Sales : +91-777 804 8217
| Schedule of quantities to accompany the Tender for the work of Package-76- Widening and Improvements of Government roads in Thiruvadanai (Highways) C&M Sub-Division including CD works and Upkeeping for a period of 60 MonthsLIST OF ROAD ATTACHED IN PRICE BID DOCUMENT. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer (For box cutting) for boxing as per clause 111,112,202,301,900 of MORT & H Specification Revision V | BI01010001010000000000000515BI0100001112 | ||
| 2 | 1.01 | ROAD A | 1078 | Cubic Metre | |
| 3 | 1.02 | ROAD B | 1069.92 | Cubic Metre | |
| 4 | 1.03 | ROAD C | 768.84 | Cubic Metre | |
| 5 | 1.04 | ROAD D | 1314.27 | Cubic Metre | |
| 6 | 2 | Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for pickig and all other tools and plants employed of the work and including all other incidental charges etc., complete as per MORTH Specification no.111,112,202 | |||
| 7 | 2.01 | ROAD A | 1065 | Square Metre | |
| 8 | 2.02 | ROAD B | 992.12 | Square Metre | |
| 9 | 2.03 | ROAD C | 1747.37 | Square Metre | |
| 10 | 2.04 | ROAD D | 2538.41 | Square Metre | |
| 11 | 2.05 | ROAD E | 227.92 | Square Metre | |
| 12 | 2.06 | ROAD F | 226.67 | Square Metre | |
| 13 | 2.07 | ROAD G | 225 | Square Metre | |
| 14 | 2.08 | ROAD H | 226.67 | Square Metre | |
| 15 | 2.09 | ROAD I | 227.5 | Square Metre | |
| 16 | 2.1 | ROAD J | 226.25 | Square Metre | |
| 17 | 3 | Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification No.111, 112, 401,900 - for grading- III Material | |||
| 18 | 3.01 | ROAD A | 260 | Cubic Metre | |
| 19 | 3.02 | ROAD B | 257.95 | Cubic Metre | |
| 20 | 3.03 | ROAD C | 244.63 | Cubic Metre | |
| 21 | 4 | Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification No.111, 112, 401,900 - for grading- V Material | |||
| 22 | 4.01 | ROAD A | 351 | Cubic Metre | |
| 23 | 4.02 | ROAD A (Paverblock Portion) | 312.5 | Cubic Metre | |
| 24 | 4.03 | ROAD B | 348.24 | Cubic Metre | |
| 25 | 4.04 | ROAD C | 305.79 | Cubic Metre | |
| 26 | 4.05 | ROAD D | 930.68 | Cubic Metre | |
| 27 | 5 | Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406 of MORTH Specification. | |||
| 28 | 5.01 | ROAD A | 969.5 | Cubic Metre | |
| 29 | 5.02 | ROAD A( Paverblock Portion) | 312.5 | Cubic Metre | |
| 30 | 5.03 | ROAD B | 1091.34 | Cubic Metre | |
| 31 | 5.04 | ROAD C | 1660 | Cubic Metre | |
| 32 | 5.05 | ROAD D | 1681.64 | Cubic Metre | |
| 33 | 5.06 | ROAD E | 68.39 | Cubic Metre | |
| 34 | 5.07 | ROAD F | 68.02 | Cubic Metre | |
| 35 | 5.08 | ROAD G | 67.51 | Cubic Metre | |
| 36 | 5.09 | ROAD H | 68.01 | Cubic Metre | |
| 37 | 5.1 | ROAD I | 68.26 | Cubic Metre | |
| 38 | 5.11 | ROAD J | 67.89 | Cubic Metre | |
| 39 | 6 | Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification no.111,112, 501,502,900- over WMM | |||
| 40 | 6.01 | ROAD A | 4855 | Square Metre | |
| 41 | 6.02 | ROAD B | 5555.9 | Square Metre | |
| 42 | 6.03 | ROAD C | 7688.45 | Square Metre | |
| 43 | 6.04 | ROAD D | 11058.2 | Square Metre | |
| 44 | 6.05 | ROAD E | 683.75 | Square Metre | |
| 45 | 6.06 | ROAD F | 680 | Square Metre | |
| 46 | 6.07 | ROAD G | 675 | Square Metre | |
| 47 | 6.08 | ROAD H | 680 | Square Metre | |
| 48 | 6.09 | ROAD I | 682.5 | Square Metre | |
| 49 | 6.1 | ROAD J | 678.75 | Square Metre | |
| 50 | 7 | Tack coat - Providing and applying tack coat with bitumen emulsion(RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification no.111,112,501, 503,900- over granular surfaces treated with primer | |||
| 51 | 7.01 | ROAD A | 4855 | Square Metre | |
| 52 | 7.02 | ROAD B | 5555.9 | Square Metre | |
| 53 | 7.03 | ROAD C | 7688.45 | Square Metre | |
| 54 | 7.04 | ROAD D | 11058.2 | Square Metre | |
| 55 | 7.05 | ROAD E | 683.75 | Square Metre | |
| 56 | 7.06 | ROAD F | 680 | Square Metre | |
| 57 | 7.07 | ROAD G | 675 | Square Metre | |
| 58 | 7.08 | ROAD H | 680 | Square Metre | |
| 59 | 7.09 | ROAD I | 682.5 | Square Metre | |
| 60 | 7.1 | ROAD J | 678.75 | Square Metre | |
| 61 | 8 | Tack coat - Providing and applying tack coat with bitumen emulsion(RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification no.111,112,501, 503,900- over granular surfaces treated with primer | |||
| 62 | 8.01 | ROAD E | 9847.5 | Square Metre | |
| 63 | 8.02 | ROAD F | 6851.25 | Square Metre | |
| 64 | 8.03 | ROAD G | 6825 | Square Metre | |
| 65 | 8.04 | ROAD H | 6663.75 | Square Metre | |
| 66 | 8.05 | ROAD I | 3817.5 | Square Metre | |
| 67 | 8.06 | ROAD J | 8321.25 | Square Metre | |
| 68 | 9 | Advance patch work using 45 mm IRC size HBG metal for making the pot holes and patching using VG10 grade bitumen including mixing at the rate of 44 Kg / Cum of chips after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc., complete, as per MORTH Specification. | |||
| 69 | 9.01 | ROAD E | 49.21 | Square Metre | |
| 70 | 9.02 | ROAD F | 34.19 | Square Metre | |
| 71 | 9.03 | ROAD G | 34.12 | Square Metre | |
| 72 | 9.04 | ROAD H | 33.31 | Square Metre | |
| 73 | 9.05 | ROAD I | 19.09 | Square Metre | |
| 74 | 9.06 | ROAD J | 41.55 | Square Metre | |
| 75 | 10 | Bituminous Macadam Providing and laying bituminous macadam with Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade- 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 of MORTH Specification no.111,112,501,503,900 - Grading II | |||
| 76 | 10.01 | ROAD A | 242.75 | Cubic Metre | |
| 77 | 10.02 | ROAD B | 277.79 | Cubic Metre | |
| 78 | 10.03 | ROAD C | 384.42 | Cubic Metre | |
| 79 | 10.04 | ROAD D | 552.91 | Cubic Metre | |
| 80 | 10.05 | ROAD E | 104.87 | Cubic Metre | |
| 81 | 10.06 | ROAD F | 74.7 | Cubic Metre | |
| 82 | 10.07 | ROAD G | 74.82 | Cubic Metre | |
| 83 | 10.08 | ROAD H | 73.01 | Cubic Metre | |
| 84 | 10.09 | ROAD I | 44.83 | Cubic Metre | |
| 85 | 10.1 | ROAD J | 90.02 | Cubic Metre | |
| 86 | 11 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specificationno.111,112,507,900 complete in all respects - Grading II | |||
| 87 | 11.01 | ROAD A | 145.65 | Cubic Metre | |
| 88 | 11.02 | ROAD B | 166.68 | Cubic Metre | |
| 89 | 11.03 | ROAD C | 230.65 | Cubic Metre | |
| 90 | 11.04 | ROAD D | 331.75 | Cubic Metre | |
| 91 | 11.05 | ROAD E | 315.94 | Cubic Metre | |
| 92 | 11.06 | ROAD F | 225.94 | Cubic Metre | |
| 93 | 11.07 | ROAD G | 225 | Cubic Metre | |
| 94 | 11.08 | ROAD H | 220.32 | Cubic Metre | |
| 95 | 11.09 | ROAD I | 135 | Cubic Metre | |
| 96 | 11.1 | ROAD J | 270 | Cubic Metre | |
| 97 | 12 | Providing and laying 83mm thick Hi strength type of interlocking colour paver block of minimum compressive strength 40 N sq.mm in uniform shape of approved make to be laid in harring bone patern with approved non skitting surface in top as diected by the engineer the rate in inclusive of providing transporting loading and unloading and laying as per standard specification etc.,complete for paver blocked portion as per MORTH specification No.IRC SP 63:2004 | |||
| 98 | 12.01 | ROAD A | 1250 | Square Metre | |
| 99 | 13 | Refiling excavated earthwork including removal and satisfactory disposal of all materials necessary for the construction of the roadway and side drains in accordance with the specifications and the lines grades and cross sections shown in the drawins or as indicated by the engineer including power roller rolling all labour charges etc., complete as per standard specifications No.111, 112, 202, 301, 302, 303, 900. | |||
| 100 | 13.01 | ROAD B | 119.58 | Cubic Metre | |
| 101 | 13.02 | ROAD C | 419.37 | Cubic Metre | |
| 102 | 13.03 | ROAD D | 655.59 | Cubic Metre | |
| 103 | 13.04 | ROAD E | 560 | Cubic Metre | |
| 104 | 13.05 | ROAD F | 400 | Cubic Metre | |
| 105 | 13.06 | ROAD G | 400 | Cubic Metre | |
| 106 | 13.07 | ROAD H | 390 | Cubic Metre | |
| 107 | 13.08 | ROAD I | 220 | Cubic Metre | |
| 108 | 13.09 | ROAD J | 480 | Cubic Metre | |
| 109 | 13.1 | ROAD L (FOR RETAINING WALL) | 264 | Cubic Metre | |
| 110 | 14 | Excavation \nExcavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer including compaction by power roller rolling as per SS20B MORTH Specification no.111,112,301,305,900 for Carted Earth | |||
| 111 | 14.01 | ROAD C (FOR BOX CULVERT) | 195 | Cubic Metre | |
| 112 | 15 | Providing RCC M15 Grade precast KM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete as per MORT & H Specification No. 804 | |||
| 113 | 15.01 | ROAD A | 1 | Number | |
| 114 | 15.02 | ROAD B | 1 | Number | |
| 115 | 15.03 | ROAD C | 2 | Number | |
| 116 | 15.04 | ROAD D | 2 | Number | |
| 117 | 15.05 | ROAD E | 2 | Numbers | |
| 118 | 15.06 | ROAD F | 2 | Numbers | |
| 119 | 15.07 | ROAD G | 2 | Number | |
| 120 | 15.08 | ROAD H | 1 | Number | |
| 121 | 15.09 | ROAD I | 1 | Numbers | |
| 122 | 15.1 | ROAD J | 3 | Numbers | |
| 123 | 16 | Providing RCC M15 Grade precast HM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete as per MORT & H Specification No. 804 | |||
| 124 | 16.01 | ROAD A | 3 | Numbers | |
