleaning & inspection, as per scope of work. | 32 | Lumpsum per Equipment | |
22 | 22 | Replacement FD fan Bearing assy, as per scope of work. | 8 | NO | |
23 | 23 | Replacement of FD fan impeller(Blade brg, as per scope of work. | 4 | NO | |
24 | 24 | O/ H OF FD FAN bearing assy, as per scope of work. | 8 | NO | |
25 | 25 | O/H OF FD FAN Blade Bearing assy with, as per scope of work. | 2 | NO | |
26 | 26 | O/H OF FD FAN servomotor assy, as per scope of work. | 2 | NO | |
27 | 27 | FD FAN Blade Bearing Assembly Servomotor, as per scope of work. | 4 | NO | |
28 | 28 | Replacement /Alignment of FD FAN Rigifle | 8 | NO | |
29 | 29 | Water Jet cleaning of APH baskets, as per scope of work. | 2 | Lumpsum per Equipment | |
30 | 30 | Cleaning of APH external, as per scope of work. | 28 | Lumpsum per Equipment | |
31 | 31 | INTERNAL CLEANING OF APH, as per scope of work. | 28 | Lumpsum per Equipment | |
32 | 32 | Repl of HE baskets-E rows ( 1 Set= 24 No, as per scope of work. | 8 | SET | |
33 | 33 | Repl of HE baskets-D rows ( 1 Set= 24 No, as per scope of work. | 8 | SET | |
34 | 34 | Repl of HE baskets-C only ( 1 Set= 12 No, as per scope of work. | 8 | SET | |
35 | 35 | Repl of HE baskets-AB rows only ( 1 Set=, as per scope of work. | 8 | SET | |
36 | 36 | Repl of HIE baskets-E only ( 1 Set= 24, as per scope of work. | 8 | SET | |
37 | 37 | Repl of HIE baskets-D only ( 1 Set= 24, as per scope of work. | 8 | SET | |
38 | 38 | Repl of HIE baskets-C only ( 1 Set= 12, as per scope of work. | 8 | SET | |
39 | 39 | Repl of HIE baskets-AB only ( 1 Set= 12, as per scope of work. | 8 | SET | |
40 | 40 | Reversal/refitting of HIE-E basket ( 1 S, as per scope of work. | 7 | SET | |
41 | 41 | Reversal/refitting of HIE-D basket ( 1 S, as per scope of work. | 7 | SET | |
42 | 42 | Reversal/refitting of HIE-C basket ( 1 S, as per scope of work. | 7 | SET | |
43 | 43 | Reversal/refitting of HIE-AB basket, as per scope of work. | 7 | SET | |
44 | 44 | Replacement of Cold end baskets with new, as per scope of work. | 8 | SET | |
45 | 45 | Reversal & refitting of HE basket, as per scope of work. | 8 | Lumpsum per Equipment | |
46 | 46 | Reversal & refitting of HE basket-C& AB, as per scope of work. | 8 | Lumpsum per Equipment | |
47 | 47 | Removal,Reversal,Reftting of CE baskets, as per scope of work. | 8 | SET | |
48 | 48 | REPAIR OF APH CASING , CASING STIFFENERS, as per scope of work. | 2850 | Meter | |
49 | 49 | Replacement of APH CASING, STIFFNERS,DIA, as per scope of work. | 5500 | Meter | |
50 | 50 | Repair & setting of A.P.H. seals, as per scope of work. | 28 | Lumpsum per Equipment | |
51 | 51 | Inspection & servicing of Guide bearing, as per scope of work. | 28 | Lumpsum per Equipment | |
52 | 52 | Inspection & servicing of Support bearin, as per scope of work. | 28 | Lumpsum per Equipment | |
53 | 53 | Replacement & Overhauling of Guide beari, as per scope of work. | 6 | Lumpsum per Equipment | |
54 | 54 | Replacement & Overhauling of Support, as per scope of work. | 2 | Lumpsum per Equipment | |
55 | 55 | Servicing of Lub oil system of APH, as per scope of work. | 28 | Lumpsum per Equipment | |
56 | 56 | Servicing of Drive Mechanism OF APH, as per scope of work. | 28 | Lumpsum per Equipment | |
57 | 57 | Replacement of Drive Mechanism APH, as per scope of work. | 10 | Lumpsum per Equipment | |
58 | 58 | Overhauling of Drive unit assy.of APH, as per scope of work. | 16 | Lumpsum per Equipment | |
59 | 59 | Overrunning clutch replacement OF APH, as per scope of work. | 8 | NO | |
60 | 60 | OVERHAULING & REPLACEMENT OF AIR MOTOR, as per scope of work. | 4 | NO | |
61 | 61 | Cleaning & repair ,replacement of Fire, as per scope of work. | 28 | Lumpsum per Equipment | |
62 | 62 | A.P.H. Soot blowers O/h ,replacement/rep, as per scope of work. | 28 | Lumpsum per Equipment | |
63 | 63 | REPLACEMENT/ ALIGNMENT OF APH SECTOR, as per scope of work. | 40 | SET | |
64 | 64 | A.P.H. baskets support repair, as per scope of work. | 160 | Meter | |
65 | 65 | BASKET SUPPORT REPLACEMENT, as per scope of work. | 8 | Lumpsum per Equipment | |
66 | 66 | APH SECTOR PLATE REPAIR/RECTIFICATION, as per scope of work. | 96 | NO | |
67 | 67 | REMOVAL & REPLACEMENT OF APH SECTOR Pla | 24 | NO | |
68 | 68 | REMOVAL & REPLACEMENT OF SPOOL PIECE OF, as per scope of work. | 1 | NO | |
69 | 69 | REPLACEMENT OF PINS OF APH PIN RACK, as per scope of work. | 500 | NO | |
70 | 70 | LOAD TESTING OF 15 Tons, as per scope of work. | 3 | NO | |
71 | 71 | LOAD TESTING OF 10 Tons, as per scope of work. | 5 | NO | |
72 | 72 | LOAD TESTING OF 7.5 Tons, as per scope of work. | 5 | NO | |
73 | 73 | LOAD TESTING OF 2 Tons, as per scope of work. | 5 | NO | |
74 | 74 | O/H of 15 Tons, as per scope of work. | 3 | NO | |
75 | 75 | O/H of 10 Tons, as per scope of work. | 8 | NO | |
76 | 76 | O/H of 7.5 Tons, as per scope of work. | 8 | NO | |
77 | 77 | O/H of 2 Tons, as per scope of work. | 5 | NO | |
78 | 78 | SEAL AIR FAN BEARING ASSY INSPECTION, as per scope of work. | 16 | Lumpsum per Equipment | |
79 | 79 | SEAL AIR FAN BEARING ASSY REPLACEMENT, as per scope of work. | 8 | Lumpsum per Equipment | |
80 | 80 | ROTOR ASSY REPLACEMENT, as per scope of work. | 2 | Lumpsum per Equipment | |
81 | 81 | Replacement & ALIGNMENT OF SEAL AIR FA, as per scope of work. | 8 | NO | |
82 | 82 | EXTERNAL CLEANING & UPKEEP of lube oil, as per scope of work. | 28 | Lumpsum per Equipment | |
83 | 83 | Assistance in emergency shut down / comm, as per scope of work. | 200 | NO | |
84 | 84 | Replacement of Rotor assy.of ID fan, as per scope of work. | 1 | Lumpsum per Equipment |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail