Operation And Maintenance Of Pumping Installations , Controlling Valves At Ncb Area And Navy House Area Under Age E/M No . I Of Ge ( Utility-Ii ) Visakhapatnam , Manning , Operation And Maintenance Of Dg Sets , Pump Sets , Including Maintenance/ Repair And Attending Minor Breakdowns Of Water Supply And Electrical Supply , Lt Ug Cables/ Lt Switch Gear , Panel Boards , Distribution System Installed At Navy House Area Round The Clock In 3 Shifts Of 08 Hours Each Including Sundays And Holidays Complete All As Specified And Directed By Engr-In -Charge . , Manpower :-One Fgm ( Skilled ) Per Shift . Shift Timings:- I St Shift - 0600 Hrs To 1400 HrsIi Nd Shift - 1400 Hrs To 2200 HrsIii Rd Shift - 2200 Hrs To 0600 Hrs , List Of Plants To Be Operated Are As Under: ( A ) Dg Set 82 . 5 Kva - 01 No . ( B ) Dg Set 125 Kva - 01 No . ( C ) Pumpsets Upto 10 Hp - 03 Nos , Manning , Operation And Maintenance Of Dg Sets , Pump Sets , Controlling Valves At Ncb Pump House Area And Distribution Valves At Krishna , Indravati , Sharada , Godavary And Agni Buildings Round The Clock In Three Shifts A Day Each Shift Of 08 Hours ( Including Sunday And Holiday ) Including Cleaning , Arresting Leakages , Well Maintaining Of All Valve Pits ( Chambers ) Complete All As Directed And Specified By Engr-In-Charge . , Manpower :- One Fgm ( Skilled ) Per Shift . Shift Timings:-I St Shift - 0600 Hrs To 1400 HrsIi Nd Shift - 1400 Hrs To 2200 HrsIii Rd Shift - 2200 Hrs To 0600 Hrs , List Of Plants To Be Operated Are As Under: ( A ) Dg Set 75 Kva - 02 Nos . ( B ) Dg Set 40 Kva - 01 No . ( C ) Fire Fighting Systems - 01 Lot ( D ) Pump Sets Upto 30 Hp - 04 Nos . , Manpower :- One Valve Man ( Semi-Skilled ) Per Shift . Shift Timings: 0900 Hrs To 1700 Hrs , Note For Sl Item No . 1 & 2: The Quoted Rate Is Inclusive Of Following :- ( A ) Filling The Sump During The Pumping Hours And Pumping Sump Water To Navy House Area As Per The Timings Given By Engineer-In-Charge . ( B ) Operation Of Dg Set For Electric Supply During Failure Of ( Apepdcl ) Electric Supply . ( C ) Minor Store Items Required During Maintenance Such As Distilled Water , Washers , Nuts , Bolts , Rubber Gaskets & Insulation Tapes Etc . , Including Provision Of Necessary T&P At Site Are Deemed To Be Included In The Quoted Rate . ( D ) Before Commencement Of Work The Contractor Shall Submit The List Of Manpower To Be Employed As Per Requisite Qualifications Specified In Particular Specification For Approval Of Ge Duly Recommended By Engineer-In- Charge . , M&L For Descaling Of Radiator Suitable For Dg Set Of Capcity Upto 75/100/125 Kva By Dismantling The Upper And Lower Tank , Cleaning The Core Pipes And Components With Cleaning Chemicals , Arresting The Leaking Core By Brazing/ Dummy With Lead Including Cleaning Of Upper And Lower Tanks , Replacing The Upper And Lower Tank Gaskets And Required Nuts , Bolts , Painting With One Coat Of Synthetic Enamel Paint Of Approved Colour , Refixing The Same Including Testing Complete All As Specified And Directed . , All As Per Sl Item No . 3 Above But Dg Set Of Capacity 160/200 Kva , All As Per Sl Item No . 3 Above But Dg Set Of Capacity 320 Kva , M&L For Repair And Calibration Of Turbo Super Charger Suitable For Dg Set Of Capcity Upto 75/100/125 Kva As Per Calibration Procedure , Norms And As Per Manufacturers Guide Lines Including Replacement Of Turbo Supply Hoses , Discharge Hoses , Clamps And De-Scaling Of Turbo Charger Complete All As Specified And Directed . , All As Per Sl Item No . 3 Above But Dg Set Of Capacity 160/200 Kva , All As Per Sl Item No . 3 Above But Dg Set Of Capacity 320 Kva , All As Per Sl Item No . 3 Above But Dg Set Of Capacity 500 Kva , Supply And Replace Self Starter 24 Volts Suitable For Dg Set Of Capcity Upto 75/100/125 Kva Complete All As Specified And Directed . Make: Kirloskar/ Cummins , All As Per Sl Item No . 10 Above But Dg Set Of Capacity 160/200 Kva , All As Per Sl Item No . 10 Above But Dg Set Of Capacity 320 Kva , All As Per Sl Item No . 10 Above But Dg Set Of Capacity 500 Kva , M&L For Servicing Of Alternator Of Any Make Suitable For Dg Set Of Capcity 100 To 200 Kva By Opening The End Cover , Cleaning The Dust And Rust Formed Over The Terminals , Cleaning With Ctc Liquid , Checking Of Diodes , Isolating Transformer And Avr Panel And Winding The Alternator And Rotor With Appropriate Gauge Of Super Enamelled Copper Wire Of Same Gauge And Same No Of Turns Of Existing Make Insulating Winding With Existing Class Of Insulation Varnishing Baking Up Complete Including Testing And Commissioning Complete All As Specified And Directed . , Supply , Fix , Testing And Commissioning New 12V , 180 Ah In-Built Battery Charger Including Removing Existing Unserviceable One Complete All As Directed . , Supply And Replacement Of Coolant For Radiator Of Dg Set Of Any Capacity At Various Locations Complete All As Directed , Supply And Filling Engine Oil 15 W 40 Grade Castrol Crb For Topping Up ( Including Draining Out Old Oil From Gen Set ) Complete All As Specified And Directed . Make : Servo/ Valvoline/ Hpcl , S&F 20 Mm ( Outer Dia ) 3-Layer Pp-R ( Polypropylene Random Copolymer ) Concealed Sdr 7 . 4 Stabilized And Antimicrobial Fusion Welded Having Thermal Stability For Hot And Cold Water Supply All Pp-R Plain And Brass Threaded Polypropylene Random Fittings Fixed To Walls , Ceilings Etc , Complete Including Taking Down Old Unserviceable Gi Pipe All As Specified And Directed By Engineer-In-Charge: , All As Per Sl Item No . 18 Above But Of Size 40 Mm ( Outer Dia ) , All As Per Sl Item No . 18 Above But Of Size 50 Mm ( Outer Dia ) , All As Per Sl Item No . 18 Above But Of Size 75 Mm ( Outer Dia ) , Labour For Attending Gi Pipe Line Complaints ( Break Downs ) In Buildings Upto Fourth Storey , Terrace And Plain Area For Pipe Of Size 20 Mm To 80 Mm Dia Including Cutting And Threading Of Pipes As Per Site Requirement Complete All As Specified And Directed By Engr-In-Charge . Note: Gi Pipe And Fittings Shall Be Measured And Paid Separately Under Relevent Items . , Labour For Attending Gi Pipe Line Complaints ( Break Downs ) In Buildings Fifth To Eigth Storey Including Terrace For Pipe Of Size 20 Mm To 50 Mm Dia Including Cutting And Threading Of Pipes As Per Site Requirement Including Necessary Scaffolding And Safety Measures Complete All As Specified And Directed By Engr-In-Charge . Note: Gi Pipe And Fittings Shall Be Measured And Paid Separately Under Relevent Items . , All As Per Si Item No . 23 Above But Nine To Twelveth Storey , Supply Only Gi Tubing Medium Grade Of Following SizesNote: The Quoted Rates Shall Be Deemed To Include Gi Sockets And Gi Nipple As Required At Site . , 20 Mm Bore , 25 Mm Bore , 40 Mm Bore , 50 Mm Bore , 80 Mm Bore , Supply & Replace 100 Mm Dia Gi Tubes Medium Grade With All Fittings Fixed To Wall And Ceilings Or Laid In Floors Including Necessary Scaffolding Complete All As Specified And Directed . , Supply And Replacement Of 25 Mm Dia High Density Polythene Pipe ( Hdpe ) Of Pressure Rating 6 Kg/ Sqcm , Including Making Leak Proof Joints Complete All As Specified And Directed By Engineer-In-Charge , All As Per Sl . Item No . 27 Above But Of Size 40 Mm Dia , All As Per Sl . Item No . 27 Above But Of Size 50 Mm Dia , Supply And Replace 2000 Litres Capacity Rotational Moulded Polyethylene Three Layer Water Storage Tanks ( Cylindrical Vertical With Closed Top ) Hoisted And Fixed In Position As Per Site Requirement As Specified In Ssr Part I Complete All As Directed , Supply And Fix 20 Mm Dia Gun Metal Gate Valve , With Iron Wheel Head , Screwed Both Ends For Iron Pipe And Fixed Including Cutting The Pipe Line And Taking Down Old Unserviceable Valves Wherever Required Complete All As Specified And Directed . , All As Per Sl Item No . 31 Above But 25 Mm Dia , All As P