| 125 | 16.02 | ROAD B | 3 | Numbers | |
| 126 | 16.03 | ROAD C | 6 | Number | |
| 127 | 16.04 | ROAD D | 8 | Number | |
| 128 | 16.05 | ROAD E | 11 | Numbers | |
| 129 | 16.06 | ROAD F | 8 | Numbers | |
| 130 | 16.07 | ROAD G | 8 | Number | |
| 131 | 16.08 | ROAD H | 8 | Numbers | |
| 132 | 16.09 | ROAD I | 5 | Numbers | |
| 133 | 16.1 | ROAD J | 9 | Numbers | |
| 134 | 17 | Providing RCC M.15 grade Precast Boundary stones / Guide post of standard design as per IRC 8-1980 and fixing in position including painting and printing etc., complete (as per MORT & H specification | |||
| 135 | 17.01 | ROAD C | 40 | Number | |
| 136 | 17.02 | ROAD D | 80 | Number | |
| 137 | 17.03 | ROAD E | 30 | Numbers | |
| 138 | 17.04 | ROAD F | 70 | Numbers | |
| 139 | 17.05 | ROAD G | 70 | Number | |
| 140 | 17.06 | ROAD H | 70 | Numbers | |
| 141 | 17.07 | ROAD I | 30 | Numbers | |
| 142 | 17.08 | ROAD J | 100 | Numbers | |
| 143 | 18 | Excavation \nExcavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer including compaction by power roller rolling as per MORTH Specification no.111,112,301,305,900 for PROTECTIVE WALL | |||
| 144 | 18.01 | ROAD C (FOR PROTECTIVE WALL) | 504.6 | Cubic Metre | |
| 145 | 19 | Providing and fixing SEEPAGE PIPES of 100mm dia with 4.00 kg per Cm2 of PVC pipes of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite cost and labour for 900mms diaganite chis at theperiphery and labour charges for fixing etc., complete to drain the back fill the retaining wall | |||
| 146 | 19.01 | ROAD C (FOR PROTECTIVE WALL) | 145 | Each | |
| 147 | 20 | Dismantling\nDismantling the salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc,as per MORTH Specification no.111,112,202 SI.No.14 | |||
| 148 | 20.01 | ROAD B (FOR BOX CULVERT) | 19.2 | Cubic Metre | |
| 149 | 20.02 | ROAD C (FOR BOX CULVERT) | 6.4 | Cubic Metre | |
| 150 | 20.03 | ROAD D (FOR BOX CULVERT) | 6.4 | Cubic Metre | |
| 151 | 20.04 | ROAD K (FOR BOX CULVERT) | 32 | Cubic Metre | |
| 152 | 21 | Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per standard specification 111,112,304 for Box culvert and wing wall. | |||
| 153 | 21.01 | ROAD B (FOR BOX CULVERT) | 428.01 | Cubic Metre | |
| 154 | 21.02 | ROAD C (FOR BOX CULVERT) | 142.67 | Cubic Metre | |
| 155 | 21.03 | ROAD D(FOR BOX CULVERT) | 142.67 | Cubic Metre | |
| 156 | 22 | Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per standard specification 111,112,304 for foundation | |||
| 157 | 22.01 | ROAD A (FOR DRAIN) | 537.6 | Cubic Metre | |
| 158 | 22.02 | ROAD B (FOR DRAIN) | 76.8 | Cubic Metre | |
| 159 | 22.03 | ROAD K (FOR BOX CULVERT) | 433.9 | Cubic Metre | |
| 160 | 22.04 | ROAD L (FOR RETAINING WALL) | 193.36 | Cubic Metre | |
| 161 | 23 | Vibrated Cement Concrete M15 using 40mm ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication for steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete as per MORTH Specification no.111,112,1000, 1500, 1700,2200,900 For foundation Concrete | |||
| 162 | 23.01 | ROAD C (FOR PROTECTIVE WALL) | 63.08 | Cubic Metre | |
| 163 | 24 | Vibrated Cement Concrete M10 (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to worksite and cost of cement at site including cost of soft water, labour charges for mixing, transporting, laying, curing working at depths, tools and plants and maintaining of protective bunds, coffer dams, shoring, strutting etc., complete as per standard specifications FOR foundation. | |||
| 164 | 24.01 | ROAD A (FOR DRAIN) | 44.8 | Cubic Metre | |
| 165 | 24.02 | ROAD B (FOR DRAIN) | 6.4 | Cubic Metre | |
| 166 | 25 | Vibrated Cement Concrete M15 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., as per MORTH Specification no. 111,112,1000, 1500, 1700,2100,900 complete for ABOVE SILL LEVEL | |||
| 167 | 25.01 | ROAD L (FOR RETAINING WALL) | 351.21 | Cubic Metre | |
| 168 | 26 | Vibrated Cement Concrete M15 using 40mm ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication for steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete as per MORTH Specification no.111,112,1000, 1500, 1700,2200,900 For LEVELLING COURSE BELOW BOX CULVERT AND WING WALL. | |||
| 169 | 26.01 | ROAD B (FOR BOX CULVERT) | 24.09 | Cubic Metre | |
| 170 | 26.02 | ROAD C (FOR BOX CULVERT) | 8.03 | Cubic Metre | |
| 171 | 26.03 | ROAD D (FOR BOX CULVERT) | 8.03 | Cubic Metre | |
| 172 | 26.04 | ROAD K (FOR BOX CULVERT) | 31.2 | Cubic Metre | |
| 173 | 27 | Vibrated Cement Concrete M25 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., as per MORTH Specification no. 111,112,1000, 1500, 1700,2100,900 complete for FOUNDATION FOR BOX CULVERT | |||
| 174 | 27.01 | ROAD B (FOR BOX CULVERT) | 93.6 | Cubic Metre | |
| 175 | 27.02 | ROAD C (FOR BOX CULVERT) | 31.2 | Cubic Metre | |
| 176 | 27.03 | ROAD D (FOR BOX CULVERT) | 31.2 | Cubic Metre | |
| 177 | 27.04 | ROAD K (FOR BOX CULVERT) | 103.8 | Cubic Metre | |
| 178 | 28 | Vibrated Cement Concrete M15 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., as per MORTH Specification no. 111,112,1000, 1500, 1700,2100,900 complete for FOUNDATION BELOW SILL LEVEL | |||
| 179 | 28.01 | ROAD C (FOR PROTECTIVE WALL) | 267.96 | Cubic Metre | |
| 180 | 28.02 | ROAD L (FOR RETAINING WALL) | 177.05 | Cubic Metre | |
| 181 | 29 | Vibrated Cement Concrete M15 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., as per MORTH Specification no. 111,112,1000, 1500, 1700,2100,900 complete for Foundation Above sill | |||
| 182 | 29.01 | ROAD C (FOR PROTECTIVE WALL) | 186.61 | Cubic Metre | |
| 183 | 30 | Supply and fabrication of steel Grade Fe-500 required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the bars straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per MORTH Vth Revision Specification No. 1000, 1500, 1600, 900 | |||
| 184 | 30.01 | ROAD A (FOR DRAIN) | 20.6 | Metric tone | |
| 185 | 30.02 | ROAD B (FOR DRAIN) | 3 | Metric tone | |
| 186 | 30.03 | ROAD B (FOR BOX CULVERT) | 6.864 | Metric tone | |
| 187 | 30.04 | ROAD C (FOR BOX CULVERT) | 2.288 | Metric tone | |
| 188 | 30.05 | ROAD D (FOR BOX CULVERT) | 2.288 | Metric tone | |
| 189 | 30.06 | ROAD K (FOR BOX CULVERT) | 10.4 | Metric tone | |
| 190 | 31 | Supply and fixing of Reinforced Cement Concrete Man Hole cover 750mm dia including frames EHD 35 as per IRC 50-1999 and IS 12592 as directed by the Departmental Officers including labour charges for fixing at every interval of 5m along the drain including all other incidental charges etc., complete for Drain. | |||
| 191 | 31.01 | ROAD A (FOR DRAIN) | 56 | Numbers | |
| 192 | 31.02 | ROAD B (FOR DRAIN) | 8 | Numbers | |
| 193 | 32 | Providing and fixing of FRP Gratings of 600 x 200 mm size with M.S flats of 25x10 mm for outer frames, 25x6 mm for inner braces and PVC pipe 150 mm dia fixed with mild steel grating, including cost and conveyance of pipes and gratings and fixing them in position. | |||
| 194 | 32.01 | ROAD A (FOR DRAIN) | 56 | Each | |
| 195 | 32.02 | ROAD B (FOR DRAIN) | 8 | Each | |
| 196 | 33 | Vibrated Reinforced Cement Concrete M25 (Design Mix) using 20mm and below ISS hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement which has to be procured by the contractor but excluding cost and fabrication of steel including cost of form work and labour charges for mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including as per standard specification MORTH Rev. V Nos. 1000,1700,2200 for Drain Slabs and Walls. | |||
| 197 | 33.01 | ROAD A (FOR DRAIN) | 226.5 | Cubic Metre | |
| 198 | 33.02 | ROAD B (FOR DRAIN) | 32.4 | Cubic Metre | |
| 199 | 34 | Vibrated Cement Concrete M30 Grade (Design mix) Using IRC size hard granite metal including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying compacting curing, including all incidental charges etc., complete as per MORTH Vth Revision Specification No. 1000, 1500, 1600, 1700, 2702, 900 for WEARING COAT 75MM uniform thickness OVER DECK SLAB AND APPROACH SLAB | |||
| 200 | 34.01 | ROAD B (FOR BOX CULVERT) | 57.33 | Square metre | |
| 201 | 34.02 | ROAD C (FOR BOX CULVERT) | 19.11 | Square metre | |
| 202 | 34.03 | ROAD D (FOR BOX CULVERT) | 19.11 | Square metre | |
| 203 | 34.04 | ROAD K (FOR BOX CULVERT) | 83.25 | Square metre | |
| 204 | 35 | Vibrated Cement Concrete M20 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., as per MORTH Specification no. 111,112,1000, 1500, 1700,2100,900 complete for Wings walls and Parapet wall | |||
| 205 | 35.01 | ROAD B (FOR BOX CULVERT) | 107.7 | Cubic Metre | |
| 206 | 35.02 | ROAD C (FOR BOX CULVERT) | 35.9 | Cubic Metre | |
| 207 | 35.03 | ROAD D (FOR BOX CULVERT) | 35.9 | Cubic Metre | |
| 208 | 35.04 | ROAD K (FOR BOX CULVERT) | 98.65 | Cubic Metre | |
| 209 | 36 | Providing and fixing SEEPAGE PIPES of 100mm dia with 4.00kg per CM2 of PVC pipes of required length of labutment and wings, retaining wall including cost and conveyance of all materials to worksite cost and labour for 900mm diaganite chis at the periphery and labour charges for fixing etc., complete to drain the back fill the retaining wall. | |||
| 210 | 36.01 | ROAD L (FOR RETAINING WALL) | 74 | Cubic Metre | |
| 211 | 37 | Quarry Dust Filling behind the abutments, Wings and pipe portion with Quarry fines including cost and conveyance to site including labour charges for filling in layers watering tamping under optimum moisture content to get the maximum density including of all other incidental charges etc., complete as per MORT & H specification no.304,900 | |||
| 212 | 37.01 | ROAD A (PAVERBLOCK) | 250 | Cubic Metre | |
| 213 | 37.02 | ROAD A (FOR DRAIN) | 44.8 | Cubic Metre | |
| 214 | 37.03 | ROAD B (FOR DRAIN) | 6.4 | Cubic Metre | |
| 215 | 37.04 | ROAD B (FOR BOX CULVERT) | 38.65 | Cubic Metre | |
| 216 | 37.05 | ROAD C (FOR BOX CULVERT) | 12.88 | Cubic Metre | |
| 217 | 37.06 | ROAD C (FOR PROTECTIVE WALL) | 63.08 | Cubic Metre | |
| 218 | 37.07 | ROAD D (FOR BOX CULVERT) | 12.88 | Cubic Metre | |
| 219 | 37.08 | ROAD K (FOR BOX CULVERT) | 16.02 | Cubic Metre | |
| 220 | 37.09 | ROAD L (FOR RETAINING WALL) | 32.63 | Cubic Metre | |
| 221 | 38 | Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Formation of embankment using carted earth with a lead of 2 km. having CBR value of more than 8 FOR DIVERSION ROAD\n | |||
| 222 | 38.01 | ROAD B (FOR BOX CULVERT) | 585 | Cubic Metre | |
| 223 | 38.02 | ROAD D (FOR BOX CULVERT) | 195 | Cubic Metre | |
| 224 | 38.03 | ROAD K (FOR BOX CULVERT) | 975 | Cubic Metre | |
| 225 | 39 | Earth work excavation in all classes of soils including wheathered rock not requiring blasting and depositing on bank with initial leads and lifts as per SS20B including cost of all labour, equipments and all incidental charges back filling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation of Safety Kerb | |||
| 226 | 39.01 | ROAD B (FOR KERB WALL) | 33.75 | Cubic Metre | |
| 227 | 40 | Vibrated Cement Concrete M-20 Grade, Nominal Mix, 1:2:4 using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at site including labour charges for mixing,transporting, laying, and curing concrete,working at heights,hire charges for tools and plants, including all other incidental charges,etc.,complete as per standard specification for Safety Kerb | |||
| 228 | 40.01 | ROAD B (FOR KERB WALL) | 131.25 | Cubic Metre | |
| 229 | 41 | Providing and laying of Gravel including cost and conveyance of the same to work site including stacking the same to departemental gauge for premeasurement including all labour charges for laying, spreading etc., complete and as directed by the departmental engineers for making For diversion road\n | |||
| 230 | 41.01 | ROAD B (FOR BOX CULVERT) | 148.5 | Cubic Metre | |
| 231 | 41.02 | ROAD C (FOR BOX CULVERT) | 49.5 | Cubic Metre | |
| 232 | 41.03 | ROAD D (FOR BOX CULVERT) | 49.5 | Cubic Metre | |
| 233 | 41.04 | ROAD K (FOR BOX CULVERT) | 247.5 | Cubic Metre | |
| 234 | 42 | Clearing the Light jungles including weeding out shrubs bushes, egetables, growth etc., as per spcifications and directions of Engineer in charge (Twice a year) for 60 months | |||
| 235 | 42.01 | ROAD C (UPKEEPING 1st YEAR) | 5742 | Square metre | |
| 236 | 42.02 | ROAD C (UPKEEPING 2nd YEAR) | 5742 | Square metre | |
| 237 | 42.03 | ROAD C (UPKEEPING 3rd YEAR) | 5742 | Square metre | |
| 238 | 42.04 | ROAD C (UPKEEPING 4th YEAR) | 5742 | Square metre | |
| 239 | 42.05 | ROAD C (UPKEEPING 5th YEAR) | 5742 | Square metre | |
| 240 | 42.06 | ROAD D (UPKEEPING 1st YEAR) | 1386 | Square metre | |
| 241 | 42.07 | ROAD D (UPKEEPING 2nd YEAR) | 1386 | Square metre | |
| 242 | 42.08 | ROAD D (UPKEEPING 3rd YEAR) | 1386 | Square metre | |
| 243 | 42.09 | ROAD D (UPKEEPING 4th YEAR) | 1386 | Square metre | |
| 244 | 42.1 | ROAD D (UPKEEPING 5th YEAR) | 1386 | Square metre | |
| 245 | 42.11 | ROAD E (UPKEEPING 1st YEAR) | 9342 | Square metre | |
| 246 | 42.12 | ROAD E (UPKEEPING 2nd YEAR) | 9342 | Square metre | |
| 247 | 42.13 | ROAD E (UPKEEPING 3rd YEAR) | 9342 | Square metre | |
| 248 | 42.14 | ROAD E (UPKEEPING 4th YEAR) | 9342 | Square metre | |
| 249 | 42.15 | ROAD E (UPKEEPING 5th YEAR) | 9342 | Square metre | |
| 250 | 42.16 | ROAD F (UPKEEPING 1st YEAR) | 7182 | Square metre | |
| 251 | 42.17 | ROAD F (UPKEEPING 2nd YEAR) | 7182 | Square metre | |
| 252 | 42.18 | ROAD F (UPKEEPING 3rd YEAR) | 7182 | Square metre | |
| 253 | 42.19 | ROAD F (UPKEEPING 4th YEAR) | 7182 | Square metre | |
| 254 | 42.2 | ROAD F (UPKEEPING 5th YEAR) | 7182 | Square metre | |
| 255 | 42.21 | ROAD G (UPKEEPING 1st YEAR) | 7182 | Square metre | |
| 256 | 42.22 | ROAD G (UPKEEPING 2nd YEAR) | 7182 | Square metre | |
| 257 | 42.23 | ROAD G (UPKEEPING 3rd YEAR) | 7182 | Square metre | |
| 258 | 42.24 | ROAD G (UPKEEPING 4th YEAR) | 7182 | Square metre | |
| 259 | 42.25 | ROAD G (UPKEEPING 5th YEAR) | 7182 | Square metre | |
| 260 | 42.26 | ROAD H (UPKEEPING 1st YEAR) | 7182 | Square metre | |
| 261 | 42.27 | ROAD H (UPKEEPING 2nd YEAR) | 7182 | Square metre | |
| 262 | 42.28 | ROAD H (UPKEEPING 3rd YEAR) | 7182 | Square metre | |
| 263 | 42.29 | ROAD H (UPKEEPING 4th YEAR) | 7182 | Square metre | |
| 264 | 42.3 | ROAD H (UPKEEPING 5th YEAR) | 7182 | Square metre | |
| 265 | 42.31 | ROAD I (UPKEEPING 1st YEAR) | 4302 | Square metre | |
| 266 | 42.32 | ROAD I (UPKEEPING 2nd YEAR) | 4302 | Square metre | |
| 267 | 42.33 | ROAD I (UPKEEPING 3rd YEAR) | 4302 | Square metre | |
| 268 | 42.34 | ROAD I (UPKEEPING 4th YEAR) | 4302 | Square metre | |
| 269 | 42.35 | ROAD I (UPKEEPING 5th YEAR) | 4302 | Square metre | |
| 270 | 42.36 | ROAD J (UPKEEPING 1st YEAR) | 7902 | Square metre | |
| 271 | 42.37 | ROAD J (UPKEEPING 2nd YEAR) | 7902 | Square metre | |
| 272 | 42.38 | ROAD J (UPKEEPING 3rd YEAR) | 7902 | Square metre | |
| 273 | 42.39 | ROAD J (UPKEEPING 4th YEAR) | 7902 | Square metre | |
| 274 | 42.4 | ROAD J (UPKEEPING 5th YEAR) | 7902 | Square metre | |
| 275 | 43 | Excavation \nExcavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer including compaction by power roller rolling as per SS20B MORTH Specification no.111,112,301,305,900 for Making up the berms. (Yearly Two Times) | |||
| 276 | 43.01 | ROAD A (UPKEEPING 2nd YEAR) | 119.5 | Cubic Metre | |
| 277 | 43.02 | ROAD A (UPKEEPING 3rd YEAR) | 119.5 | Cubic Metre | |
| 278 | 43.03 | ROAD A (UPKEEPING 4th YEAR) | 119.5 | Cubic Metre | |
| 279 | 43.04 | ROAD A (UPKEEPING 5th YEAR) | 119.5 | Cubic Metre | |
| 280 | 43.05 | ROAD B (UPKEEPING 2nd YEAR) | 119.5 | Cubic Metre | |
| 281 | 43.06 | ROAD B (UPKEEPING 3rd YEAR) | 119.5 | Cubic Metre | |
| 282 | 43.07 | ROAD B (UPKEEPING 4th YEAR) | 119.5 | Cubic Metre | |
| 283 | 43.08 | ROAD B (UPKEEPING 5th YEAR) | 119.5 | Cubic Metre | |
| 284 | 43.09 | ROAD C (UPKEEPING 2nd YEAR) | 251.62 | Cubic Metre | |
| 285 | 43.1 | ROAD C (UPKEEPING 3rd YEAR) | 251.62 | Cubic Metre | |
| 286 | 43.11 | ROAD C (UPKEEPING 4th YEAR) | 251.62 | Cubic Metre | |
| 287 | 43.12 | ROAD C (UPKEEPING 5th YEAR) | 251.62 | Cubic Metre | |
| 288 | 43.13 | ROAD D (UPKEEPING 2nd YEAR) | 180 | Cubic Metre | |
| 289 | 43.14 | ROAD D (UPKEEPING 3rd YEAR) | 180 | Cubic Metre | |
| 290 | 43.15 | ROAD D (UPKEEPING 4th YEAR) | 180 | Cubic Metre | |
| 291 | 43.16 | ROAD D (UPKEEPING 5th YEAR) | 180 | Cubic Metre | |
| 292 | 43.17 | ROAD E (UPKEEPING 2nd YEAR) | 336 | Cubic Metre | |
| 293 | 43.18 | ROAD E (UPKEEPING 3rd YEAR) | 336 | Cubic Metre | |
| 294 | 43.19 | ROAD E (UPKEEPING 4th YEAR) | 336 | Cubic Metre | |
| 295 | 43.2 | ROAD E (UPKEEPING 5th YEAR) | 336 | Cubic Metre | |
| 296 | 43.21 | ROAD F (UPKEEPING 2nd YEAR) | 240 | Cubic Metre | |
| 297 | 43.22 | ROAD F (UPKEEPING 3rd YEAR) | 240 | Cubic Metre | |
| 298 | 43.23 | ROAD F (UPKEEPING 4th YEAR) | 240 | Cubic Metre | |
| 299 | 43.24 | ROAD F (UPKEEPING 5th YEAR) | 240 | Cubic Metre | |
| 300 | 43.25 | ROAD G (UPKEEPING 2nd YEAR) | 240 | Cubic Metre | |
| 301 | 43.26 | ROAD G (UPKEEPING 3rd YEAR) | 240 | Cubic Metre | |
| 302 | 43.27 | ROAD G (UPKEEPING 4th YEAR) | 240 | Cubic Metre | |
| 303 | 43.28 | ROAD G (UPKEEPING 5th YEAR) | 240 | Cubic Metre | |
| 304 | 43.29 | ROAD H (UPKEEPING 2nd YEAR) | 234 | Cubic Metre | |
| 305 | 43.3 | ROAD H (UPKEEPING 3rd YEAR) | 234 | Cubic Metre | |
| 306 | 43.31 | ROAD H (UPKEEPING 4th YEAR) | 234 | Cubic Metre | |
| 307 | 43.32 | ROAD H (UPKEEPING 5th YEAR) | 234 | Cubic Metre | |
| 308 | 43.33 | ROAD I (UPKEEPING 2nd YEAR) | 132 | Cubic Metre | |
| 309 | 43.34 | ROAD I (UPKEEPING 3rd YEAR) | 132 | Cubic Metre | |
| 310 | 43.35 | ROAD I (UPKEEPING 4th YEAR) | 132 | Cubic Metre | |
| 311 | 43.36 | ROAD I (UPKEEPING 5th YEAR) | 132 | Cubic Metre | |
| 312 | 43.37 | ROAD J (UPKEEPING 2nd YEAR) | 288 | Cubic Metre | |
| 313 | 43.38 | ROAD J (UPKEEPING 3rd YEAR) | 288 | Cubic Metre | |
| 314 | 43.39 | ROAD J (UPKEEPING 4th YEAR) | 288 | Cubic Metre | |
| 315 | 43.4 | ROAD J (UPKEEPING 5th YEAR) | 288 | Cubic Metre | |
| 316 | 44 | Deploying earth moving machinery for desilting channal and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. For U/s and D/s culvert Clearance using JCB (Sl.No:XI-18) | |||
| 317 | 44.01 | ROAD A (UPKEEPING 1st YEAR) | 2 | Hours | |
| 318 | 44.02 | ROAD A (UPKEEPING 2nd YEAR) | 2 | Hours | |
| 319 | 44.03 | ROAD A (UPKEEPING 3rd YEAR) | 2 | Hours | |
| 320 | 44.04 | ROAD A (UPKEEPING 4th YEAR) | 2 | Hours | |
| 321 | 44.05 | ROAD A (UPKEEPING 5th YEAR) | 2 | Hours | |
| 322 | 44.06 | ROAD B (UPKEEPING 1ST YEAR) | 3 | Hours | |
| 323 | 44.07 | ROAD B (UPKEEPING 2nd YEAR) | 3 | Hours | |
| 324 | 44.08 | ROAD B (UPKEEPING 3rd YEAR) | 3 | Hours | |
| 325 | 44.09 | ROAD B (UPKEEPING 4th YEAR) | 3 | Hours | |
| 326 | 44.1 | ROAD B (UPKEEPING 5th YEAR) | 3 | Hours | |
| 327 | 44.11 | ROAD C (UPKEEPING 1st YEAR) | 1 | Hours | |
| 328 | 44.12 | ROAD C (UPKEEPING 2nd YEAR) | 1 | Hours | |
| 329 | 44.13 | ROAD C (UPKEEPING 3rd YEAR) | 1 | Hours | |
| 330 | 44.14 | ROAD C (UPKEEPING 4th YEAR) | 1 | Hours | |
| 331 | 44.15 | ROAD C (UPKEEPING 5th YEAR) | 1 | Hours | |
| 332 | 44.16 | ROAD D (UPKEEPING 1st YEAR) | 5 | Hours | |
| 333 | 44.17 | ROAD D (UPKEEPING 2nd YEAR) | 5 | Hours | |
| 334 | 44.18 | ROAD D (UPKEEPING 3rd YEAR) | 5 | Hours | |
| 335 | 44.19 | ROAD D (UPKEEPING 4th YEAR) | 5 | Hours | |
| 336 | 44.2 | ROAD D (UPKEEPING 5th YEAR) | 5 | Hours | |
| 337 | 44.21 | ROAD E (UPKEEPING 1st YEAR) | 7 | Hours | |
| 338 | 44.22 | ROAD E (UPKEEPING 2nd YEAR) | 7 | Hours | |
| 339 | 44.23 | ROAD E (UPKEEPING 3rd YEAR) | 7 | Hours | |
| 340 | 44.24 | ROAD E (UPKEEPING 4th YEAR) | 7 | Hours | |
| 341 | 44.25 | ROAD E (UPKEEPING 5th YEAR) | 7 | Hours | |
| 342 | 44.26 | ROAD F (UPKEEPING 1st YEAR) | 6 | Hours | |
| 343 | 44.27 | ROAD F (UPKEEPING 2nd YEAR) | 6 | Hours | |
| 344 | 44.28 | ROAD F (UPKEEPING 3rd YEAR) | 6 | Hours | |
| 345 | 44.29 | ROAD F (UPKEEPING 4th YEAR) | 6 | Hours | |
| 346 | 44.3 | ROAD F (UPKEEPING 5th YEAR) | 6 | Hours | |
| 347 | 44.31 | ROAD G (UPKEEPING 1st YEAR) | 5 | Hours | |
| 348 | 44.32 | ROAD G (UPKEEPING 2nd YEAR) | 5 | Hours | |
| 349 | 44.33 | ROAD G (UPKEEPING 3rd YEAR) | 5 | Hours | |
| 350 | 44.34 | ROAD G (UPKEEPING 4th YEAR) | 5 | Hours | |
| 351 | 44.35 | ROAD G (UPKEEPING 5th YEAR) | 5 | Hours | |
| 352 | 44.36 | ROAD H (UPKEEPING 1st YEAR) | 7 | Hours | |
| 353 | 44.37 | ROAD H (UPKEEPING 2nd YEAR) | 7 | Hours | |
| 354 | 44.38 | ROAD H (UPKEEPING 3rd YEAR) | 7 | Hours | |
| 355 | 44.39 | ROAD H (UPKEEPING 4th YEAR) | 7 | Hours | |
| 356 | 44.4 | ROAD H (UPKEEPING 5th YEAR) | 7 | Hours | |
| 357 | 44.41 | ROAD I (UPKEEPING 1st YEAR) | 6 | Hours | |
| 358 | 44.42 | ROAD I (UPKEEPING 2nd YEAR) | 6 | Hours | |
| 359 | 44.43 | ROAD I (UPKEEPING 3rd YEAR) | 6 | Hours | |
| 360 | 44.44 | ROAD I (UPKEEPING 4th YEAR) | 6 | Hours | |
| 361 | 44.45 | ROAD I (UPKEEPING 5th YEAR) | 6 | Hours | |
| 362 | 44.46 | ROAD J (UPKEEPING 1st YEAR) | 8 | Hours | |
| 363 | 44.47 | ROAD J (UPKEEPING 2nd YEAR) | 8 | Hours | |
| 364 | 44.48 | ROAD J (UPKEEPING 3rd YEAR) | 8 | Hours | |
| 365 | 44.49 | ROAD J (UPKEEPING 4th YEAR) | 8 | Hours | |
| 366 | 44.5 | ROAD J (UPKEEPING 5th YEAR) | 8 | Hours | |
| 367 | 45 | White washing two coats with freshly burnt white shell lime inclusing cost of lime, blue powder fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specification and as directed. | |||
| 368 | 45.01 | ROAD A (UPKEEPING 1ST YEAR) | 12.96 | Square metre | |
| 369 | 45.02 | ROAD A (UPKEEPING 2nd YEAR) | 12.96 | Square metre | |
| 370 | 45.03 | ROAD A (UPKEEPING 3rd YEAR) | 12.96 | Square metre | |
| 371 | 45.04 | ROAD A (UPKEEPING 4th YEAR) | 12.96 | Square metre | |
| 372 | 45.05 | ROAD A (UPKEEPING 5th YEAR) | 12.96 | Square metre | |
| 373 | 45.06 | ROAD B (UPKEEPING 1ST YEAR) | 23.86 | Square metre | |
| 374 | 45.07 | ROAD B (UPKEEPING 2nd YEAR) | 23.86 | Square metre | |
| 375 | 45.08 | ROAD B (UPKEEPING 3rd YEAR) | 23.86 | Square metre | |
| 376 | 45.09 | ROAD B (UPKEEPING 4th YEAR) | 23.86 | Square metre | |
| 377 | 45.1 | ROAD B (UPKEEPING 5th YEAR) | 23.86 | Square metre | |
| 378 | 45.11 | ROAD C (UPKEEPING 1ST YEAR) | 6.48 | Square metre | |
| 379 | 45.12 | ROAD C (UPKEEPING 2nd YEAR) | 6.48 | Square metre | |
| 380 | 45.13 | ROAD C (UPKEEPING 3rd YEAR) | 6.48 | Square metre | |
| 381 | 45.14 | ROAD C (UPKEEPING 4th YEAR) | 6.48 | Square metre | |
| 382 | 45.15 | ROAD C (UPKEEPING 5th YEAR) | 6.48 | Square metre | |
| 383 | 45.16 | ROAD D (UPKEEPING 1ST YEAR) | 32.4 | Square metre | |
| 384 | 45.17 | ROAD D (UPKEEPING 2nd YEAR) | 32.4 | Square metre | |
| 385 | 45.18 | ROAD D (UPKEEPING 3rd YEAR) | 32.4 | Square metre | |
| 386 | 45.19 | ROAD D (UPKEEPING 4th YEAR) | 32.4 | Square metre | |
| 387 | 45.2 | ROAD D (UPKEEPING 5th YEAR) | 32.4 | Square metre | |
| 388 | 45.21 | ROAD E (UPKEEPING 1ST YEAR) | 57.18 | Square metre | |
| 389 | 45.22 | ROAD E (UPKEEPING 2nd YEAR) | 57.18 | Square metre | |
| 390 | 45.23 | ROAD E (UPKEEPING 3rd YEAR) | 57.18 | Square metre | |
| 391 | 45.24 | ROAD E (UPKEEPING 4th YEAR) | 57.18 | Square metre | |
| 392 | 45.25 | ROAD E (UPKEEPING 5th YEAR) | 57.18 | Square metre | |
| 393 | 45.26 | ROAD F (UPKEEPING 1ST YEAR) | 91.06 | Square metre | |
| 394 | 45.27 | ROAD F (UPKEEPING 2nd YEAR) | 91.06 | Square metre | |
| 395 | 45.28 | ROAD F (UPKEEPING 3rd YEAR) | 91.06 | Square metre | |
| 396 | 45.29 | ROAD F (UPKEEPING 4th YEAR) | 91.06 | Square metre | |
| 397 | 45.3 | ROAD F (UPKEEPING 5th YEAR) | 91.06 | Square metre | |
| 398 | 45.31 | ROAD G (UPKEEPING 1ST YEAR) | 32.9 | Square metre | |
| 399 | 45.32 | ROAD G (UPKEEPING 2nd YEAR) | 32.9 | Square metre | |
| 400 | 45.33 | ROAD G (UPKEEPING 3rd YEAR) | 32.9 | Square metre | |
| 401 | 45.34 | ROAD G (UPKEEPING 4th YEAR) | 32.9 | Square metre | |
| 402 | 45.35 | ROAD G (UPKEEPING 5th YEAR) | 32.9 | Square metre | |
| 403 | 45.36 | ROAD H (UPKEEPING 1st YEAR) | 58.29 | Square metre | |
| 404 | 45.37 | ROAD H (UPKEEPING 2nd YEAR) | 58.29 | Square metre | |
| 405 | 45.38 | ROAD H (UPKEEPING 3rd YEAR) | 58.29 | Square metre | |
| 406 | 45.39 | ROAD H (UPKEEPING 4th YEAR) | 58.29 | Square metre | |
| 407 | 45.4 | ROAD H (UPKEEPING 5th YEAR) | 58.29 | Square metre | |
| 408 | 45.41 | ROAD I (UPKEEPING 1st YEAR) | 90.08 | Square metre | |
| 409 | 45.42 | ROAD I (UPKEEPING 2nd YEAR) | 90.08 | Square metre | |
| 410 | 45.43 | ROAD I (UPKEEPING 3rd YEAR) | 90.08 | Square metre | |
| 411 | 45.44 | ROAD I (UPKEEPING 4th YEAR) | 90.08 | Square metre | |
| 412 | 45.45 | ROAD I (UPKEEPING 5th YEAR) | 90.08 | Square metre | |
| 413 | 45.46 | ROAD J (UPKEEPING 1st YEAR) | 59.64 | Square metre | |
| 414 | 45.47 | ROAD J (UPKEEPING 2nd YEAR) | 59.64 | Square metre | |
| 415 | 45.48 | ROAD J (UPKEEPING 3rd YEAR) | 59.64 | Square metre | |
| 416 | 45.49 | ROAD J (UPKEEPING 4th YEAR) | 59.64 | Square metre | |
| 417 | 45.5 | ROAD J (UPKEEPING 5th YEAR) | 59.64 | Square metre | |
| 418 | 46 | Coal tarring with two coats of coal tar including cost and conveyance of all materials and including all labour charges and incidential charges etc.,complete | |||
| 419 | 46.01 | ROAD A (UPKEEPING 1ST YEAR) | 0.82 | Square metre | |
| 420 | 46.02 | ROAD A (UPKEEPING 2nd YEAR) | 0.82 | Square metre | |
| 421 | 46.03 | ROAD A (UPKEEPING 3rd YEAR) | 0.82 | Square metre | |
| 422 | 46.04 | ROAD A (UPKEEPING 4th YEAR) | 0.82 | Square metre | |
| 423 | 46.05 | ROAD A (UPKEEPING 5th YEAR) | 0.82 | Square metre | |
| 424 | 46.06 | ROAD B (UPKEEPING 1ST YEAR) | 3.02 | Square metre | |
| 425 | 46.07 | ROAD B (UPKEEPING 2nd YEAR) | 3.02 | Square metre | |
| 426 | 46.08 | ROAD B (UPKEEPING 3rd YEAR) | 3.02 | Square metre | |
| 427 | 46.09 | ROAD B (UPKEEPING 4th YEAR) | 3.02 | Square metre | |
| 428 | 46.1 | ROAD B (UPKEEPING 5th YEAR) | 3.02 | Square metre | |
| 429 | 46.11 | ROAD C (UPKEEPING 1ST YEAR) | 0.41 | Square metre | |
| 430 | 46.12 | ROAD C (UPKEEPING 2nd YEAR) | 0.41 | Square metre | |
| 431 | 46.13 | ROAD C (UPKEEPING 3rd YEAR) | 0.41 | Square metre | |
| 432 | 46.14 | ROAD C (UPKEEPING 4th YEAR) | 0.41 | Square metre | |
| 433 | 46.15 | ROAD C (UPKEEPING 5th YEAR) | 0.41 | Square metre | |
| 434 | 46.16 | ROAD D (UPKEEPING 1ST YEAR) | 2.05 | Square metre | |
| 435 | 46.17 | ROAD D (UPKEEPING 2nd YEAR) | 2.05 | Square metre | |
| 436 | 46.18 | ROAD D (UPKEEPING 3rd YEAR) | 2.05 | Square metre | |
| 437 | 46.19 | ROAD D (UPKEEPING 4th YEAR) | 2.05 | Square metre | |
| 438 | 46.2 | ROAD D (UPKEEPING 5th YEAR) | 2.05 | Square metre | |
| 439 | 46.21 | ROAD E (UPKEEPING 1ST YEAR) | 5.69 | Square metre | |
| 440 | 46.22 | ROAD E (UPKEEPING 2nd YEAR) | 5.69 | Square metre | |
| 441 | 46.23 | ROAD E (UPKEEPING 3rd YEAR) | 5.69 | Square metre | |
| 442 | 46.24 | ROAD E (UPKEEPING 4th YEAR) | 5.69 | Square metre | |
| 443 | 46.25 | ROAD E (UPKEEPING 5th YEAR) | 5.69 | Square metre | |
| 444 | 46.26 | ROAD F (UPKEEPING 1ST YEAR) | 4.69 | Square metre | |
| 445 | 46.27 | ROAD F (UPKEEPING 2nd YEAR) | 4.69 | Square metre | |
| 446 | 46.28 | ROAD F (UPKEEPING 3rd YEAR) | 4.69 | Square metre | |
| 447 | 46.29 | ROAD F (UPKEEPING 4th YEAR) | 4.69 | Square metre | |
| 448 | 46.3 | ROAD F (UPKEEPING 5th YEAR) | 4.69 | Square metre | |
| 449 | 46.31 | ROAD G (UPKEEPING 1ST YEAR) | 3.05 | Square metre | |
| 450 | 46.32 | ROAD G (UPKEEPING 2nd YEAR) | 3.05 | Square metre | |
| 451 | 46.33 | ROAD G (UPKEEPING 3rd YEAR) | 3.05 | Square metre | |
| 452 | 46.34 | ROAD G (UPKEEPING 4th YEAR) | 3.05 | Square metre | |
| 453 | 46.35 | ROAD G (UPKEEPING 5th YEAR) | 3.05 | Square metre | |
| 454 | 46.36 | ROAD H (UPKEEPING 1st YEAR) | 7.84 | Square metre | |
| 455 | 46.37 | ROAD H (UPKEEPING 2nd YEAR) | 7.84 | Square metre | |
| 456 | 46.38 | ROAD H (UPKEEPING 3rd YEAR) | 7.84 | Square metre | |
| 457 | 46.39 | ROAD H (UPKEEPING 4th YEAR) | 7.84 | Square metre | |
| 458 | 46.4 | ROAD H (UPKEEPING 5th YEAR) | 7.84 | Square metre | |
| 459 | 46.41 | ROAD I (UPKEEPING 1st YEAR) | 4.89 | Square metre | |
| 460 | 46.42 | ROAD I (UPKEEPING 2nd YEAR) | 4.89 | Square metre | |
| 461 | 46.43 | ROAD I (UPKEEPING 3rd YEAR) | 4.89 | Square metre | |
| 462 | 46.44 | ROAD I (UPKEEPING 4th YEAR) | 4.89 | Square metre | |
| 463 | 46.45 | ROAD I (UPKEEPING 5th YEAR) | 4.89 | Square metre | |
| 464 | 46.46 | ROAD J (UPKEEPING 1st YEAR) | 6.1 | Square metre | |
| 465 | 46.47 | ROAD J (UPKEEPING 2nd YEAR) | 6.1 | Square metre | |
| 466 | 46.48 | ROAD J (UPKEEPING 3rd YEAR) | 6.1 | Square metre | |
| 467 | 46.49 | ROAD J (UPKEEPING 4th YEAR) | 6.1 | Square metre | |
| 468 | 46.5 | ROAD J (UPKEEPING 5th YEAR) | 6.1 | Square metre | |
| 469 | 47 | Painting the Existing Culvert, Parapet as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete | |||
| 470 | 47.01 | ROAD A (UPKEEPING 1st YEAR) | 3.42 | Square metre | |
| 471 | 47.02 | ROAD B (UPKEEPING 1st YEAR) | 3.42 | Square metre | |
| 472 | 47.03 | ROAD C (UPKEEPING 1st YEAR) | 1.71 | Square metre | |
| 473 | 47.04 | ROAD D (UPKEEPING 1st YEAR) | 8.55 | Square metre | |
| 474 | 47.05 | ROAD E (UPKEEPING 1st YEAR) | 11.97 | Square metre | |
| 475 | 47.06 | ROAD F (UPKEEPING 1st YEAR) | 10.26 | Square metre | |
| 476 | 47.07 | ROAD G (UPKEEPING 1st YEAR) | 7.02 | Square metre | |
| 477 | 47.08 | ROAD H (UPKEEPING 1st YEAR) | 11.97 | Square metre | |
| 478 | 47.09 | ROAD I (UPKEEPING 1st YEAR) | 10.26 | Square metre | |
| 479 | 47.1 | ROAD J (UPKEEPING 1st YEAR) | 13.68 | Square metre | |
| 480 | 48 | Lettering the Existing Culvert, Parapet as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete | |||
| 481 | 48.01 | ROAD A (UPKEEPING 1st YEAR) | 50 | Number | |
| 482 | 48.02 | ROAD B (UPKEEPING 1st YEAR) | 50 | Number | |
| 483 | 48.03 | ROAD C (UPKEEPING 1st YEAR) | 25 | Number | |
| 484 | 48.04 | ROAD D (UPKEEPING 1st YEAR) | 125 | Number | |
| 485 | 48.05 | ROAD E (UPKEEPING 1st YEAR) | 175 | Number | |
| 486 | 48.06 | ROAD F (UPKEEPING 1st YEAR) | 150 | Number | |
| 487 | 48.07 | ROAD G (UPKEEPING 1st YEAR) | 150 | Number | |
| 488 | 48.08 | ROAD H (UPKEEPING 1st YEAR) | 175 | Number | |
| 489 | 48.09 | ROAD I (UPKEEPING 1st YEAR) | 150 | Number | |
| 490 | 48.1 | ROAD J (UPKEEPING 1st YEAR) | 200 | Number | |
| 491 | 48.11 | Chiseling the tree barks upto a size of 15cm X15cm and painting with first class enamel paint and numbering the trees as per the avenue register | |||
| 492 | 48.12 | ROAD E (UPKEEPING 1st YEAR) | 15 | Number | |
| 493 | 48.13 | ROAD F (UPKEEPING 1st YEAR) | 8 | Number | |
| 494 | 48.14 | ROAD G (UPKEEPING 1st YEAR) | 8 | Number | |
| 495 | 48.15 | ROAD H (UPKEEPING 1st YEAR) | 30 | Number | |
| 496 | 48.16 | ROAD I (UPKEEPING 1st YEAR) | 10 | Number | |
| 497 | 48.17 | ROAD J (UPKEEPING 1st YEAR) | 30 | Number | |
| 498 | 49 | Painting the KM Stone as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete | |||
| 499 | 49.01 | ROAD A (UPKEEPING 2nd YEAR) | 0.49 | Square metre | |
| 500 | 49.02 | ROAD A (UPKEEPING 3rd YEAR) | 0.49 | Square metre | |
| 501 | 49.03 | ROAD A (UPKEEPING 4th YEAR) | 0.49 | Square metre | |
| 502 | 49.04 | ROAD A (UPKEEPING 5th YEAR) | 0.49 | Square metre | |
| 503 | 49.05 | ROAD B (UPKEEPING 2nd YEAR) | 0.49 | Square metre | |
| 504 | 49.06 | ROAD B (UPKEEPING 3rd YEAR) | 0.49 | Square metre | |
| 505 | 49.07 | ROAD B (UPKEEPING 4th YEAR) | 0.49 | Square metre | |
| 506 | 49.08 | ROAD B (UPKEEPING 5th YEAR) | 0.49 | Square metre | |
| 507 | 49.09 | ROAD C (UPKEEPING 2nd YEAR) | 0.49 | Square metre | |
| 508 | 49.1 | ROAD C (UPKEEPING 3rd YEAR) | 0.49 | Square metre | |
| 509 | 49.11 | ROAD C (UPKEEPING 4th YEAR) | 0.49 | Square metre | |
| 510 | 49.12 | ROAD C (UPKEEPING 5th YEAR) | 0.49 | Square metre | |
| 511 | 49.13 | ROAD D (UPKEEPING 2nd YEAR) | 0.49 | Square metre | |
| 512 | 49.14 | ROAD D (UPKEEPING 3rd YEAR) | 0.49 | Square metre | |
| 513 | 49.15 | ROAD D (UPKEEPING 4th YEAR) | 0.49 | Square metre | |
| 514 | 49.16 | ROAD D (UPKEEPING 5th YEAR) | 0.49 | Square metre | |
| 515 | 49.17 | ROAD E (UPKEEPING 2nd YEAR) | 1.49 | Square metre | |
| 516 | 49.18 | ROAD E (UPKEEPING 3rd YEAR) | 1.49 | Square metre | |
| 517 | 49.19 | ROAD E (UPKEEPING 4th YEAR) | 1.49 | Square metre | |
| 518 | 49.2 | ROAD E (UPKEEPING 5th YEAR) | 1.49 | Square metre | |
| 519 | 49.21 | ROAD F (UPKEEPING 2nd YEAR) | 0.49 | Square metre | |
| 520 | 49.22 | ROAD F (UPKEEPING 3rd YEAR) | 0.49 | Square metre | |
| 521 | 49.23 | ROAD F (UPKEEPING 4th YEAR) | 0.49 | Square metre | |
| 522 | 49.24 | ROAD F (UPKEEPING 5th YEAR) | 0.49 | Square metre | |
| 523 | 49.25 | ROAD G (UPKEEPING 2nd YEAR) | 0.98 | Square metre | |
| 524 | 49.26 | ROAD G (UPKEEPING 3rd YEAR) | 0.98 | Square metre | |
| 525 | 49.27 | ROAD G (UPKEEPING 4th YEAR) | 0.49 | Square metre | |
| 526 | 49.28 | ROAD G (UPKEEPING 5th YEAR) | 0.49 | Square metre | |
| 527 | 49.29 | ROAD H (UPKEEPING 2nd YEAR) | 0.99 | Square metre | |
| 528 | 49.3 | ROAD H (UPKEEPING 3rd YEAR) | 0.99 | Square metre | |
| 529 | 49.31 | ROAD H (UPKEEPING 4th YEAR) | 0.99 | Square metre | |
| 530 | 49.32 | ROAD H (UPKEEPING 5th YEAR) | 0.99 | Square metre | |
| 531 | 49.33 | ROAD I (UPKEEPING 2nd YEAR) | 0.99 | Square metre | |
| 532 | 49.34 | ROAD I (UPKEEPING 3rd YEAR) | 0.99 | Square metre | |
| 533 | 49.35 | ROAD I (UPKEEPING 4th YEAR) | 0.99 | Square metre | |
| 534 | 49.36 | ROAD I (UPKEEPING 5th YEAR) | 0.99 | Square metre | |
| 535 | 49.37 | ROAD J (UPKEEPING 2nd YEAR) | 1.99 | Square metre | |
| 536 | 49.38 | ROAD J (UPKEEPING 3rd YEAR) | 1.99 | Square metre | |
| 537 | 49.39 | ROAD J (UPKEEPING 4th YEAR) | 1.99 | Square metre | |
| 538 | 49.4 | ROAD J (UPKEEPING 5th YEAR) | 1.99 | Square metre | |
| 539 | 50 | Painting the HM Stone as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete | |||
| 540 | 50.01 | ROAD A (UPKEEPING 2nd YEAR) | 10.07 | Square metre | |
| 541 | 50.02 | ROAD A (UPKEEPING 3rd YEAR) | 10.07 | Square metre | |
| 542 | 50.03 | ROAD A (UPKEEPING 4th YEAR) | 10.07 | Square metre | |
| 543 | 50.04 | ROAD A (UPKEEPING 5th YEAR) | 10.07 | Square metre | |
| 544 | 50.05 | ROAD B (UPKEEPING 2nd YEAR) | 5.89 | Square metre | |
| 545 | 50.06 | ROAD B (UPKEEPING 3rd YEAR) | 5.89 | Square metre | |
| 546 | 50.07 | ROAD B (UPKEEPING 4th YEAR) | 5.89 | Square metre | |
| 547 | 50.08 | ROAD B (UPKEEPING 5th YEAR) | 5.89 | Square metre | |
| 548 | 50.09 | ROAD C (UPKEEPING 2nd YEAR) | 2.09 | Square metre | |
| 549 | 50.1 | ROAD C (UPKEEPING 3rd YEAR) | 2.09 | Square metre | |
| 550 | 50.11 | ROAD C (UPKEEPING 4th YEAR) | 2.09 | Square metre | |
| 551 | 50.12 | ROAD C (UPKEEPING 5th YEAR) | 2.09 | Square metre | |
| 552 | 50.13 | ROAD D (UPKEEPING 2nd YEAR) | 10.07 | Square metre | |
| 553 | 50.14 | ROAD D (UPKEEPING 3rd YEAR) | 10.07 | Square metre | |
| 554 | 50.15 | ROAD D (UPKEEPING 4th YEAR) | 10.07 | Square metre | |
| 555 | 50.16 | ROAD D (UPKEEPING 5th YEAR) | 10.07 | Square metre | |
| 556 | 50.17 | ROAD E (UPKEEPING 2nd YEAR) | 14.25 | Square metre | |
| 557 | 50.18 | ROAD E (UPKEEPING 3rd YEAR) | 14.25 | Square metre | |
| 558 | 50.19 | ROAD E (UPKEEPING 4th YEAR) | 14.25 | Square metre | |
| 559 | 50.2 | ROAD E (UPKEEPING 5th YEAR) | 14.25 | Square metre | |
| 560 | 50.21 | ROAD F (UPKEEPING 2nd YEAR) | 8.59 | Square metre | |
| 561 | 50.22 | ROAD F (UPKEEPING 3rd YEAR) | 8.59 | Square metre | |
| 562 | 50.23 | ROAD F (UPKEEPING 4th YEAR) | 8.59 | Square metre | |
| 563 | 50.24 | ROAD F (UPKEEPING 5th YEAR) | 8.59 | Square metre | |
| 564 | 50.25 | ROAD G (UPKEEPING 2nd YEAR) | 7.29 | Square metre | |
| 565 | 50.26 | ROAD G (UPKEEPING 3rd YEAR) | 7.29 | Square metre | |
| 566 | 50.27 | ROAD G (UPKEEPING 4th YEAR) | 7.29 | Square metre | |
| 567 | 50.28 | ROAD G (UPKEEPING 5th YEAR) | 7.29 | Square metre | |
| 568 | 50.29 | ROAD H (UPKEEPING 2nd YEAR) | 13.49 | Square metre | |
| 569 | 50.3 | ROAD H (UPKEEPING 3rd YEAR) | 13.49 | Square metre | |
| 570 | 50.31 | ROAD H (UPKEEPING 4th YEAR) | 13.49 | Square metre | |
| 571 | 50.32 | ROAD H (UPKEEPING 5th YEAR) | 13.49 | Square metre | |
| 572 | 50.33 | ROAD I (UPKEEPING 2nd YEAR) | 11.22 | Square metre | |
| 573 | 50.34 | ROAD I (UPKEEPING 3rd YEAR) | 11.22 | Square metre | |
| 574 | 50.35 | ROAD I (UPKEEPING 4th YEAR) | 11.22 | Square metre | |
| 575 | 50.36 | ROAD I (UPKEEPING 5th YEAR) | 11.22 | Square metre | |
| 576 | 50.37 | ROAD J (UPKEEPING 2nd YEAR) | 15.58 | Square metre | |
| 577 | 50.38 | ROAD J (UPKEEPING 3rd YEAR) | 15.58 | Square metre | |
| 578 | 50.39 | ROAD J (UPKEEPING 4th YEAR) | 15.58 | Square metre | |
| 579 | 50.4 | ROAD J (UPKEEPING 5th YEAR) | 15.58 | Square metre | |
| 580 | 51 | Painting the Boundry Stone as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete | |||
| 581 | 51.01 | ROAD A (UPKEEPING 2nd YEAR) | 4.53 | Square metre | |
| 582 | 51.02 | ROAD A (UPKEEPING 3rd YEAR) | 4.53 | Square metre | |
| 583 | 51.03 | ROAD A (UPKEEPING 4th YEAR) | 4.53 | Square metre | |
| 584 | 51.04 | ROAD A (UPKEEPING 5th YEAR) | 4.53 | Square metre | |
| 585 | 51.05 | ROAD B (UPKEEPING 2nd YEAR) | 4.53 | Square metre | |
| 586 | 51.06 | ROAD B (UPKEEPING 3rd YEAR) | 4.53 | Square metre | |
| 587 | 51.07 | ROAD B (UPKEEPING 4th YEAR) | 4.53 | Square metre | |
| 588 | 51.08 | ROAD B (UPKEEPING 5th YEAR) | 4.52 | Square metre | |
| 589 | 51.09 | ROAD C (UPKEEPING 2nd YEAR) | 9.05 | Square metre | |
| 590 | 51.1 | ROAD C (UPKEEPING 3rd YEAR) | 9.05 | Square metre | |
| 591 | 51.11 | ROAD C (UPKEEPING 4th YEAR) | 9.05 | Square metre | |
| 592 | 51.12 | ROAD C (UPKEEPING 5th YEAR) | 9.05 | Square metre | |
| 593 | 51.13 | ROAD D (UPKEEPING 2nd YEAR) | 18.1 | Square metre | |
| 594 | 51.14 | ROAD D (UPKEEPING 3rd YEAR) | 18.1 | Square metre | |
| 595 | 51.15 | ROAD D (UPKEEPING 4th YEAR) | 18.1 | Square metre | |
| 596 | 51.16 | ROAD D (UPKEEPING 5th YEAR) | 18.1 | Square metre | |
| 597 | 51.17 | ROAD E (UPKEEPING 2nd YEAR) | 6.79 | Square metre | |
| 598 | 51.18 | ROAD E (UPKEEPING 3rd YEAR) | 6.79 | Square metre | |
| 599 | 51.19 | ROAD E (UPKEEPING 4th YEAR) | 6.79 | Square metre | |
| 600 | 51.2 | ROAD E (UPKEEPING 5th YEAR) | 6.79 | Square metre | |
| 601 | 51.21 | ROAD F (UPKEEPING 2nd YEAR) | 4.52 | Square metre | |
| 602 | 51.22 | ROAD F (UPKEEPING 3rd YEAR) | 4.52 | Square metre | |
| 603 | 51.23 | ROAD F (UPKEEPING 4th YEAR) | 4.52 | Square metre | |
| 604 | 51.24 | ROAD F (UPKEEPING 5th YEAR) | 4.52 | Square metre | |
| 605 | 51.25 | ROAD G (UPKEEPING 2nd YEAR) | 4.52 | Square metre | |
| 606 | 51.26 | ROAD G (UPKEEPING 3rd YEAR) | 4.52 | Square metre | |
| 607 | 51.27 | ROAD G (UPKEEPING 4th YEAR) | 4.52 | Square metre | |
| 608 | 51.28 | ROAD G (UPKEEPING 5th YEAR) | 4.52 | Square metre | |
| 609 | 51.29 | ROAD H (UPKEEPING 2nd YEAR) | 4.52 | Square metre | |
| 610 | 51.3 | ROAD H (UPKEEPING 3rd YEAR) | 4.52 | Square metre | |
| 611 | 51.31 | ROAD H (UPKEEPING 4th YEAR) | 4.52 | Square metre | |
| 612 | 51.32 | ROAD H (UPKEEPING 5th YEAR) | 4.52 | Square metre | |
| 613 | 51.33 | ROAD I (UPKEEPING 2nd YEAR) | 4.52 | Square metre | |
| 614 | 51.34 | ROAD I (UPKEEPING 3rd YEAR) | 4.52 | Square metre | |
| 615 | 51.35 | ROAD I (UPKEEPING 4th YEAR) | 4.52 | Square metre | |
| 616 | 51.36 | ROAD I (UPKEEPING 5th YEAR) | 4.52 | Square metre | |
| 617 | 51.37 | ROAD J (UPKEEPING 2nd YEAR) | 6.79 | Square metre | |
| 618 | 51.38 | ROAD J (UPKEEPING 3rd YEAR) | 6.79 | Square metre | |
| 619 | 51.39 | ROAD J (UPKEEPING 4th YEAR) | 6.79 | Square metre | |
| 620 | 51.4 | ROAD J (UPKEEPING 5th YEAR) | 6.79 | Square metre | |
| 621 | 52 | Lettering the KM Stone as per IRC standard including the cost of Labour charges and material etc., complete | |||
| 622 | 52.01 | ROAD A (UPKEEPING 2nd YEAR) (5 to 10 CM) | 15 | Numbers | |
| 623 | 52.02 | ROAD A (UPKEEPING 2nd YEAR) (10 to 15 CM) | 2 | Numbers | |
| 624 | 52.03 | ROAD A (UPKEEPING 3rd YEAR) (5 to 10 CM) | 15 | Numbers | |
| 625 | 52.04 | ROAD A (UPKEEPING 3rd YEAR) (10 to 15 CM) | 2 | Numbers | |
| 626 | 52.05 | ROAD A (UPKEEPING 4th YEAR) (5 to 10 CM) | 15 | Numbers | |
| 627 | 52.06 | ROAD A (UPKEEPING 4th YEAR) (10 to 15 CM) | 2 | Numbers | |
| 628 | 52.07 | ROAD A (UPKEEPING 5th YEAR) (5 to 10 CM) | 15 | Numbers | |
| 629 | 52.08 | ROAD A (UPKEEPING 5th YEAR) (10 to 15 CM) | 2 | Numbers | |
| 630 | 52.09 | ROAD B (UPKEEPING 2nd YEAR) (5 to 10 CM) | 15 | Numbers | |
| 631 | 52.1 | ROAD B (UPKEEPING 2nd YEAR) (10 to 15 CM) | 2 | Numbers | |
| 632 | 52.11 | ROAD B (UPKEEPING 3rd YEAR) (5 to 10 CM) | 15 | Numbers | |
| 633 | 52.12 | ROAD B (UPKEEPING 3rd YEAR) (10 to 15 CM) | 2 | Numbers | |
| 634 | 52.13 | ROAD B (UPKEEPING 4th YEAR) (5 to 10 CM) | 15 | Numbers | |
| 635 | 52.14 | ROAD B (UPKEEPING 4th YEAR) (10 to 15 CM) | 2 | Numbers | |
| 636 | 52.15 | ROAD B (UPKEEPING 5th YEAR) (5 to 10 CM) | 15 | Numbers | |
| 637 | 52.16 | ROAD B (UPKEEPING 5th YEAR) (10 to 15 CM) | 2 | Numbers | |
| 638 | 52.17 | ROAD C (UPKEEPING 2nd YEAR) (5 to 10 CM) | 15 | Numbers | |
| 639 | 52.18 | ROAD C (UPKEEPING 2nd YEAR) (10 to 15 CM) | 2 | Numbers | |
| 640 | 52.19 | ROAD C (UPKEEPING 3rd YEAR) (5 to 10 CM) | 15 | Numbers | |
| 641 | 52.2 | ROAD C (UPKEEPING 3rd YEAR) (10 to 15 CM) | 2 | Numbers | |
| 642 | 52.21 | ROAD C (UPKEEPING 4th YEAR) (5 to 10 CM) | 15 | Numbers | |
| 643 | 52.22 | ROAD C (UPKEEPING 4th YEAR) (10 to 15 CM) | 2 | Numbers | |
| 644 | 52.23 | ROAD C (UPKEEPING 5th YEAR) (5 to 10 CM) | 15 | Numbers | |
| 645 | 52.24 | ROAD C (UPKEEPING 5th YEAR) (10 to 15 CM) | 2 | Numbers | |
| 646 | 52.25 | ROAD D (UPKEEPING 2nd YEAR) (5 to 10 CM) | 15 | Numbers | |
| 647 | 52.26 | ROAD D (UPKEEPING 2nd YEAR) (10 to 15 CM) | 2 | Numbers | |
| 648 | 52.27 | ROAD D (UPKEEPING 3rd YEAR) (5 to 10 CM) | 15 | Numbers | |
| 649 | 52.28 | ROAD D (UPKEEPING 3rd YEAR) (10 to 15 CM) | 2 | Numbers | |
| 650 | 52.29 | ROAD D (UPKEEPING 4th YEAR) (5 to 10 CM) | 15 | Numbers | |
| 651 | 52.3 | ROAD D (UPKEEPING 4th YEAR) (10 to 15 CM) | 2 | Numbers | |
| 652 | 52.31 | ROAD D (UPKEEPING 5th YEAR) (5 to 10 CM) | 15 | Numbers | |
| 653 | 52.32 | ROAD D (UPKEEPING 5th YEAR) (10 to 15 CM) | 2 | Numbers | |
| 654 | 52.33 | ROAD E (UPKEEPING 2nd YEAR) (5 to 10 CM) | 45 | Numbers | |
| 655 | 52.34 | ROAD E (UPKEEPING 2nd YEAR) (10 to 15 CM) | 6 | Numbers | |
| 656 | 52.35 | ROAD E (UPKEEPING 3rd YEAR) (5 to 10 CM) | 45 | Numbers | |
| 657 | 52.36 | ROAD E (UPKEEPING 3rd YEAR) (10 to 15 CM) | 6 | Numbers | |
| 658 | 52.37 | ROAD E (UPKEEPING 4th YEAR) (5 to 10 CM) | 45 | Numbers | |
| 659 | 52.38 | ROAD E (UPKEEPING 4th YEAR) (10 to 15 CM) | 6 | Numbers | |
| 660 | 52.39 | ROAD E (UPKEEPING 5th YEAR) (5 to 10 CM) | 45 | Numbers | |
| 661 | 52.4 | ROAD E (UPKEEPING 5th YEAR) (10 to 15 CM) | 6 | Numbers | |
| 662 | 52.41 | ROAD F (UPKEEPING 2nd YEAR) (5 to 10 CM) | 30 | Numbers | |
| 663 | 52.42 | ROAD F (UPKEEPING 2nd YEAR) (10 to 15 CM) | 4 | Numbers | |
| 664 | 52.43 | ROAD F (UPKEEPING 3rd YEAR) (5 to 10 CM) | 30 | Numbers | |
| 665 | 52.44 | ROAD F (UPKEEPING 3rd YEAR) (10 to 15 CM) | 4 | Numbers | |
| 666 | 52.45 | ROAD F (UPKEEPING 4th YEAR) (5 to 10 CM) | 30 | Numbers | |
| 667 | 52.46 | ROAD F (UPKEEPING 4th YEAR) (10 to 15 CM) | 4 | Numbers | |
| 668 | 52.47 | ROAD F (UPKEEPING 5th YEAR) (5 to 10 CM) | 30 | Numbers | |
| 669 | 52.48 | ROAD F (UPKEEPING 5th YEAR) (10 to 15 CM) | 4 | Numbers | |
| 670 | 52.49 | ROAD G (UPKEEPING 2nd YEAR) (5 to 10 CM) | 15 | Numbers | |
| 671 | 52.5 | ROAD G (UPKEEPING 2nd YEAR) (10 to 15 CM) | 2 | Numbers | |
| 672 | 52.51 | ROAD G (UPKEEPING 3rd YEAR) (5 to 10 CM) | 15 | Numbers | |
| 673 | 52.52 | ROAD G (UPKEEPING 3rd YEAR) (10 to 15 CM) | 2 | Numbers | |
| 674 | 52.53 | ROAD G (UPKEEPING 4th YEAR) (5 to 10 CM) | 15 | Numbers | |
| 675 | 52.54 | ROAD G (UPKEEPING 4th YEAR) (10 to 15 CM) | 2 | Numbers | |
| 676 | 52.55 | ROAD G (UPKEEPING 5th YEAR) (5 to 10 CM) | 15 | Numbers | |
| 677 | 52.56 | ROAD G (UPKEEPING 5th YEAR) (10 to 15 CM) | 2 | Numbers | |
| 678 | 52.57 | ROAD H (UPKEEPING 2nd YEAR) (5 to 10 CM) | 30 | Numbers | |
| 679 | 52.58 | ROAD H (UPKEEPING 2nd YEAR) (10 to 15 CM) | 4 | Numbers | |
| 680 | 52.59 | ROAD H (UPKEEPING 3rd YEAR) (5 to 10 CM) | 30 | Numbers | |
| 681 | 52.6 | ROAD H (UPKEEPING 3rd YEAR) (10 to 15 CM) | 4 | Numbers | |
| 682 | 52.61 | ROAD H (UPKEEPING 4th YEAR) (5 to 10 CM) | 30 | Numbers | |
| 683 | 52.62 | ROAD H (UPKEEPING 4th YEAR) (10 to 15 CM) | 4 | Numbers | |
| 684 | 52.63 | ROAD H (UPKEEPING 5th YEAR) (5 to 10 CM) | 30 | Numbers | |
| 685 | 52.64 | ROAD H (UPKEEPING 5th YEAR) (10 to 15 CM) | 4 | Numbers | |
| 686 | 52.65 | ROAD I (UPKEEPING 2nd YEAR) (5 to 10 CM) | 30 | Numbers | |
| 687 | 52.66 | ROAD I (UPKEEPING 2nd YEAR) (10 to 15 CM) | 4 | Numbers | |
| 688 | 52.67 | ROAD I (UPKEEPING 3rd YEAR) (5 to 10 CM) | 30 | Numbers | |
| 689 | 52.68 | ROAD I (UPKEEPING 3rd YEAR) (10 to 15 CM) | 4 | Numbers | |
| 690 | 52.69 | ROAD I (UPKEEPING 4th YEAR) (5 to 10 CM) | 30 | Numbers | |
| 691 | 52.7 | ROAD I (UPKEEPING 4th YEAR) (10 to 15 CM) | 4 | Numbers | |
| 692 | 52.71 | ROAD I (UPKEEPING 5th YEAR) (5 to 10 CM) | 30 | Numbers | |
| 693 | 52.72 | ROAD I (UPKEEPING 5th YEAR) (10 to 15 CM) | 4 | Numbers | |
| 694 | 52.73 | ROAD J (UPKEEPING 2nd YEAR) (5 to 10 CM) | 30 | Numbers | |
| 695 | 52.74 | ROAD J (UPKEEPING 2nd YEAR) (10 to 15 CM) | 4 | Numbers | |
| 696 | 52.75 | ROAD J (UPKEEPING 3rd YEAR) (5 to 10 CM) | 30 | Numbers | |
| 697 | 52.76 | ROAD J (UPKEEPING 3rd YEAR) (10 to 15 CM) | 4 | Numbers | |
| 698 | 52.77 | ROAD J (UPKEEPING 4th YEAR) (5 to 10 CM) | 30 | Numbers | |
| 699 | 52.78 | ROAD J (UPKEEPING 4th YEAR) (10 to 15 CM) | 4 | Numbers | |
| 700 | 52.79 | ROAD J (UPKEEPING 5th YEAR) (5 to 10 CM) | 30 | Numbers | |
| 701 | 52.8 | ROAD J (UPKEEPING 5th YEAR) (10 to 15 CM) | 4 | Numbers | |
| 702 | 53 | Lettering the HM Stone as per IRC standard including the cost of Labour charges and material etc., complete | |||
| 703 | 53.01 | ROAD A (UPKEEPING 2nd YEAR) (5 to 10 CM) | 141 | Numbers | |
| 704 | 53.02 | ROAD A (UPKEEPING 2nd YEAR) (10 to 15 CM) | 16 | Numbers | |
| 705 | 53.03 | ROAD A (UPKEEPING 3rd YEAR) (5 to 10 CM) | 141 | Numbers | |
| 706 | 53.04 | ROAD A (UPKEEPING 3rd YEAR) (10 to 15 CM) | 16 | Numbers | |
| 707 | 53.05 | ROAD A (UPKEEPING 4th YEAR) (5 to 10 CM) | 141 | Numbers | |
| 708 | 53.06 | ROAD A (UPKEEPING 4th YEAR) (10 to 15 CM) | 16 | Numbers | |
| 709 | 53.07 | ROAD A (UPKEEPING 5th YEAR) (5 to 10 CM) | 141 | Numbers | |
| 710 | 53.08 | ROAD A (UPKEEPING 5th YEAR) (10 to 15 CM) | 16 | Numbers | |
| 711 | 53.09 | ROAD B (UPKEEPING 2nd YEAR) (5 to 10 CM) | 75 | Numbers | |
| 712 | 53.1 | ROAD B (UPKEEPING 2nd YEAR) (10 to 15 CM) | 12 | Numbers | |
| 713 | 53.11 | ROAD B (UPKEEPING 3rd YEAR) (5 to 10 CM) | 75 | Numbers | |
| 714 | 53.12 | ROAD B (UPKEEPING 3rd YEAR) (10 to 15 CM) | 12 | Numbers | |
| 715 | 53.13 | ROAD B (UPKEEPING 4th YEAR) (5 to 10 CM) | 75 | Numbers | |
| 716 | 53.14 | ROAD B (UPKEEPING 4th YEAR) (10 to 15 CM) | 12 | Numbers | |
| 717 | 53.15 | ROAD B (UPKEEPING 5th YEAR) (5 to 10 CM) | 75 | Numbers | |
| 718 | 53.16 | ROAD B (UPKEEPING 5th YEAR) (10 to 15 CM) | 12 | Numbers | |
| 719 | 53.17 | ROAD C (UPKEEPING 2nd YEAR) (5 to 10 CM) | 29 | Numbers | |
| 720 | 53.18 | ROAD C (UPKEEPING 2nd YEAR) (10 to 15 CM) | 4 | Numbers | |
| 721 | 53.19 | ROAD C (UPKEEPING 3rd YEAR) (5 to 10 CM) | 29 | Numbers | |
| 722 | 53.2 | ROAD C (UPKEEPING 3rd YEAR) (10 to 15 CM) | 4 | Numbers | |
| 723 | 53.21 | ROAD C (UPKEEPING 4th YEAR) (5 to 10 CM) | 29 | Numbers | |
| 724 | 53.22 | ROAD C (UPKEEPING 4th YEAR) (10 to 15 CM) | 4 | Numbers | |
| 725 | 53.23 | ROAD C (UPKEEPING 5th YEAR) (5 to 10 CM) | 29 | Numbers | |
| 726 | 53.24 | ROAD C (UPKEEPING 5th YEAR) (10 to 15 CM) | 4 | Numbers | |
| 727 | 53.25 | ROAD D (UPKEEPING 2nd YEAR) (5 to 10 CM) | 141 | Numbers | |
| 728 | 53.26 | ROAD D (UPKEEPING 2nd YEAR) (10 to 15 CM) | 16 | Numbers | |
| 729 | 53.27 | ROAD D (UPKEEPING 3rd YEAR) (5 to 10 CM) | 141 | Numbers | |
| 730 | 53.28 | ROAD D (UPKEEPING 3rd YEAR) (10 to 15 CM) | 16 | Numbers | |
| 731 | 53.29 | ROAD D (UPKEEPING 4th YEAR) (5 to 10 CM) | 141 | Numbers | |
| 732 | 53.3 | ROAD D (UPKEEPING 4th YEAR) (10 to 15 CM) | 16 | Numbers | |
| 733 | 53.31 | ROAD D (UPKEEPING 5th YEAR) (5 to 10 CM) | 141 | Numbers | |
| 734 | 53.32 | ROAD D (UPKEEPING 5th YEAR) (10 to 15 CM) | 16 | Numbers | |
| 735 | 53.33 | ROAD E (UPKEEPING 2nd YEAR) (5 to 10 CM) | 199 | Numbers | |
| 736 | 53.34 | ROAD E (UPKEEPING 2nd YEAR) (10 to 15 CM) | 24 | Numbers | |
| 737 | 53.35 | ROAD E (UPKEEPING 3rd YEAR) (5 to 10 CM) | 199 | Numbers | |
| 738 | 53.36 | ROAD E (UPKEEPING 3rd YEAR) (10 to 15 CM) | 24 | Numbers | |
| 739 | 53.37 | ROAD E (UPKEEPING 4th YEAR) (5 to 10 CM) | 199 | Numbers | |
| 740 | 53.38 | ROAD E (UPKEEPING 4th YEAR) (10 to 15 CM) | 24 | Numbers | |
| 741 | 53.39 | ROAD E (UPKEEPING 5th YEAR) (5 to 10 CM) | 199 | Numbers | |
| 742 | 53.4 | ROAD E (UPKEEPING 5th YEAR) (10 to 15 CM) | 24 | Numbers | |
| 743 | 53.41 | ROAD F (UPKEEPING 2nd YEAR) (5 to 10 CM) | 166 | Numbers | |
| 744 | 53.42 | ROAD F (UPKEEPING 2nd YEAR) (10 to 15 CM) | 16 | Numbers | |
| 745 | 53.43 | ROAD F (UPKEEPING 3rd YEAR) (5 to 10 CM) | 166 | Numbers | |
| 746 | 53.44 | ROAD F (UPKEEPING 3rd YEAR) (10 to 15 CM) | 16 | Numbers | |
| 747 | 53.45 | ROAD F (UPKEEPING 4th YEAR) (5 to 10 CM) | 166 | Numbers | |
| 748 | 53.46 | ROAD F (UPKEEPING 4th YEAR) (10 to 15 CM) | 16 | Numbers | |
| 749 | 53.47 | ROAD F (UPKEEPING 5th YEAR) (5 to 10 CM) | 166 | Numbers | |
| 750 | 53.48 | ROAD F (UPKEEPING 5th YEAR) (10 to 15 CM) | 16 | Numbers | |
| 751 | 53.49 | ROAD G (UPKEEPING 2nd YEAR) (5 to 10 CM) | 135 | Numbers | |
| 752 | 53.5 | ROAD G (UPKEEPING 2nd YEAR) (10 to 15 CM) | 10 | Numbers | |
| 753 | 53.51 | ROAD G (UPKEEPING 3rd YEAR) (5 to 10 CM) | 135 | Numbers | |
| 754 | 53.52 | ROAD G (UPKEEPING 3rd YEAR) (10 to 15 CM) | 10 | Numbers | |
| 755 | 53.53 | ROAD G (UPKEEPING 4th YEAR) (5 to 10 CM) | 135 | Numbers | |
| 756 | 53.54 | ROAD G (UPKEEPING 4th YEAR) (10 to 15 CM) | 10 | Numbers | |
| 757 | 53.55 | ROAD G (UPKEEPING 5th YEAR) (5 to 10 CM) | 135 | Numbers | |
| 758 | 53.56 | ROAD G (UPKEEPING 5th YEAR) (10 to 15 CM) | 10 | Numbers | |
| 759 | 53.57 | ROAD H (UPKEEPING 2nd YEAR) (5 to 10 CM) | 191 | Numbers | |
| 760 | 53.58 | ROAD H (UPKEEPING 2nd YEAR) (10 to 15 CM) | 16 | Numbers | |
| 761 | 53.59 | ROAD H (UPKEEPING 3rd YEAR) (5 to 10 CM) | 191 | Numbers | |
| 762 | 53.6 | ROAD H (UPKEEPING 3rd YEAR) (10 to 15 CM) | 16 | Numbers | |
| 763 | 53.61 | ROAD H (UPKEEPING 4th YEAR) (5 to 10 CM) | 191 | Numbers | |
| 764 | 53.62 | ROAD H (UPKEEPING 4th YEAR) (10 to 15 CM) | 16 | Numbers | |
| 765 | 53.63 | ROAD H (UPKEEPING 5th YEAR) (5 to 10 CM) | 191 | Numbers | |
| 766 | 53.64 | ROAD H (UPKEEPING 5th YEAR) (10 to 15 CM) | 16 | Numbers | |
| 767 | 53.65 | ROAD I (UPKEEPING 2nd YEAR) (5 to 10 CM) | 160 | Numbers | |
| 768 | 53.66 | ROAD I (UPKEEPING 2nd YEAR) (10 to 15 CM) | 10 | Numbers | |
| 769 | 53.67 | ROAD I (UPKEEPING 3rd YEAR) (5 to 10 CM) | 160 | Numbers | |
| 770 | 53.68 | ROAD I (UPKEEPING 3rd YEAR) (10 to 15 CM) | 10 | Numbers | |
| 771 | 53.69 | ROAD I (UPKEEPING 4th YEAR) (5 to 10 CM) | 160 | Numbers | |
| 772 | 53.7 | ROAD I (UPKEEPING 4th YEAR) (10 to 15 CM) | 10 | Numbers | |
| 773 | 53.71 | ROAD I (UPKEEPING 5th YEAR) (5 to 10 CM) | 160 | Numbers | |
| 774 | 53.72 | ROAD I (UPKEEPING 5th YEAR) (10 to 15 CM) | 10 | Numbers | |
| 775 | 53.73 | ROAD J (UPKEEPING 2nd YEAR) (5 to 10 CM) | 220 | Numbers | |
| 776 | 53.74 | ROAD J (UPKEEPING 2nd YEAR) (10 to 15 CM) | 20 | Numbers | |
| 777 | 53.75 | ROAD J (UPKEEPING 3rd YEAR) (5 to 10 CM) | 220 | Numbers | |
| 778 | 53.76 | ROAD J (UPKEEPING 3rd YEAR) (10 to 15 CM) | 20 | Numbers | |
| 779 | 53.77 | ROAD J (UPKEEPING 4th YEAR) (5 to 10 CM) | 220 | Numbers | |
| 780 | 53.78 | ROAD J (UPKEEPING 4th YEAR) (10 to 15 CM) | 20 | Numbers | |
| 781 | 53.79 | ROAD J (UPKEEPING 5th YEAR) (5 to 10 CM) | 220 | Numbers | |
| 782 | 53.8 | ROAD J (UPKEEPING 5th YEAR) (10 to 15 CM) | 20 | Numbers | |
| 783 | 54 | Lettering the Boundry Stone as per IRC standard including the cost of Labour charges and material etc., complete | |||
| 784 | 54.01 | ROAD A (UPKEEPING 2nd YEAR) (5 to 10 CM) | 40 | Numbers | |
| 785 | 54.02 | ROAD A (UPKEEPING 3rd YEAR) (5 to 10 CM) | 40 | Numbers | |
| 786 | 54.03 | ROAD A (UPKEEPING 4th YEAR) (5 to 10 CM) | 40 | Numbers | |
| 787 | 54.04 | ROAD A (UPKEEPING 5th YEAR) (5 to 10 CM) | 40 | Numbers | |
| 788 | 54.05 | ROAD B (UPKEEPING 2nd YEAR) (5 to 10 CM) | 40 | Numbers | |
| 789 | 54.06 | ROAD B (UPKEEPING 3rd YEAR) (5 to 10 CM) | 40 | Numbers | |
| 790 | 54.07 | ROAD B (UPKEEPING 4th YEAR) (5 to 10 CM) | 40 | Numbers | |
| 791 | 54.08 | ROAD B (UPKEEPING 5th YEAR) (5 to 10 CM) | 40 | Numbers | |
| 792 | 54.09 | ROAD C (UPKEEPING 2nd YEAR) (5 to 10 CM) | 80 | Numbers | |
| 793 | 54.1 | ROAD C (UPKEEPING 3rd YEAR) (5 to 10 CM) | 80 | Numbers | |
| 794 | 54.11 | ROAD C (UPKEEPING 4th YEAR) (5 to 10 CM) | 80 | Numbers | |
| 795 | 54.12 | ROAD C (UPKEEPING 5th YEAR) (5 to 10 CM) | 80 | Numbers | |
| 796 | 54.13 | ROAD D (UPKEEPING 2nd YEAR) (5 to 10 CM) | 160 | Numbers | |
| 797 | 54.14 | ROAD D (UPKEEPING 3rd YEAR) (5 to 10 CM) | 160 | Numbers | |
| 798 | 54.15 | ROAD D (UPKEEPING 4th YEAR) (5 to 10 CM) | 160 | Numbers | |
| 799 | 54.16 | ROAD D (UPKEEPING 5th YEAR) (5 to 10 CM) | 160 | Numbers | |
| 800 | 54.17 | ROAD E (UPKEEPING 2nd YEAR) (5 to 10 CM) | 60 | Numbers | |
| 801 | 54.18 | ROAD E (UPKEEPING 3rd YEAR) (5 to 10 CM) | 60 | Numbers | |
| 802 | 54.19 | ROAD E (UPKEEPING 4th YEAR) (5 to 10 CM) | 60 | Numbers | |
| 803 | 54.2 | ROAD E (UPKEEPING 5th YEAR) (5 to 10 CM) | 60 | Numbers | |
| 804 | 54.21 | ROAD F (UPKEEPING 2nd YEAR) (5 to 10 CM) | 40 | Numbers | |
| 805 | 54.22 | ROAD F (UPKEEPING 3rd YEAR) (5 to 10 CM) | 40 | Numbers | |
| 806 | 54.23 | ROAD F (UPKEEPING 4th YEAR) (5 to 10 CM) | 40 | Numbers | |
| 807 | 54.24 | ROAD F (UPKEEPING 5th YEAR) (5 to 10 CM) | 40 | Numbers | |
| 808 | 54.25 | ROAD G (UPKEEPING 2nd YEAR) (5 to 10 CM) | 40 | Numbers | |
| 809 | 54.26 | ROAD G (UPKEEPING 3rd YEAR) (5 to 10 CM) | 40 | Numbers | |
| 810 | 54.27 | ROAD G (UPKEEPING 4th YEAR) (5 to 10 CM) | 40 | Numbers | |
| 811 | 54.28 | ROAD G (UPKEEPING 5th YEAR) (5 to 10 CM) | 40 | Numbers | |
| 812 | 54.29 | ROAD H (UPKEEPING 2nd YEAR) (5 to 10 CM) | 140 | Numbers | |
| 813 | 54.3 | ROAD H (UPKEEPING 3rd YEAR) (5 to 10 CM) | 140 | Numbers | |
| 814 | 54.31 | ROAD H (UPKEEPING 4th YEAR) (5 to 10 CM) | 140 | Numbers | |
| 815 | 54.32 | ROAD H (UPKEEPING 5th YEAR) (5 to 10 CM) | 140 | Numbers | |
| 816 | 54.33 | ROAD I (UPKEEPING 2nd YEAR) (5 to 10 CM) | 40 | Numbers | |
| 817 | 54.34 | ROAD I (UPKEEPING 3rd YEAR) (5 to 10 CM) | 40 | Numbers | |
| 818 | 54.35 | ROAD I (UPKEEPING 4th YEAR) (5 to 10 CM) | 40 | Numbers | |
| 819 | 54.36 | ROAD I (UPKEEPING 5th YEAR) (5 to 10 CM) | 40 | Numbers | |
| 820 | 54.37 | ROAD J (UPKEEPING 2nd YEAR) (5 to 10 CM) | 60 | Numbers | |
| 821 | 54.38 | ROAD J (UPKEEPING 3rd YEAR) (5 to 10 CM) | 60 | Numbers | |
| 822 | 54.39 | ROAD J (UPKEEPING 4th YEAR) (5 to 10 CM) | 60 | Numbers | |
| 823 | 54.4 | ROAD J (UPKEEPING 5th YEAR) (5 to 10 CM) | 60 | Numbers | |
| 824 | 55 | Painting the tree barks upto a size of 15cm x 15cm with first class enamel paintas per avenue register complete | |||
| 825 | 55.01 | ROAD E (UPKEEPING 2nd YEAR) | 0.34 | Square metre | |
| 826 | 55.02 | ROAD E (UPKEEPING 3rd YEAR) | 0.34 | Square metre | |
| 827 | 55.03 | ROAD E (UPKEEPING 4th YEAR) | 0.34 | Square metre | |
| 828 | 55.04 | ROAD E (UPKEEPING 5th YEAR) | 0.34 | Square metre | |
| 829 | 55.05 | ROAD F (UPKEEPING 2nd YEAR) | 0.18 | Square metre | |
| 830 | 55.06 | ROAD F (UPKEEPING 3rd YEAR) | 0.18 | Square metre | |
| 831 | 55.07 | ROAD F (UPKEEPING 4th YEAR) | 0.18 | Square metre | |
| 832 | 55.08 | ROAD F (UPKEEPING 5th YEAR) | 0.18 | Square metre | |
| 833 | 55.09 | ROAD G (UPKEEPING 2nd YEAR) | 0.18 | Square metre | |
| 834 | 55.1 | ROAD G (UPKEEPING 3rd YEAR) | 0.18 | Square metre | |
| 835 | 55.11 | ROAD G (UPKEEPING 4th YEAR) | 0.18 | Square metre | |
| 836 | 55.12 | ROAD G (UPKEEPING 5th YEAR) | 0.18 | Square metre | |
| 837 | 55.13 | ROAD H (UPKEEPING 2nd YEAR) | 0.68 | Square metre | |
| 838 | 55.14 | ROAD H (UPKEEPING 3rd YEAR) | 0.68 | Square metre | |
| 839 | 55.15 | ROAD H (UPKEEPING 4th YEAR) | 0.68 | Square metre | |
| 840 | 55.16 | ROAD H (UPKEEPING 5th YEAR) | 0.68 | Square metre | |
| 841 | 55.17 | ROAD I (UPKEEPING 2nd YEAR) | 0.23 | Square metre | |
| 842 | 55.18 | ROAD I (UPKEEPING 3rd YEAR) | 0.23 | Square metre | |
| 843 | 55.19 | ROAD I (UPKEEPING 4th YEAR) | 0.23 | Square metre | |
| 844 | 55.2 | ROAD I (UPKEEPING 5th YEAR) | 0.23 | Square metre | |
| 845 | 55.21 | ROAD J (UPKEEPING 2nd YEAR) | 0.68 | Square metre | |
| 846 | 55.22 | ROAD J (UPKEEPING 3rd YEAR) | 0.68 | Square metre | |
| 847 | 55.23 | ROAD J (UPKEEPING 4th YEAR) | 0.68 | Square metre | |
| 848 | 55.24 | ROAD J (UPKEEPING 5th YEAR) | 0.68 | Square metre | |
| 849 | 56 | Lettering the tree barks upto a size of 15cm x 15cm with first class enamel paint as per avenue register complete | |||
| 850 | 56.01 | ROAD C (UPKEEPING 4th YEAR) (5 to 10 CM) | 24 | Numbers | |
| 851 | 56.02 | ROAD E (UPKEEPING 2nd YEAR) (5 to 10 CM) | 30 | Numbers | |
| 852 | 56.03 | ROAD E (UPKEEPING 3rd YEAR) (5 to 10 CM) | 30 | Numbers | |
| 853 | 56.04 | ROAD E (UPKEEPING 4th YEAR) (5 to 10 CM) | 30 | Numbers | |
| 854 | 56.05 | ROAD E (UPKEEPING 5th YEAR) (5 to 10 CM) | 30 | Numbers | |
| 855 | 56.06 | ROAD F (UPKEEPING 2nd YEAR) (5 to 10 CM) | 16 | Numbers | |
| 856 | 56.07 | ROAD F (UPKEEPING 3rd YEAR) (5 to 10 CM) | 16 | Numbers | |
| 857 | 56.08 | ROAD F (UPKEEPING 4th YEAR) (5 to 10 CM) | 16 | Numbers | |
| 858 | 56.09 | ROAD F (UPKEEPING 5th YEAR) (5 to 10 CM) | 16 | Numbers | |
| 859 | 56.1 | ROAD G (UPKEEPING 2nd YEAR) (5 to 10 CM) | 16 | Numbers | |
| 860 | 56.11 | ROAD G (UPKEEPING 3rd YEAR) (5 to 10 CM) | 16 | Numbers | |
| 861 | 56.12 | ROAD G (UPKEEPING 4th YEAR) (5 to 10 CM) | 16 | Numbers | |
| 862 | 56.13 | ROAD G (UPKEEPING 5th YEAR) (5 to 10 CM) | 16 | Numbers | |
| 863 | 56.14 | ROAD H (UPKEEPING 2nd YEAR) (5 to 10 CM) | 60 | Numbers | |
| 864 | 56.15 | ROAD H (UPKEEPING 3rd YEAR) (5 to 10 CM) | 60 | Numbers | |
| 865 | 56.16 | ROAD H (UPKEEPING 4th YEAR) (5 to 10 CM) | 60 | Numbers | |
| 866 | 56.17 | ROAD H (UPKEEPING 5th YEAR) (5 to 10 CM) | 60 | Numbers | |
| 867 | 56.18 | ROAD I (UPKEEPING 2nd YEAR) (5 to 10 CM) | 20 | Numbers | |
| 868 | 56.19 | ROAD I (UPKEEPING 3rd YEAR) (5 to 10 CM) | 20 | Numbers | |
| 869 | 56.2 | ROAD I (UPKEEPING 4th YEAR) (5 to 10 CM) | 20 | Numbers | |
| 870 | 56.21 | ROAD I (UPKEEPING 5th YEAR) (5 to 10 CM) | 20 | Numbers | |
| 871 | 56.22 | ROAD J (UPKEEPING 2nd YEAR) (5 to 10 CM) | 60 | Numbers | |
| 872 | 56.23 | ROAD J (UPKEEPING 3rd YEAR) (5 to 10 CM) | 60 | Numbers | |
| 873 | 56.24 | ROAD J (UPKEEPING 4th YEAR) (5 to 10 CM) | 60 | Numbers | |
| 874 | 56.25 | ROAD J (UPKEEPING 4th YEAR) (5 to 10 CM) | 60 | Numbers | |
| 875 | 57 | Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification no.111,112,501, 503,900 - over bituminous surfaces | |||
| 876 | 57.01 | ROAD A (UPKEEPING 4th YEAR) | 165 | Square metre | |
| 877 | 57.02 | ROAD A (UPKEEPING 5th YEAR) | 275 | Square metre | |
| 878 | 57.03 | ROAD B (UPKEEPING 4th YEAR) | 168 | Square metre | |
| 879 | 57.04 | ROAD B (UPKEEPING 5th YEAR) | 280 | Square metre | |
| 880 | 57.05 | ROAD C (UPKEEPING 4th YEAR) | 231 | Square metre | |
| 881 | 57.06 | ROAD C (UPKEEPING 5th YEAR) | 385 | Square metre | |
| 882 | 57.07 | ROAD D (UPKEEPING 4th YEAR) | 330 | Square metre | |
| 883 | 57.08 | ROAD D (UPKEEPING 5th YEAR) | 550 | Square metre | |
| 884 | 57.09 | ROAD E (UPKEEPING 4th YEAR) | 316 | Square metre | |
| 885 | 57.1 | ROAD E (UPKEEPING 5th YEAR) | 526.67 | Square metre | |
| 886 | 57.11 | ROAD F (UPKEEPING 4th YEAR) | 226 | Square metre | |
| 887 | 57.12 | ROAD F (UPKEEPING 5th YEAR) | 376.67 | Square metre | |
| 888 | 57.13 | ROAD G (UPKEEPING 4th YEAR) | 225 | Square metre | |
| 889 | 57.14 | ROAD G (UPKEEPING 5th YEAR) | 375 | Square metre | |
| 890 | 57.15 | ROAD H (UPKEEPING 4th YEAR) | 220.33 | Square metre | |
| 891 | 57.16 | ROAD H (UPKEEPING 5th YEAR) | 367.33 | Square metre | |
| 892 | 57.17 | ROAD I (UPKEEPING 4th YEAR) | 135 | Square metre | |
| 893 | 57.18 | ROAD I (UPKEEPING 5th YEAR) | 225 | Square metre | |
| 894 | 57.19 | ROAD J (UPKEEPING 4th YEAR) | 270 | Square metre | |
| 895 | 57.2 | ROAD J (UPKEEPING 5th YEAR) | 450 | Square metre | |
| 896 | 58 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specificationno.111,112,507,900 complete in all respects - Grading II for patch Work | |||
| 897 | 58.01 | ROAD A (UPKEEPING 4th YEAR) | 4.95 | Cubic Metre | |
| 898 | 58.02 | ROAD A (UPKEEPING 5th YEAR) | 8.25 | Cubic Metre | |
| 899 | 58.03 | ROAD B (UPKEEPING 4th YEAR) | 5.04 | Cubic Metre | |
| 900 | 58.04 | ROAD B (UPKEEPING 5th YEAR) | 8.4 | Cubic Metre | |
| 901 | 58.05 | ROAD C (UPKEEPING 4th YEAR) | 6.93 | Cubic Metre | |
| 902 | 58.06 | ROAD C (UPKEEPING 5th YEAR) | 11.55 | Cubic Metre | |
| 903 | 58.07 | ROAD D (UPKEEPING 4th YEAR) | 9.9 | Cubic Metre | |
| 904 | 58.08 | ROAD D (UPKEEPING 5th YEAR) | 16.5 | Cubic Metre | |
| 905 | 58.09 | ROAD E (UPKEEPING 4th YEAR) | 9.48 | Cubic Metre | |
| 906 | 58.1 | ROAD E (UPKEEPING 5th YEAR) | 15.8 | Cubic Metre | |
| 907 | 58.11 | ROAD F (UPKEEPING 4th YEAR) | 6.78 | Cubic Metre | |
| 908 | 58.12 | ROAD F (UPKEEPING 5th YEAR) | 11.3 | Cubic Metre | |
| 909 | 58.13 | ROAD G (UPKEEPING 4th YEAR) | 6.75 | Cubic Metre | |
| 910 | 58.14 | ROAD G (UPKEEPING 5th YEAR) | 11.25 | Cubic Metre | |
| 911 | 58.15 | ROAD H (UPKEEPING 4th YEAR) | 6.61 | Cubic Metre | |
| 912 | 58.16 | ROAD H (UPKEEPING 5th YEAR) | 11.02 | Cubic Metre | |
| 913 | 58.17 | ROAD I (UPKEEPING 4th YEAR) | 4.05 | Cubic Metre | |
| 914 | 58.18 | ROAD I (UPKEEPING 5th YEAR) | 6.75 | Cubic Metre | |
| 915 | 58.19 | ROAD J (UPKEEPING 4th YEAR) | 8.1 | Cubic Metre | |
| 916 | 58.2 | ROAD J (UPKEEPING 5th YEAR) | 13.5 | Cubic Metre | |
| 917 | 58.21 | Calculation of SubTotal, GST and Total Amount carried out by system automatically | |||
| 918 | 58.22 | Basic cost of value put to tender as per estimate | 1 | (A) | |
| 919 | 58.23 | Add GST at 12% | 1 | (B) | |
| 920 | 58.24 | Total Value put to Tender | 1 | (A+B) | |
| 921 | 58.25 | Excess/Less Percentage | 1 | (D) | |
| 922 | 58.26 | Final Value | 1 | (E) | |
| 923 | 58.27 | Add GST at 12% of Final Value | 1 | (F) | |
| 924 | 58.28 | Total Value of Contract Including 12% of GST | 1 | (E+F) |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy