Improvements Of Government Roads In Mudukulathur Highways C And M Sub Division Including Cd Works And Including Upkeeping For A Period Of 60 Months, Ramanathpuram-Tamil Nadu

Highways Department-HD has published Improvements Of Government Roads In Mudukulathur Highways C And M Sub Division Including Cd Works And Including Upkeeping For A Period Of 60 Months. Submission Date for this Tender is 07-07-2020. Drainage Tenders in Ramanathpuram Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

24503816
Improvements Of Government Roads In Mudukulathur Highways C And M Sub Division Including Cd Works And Including Upkeeping For A Period Of 60 Months
Open Tender
Indian
Tamil Nadu
Ramanathpuram
07-07-2020

Tender Details

Improvements Of Government Roads In Mudukulathur Highways C And M Sub Division Including Cd Works And Including Upkeeping For A Period Of 60 Months

Key Value

Document Fees
Refer document
EMD
INR 288000.0 /-
Tender Value
INR 5.55 Crore /-

BOQ Items

Schedule of quantities to accompany the Tender for the work of Package-73- Improvements of Government roads in Mudukulathur (Highways) C&M Sub-Division including CD works and Upkeeping for a period of 60 Months LIST OF ROAD ATTACHED IN PRICE BID DOCUMENT.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for pickig and all other tools and plants employed of the work and including all other incidental charges etc., complete as per MORTH Specification no.111,112,202 BI01010001010000000000000515BI0100001112
2 1.01 ROAD A 2557.42 Cubic Metre
3 1.02 ROAD B 2991.34 Cubic Metre
4 1.03 ROAD C 3649.38 Cubic Metre
5 1.04 ROAD D 1250 Cubic Metre
6 1.05 ROAD E 118.75 Cubic Metre
7 1.06 ROAD F 298.83 Cubic Metre
8 1.07 ROAD G 75.17 Cubic Metre
9 2 Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406 of MORTH Vth Revision Specification no.111,112,406,900
10 2.01 ROAD A 800.04 Cubic Metre
11 2.02 ROAD B 903.97 Cubic Metre
12 2.03 ROAD C 1114.51 Cubic Metre
13 2.04 ROAD D 383.75 Cubic Metre
14 2.05 ROAD E 85.78 Cubic Metre
15 2.06 ROAD F 85.53 Cubic Metre
16 2.07 ROAD G 87.85 Cubic Metre
17 3 Advance patch work using 45.00 mm IRC size HBG metal for making the pot holes and patching using VG10 grade bitumen including mixing at the rate of 44 Kg / Cum of chips after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc., complete. as per MORTH Vth Revision Specification No. 111, 112, 501, 900, 3004
18 3.01 ROAD E 23.43 Cubic Metre
19 3.02 ROAD F 84.5 Cubic Metre
20 3.03 ROAD G 51.33 Cubic Metre
21 4 Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification no.111,112, 501,502,900- over WMM
22 4.01 ROAD A 7672.25 Square Metre
23 4.02 ROAD B 8974.01 Square Metre
24 4.03 ROAD C 10948.1 Square Metre
25 4.04 ROAD D 3802.5 Square Metre
26 4.05 ROAD E 772.5 Square Metre
27 4.06 ROAD F 896.5 Square Metre
28 4.07 ROAD G 552 Square Metre
29 5 Tack coat - Providing and applying tack coat with bitumen emulsion(RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification no.111,112,501, 503,900- over granular surfaces treated with primer
30 5.01 ROAD A 7672.25 Square Metre
31 5.02 ROAD B 8974.01 Square Metre
32 5.03 ROAD C 10948.1 Square Metre
33 5.04 ROAD D 3802.5 Square Metre
34 5.05 ROAD E 772.5 Square Metre
35 5.06 ROAD F 896.5 Square Metre
36 5.07 ROAD G 552 Square Metre
37 6 Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification no.111,112,501, 503,900 - over bituminous surfaces
38 6.01 ROAD E 4556.25 Square Metre
39 6.02 ROAD F 19178.5 Square Metre
40 6.03 ROAD G 10469.5 Square Metre
41 7 Bituminous Macadam Providing and laying bituminous macadam with Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade- 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 of MORTH Specification no.111,112,501,503,900 - Grading II
42 7.01 ROAD A 383.62 Cubic Metre
43 7.02 ROAD B 448.71 Cubic Metre
44 7.03 ROAD C 547.41 Cubic Metre
45 7.04 ROAD D 190.13 Cubic Metre
46 7.05 ROAD E 50.83 Cubic Metre
47 7.06 ROAD F 181.51 Cubic Metre
48 7.07 ROAD G 105.31 Cubic Metre
49 8 Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-40) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specificationno.111,112,507,900 complete in all respects - Grading II
50 8.01 ROAD A 230.18 Cubic Metre
51 8.02 ROAD B 269.22 Cubic Metre
52 8.03 ROAD C 328.45 Cubic Metre
53 8.04 ROAD D 114.08 Cubic Metre
54 8.05 ROAD E 159.87 Cubic Metre
55 8.06 ROAD F 602.24 Cubic Metre
56 8.07 ROAD G 330.65 Cubic Metre
57 9 Excavation \nExcavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer including compaction by power roller rolling as per SS20B MORTH Specification no.111,112,301,305,900 for Making up the berms.
58 9.01 ROAD A 385 Cubic Metre
59 9.02 ROAD B 471.69 Cubic Metre
60 9.03 ROAD C 559.45 Cubic Metre
61 9.04 ROAD D 187 Cubic Metre
62 9.05 ROAD E 280 Cubic Metre
63 9.06 ROAD F 715 Cubic Metre
64 9.07 ROAD G 384 Cubic Metre
65 10 Providing RCC M15 Grade precast KM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete as per MORT & H Specification No. 804
66 10.01 ROAD A 3 Number
67 10.02 ROAD B 2 Number
68 10.03 ROAD C 2 Number
69 10.04 ROAD D 1 Number
70 10.05 ROAD E 1 Number
71 10.06 ROAD F 4 Number
72 10.07 ROAD G 2 Number
73 11 Providing RCC M15 Grade precast HM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete as per MORT & H Specification No. 804
74 11.01 ROAD A 8 Number
75 11.02 ROAD B 10 Number
76 11.03 ROAD C 12 Number
77 11.04 ROAD D 5 Number
78 11.05 ROAD E 6 Number
79 11.06 ROAD F 16 Number
80 11.07 ROAD G 7 Number
81 12 Providing RCC M15 Grade precast Boundary stones of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete as per MORT & H Specification No. 804
82 12.01 ROAD A 50 Number
83 12.02 ROAD B 96 Number
84 12.03 ROAD C 140 Number
85 12.04 ROAD D 50 Number
86 12.05 ROAD E 56 Number
87 12.06 ROAD F 190 Number
88 12.07 ROAD G 96 Number
89 13 Dismantling\nDismantling the salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc,as per MORTH Specification no.111,112,202 SI.No.14
90 13.01 ROAD A (Box Culvert) 21 Cubic Metre
91 13.02 ROAD B (Box Culvert) 5.25 Cubic Metre
92 13.03 ROAD C (Box Culvert) 26.25 Cubic Metre
93 14 Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per standard specification 111,112,304 for foundation OF CULVERT
94 14.01 ROAD A (Box Culvert) 427.6 Cubic Metre
95 14.02 ROAD B (Box Culvert) 114.28 Cubic Metre
96 14.03 ROAD C (Box Culvert) 571.4 Cubic Metre
97 15 Vibrated Cement Concrete M15 using 40mm ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication for steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete as per MORTH Specification no.111,112,1000, 1500, 1700,2200,900 For foundation Concrete
98 15.01 ROAD A (Box Culvert) 27.32 Cubic Metre
99 15.02 ROAD B (Box Culvert) 7.3 Cubic Metre
100 15.03 ROAD C (Box Culvert) 36.5 Cubic Metre
101 16 Vibrated Reinforced Cement Concrete M25 ( Design Mix) using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for formwork, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevent standard specification for CELL BOX .
102 16.01 ROAD A (Box Culvert) 124.8 Cubic Metre
103 16.02 ROAD B (Box Culvert) 31.2 Cubic Metre
104 16.03 ROAD C (Box Culvert) 156 Cubic Metre
105 17 Supply and fabrication of steel Grade Fe-500 required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the bars straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per MORTH Vth Revision Specification No. 1000, 1500, 1600, 900
106 17.01 ROAD A (Box Culvert) 9.152 MT
107 17.02 ROAD B (Box Culvert) 2.288 MT
108 17.03 ROAD C (Box Culvert) 11.44 MT
109 18 Vibrated Cement Concrete M30 Grade (Design mix) Using IRC size hard granite metal including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying compacting curing, including all incidental charges etc., complete as per MORTH Vth Revision Specification No. 1000, 1500, 1600, 1700, 2702, 900 for WEARING COAT 75MM uniform thickness OVER DECK SLAB AND APPROACH SLAB
110 18.01 ROAD A (Box Culvert) 76.44 Square metre
111 18.02 ROAD B (Box Culvert) 19.11 Square metre
112 18.03 ROAD C (Box Culvert) 95.55 Square metre
113 19 Vibrated Cement Concrete M20 using 40MM crushed ISS size HBG graded metal of including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for compacting, finishing and curing including all incidental charges etc., complete as per MORTH Vth Revision Specification No. 1000, 1500, 1600, 1700, 2300 900 for ABOVE SILL LEVEL FOR WINGS WALLS & PARAPET WALL.
114 19.01 ROAD A (Slab Culvert) 89.28 Cubic Metre
115 19.02 ROAD B (Box Culvert) 26.33 Cubic Metre
116 19.03 ROAD C (Box Culvert) 131.65 Cubic Metre
117 20 Stone Dust Filling hebnind the abutments and Wings with Stone Dust including cost and conveyance to site including labour chrges for filling in layers watering tamping under optimum moisture content to get the maximum density including of all other incidental charges etc., complete as per MORTH VTH Revision Specification No. 304, 900
118 20.01 ROAD A (Box Culvert) 53.16 Cubic Metre
119 20.02 ROAD B (Box Culvert) 13.29 Cubic Metre
120 20.03 ROAD C (Box Culvert) 66.45 Cubic Metre
121 21 Excavation \nExcavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer including compaction by power roller rolling as per MORTH Specification No.111, 112, 301, 305, 900 Formation of Diversion road using Carted earth an average lead of 2 km Lead
122 21.01 ROAD B(Box Culvert) 250 Cubic Metre
123 21.02 ROAD C (Box Culvert) 500 Cubic Metre
124 22 Clearing the Light jungles including weeding out shrubs bushes, egetables, growth etc., as per spcifications and directions of Engineer in charge (Twice a year) for 60 months
125 22.01 ROAD A (UPKEEPING 1st YEAR) 6768 Square metre
126 22.02 ROAD A (UPKEEPING 2nd YEAR) 6768 Square metre
127 22.03 ROAD A (UPKEEPING 3rd YEAR) 6768 Square metre
128 22.04 ROAD A (UPKEEPING 4th YEAR) 6768 Square metre
129 22.05 ROAD A (UPKEEPING 5th YEAR) 6768 Square metre
130 22.06 ROAD B (UPKEEPING 1st YEAR) 7938 Square metre
131 22.07 ROAD B (UPKEEPING 2nd YEAR) 7938 Square metre
132 22.08 ROAD B (UPKEEPING 3rd YEAR) 7938 Square metre
133 22.09 ROAD B (UPKEEPING 4th YEAR) 7938 Square metre
134 22.1 ROAD B (UPKEEPING 5th YEAR) 7938 Square metre
135 22.11 ROAD C (UPKEEPING 1st YEAR) 10584 Square metre
136 22.12 ROAD C (UPKEEPING 2nd YEAR) 10584 Square metre
137 22.13 ROAD C (UPKEEPING 3rd YEAR) 10584 Square metre
138 22.14 ROAD C (UPKEEPING 4th YEAR) 10584 Square metre
139 22.15 ROAD C (UPKEEPING 5th YEAR) 10584 Square metre
140 22.16 ROAD D (UPKEEPING 1st YEAR) 3348 Square metre
141 22.17 ROAD D (UPKEEPING 2nd YEAR) 3348 Square metre
142 22.18 ROAD D (UPKEEPING 3rd YEAR) 3348 Square metre
143 22.19 ROAD D (UPKEEPING 4th YEAR) 3348 Square metre
144 22.2 ROAD D (UPKEEPING 5th YEAR) 3348 Square metre
145 22.21 ROAD E (UPKEEPING 1st YEAR) 3780 Square metre
146 22.22 ROAD E (UPKEEPING 2nd YEAR) 3780 Square metre
147 22.23 ROAD E (UPKEEPING 3rd YEAR) 3780 Square metre
148 22.24 ROAD E (UPKEEPING 4th YEAR) 3780 Square metre
149 22.25 ROAD E (UPKEEPING 5th YEAR) 3780 Square metre
150 22.26 ROAD F (UPKEEPING 1st YEAR) 12708 Square metre
151 22.27 ROAD F (UPKEEPING 2nd YEAR) 12708 Square metre
152 22.28 ROAD F (UPKEEPING 3rd YEAR) 12708 Square metre
153 22.29 ROAD F (UPKEEPING 4th YEAR) 12708 Square metre
154 22.3 ROAD F (UPKEEPING 5th YEAR) 12708 Square metre
155 22.31 ROAD G (UPKEEPING 1st YEAR) 6912 Square metre
156 22.32 ROAD G (UPKEEPING 2nd YEAR) 6912 Square metre
157 22.33 ROAD G (UPKEEPING 3rd YEAR) 6912 Square metre
158 22.34 ROAD G (UPKEEPING 4th YEAR) 6912 Square metre
159 22.35 ROAD G (UPKEEPING 5th YEAR) 6912 Square metre
160 23 Excavation \nExcavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer including compaction by power roller rolling as per SS20B MORTH Specification no.111,112,301,305,900 for Making up the berms. (Yearly Two Times)
161 23.01 ROAD A (UPKEEPING 2nd YEAR) 231 Cubic Metre
162 23.02 ROAD A (UPKEEPING 3rd YEAR) 231 Cubic Metre
163 23.03 ROAD A (UPKEEPING 4th YEAR) 231 Cubic Metre
164 23.04 ROAD A (UPKEEPING 5th YEAR) 231 Cubic Metre
165 23.05 ROAD B (UPKEEPING 2nd YEAR) 250 Cubic Metre
166 23.06 ROAD B (UPKEEPING 3rd YEAR) 250 Cubic Metre
167 23.07 ROAD B (UPKEEPING 4th YEAR) 250 Cubic Metre
168 23.08 ROAD B (UPKEEPING 5th YEAR) 250 Cubic Metre
169 23.09 ROAD C (UPKEEPING 2nd YEAR) 250 Cubic Metre
170 23.1 ROAD C (UPKEEPING 3rd YEAR) 250 Cubic Metre
171 23.11 ROAD C (UPKEEPING 4th YEAR) 250 Cubic Metre
172 23.12 ROAD C (UPKEEPING 5th YEAR) 250 Cubic Metre
173 23.13 ROAD D (UPKEEPING 2nd YEAR) 112.2 Cubic Metre
174 23.14 ROAD D (UPKEEPING 3rd YEAR) 112.2 Cubic Metre
175 23.15 ROAD D (UPKEEPING 4th YEAR) 112.2 Cubic Metre
176 23.16 ROAD D (UPKEEPING 5th YEAR) 112.2 Cubic Metre
177 23.17 ROAD E (UPKEEPING 2nd YEAR) 168 Cubic Metre
178 23.18 ROAD E (UPKEEPING 3rd YEAR) 168 Cubic Metre
179 23.19 ROAD E (UPKEEPING 4th YEAR) 168 Cubic Metre
180 23.2 ROAD E (UPKEEPING 5th YEAR) 168 Cubic Metre
181 23.21 ROAD F (UPKEEPING 2nd YEAR) 429 Cubic Metre
182 23.22 ROAD F (UPKEEPING 3rd YEAR) 429 Cubic Metre
183 23.23 ROAD F (UPKEEPING 4th YEAR) 429 Cubic Metre
184 23.24 ROAD F (UPKEEPING 5th YEAR) 429 Cubic Metre
185 23.25 ROAD G (UPKEEPING 2nd YEAR) 230.4 Cubic Metre
186 23.26 ROAD G (UPKEEPING 3rd YEAR) 230.4 Cubic Metre
187 23.27 ROAD G (UPKEEPING 4th YEAR) 230.4 Cubic Metre
188 23.28 ROAD G (UPKEEPING 5th YEAR) 230.4 Cubic Metre
189 24 Deploying earth moving machinery for desilting channal and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. For U/s and D/s culvert Clearance using JCB (Sl.No:XI-18)
190 24.01 ROAD A (UPKEEPING 1ST YEAR) 3 Hour
191 24.02 ROAD A (UPKEEPING 2nd YEAR) 8 Hour
192 24.03 ROAD A (UPKEEPING 3rd YEAR) 8 Hour
193 24.04 ROAD A (UPKEEPING 4th YEAR) 8 Hour
194 24.05 ROAD A (UPKEEPING 5th YEAR) 8 Hour
195 24.06 ROAD B (UPKEEPING 1ST YEAR) 3 Hour
196 24.07 ROAD B (UPKEEPING 2nd YEAR) 4 Hour
197 24.08 ROAD B (UPKEEPING 3rd YEAR) 4 Hour
198 24.09 ROAD B (UPKEEPING 4th YEAR) 4 Hour
199 24.1 ROAD B (UPKEEPING 5th YEAR) 4 Hour
200 24.11 ROAD C (UPKEEPING 2nd YEAR) 6 Hour
201 24.12 ROAD C (UPKEEPING 3rd YEAR) 6 Hour
202 24.13 ROAD C (UPKEEPING 4th YEAR) 6 Hour
203 24.14 ROAD C (UPKEEPING 5th YEAR) 6 Hour
204 24.15 ROAD D (UPKEEPING 1ST YEAR) 5 Hour
205 24.16 ROAD D (UPKEEPING 2nd YEAR) 5 Hour
206 24.17 ROAD D (UPKEEPING 3rd YEAR) 5 Hour
207 24.18 ROAD D (UPKEEPING 4th YEAR) 5 Hour
208 24.19 ROAD D (UPKEEPING 5th YEAR) 5 Hour
209 24.2 ROAD E (UPKEEPING 1ST YEAR) 1 Hour
210 24.21 ROAD E (UPKEEPING 2nd YEAR) 1 Hour
211 24.22 ROAD E (UPKEEPING 3rd YEAR) 1 Hour
212 24.23 ROAD E (UPKEEPING 4th YEAR) 1 Hour
213 24.24 ROAD E (UPKEEPING 5th YEAR) 1 Hour
214 24.25 ROAD F (UPKEEPING 1ST YEAR) 4 Hour
215 24.26 ROAD F (UPKEEPING 2nd YEAR) 4 Hour
216 24.27 ROAD F (UPKEEPING 3rd YEAR) 4 Hour
217 24.28 ROAD F (UPKEEPING 4th YEAR) 4 Hour
218 24.29 ROAD F (UPKEEPING 5th YEAR) 4 Hour
219 24.3 ROAD G (UPKEEPING 1ST YEAR) 4 Hour
220 24.31 ROAD G(UPKEEPING 2nd YEAR) 4 Hour
221 24.32 ROAD G (UPKEEPING 3rd YEAR) 4 Hour
222 24.33 ROAD G (UPKEEPING 4th YEAR) 4 Hour
223 24.34 ROAD G (UPKEEPING 5th YEAR) 4 Hour
224 25 White washing two coats with freshly burnt white shell lime inclusing cost of lime, blue powder fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specification and as directed.
225 25.01 ROAD A (UPKEEPING 1ST YEAR) 74.99 Square metre
226 25.02 ROAD A (UPKEEPING 2nd YEAR) 74.99 Square metre
227 25.03 ROAD A (UPKEEPING 3rd YEAR) 74.99 Square metre
228 25.04 ROAD A (UPKEEPING 4th YEAR) 74.99 Square metre
229 25.05 ROAD A (UPKEEPING 5th YEAR) 74.99 Square metre
230 25.06 ROAD B (UPKEEPING 1ST YEAR) 34.03 Square metre
231 25.07 ROAD B (UPKEEPING 2nd YEAR) 34.03 Square metre
232 25.08 ROAD B (UPKEEPING 3rd YEAR) 34.03 Square metre
233 25.09 ROAD B (UPKEEPING 4th YEAR) 34.03 Square metre
234 25.1 ROAD B (UPKEEPING 5th YEAR) 34.03 Square metre
235 25.11 ROAD C (UPKEEPING 1ST YEAR) 111.29 Square metre
236 25.12 ROAD C (UPKEEPING 2nd YEAR) 111.29 Square metre
237 25.13 ROAD C (UPKEEPING 3rd YEAR) 111.29 Square metre
238 25.14 ROAD C (UPKEEPING 4th YEAR) 111.29 Square metre
239 25.15 ROAD C (UPKEEPING 5th YEAR) 111.29 Square metre
240 25.16 ROAD D (UPKEEPING 1ST YEAR) 56.23 Square metre
241 25.17 ROAD D (UPKEEPING 2nd YEAR) 56.23 Square metre
242 25.18 ROAD D (UPKEEPING 3rd YEAR) 56.23 Square metre
243 25.19 ROAD D (UPKEEPING 4th YEAR) 56.23 Square metre
244 25.2 ROAD D (UPKEEPING 5th YEAR) 56.23 Square metre
245 25.21 ROAD E (UPKEEPING 1ST YEAR) 22.9 Square metre
246 25.22 ROAD E (UPKEEPING 2nd YEAR) 22.9 Square metre
247 25.23 ROAD E (UPKEEPING 3rd YEAR) 22.9 Square metre
248 25.24 ROAD E (UPKEEPING 4th YEAR) 22.9 Square metre
249 25.25 ROAD E (UPKEEPING 5th YEAR) 22.9 Square metre
250 25.26 ROAD F (UPKEEPING 1ST YEAR) 79.43 Square metre
251 25.27 ROAD F (UPKEEPING 2nd YEAR) 79.43 Square metre
252 25.28 ROAD F (UPKEEPING 3rd YEAR) 79.43 Square metre
253 25.29 ROAD F (UPKEEPING 4th YEAR) 79.43 Square metre
254 25.3 ROAD F (UPKEEPING 5th YEAR) 79.43 Square metre
255 25.31 ROAD G (UPKEEPING 1ST YEAR) 63.24 Square metre
256 25.32 ROAD G (UPKEEPING 2nd YEAR) 63.24 Square metre
257 25.33 ROAD G (UPKEEPING 3rd YEAR) 63.24 Square metre
258 25.34 ROAD G (UPKEEPING 4th YEAR) 63.24 Square metre
259 25.35 ROAD G (UPKEEPING 5th YEAR) 63.24 Square metre
260 26 Tree/EB pole /culvert / Retaining wall banding using Coal tar with standard dimension including all matyerials and labour and all other incidental charges etc.,
261 26.01 ROAD A (UPKEEPING 1ST YEAR) 12.1 Square metre
262 26.02 ROAD A (UPKEEPING 2nd YEAR) 12.1 Square metre
263 26.03 ROAD A (UPKEEPING 3rd YEAR) 12.1 Square metre
264 26.04 ROAD A (UPKEEPING 4th YEAR) 12.1 Square metre
265 26.05 ROAD A (UPKEEPING 5th YEAR) 12.1 Square metre
266 26.06 ROAD B (UPKEEPING 1ST YEAR) 4.21 Square metre
267 26.07 ROAD B (UPKEEPING 2nd YEAR) 4.21 Square metre
268 26.08 ROAD B (UPKEEPING 3rd YEAR) 4.21 Square metre
269 26.09 ROAD B (UPKEEPING 4th YEAR) 4.21 Square metre
270 26.1 ROAD B (UPKEEPING 5th YEAR) 4.21 Square metre
271 26.11 ROAD C (UPKEEPING 1ST YEAR) 19.56 Square metre
272 26.12 ROAD C (UPKEEPING 2nd YEAR) 19.56 Square metre
273 26.13 ROAD C (UPKEEPING 3rd YEAR) 19.56 Square metre
274 26.14 ROAD C (UPKEEPING 4th YEAR) 19.56 Square metre
275 26.15 ROAD C (UPKEEPING 5th YEAR) 19.56 Square metre
276 26.16 ROAD D (UPKEEPING 1ST YEAR) 7.87 Square metre
277 26.17 ROAD D (UPKEEPING 2nd YEAR) 7.87 Square metre
278 26.18 ROAD D (UPKEEPING 3rd YEAR) 7.87 Square metre
279 26.19 ROAD D (UPKEEPING 4th YEAR) 7.87 Square metre
280 26.2 ROAD D (UPKEEPING 5th YEAR) 7.87 Square metre
281 26.21 ROAD E (UPKEEPING 1ST YEAR) 5.35 Square metre
282 26.22 ROAD E (UPKEEPING 2nd YEAR) 5.35 Square metre
283 26.23 ROAD E (UPKEEPING 3rd YEAR) 5.35 Square metre
284 26.24 ROAD E (UPKEEPING 4th YEAR) 5.35 Square metre
285 26.25 ROAD E (UPKEEPING 5th YEAR) 5.35 Square metre
286 26.26 ROAD F (UPKEEPING 1ST YEAR) 10.02 Square metre
287 26.27 ROAD F (UPKEEPING 2nd YEAR) 10.02 Square metre
288 26.28 ROAD F (UPKEEPING 3rd YEAR) 10.02 Square metre
289 26.29 ROAD F (UPKEEPING 4th YEAR) 10.02 Square metre
290 26.3 ROAD F (UPKEEPING 5th YEAR) 10.02 Square metre
291 26.31 ROAD G (UPKEEPING 1ST YEAR) 14.61 Square metre
292 26.32 ROAD G (UPKEEPING 2nd YEAR) 14.61 Square metre
293 26.33 ROAD G (UPKEEPING 3rd YEAR) 14.61 Square metre
294 26.34 ROAD G (UPKEEPING 4th YEAR) 14.61 Square metre
295 26.35 ROAD G (UPKEEPING 5th YEAR) 14.61 Square metre
296 27 Painting the existing CULVERT/ BRDIGE as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete
297 27.01 ROAD A (UPKEEPING 1ST YEAR) (Culvert Parapets) 13.68 Square metre
298 27.02 ROAD B (UPKEEPING 1ST YEAR) (Culvert Parapets) 5.13 Square metre
299 27.03 ROAD C (UPKEEPING 1ST YEAR) (Culvert Parapets) 10.26 Square metre
300 27.04 ROAD D (UPKEEPING 1ST YEAR) (Culvert Parapets) 8.55 Square metre
301 27.05 ROAD E (UPKEEPING 1ST YEAR) (Culvert Parapets) 5.81 Square metre
302 27.06 ROAD F (UPKEEPING 1ST YEAR) (Culvert Parapets) 6.84 Square metre
303 27.07 ROAD G (UPKEEPING 1ST YEAR) (Culvert Parapets) 6.84 Square metre
304 28 Lettering the existing culverts as per IRC standard including the cost of Labour charges and material etc., complete
305 28.01 ROAD A (UPKEEPING 1ST YEAR) (Culvert Parapets) ( 5 - 10cm) 200 Number
306 28.02 ROAD B (UPKEEPING 1ST YEAR) (Culvert Parapets) ( 5 - 10cm) 75 Number
307 28.03 ROAD C (UPKEEPING 1ST YEAR) (Culvert Parapets) ( 5 - 10cm) 150 Number
308 28.04 ROAD D (UPKEEPING 1ST YEAR) (Culvert Parapets) ( 5 - 10cm) 125 Number
309 28.05 ROAD E (UPKEEPING 1ST YEAR) (Culvert Parapets) ( 5 - 10cm) 25 Number
310 28.06 ROAD F (UPKEEPING 1ST YEAR) (Culvert Parapets) ( 5 - 10cm) 100 Number
311 28.07 ROAD G (UPKEEPING 1ST YEAR) (Culvert Parapets) ( 5 - 10cm) 100 Number
312 29 Chiseling the tree barks upto a size of 15cm x 15cm and painting with first class enamel paint and numbering the trees as per avenue register complete
313 29.01 ROAD A (UPKEEPING 1ST YEAR) 30 Number
314 29.02 ROAD B (UPKEEPING 1ST YEAR) 10 Number
315 29.03 ROAD C (UPKEEPING 1ST YEAR) 42 Number
316 29.04 ROAD D (UPKEEPING 1ST YEAR) 18 Number
317 29.05 ROAD E (UPKEEPING 1ST YEAR) 9 Number
318 29.06 ROAD F (UPKEEPING 1ST YEAR) 21 Number
319 29.07 ROAD G (UPKEEPING 1ST YEAR) 35 Number
320 30 Vibrated Cement Concrete M15 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., complete for BROKEN PARAPET WALL as per MORTH Specification no. 111,112,1000, 1500, 1700,2200,900
321 30.01 ROAD D 30.12 Cubic Metre
322 30.02 ROAD G 12.67 Cubic Metre
323 31 Painting the KM Stone as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete
324 31.01 ROAD A (UPKEEPING 2nd YEAR) ( KM stone) 1.08 Square metre
325 31.02 ROAD A (UPKEEPING 3rd YEAR) 1.08 Square metre
326 31.03 ROAD A (UPKEEPING 4th YEAR) 1.08 Square metre
327 31.04 ROAD A (UPKEEPING 5th YEAR) 1.08 Square metre
328 31.05 ROAD B (UPKEEPING 2nd YEAR) 0.72 Square metre
329 31.06 ROAD B (UPKEEPING 3rd YEAR) 0.72 Square metre
330 31.07 ROAD B (UPKEEPING 4th YEAR) 0.72 Square metre
331 31.08 ROAD B (UPKEEPING 5th YEAR) 0.72 Square metre
332 31.09 ROAD C (UPKEEPING 2nd YEAR) 0.72 Square metre
333 31.1 ROAD C (UPKEEPING 3rd YEAR) 0.72 Square metre
334 31.11 ROAD C (UPKEEPING 4th YEAR) 0.72 Square metre
335 31.12 ROAD C (UPKEEPING 5th YEAR) 0.72 Square metre
336 31.13 ROAD D (UPKEEPING 2nd YEAR) 0.36 Square metre
337 31.14 ROAD D (UPKEEPING 3rd YEAR) 0.36 Square metre
338 31.15 ROAD D (UPKEEPING 4th YEAR) 0.36 Square metre
339 31.16 ROAD D (UPKEEPING 5th YEAR) 0.36 Square metre
340 31.17 ROAD E (UPKEEPING 2nd YEAR) 0.5 Square metre
341 31.18 ROAD E (UPKEEPING 3rd YEAR) 0.5 Square metre
342 31.19 ROAD E (UPKEEPING 4th YEAR) 0.5 Square metre
343 31.2 ROAD E (UPKEEPING 5th YEAR) 0.5 Square metre
344 31.21 ROAD F (UPKEEPING 2nd YEAR) 1.98 Square metre
345 31.22 ROAD F (UPKEEPING 3rd YEAR) 1.98 Square metre
346 31.23 ROAD F (UPKEEPING 4th YEAR) 1.98 Square metre
347 31.24 ROAD F (UPKEEPING 5th YEAR) 1.98 Square metre
348 31.25 ROAD G (UPKEEPING 2nd YEAR) 0.99 Square metre
349 31.26 ROAD G (UPKEEPING 3rd YEAR) 0.99 Square metre
350 31.27 ROAD G (UPKEEPING 4th YEAR) 0.99 Square metre
351 31.28 ROAD G (UPKEEPING 5th YEAR) 0.99 Square metre
352 32 Painting the HM Stone as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete
353 32.01 ROAD A (UPKEEPING 2nd YEAR) 1.52 Square metre
354 32.02 ROAD A (UPKEEPING 3rd YEAR) 1.52 Square metre
355 32.03 ROAD A (UPKEEPING 4th YEAR) 1.52 Square metre
356 32.04 ROAD A (UPKEEPING 5th YEAR) 1.52 Square metre
357 32.05 ROAD B (UPKEEPING 2nd YEAR) 1.9 Square metre
358 32.06 ROAD B (UPKEEPING 3rd YEAR) 1.9 Square metre
359 32.07 ROAD B (UPKEEPING 4th YEAR) 1.9 Square metre
360 32.08 ROAD B (UPKEEPING 5th YEAR) 1.9 Square metre
361 32.09 ROAD C (UPKEEPING 2nd YEAR) 2.28 Square metre
362 32.1 ROAD C (UPKEEPING 3rd YEAR) 2.28 Square metre
363 32.11 ROAD C (UPKEEPING 4th YEAR) 2.28 Square metre
364 32.12 ROAD C (UPKEEPING 5th YEAR) 2.28 Square metre
365 32.13 ROAD D (UPKEEPING 2nd YEAR) 0.95 Square metre
366 32.14 ROAD D (UPKEEPING 3rd YEAR) 0.95 Square metre
367 32.15 ROAD D (UPKEEPING 4th YEAR) 0.95 Square metre
368 32.16 ROAD D (UPKEEPING 5th YEAR) 0.95 Square metre
369 32.17 ROAD E (UPKEEPING 2nd YEAR) 1.14 Square metre
370 32.18 ROAD E (UPKEEPING 3rd YEAR) 1.14 Square metre
371 32.19 ROAD E (UPKEEPING 4th YEAR) 1.14 Square metre
372 32.2 ROAD E (UPKEEPING 5th YEAR) 1.14 Square metre
373 32.21 ROAD F (UPKEEPING 2nd YEAR) 9.88 Square metre
374 32.22 ROAD F (UPKEEPING 3rd YEAR) 9.88 Square metre
375 32.23 ROAD F (UPKEEPING 4th YEAR) 9.88 Square metre
376 32.24 ROAD F (UPKEEPING 5th YEAR) 9.88 Square metre
377 32.25 ROAD G (UPKEEPING 2nd YEAR) 1.34 Square metre
378 32.26 ROAD G (UPKEEPING 3rd YEAR) 1.34 Square metre
379 32.27 ROAD G (UPKEEPING 4th YEAR) 1.34 Square metre
380 32.28 ROAD G (UPKEEPING 5th YEAR) 1.34 Square metre
381 33 Painting the Boundary Pillars as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete
382 33.01 ROAD A (UPKEEPING 2nd YEAR) 11.31 Square metre
383 33.02 ROAD A (UPKEEPING 3rd YEAR) 11.31 Square metre
384 33.03 ROAD A (UPKEEPING 4th YEAR) 11.31 Square metre
385 33.04 ROAD A (UPKEEPING 5th YEAR) 11.31 Square metre
386 33.05 ROAD B (UPKEEPING 2nd YEAR) 21.71 Square metre
387 33.06 ROAD B (UPKEEPING 3rd YEAR) 21.71 Square metre
388 33.07 ROAD B (UPKEEPING 4th YEAR) 21.71 Square metre
389 33.08 ROAD B (UPKEEPING 5th YEAR) 21.71 Square metre
390 33.09 ROAD C (UPKEEPING 2nd YEAR) 31.67 Square metre
391 33.1 ROAD C (UPKEEPING 3rd YEAR) 31.67 Square metre
392 33.11 ROAD C (UPKEEPING 4th YEAR) 31.67 Square metre
393 33.12 ROAD C (UPKEEPING 5th YEAR) 31.67 Square metre
394 33.13 ROAD D (UPKEEPING 2nd YEAR) 11.31 Square metre
395 33.14 ROAD D (UPKEEPING 3rd YEAR) 11.31 Square metre
396 33.15 ROAD D (UPKEEPING 4th YEAR) 11.31 Square metre
397 33.16 ROAD D (UPKEEPING 5th YEAR) 11.31 Square metre
398 33.17 ROAD E (UPKEEPING 2nd YEAR) 12.67 Square metre
399 33.18 ROAD E (UPKEEPING 3rd YEAR) 12.67 Square metre
400 33.19 ROAD E (UPKEEPING 4th YEAR) 12.67 Square metre
401 33.2 ROAD E (UPKEEPING 5th YEAR) 12.67 Square metre
402 33.21 ROAD F (UPKEEPING 2nd YEAR) 42.97 Square metre
403 33.22 ROAD F (UPKEEPING 3rd YEAR) 42.97 Square metre
404 33.23 ROAD F (UPKEEPING 4th YEAR) 42.97 Square metre
405 33.24 ROAD F (UPKEEPING 5th YEAR) 42.97 Square metre
406 33.25 ROAD G (UPKEEPING 2nd YEAR) 21.71 Square metre
407 33.26 ROAD G (UPKEEPING 3rd YEAR) 21.71 Square metre
408 33.27 ROAD G (UPKEEPING 4th YEAR) 21.71 Square metre
409 33.28 ROAD G (UPKEEPING 5th YEAR) 21.71 Square metre
410 34 Painting the tree barks upto a size of 15cm x 15cm as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete
411 34.01 ROAD A (UPKEEPING 2nd YEAR) 0.68 Square metre
412 34.02 ROAD A (UPKEEPING 3rd YEAR) 0.68 Square metre
413 34.03 ROAD A (UPKEEPING 4th YEAR) 0.68 Square metre
414 34.04 ROAD A (UPKEEPING 5th YEAR) 0.68 Square metre
415 34.05 ROAD B (UPKEEPING 2nd YEAR) 0.23 Square metre
416 34.06 ROAD B (UPKEEPING 3rd YEAR) 0.23 Square metre
417 34.07 ROAD B (UPKEEPING 4th YEAR) 0.23 Square metre
418 34.08 ROAD B (UPKEEPING 5th YEAR) 0.23 Square metre
419 34.09 ROAD C (UPKEEPING 2nd YEAR) 0.95 Square metre
420 34.1 ROAD C (UPKEEPING 3rd YEAR) 0.95 Square metre
421 34.11 ROAD C (UPKEEPING 4th YEAR) 0.95 Square metre
422 34.12 ROAD C (UPKEEPING 5th YEAR) 0.95 Square metre
423 34.13 ROAD D (UPKEEPING 2nd YEAR) 0.41 Square metre
424 34.14 ROAD D (UPKEEPING 3rd YEAR) 0.41 Square metre
425 34.15 ROAD D (UPKEEPING 4th YEAR) 0.41 Square metre
426 34.16 ROAD D (UPKEEPING 5th YEAR) 0.41 Square metre
427 34.17 ROAD E (UPKEEPING 2nd YEAR) 0.2 Square metre
428 34.18 ROAD E (UPKEEPING 3rd YEAR) 0.2 Square metre
429 34.19 ROAD E (UPKEEPING 4th YEAR) 0.2 Square metre
430 34.2 ROAD E (UPKEEPING 5th YEAR) 0.2 Square metre
431 34.21 ROAD F (UPKEEPING 2nd YEAR) 0.47 Square metre
432 34.22 ROAD F (UPKEEPING 3rd YEAR) 0.47 Square metre
433 34.23 ROAD F (UPKEEPING 4th YEAR) 0.47 Square metre
434 34.24 ROAD F (UPKEEPING 5th YEAR) 0.47 Square metre
435 34.25 ROAD G (UPKEEPING 2nd YEAR) 0.79 Square metre
436 34.26 ROAD G (UPKEEPING 3rd YEAR) 0.79 Square metre
437 34.27 ROAD G (UPKEEPING 4th YEAR) 0.79 Square metre
438 34.28 ROAD G (UPKEEPING 5th YEAR) 0.79 Square metre
439 35 Lettering the KM Stone as per IRC standard including the cost of Labour charges and material etc., complete
440 35.01 ROAD A (UPKEEPING 2nd YEAR)(10-15cm) 6 Number
441 35.02 ROAD A (UPKEEPING 2nd YEAR)(5-10cm) 45 Number
442 35.03 ROAD A (UPKEEPING 3rd YEAR)(10-15cm) 6 Number
443 35.04 ROAD A (UPKEEPING 3rd YEAR)(5-10cm) 45 Number
444 35.05 ROAD A (UPKEEPING 4th YEAR)(10-15cm) 6 Number
445 35.06 ROAD A (UPKEEPING 4th YEAR)(5-10cm) 45 Number
446 35.07 ROAD A (UPKEEPING 5th YEAR)(10-15cm) 6 Number
447 35.08 ROAD A (UPKEEPING 5th YEAR)(5-10cm) 45 Number
448 35.09 ROAD B (UPKEEPING 2nd YEAR)(10-15cm) 4 Number
449 35.1 ROAD B (UPKEEPING 2nd YEAR)(5-10cm) 30 Number
450 35.11 ROAD B (UPKEEPING 3rd YEAR)(10-15cm) 4 Number
451 35.12 ROAD B (UPKEEPING 3rd YEAR)(5-10cm) 30 Number
452 35.13 ROAD B (UPKEEPING 4th YEAR)(10-15cm) 4 Number
453 35.14 ROAD B (UPKEEPING 4th YEAR)(5-10cm) 30 Number
454 35.15 ROAD B (UPKEEPING 5th YEAR)(10-15cm) 4 Number
455 35.16 ROAD B (UPKEEPING 5th YEAR)(5-10cm) 30 Number
456 35.17 ROAD C (UPKEEPING 2nd YEAR)(10-15cm) 4 Number
457 35.18 ROAD C (UPKEEPING 2nd YEAR)(5-10cm) 30 Number
458 35.19 ROAD C (UPKEEPING 3rd YEAR)(10-15cm) 4 Number
459 35.2 ROAD C (UPKEEPING 3rd YEAR)(5-10cm) 30 Number
460 35.21 ROAD C (UPKEEPING 4th YEAR)(10-15cm) 4 Number
461 35.22 ROAD C (UPKEEPING 4th YEAR)(5-10cm) 30 Number
462 35.23 ROAD C (UPKEEPING 5th YEAR)(10-15cm) 4 Number
463 35.24 ROAD C (UPKEEPING 5th YEAR)(5-10cm) 30 Number
464 35.25 ROAD D (UPKEEPING 2nd YEAR)(10-15cm) 2 Number
465 35.26 ROAD D (UPKEEPING 2nd YEAR)(5-10cm) 15 Number
466 35.27 ROAD D (UPKEEPING 3rd YEAR)(10-15cm) 2 Number
467 35.28 ROAD D (UPKEEPING 3rd YEAR)(5-10cm) 15 Number
468 35.29 ROAD D (UPKEEPING 4th YEAR)(10-15cm) 2 Number
469 35.3 ROAD D (UPKEEPING 4th YEAR)(5-10cm) 15 Number
470 35.31 ROAD D (UPKEEPING 5th YEAR)(10-15cm) 2 Number
471 35.32 ROAD D (UPKEEPING 5th YEAR)(5-10cm) 15 Number
472 35.33 ROAD E (UPKEEPING 2nd YEAR)(10-15cm) 2 Number
473 35.34 ROAD E (UPKEEPING 2nd YEAR)(5-10cm) 15 Number
474 35.35 ROAD E (UPKEEPING 3rd YEAR)(10-15cm) 2 Number
475 35.36 ROAD E (UPKEEPING 3rd YEAR)(5-10cm) 15 Number
476 35.37 ROAD E (UPKEEPING 4th YEAR)(10-15cm) 2 Number
477 35.38 ROAD E (UPKEEPING 4th YEAR)(5-10cm) 15 Number
478 35.39 ROAD E (UPKEEPING 5th YEAR)(10-15cm) 2 Number
479 35.4 ROAD E (UPKEEPING 5th YEAR)(5-10cm) 15 Number
480 35.41 ROAD F (UPKEEPING 2nd YEAR)(10-15cm) 8 Number
481 35.42 ROAD F (UPKEEPING 2nd YEAR)(5-10cm) 60 Number
482 35.43 ROAD F (UPKEEPING 3rd YEAR)(10-15cm) 8 Number
483 35.44 ROAD F (UPKEEPING 3rd YEAR)(5-10cm) 60 Number
484 35.45 ROAD F (UPKEEPING 4th YEAR)(10-15cm) 8 Number
485 35.46 ROAD F (UPKEEPING 4th YEAR)(5-10cm) 60 Number
486 35.47 ROAD F (UPKEEPING 5th YEAR)(10-15cm) 8 Number
487 35.48 ROAD F (UPKEEPING 5th YEAR)(5-10cm) 60 Number
488 35.49 ROAD G (UPKEEPING 2nd YEAR)(10-15cm) 8 Number
489 35.5 ROAD G (UPKEEPING 2nd YEAR)(5-10cm) 60 Number
490 35.51 ROAD G (UPKEEPING 3rd YEAR)(10-15cm) 8 Number
491 35.52 ROAD G (UPKEEPING 3rd YEAR)(5-10cm) 60 Number
492 35.53 ROAD G (UPKEEPING 4th YEAR)(10-15cm) 8 Number
493 35.54 ROAD G (UPKEEPING 4th YEAR)(5-10cm) 60 Number
494 35.55 ROAD G (UPKEEPING 5th YEAR)(10-15cm) 8 Number
495 35.56 ROAD G (UPKEEPING 5th YEAR)(5-10cm) 60 Number
496 36 Lettering the HM Stone as per IRC standard including the cost of Labour charges and material etc., complete
497 36.01 ROAD A (UPKEEPING 2nd YEAR)(10-15cm) 16 Number
498 36.02 ROAD A (UPKEEPING 2nd YEAR)(5-10cm) 216 Number
499 36.03 ROAD A (UPKEEPING 3rd YEAR)(10-15cm) 16 Number
500 36.04 ROAD A (UPKEEPING 3rd YEAR)(5-10cm) 216 Number
501 36.05 ROAD A (UPKEEPING 4th YEAR)(10-15cm) 16 Number
502 36.06 ROAD A (UPKEEPING 4th YEAR)(5-10cm) 216 Number
503 36.07 ROAD A (UPKEEPING 5th YEAR)(10-15cm) 16 Number
504 36.08 ROAD A (UPKEEPING 5th YEAR)(5-10cm) 216 Number
505 36.09 ROAD B (UPKEEPING 2nd YEAR)(10-15cm) 20 Number
506 36.1 ROAD B (UPKEEPING 2nd YEAR)(5-10cm) 120 Number
507 36.11 ROAD B (UPKEEPING 3rd YEAR)(10-15cm) 20 Number
508 36.12 ROAD B (UPKEEPING 3rd YEAR)(5-10cm) 120 Number
509 36.13 ROAD B (UPKEEPING 4th YEAR)(10-15cm) 20 Number
510 36.14 ROAD B (UPKEEPING 4th YEAR)(5-10cm) 120 Number
511 36.15 ROAD B (UPKEEPING 5th YEAR)(10-15cm) 20 Number
512 36.16 ROAD B (UPKEEPING 5th YEAR)(5-10cm) 120 Number
513 36.17 ROAD C (UPKEEPING 2nd YEAR)(10-15cm) 24 Number
514 36.18 ROAD C (UPKEEPING 2nd YEAR)(5-10cm) 174 Number
515 36.19 ROAD C (UPKEEPING 3rd YEAR)(10-15cm) 24 Number
516 36.2 ROAD C (UPKEEPING 3rd YEAR)(5-10cm) 174 Number
517 36.21 ROAD C (UPKEEPING 4th YEAR)(10-15cm) 24 Number
518 36.22 ROAD C (UPKEEPING 4th YEAR)(5-10cm) 174 Number
519 36.23 ROAD C (UPKEEPING 5th YEAR)(10-15cm) 24 Number
520 36.24 ROAD C (UPKEEPING 5th YEAR)(5-10cm) 174 Number
521 36.25 ROAD D (UPKEEPING 2nd YEAR)(10-15cm) 10 Number
522 36.26 ROAD D (UPKEEPING 2nd YEAR)(5-10cm) 135 Number
523 36.27 ROAD D (UPKEEPING 3rd YEAR)(10-15cm) 10 Number
524 36.28 ROAD D (UPKEEPING 3rd YEAR)(5-10cm) 135 Number
525 36.29 ROAD D (UPKEEPING 4th YEAR)(10-15cm) 10 Number
526 36.3 ROAD D (UPKEEPING 4th YEAR)(5-10cm) 135 Number
527 36.31 ROAD D (UPKEEPING 5th YEAR)(10-15cm) 10 Number
528 36.32 ROAD D (UPKEEPING 5th YEAR)(5-10cm) 135 Number
529 36.33 ROAD E (UPKEEPING 2nd YEAR)(10-15cm) 12 Number
530 36.34 ROAD E (UPKEEPING 2nd YEAR)(5-10cm) 37 Number
531 36.35 ROAD E (UPKEEPING 3rd YEAR)(10-15cm) 12 Number
532 36.36 ROAD E (UPKEEPING 3rd YEAR)(5-10cm) 37 Number
533 36.37 ROAD E (UPKEEPING 4th YEAR)(10-15cm) 12 Number
534 36.38 ROAD E (UPKEEPING 4th YEAR)(5-10cm) 37 Number
535 36.39 ROAD E (UPKEEPING 5th YEAR)(10-15cm) 12 Number
536 36.4 ROAD E (UPKEEPING 5th YEAR)(5-10cm) 37 Number
537 36.41 ROAD F (UPKEEPING 2nd YEAR)(10-15cm) 32 Number
538 36.42 ROAD F (UPKEEPING 2nd YEAR)(5-10cm) 182 Number
539 36.43 ROAD F (UPKEEPING 3rd YEAR)(10-15cm) 32 Number
540 36.44 ROAD F (UPKEEPING 3rd YEAR)(5-10cm) 182 Number
541 36.45 ROAD F (UPKEEPING 4th YEAR)(10-15cm) 32 Number
542 36.46 ROAD F (UPKEEPING 4th YEAR)(5-10cm) 182 Number
543 36.47 ROAD F (UPKEEPING 5th YEAR)(10-15cm) 32 Number
544 36.48 ROAD F (UPKEEPING 5th YEAR)(5-10cm) 182 Number
545 36.49 ROAD G (UPKEEPING 2nd YEAR)(10-15cm) 14 Number
546 36.5 ROAD G (UPKEEPING 2nd YEAR)(5-10cm) 114 Number
547 36.51 ROAD G (UPKEEPING 3rd YEAR)(10-15cm) 14 Number
548 36.52 ROAD G (UPKEEPING 3rd YEAR)(5-10cm) 114 Number
549 36.53 ROAD G (UPKEEPING 4th YEAR)(10-15cm) 14 Number
550 36.54 ROAD G (UPKEEPING 4th YEAR)(5-10cm) 114 Number
551 36.55 ROAD G (UPKEEPING 5th YEAR)(10-15cm) 14 Number
552 36.56 ROAD G (UPKEEPING 5th YEAR)(5-10cm) 114 Number
553 37 Lettering the Boundary Pillars as per IRC standard including the cost of Labour charges and material etc., complete
554 37.01 ROAD A (UPKEEPING 2nd YEAR)(5-10cm) 100 Number
555 37.02 ROAD A (UPKEEPING 3rd YEAR)(5-10cm) 100 Number
556 37.03 ROAD A (UPKEEPING 4th YEAR)(5-10cm) 100 Number
557 37.04 ROAD A (UPKEEPING 5th YEAR)(5-10cm) 100 Number
558 37.05 ROAD B (UPKEEPING 2nd YEAR)(5-10cm) 192 Number
559 37.06 ROAD B (UPKEEPING 3rd YEAR)(5-10cm) 192 Number
560 37.07 ROAD B (UPKEEPING 4th YEAR)(5-10cm) 192 Number
561 37.08 ROAD B (UPKEEPING 5th YEAR)(5-10cm) 192 Number
562 37.09 ROAD C (UPKEEPING 2nd YEAR)(5-10cm) 280 Number
563 37.1 ROAD C (UPKEEPING 3rd YEAR)(5-10cm) 280 Number
564 37.11 ROAD C (UPKEEPING 4th YEAR)(5-10cm) 280 Number
565 37.12 ROAD C (UPKEEPING 5th YEAR)(5-10cm) 280 Number
566 37.13 ROAD D (UPKEEPING 2nd YEAR)(5-10cm) 100 Number
567 37.14 ROAD D (UPKEEPING 3rd YEAR)(5-10cm) 100 Number
568 37.15 ROAD D (UPKEEPING 4th YEAR)(5-10cm) 100 Number
569 37.16 ROAD D (UPKEEPING 5th YEAR)(5-10cm) 100 Number
570 37.17 ROAD E (UPKEEPING 2nd YEAR)(5-10cm) 112 Number
571 37.18 ROAD E (UPKEEPING 3rd YEAR)(5-10cm) 112 Number
572 37.19 ROAD E (UPKEEPING 4th YEAR)(5-10cm) 112 Number
573 37.2 ROAD E (UPKEEPING 5th YEAR)(5-10cm) 112 Number
574 37.21 ROAD F(UPKEEPING 2nd YEAR)(5-10cm) 380 Number
575 37.22 ROAD F (UPKEEPING 3rd YEAR)(5-10cm) 380 Number
576 37.23 ROAD F (UPKEEPING 4th YEAR)(5-10cm) 380 Number
577 37.24 ROAD F (UPKEEPING 5th YEAR)(5-10cm) 380 Number
578 37.25 ROAD G (UPKEEPING 2nd YEAR)(5-10cm) 192 Number
579 37.26 ROAD G (UPKEEPING 3rd YEAR)(5-10cm) 192 Number
580 37.27 ROAD G (UPKEEPING 4th YEAR)(5-10cm) 192 Number
581 37.28 ROAD G (UPKEEPING 5th YEAR)(5-10cm) 192 Number
582 38 Lettering the tree barks upto a size of 15cm x 15cm as per IRC standard including the cost of Labour charges and material etc., complete
583 38.01 ROAD A (UPKEEPING 2nd YEAR)(5-10cm) 60 Number
584 38.02 ROAD A (UPKEEPING 3rd YEAR)(5-10cm) 60 Number
585 38.03 ROAD A (UPKEEPING 4th YEAR)(5-10cm) 60 Number
586 38.04 ROAD A (UPKEEPING 5th YEAR)(5-10cm) 60 Number
587 38.05 ROAD B (UPKEEPING 2nd YEAR)(5-10cm) 20 Number
588 38.06 ROAD B (UPKEEPING 3rd YEAR)(5-10cm) 20 Number
589 38.07 ROAD B (UPKEEPING 4th YEAR)(5-10cm) 20 Number
590 38.08 ROAD B (UPKEEPING 5th YEAR)(5-10cm) 20 Number
591 38.09 ROAD C (UPKEEPING 2nd YEAR)(5-10cm) 84 Number
592 38.1 ROAD C (UPKEEPING 3rd YEAR)(5-10cm) 84 Number
593 38.11 ROAD C (UPKEEPING 4th YEAR)(5-10cm) 84 Number
594 38.12 ROAD C (UPKEEPING 5th YEAR)(5-10cm) 84 Number
595 38.13 ROAD D (UPKEEPING 2nd YEAR)(5-10cm) 36 Number
596 38.14 ROAD D (UPKEEPING 3rd YEAR)(5-10cm) 36 Number
597 38.15 ROAD D (UPKEEPING 4th YEAR)(5-10cm) 36 Number
598 38.16 ROAD D (UPKEEPING 5th YEAR)(5-10cm) 36 Number
599 38.17 ROAD E (UPKEEPING 2nd YEAR)(5-10cm) 18 Number
600 38.18 ROAD E (UPKEEPING 3rd YEAR)(5-10cm) 18 Number
601 38.19 ROAD E(UPKEEPING 4th YEAR)(5-10cm) 18 Number
602 38.2 ROAD E(UPKEEPING 5th YEAR)(5-10cm) 18 Number
603 38.21 ROAD F(UPKEEPING 2nd YEAR)(5-10cm) 42 Number
604 38.22 ROAD F (UPKEEPING 3rd YEAR)(5-10cm) 42 Number
605 38.23 ROAD F (UPKEEPING 4th YEAR)(5-10cm) 42 Number
606 38.24 ROAD F (UPKEEPING 5th YEAR)(5-10cm) 42 Number
607 38.25 ROAD G (UPKEEPING 2nd YEAR)(5-10cm) 70 Number
608 38.26 ROAD G (UPKEEPING 3rd YEAR)(5-10cm) 70 Number
609 38.27 ROAD G (UPKEEPING 4th YEAR)(5-10cm) 70 Number
610 38.28 ROAD G (UPKEEPING 5th YEAR)(5-10cm) 70 Number
611 39 Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification no.111,112,501, 503,900 - over bituminous surfaces
612 39.01 ROAD A (UPKEEPING 4th YEAR) 230.17 Square metre
613 39.02 ROAD A (UPKEEPING 5th YEAR) 383.61 Square metre
614 39.03 ROAD B (UPKEEPING 4th YEAR) 269.22 Square metre
615 39.04 ROAD B (UPKEEPING 5th YEAR) 448.7 Square metre
616 39.05 ROAD C (UPKEEPING 4th YEAR) 328.44 Square metre
617 39.06 ROAD C (UPKEEPING 5th YEAR) 547.41 Square metre
618 39.07 ROAD D (UPKEEPING 4th YEAR) 114.08 Square metre
619 39.08 ROAD D (UPKEEPING 5th YEAR) 190.13 Square metre
620 39.09 ROAD E (UPKEEPING 4th YEAR) 159.86 Square metre
621 39.1 ROAD E (UPKEEPING 5th YEAR) 266.44 Square metre
622 39.11 ROAD F (UPKEEPING 4th YEAR) 602.25 Square metre
623 39.12 ROAD F (UPKEEPING 5th YEAR) 1003.75 Square metre
624 39.13 ROAD G (UPKEEPING 4th YEAR) 330.65 Square metre
625 39.14 ROAD G (UPKEEPING 5th YEAR) 551.08 Square metre
626 40 Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-40) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specificationno.111,112,507,900 complete in all respects - Grading II
627 40.01 ROAD A (UPKEEPING 4th YEAR) 6.91 Cubic Metre
628 40.02 ROAD A (UPKEEPING 5th YEAR) 11.51 Cubic Metre
629 40.03 ROAD B (UPKEEPING 4th YEAR) 8.08 Cubic Metre
630 40.04 ROAD B (UPKEEPING 5th YEAR) 13.46 Cubic Metre
631 40.05 ROAD C (UPKEEPING 4th YEAR) 9.85 Cubic Metre
632 40.06 ROAD C (UPKEEPING 5th YEAR) 16.42 Cubic Metre
633 40.07 ROAD D (UPKEEPING 4th YEAR) 3.42 Cubic Metre
634 40.08 ROAD D (UPKEEPING 5th YEAR) 5.7 Cubic Metre
635 40.09 ROAD E (UPKEEPING 4th YEAR) 4.8 Cubic Metre
636 40.1 ROAD E (UPKEEPING 5th YEAR) 7.99 Cubic Metre
637 40.11 ROAD F (UPKEEPING 4th YEAR) 18.07 Cubic Metre
638 40.12 ROAD F (UPKEEPING 5th YEAR) 30.11 Cubic Metre
639 40.13 ROAD G (UPKEEPING 4th YEAR) 9.92 Cubic Metre
640 40.14 ROAD G (UPKEEPING 5th YEAR) 16.53 Cubic Metre
641 40.15 Calculation of SubTotal, GST and Total Amount carried out by system automatically
642 40.16 Basic cost of value put to tender as per estimate 1 (A)
643 40.17 Add GST at 12% 1 (B)
644 40.18 Total Value put to Tender 1 (A+B)
645 40.19 Excess/Less Percentage 1 (D)
646 40.2 Final Value 1 (E)
647 40.21 Add GST at 12% of Final Value 1 (F)
648 40.22 Total Value of Contract Including 12% of GST 1 (E+F)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail