Package 17 Widening Improvements To Government Roads In Sankarankovil H Candm Subdivision Package 17 Widening Improvements Improvements To Riding Quality Junction Improvements Reconstruction Of Minor Bridge Construction Of Protective Works And Providing
Tender Overview
Project Description
Package 17 Widening Improvements To Government Roads In Sankarankovil H Candm Subdivision Package 17 Widening Improvements Improvements To Riding Quality Junction Improvements Reconstruction Of Minor Bridge Construction Of Protective Works And Providing Cc Pavements Works To Government Roads In Sankarl H Candm Sub Divi
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 26-Jun-2020 | Date Extension | Date | 03-Jul-2020 |
BOQ
| PACKAGE - 17 Widening ,Improvements,Improvements to Riding quality, Junction Improvements, Reconstruction of Minor Bridge , Construction of Protective works and Providing CC Pavements including CD Works to Government Roads in Sankarankovil (H) C&M, Sub –Division including upkeeping for a period of 60 months 1.Widening from Single Lane to Intermediat Lane and Improvements of Karivalamvanthanallur - Panaiyoor Road at Km 0/0 - 1/0 : including Reconstruction of Minor bridge at Km 0/6, including CD works , Junction Improvements at Km 0/2, Including upkeeping for a period of 60 months. 2.Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months 3.Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months 4.Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months 5.Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months 6.Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. 7. Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. 8.Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Excavation for Roadway and Drainage Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per SS20B for 97% Compaction for Box Cutting earth MORTH Rev. V Clause No. 111, 112, 301 to 305. | Item Code / Make 1 | ||
| 2 | 2 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 2 | 581.97 | Cubic\nMetre |
| 3 | 3 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 3 | 1190 | Cubic\nMetre |
| 4 | 4 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 4 | 603.75 | Cubic\nMetre |
| 5 | 5 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 5 | 81.25 | Cubic\nMetre |
| 6 | 6 | Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for Grading-V Material as per MORTH Rev. V Clause No. 111, 112, 401 & 900. | Item Code / Make 6 | ||
| 7 | 7 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 7 | 244.6 | Cubic\nMetre |
| 8 | 8 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 8 | 146.25 | Cubic\nMetre |
| 9 | 9 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 9 | 665 | Cubic\nMetre |
| 10 | 10 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 10 | 253.75 | Cubic\nMetre |
| 11 | 11 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 11 | 73.13 | Cubic\nMetre |
| 12 | 12 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 12 | 37.5 | Cubic\nMetre |
| 13 | 13 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 13 | 138.38 | Cubic\nMetre |
| 14 | 14 | Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for Grading-III Material as per MORTH Rev. V Clause No. 111, 112, 401 & 900. | Item Code / Make 14 | ||
| 15 | 15 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 15 | 168.69 | Cubic\nMetre |
| 16 | 16 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 16 | 42.19 | Cubic\nMetre |
| 17 | 17 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 17 | 175 | Cubic\nMetre |
| 18 | 18 | Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc., complete as per standard specifications as per MORTH Rev. V Clause No. 111, 112, 202 | Item Code / Make 18 | ||
| 19 | 19 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 19 | 1201.04 | Square\nMetre |
| 20 | 20 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 20 | 2500 | Square\nMetre |
| 21 | 21 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 21 | 1250 | Square\nMetre |
| 22 | 22 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 22 | 218.75 | Square\nMetre |
| 23 | 23 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 23 | 399 | Square\nMetre |
| 24 | 24 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 24 | 312.5 | Square\nMetre |
| 25 | 25 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 25 | 300 | Square\nMetre |
| 26 | 26 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 26 | 75 | Square\nMetre |
| 27 | 27 | Wet Mix Macadam (Table 400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406) as per MORTH Rev. V Clause No. 111, 112, 406 & 900. | Item Code / Make 27 | ||
| 28 | 28 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 28 | 962.18 | Cubic\nMetre |
| 29 | 29 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 29 | 121.88 | Cubic\nMetre |
| 30 | 30 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 30 | 56.25 | Cubic\nMetre |
| 31 | 31 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 31 | 1625 | Cubic\nMetre |
| 32 | 32 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 32 | 1000 | Cubic\nMetre |
| 33 | 33 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 33 | 179.69 | Cubic\nMetre |
| 34 | 34 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 34 | 119.7 | Cubic\nMetre |
| 35 | 35 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 35 | 121.88 | Cubic\nMetre |
| 36 | 36 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 36 | 117 | Cubic\nMetre |
| 37 | 37 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 37 | 46.88 | Cubic\nMetre |
| 38 | 38 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 38 | 115.31 | Cubic\nMetre |
| 39 | 39 | Prime Coat (Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502) - over WMM/ WBM as per MORTH Rev. V Clause No. 111, 112,501,502 &900 . | Item Code / Make 39 | ||
| 40 | 40 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 40 | 5290 | Square\nMetre |
| 41 | 41 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 41 | 487.5 | Square\nMetre |
| 42 | 42 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 42 | 281.25 | Square\nMetre |
| 43 | 43 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 43 | 11000 | Square\nMetre |
| 44 | 44 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 44 | 5500 | Square\nMetre |
| 45 | 45 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 45 | 1197 | Square\nMetre |
| 46 | 46 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 46 | 937.5 | Square\nMetre |
| 47 | 47 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 47 | 900 | Square\nMetre |
| 48 | 48 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 48 | 187.5 | Square\nMetre |
| 49 | 49 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 49 | 416.25 | Square\nMetre |
| 50 | 50 | Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over granular surfaces treated with primer as per MORTH Rev. V Clause No. 111, 112,501, 503 & 900. | Item Code / Make 50 | ||
| 51 | 51 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 51 | 5290 | Square\nMetre |
| 52 | 52 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 52 | 487.5 | Square\nMetre |
| 53 | 53 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 53 | 281.25 | Square\nMetre |
| 54 | 54 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 54 | 11000 | Square\nMetre |
| 55 | 55 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 55 | 5500 | Square\nMetre |
| 56 | 56 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 56 | 1197 | Square\nMetre |
| 57 | 57 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 57 | 937.5 | Square\nMetre |
| 58 | 58 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 58 | 900 | Square\nMetre |
| 59 | 59 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 59 | 187.5 | Square\nMetre |
| 60 | 60 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 60 | 416.25 | Square\nMetre |
| 61 | 61 | Providing and laying Advance BT patches using 13.2 mm IRC size HBG metal with 44 Kg of bitumen per one cubic metre which shall include repairs of pot holes and patching of all types of bituminous mix either produced at plant site or at site itself with manual method and placed at site in pot holes or in patches after trimming the pot holes or depression to painting with tack coat and compacting the layer as directed by the Engineer in charge using 60/70 bitumenas per MORTH Rev. V Clause No. 111, 112,501,900 ,3004. | Item Code / Make 61 | ||
| 62 | 62 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 62 | 26.11 | Cubic\nMetre |
| 63 | 63 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 63 | 14.51 | Cubic\nMetre |
| 64 | 64 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 64 | 7.14 | Cubic\nMetre |
| 65 | 65 | Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces as per MORTH Rev. V Clause No. 111, 112, 501, 503 & 900. | Item Code / Make 65 | ||
| 66 | 66 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 66 | 10468 | Square\nMetre |
| 67 | 67 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 67 | 5825.63 | Square\nMetre |
| 68 | 68 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 68 | 2850 | Square\nMetre |
| 69 | 69 | Bituminous Macadam (Providing and laying 50mm bituminous macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504) - as per MORTH Rev. V Clause No. 111, 112, 501, 502,503,504 & 900. | Item Code / Make 69 | ||
| 70 | 70 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 70 | 264.5 | Cubic\nMetre |
| 71 | 71 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 71 | 24.38 | Cubic\nMetre |
| 72 | 72 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 72 | 550 | Cubic\nMetre |
| 73 | 73 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 73 | 275 | Cubic\nMetre |
| 74 | 74 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 74 | 104.48 | Cubic\nMetre |
| 75 | 75 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 75 | 67.5 | Cubic\nMetre |
| 76 | 76 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 76 | 45 | Cubic\nMetre |
| 77 | 77 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 77 | 20.81 | Cubic\nMetre |
| 78 | 78 | Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II as per MORTH Rev. V Clause No. 111, 112, 501, 507 & 900. | Item Code / Make 78 | ||
| 79 | 79 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 79 | 158.7 | Cubic\nMetre |
| 80 | 80 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 80 | 14.63 | Cubic\nMetre |
| 81 | 81 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 81 | 330 | Cubic\nMetre |
| 82 | 82 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 82 | 165 | Cubic\nMetre |
| 83 | 83 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 83 | 452.85 | Cubic\nMetre |
| 84 | 84 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 84 | 202.89 | Cubic\nMetre |
| 85 | 85 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 85 | 112.5 | Cubic\nMetre |
| 86 | 86 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 86 | 12.49 | Cubic\nMetre |
| 87 | 87 | Excavation for Roadway and Drainage ; Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per SS20B for 97% Compaction for making up Berms using available cut earth MORTH Rev. V Clause No. 111, 112, 301 to 305. | Item Code / Make 87 | ||
| 88 | 88 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 88 | 505.19 | Cubic\nMetre |
| 89 | 89 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 89 | 823.5 | Cubic\nMetre |
| 90 | 90 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 90 | 519.8 | Cubic\nMetre |
| 91 | 91 | Excavation for Roadway and Drainage;Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per SS20B for 97% Compaction for making up Berms/Formation using side earth as per MORTH Rev. V Clause No. 111, 112, 301 to 305. | Item Code / Make 91 | ||
| 92 | 92 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 92 | 392 | Cubic\nMetre |
| 93 | 93 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 93 | 630 | Cubic\nMetre |
| 94 | 94 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 94 | 339 | Cubic Metre |
| 95 | 95 | Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250gms per sqm area, thickness of 2.5mm exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes. | Item Code / Make 95 | ||
| 96 | 96 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 96 | 299.5 | Square\nMetre |
| 97 | 97 | Excavation for Roadway and Drainage;Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per SS20B for 95% Compaction for making up Berms using side earth as per MORTH Rev. V Clause No. 111, 112, 301 to 305. | Item Code / Make 97 | ||
| 98 | 98 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 98 | 529.17 | Cubic Metre |
| 99 | 99 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 99 | 682.35 | Cubic\nMetre |
| 100 | 100 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 100 | 452.07 | Cubic\nMetre |
| 101 | 101 | Excavation for Roadway and Drainage;Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per SS20B for 97% Compaction for making up Berms using side earth as per MORTH Rev. V Clause No. 111, 112, 301 to 305. | Item Code / Make 101 | ||
| 102 | 102 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 102 | 759.95 | Cubic Metre |
| 103 | 103 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 103 | 333.79 | Cubic\nMetre |
| 104 | 104 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 104 | 222.52 | Cubic\nMetre |
| 105 | 105 | Vibrated cement concrete M20 Grade (Nominal Mix 1:1.5:3) using 40 mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for laying, compacting, curing, and all incidental charges etc., complete for Cradle Concrete level.MORTH Rev. V Clause No. 1000,1500, 1700,2100 | Item Code / Make 105 | ||
| 106 | 106 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 106 | 6.72 | Cubic\nMetre |
| 107 | 107 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 107 | 6.72 | Cubic\nMetre |
| 108 | 108 | Vibrated cement concrete M20 Grade (Nominal Mix 1:1.5:3) using 40 mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for laying, compacting, curing, and all incidental charges etc., complete for Body wall below sill level.MORTH Rev. V Clause No. 1000,1500, 1700,2100 | Item Code / Make 108 | ||
| 109 | 109 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 109 | 5.76 | Cubic\nMetre |
| 110 | 110 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 110 | 5.76 | Cubic\nMetre |
| 111 | 111 | Vibrated cement concrete M20 Grade (Nominal Mix 1:1.5:3) using 40 mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for laying, compacting, curing, and all incidental charges etc., complete for Body wall above sill level.MORTH Rev. V Clause No. 1000,1500, 1700,2100 | Item Code / Make 111 | ||
| 112 | 112 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 112 | 7.7 | Cubic\nMetre |
| 113 | 113 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 113 | 7.7 | Cubic\nMetre |
| 114 | 114 | Supplying and Fixing of 1000mm dia RCC NP3 Pipes confirming to IS 458 of standard length including cost and conveyance of pipes to sites including labour charges for fixing in position to proper gradient and including cost of jointing materials etc. complete.MORTH Rev. V Clause No. 2903,2904,2905,2906,2907 | Item Code / Make 114 | ||
| 115 | 115 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 115 | 30 | RM |
| 116 | 116 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 116 | 12.5 | RM |
| 117 | 117 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 117 | 12.5 | RM |
| 118 | 118 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 118 | 22.5 | RM |
| 119 | 119 | Quarry Dust FILLING including cost and conveyance to the site including labour charges for filling in layers, watering, tamping under optimum moisture content to get the maximum density and all incidental charges etc. complete as per MORTH Rev. V Clause No. 304 | Item Code / Make 119 | ||
| 120 | 120 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 120 | 12.58 | Cubic\nMetre |
| 121 | 121 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 121 | 24.53 | Cubic\nMetre |
| 122 | 122 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 122 | 12.58 | Cubic\nMetre |
| 123 | 123 | Earthwork excavationin all classes of soils weathered rock, soft rock, SDR, rock without blasting and depositing on bank, with all leads and lifts as per SS 20B, including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams sheting, shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifation Foundation of Retaining wall as per MORTH Rev. V Clause No. 111, 112, 202, 301 to 305, 900 | Item Code / Make 123 | ||
| 124 | 124 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 124 | 45.19 | Cubic\nMetre |
| 125 | 125 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 125 | 10.8 | Cubic\nMetre |
| 126 | 126 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 126 | 75 | Cubic\nMetre |
| 127 | 127 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 127 | 424.35 | Cubic\nMetre |
| 128 | 128 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 128 | 446.99 | Cubic\nMetre |
| 129 | 129 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 129 | 446.99 | Cubic\nMetre |
| 130 | 130 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 130 | 19.2 | Cubic\nMetre |
| 131 | 131 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 131 | 10.8 | Cubic\nMetre |
| 132 | 132 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 132 | 78.75 | Cubic\nMetre |
| 133 | 133 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 133 | 61.46 | Cubic\nMetre |
| 134 | 134 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 134 | 60 | Cubic\nMetre |
| 135 | 135 | Plain Cement Concrete 1:2:4 Nominal Mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for FOUNDATION CONCRETE. MORTH Rev. V Clause No. 1000,1500, 1700,2100,2200 | Item Code / Make 135 | ||
| 136 | 136 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 136 | 25 | Cubic\nMetre |
| 137 | 137 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 137 | 70.73 | Cubic\nMetre |
| 138 | 138 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 138 | 74.5 | Cubic\nMetre |
| 139 | 139 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 139 | 74.5 | Cubic\nMetre |
| 140 | 140 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 140 | 28.8 | Cubic\nMetre |
| 141 | 141 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 141 | 78.75 | Cubic\nMetre |
| 142 | 142 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 142 | 20 | Cubic\nMetre |
| 143 | 143 | Vibrated cement concrete M20 Grade (Nominal Mix 1:1.5:3) using 40 mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for laying, compacting, curing, and all incidental charges etc., complete for Retaining wall below sill level.MORTH Rev. V Clause No. 1000,1500, 1700,2100,2200 | Item Code / Make 143 | ||
| 144 | 144 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 144 | 37.8 | Cubic\nMetre |
| 145 | 145 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 145 | 232.88 | Cubic\nMetre |
| 146 | 146 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 146 | 256.41 | Cubic\nMetre |
| 147 | 147 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 147 | 256.41 | Cubic\nMetre |
| 148 | 148 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 148 | 135 | Cubic\nMetre |
| 149 | 149 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 149 | 49.56 | Cubic\nMetre |
| 150 | 150 | Vibrated cement concrete M20 Grade (Nominal Mix 1:1.5:3) using 40 mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for laying, compacting, curing, and all incidental charges etc., complete for Retaining wall above sill level.MORTH Rev. V Clause No. 1000,1500, 1700,2100,2200 | Item Code / Make 150 | ||
| 151 | 151 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 151 | 150.6 | Cubic\nMetre |
| 152 | 152 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 152 | 305.16 | Cubic\nMetre |
| 153 | 153 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 153 | 353.32 | Cubic\nMetre |
| 154 | 154 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 154 | 353.32 | Cubic\nMetre |
| 155 | 155 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 155 | 79.5 | Cubic\nMetre |
| 156 | 156 | Providing and Fixing PVC Seepage pipes of 110mm dia of required lengths for abutments wings and Retaining walls including cost and conveyance of all materials to worksite and labour charges for fixing, etc. complete to drain the backfill as per standard specification MORTH 2700,2705,2706 | Item Code / Make 156 | ||
| 157 | 157 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 157 | 84 | RM |
| 158 | 158 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 158 | 452 | RM |
| 159 | 159 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 159 | 450 | RM |
| 160 | 160 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 160 | 450 | RM |
| 161 | 161 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 161 | 64 | RM |
| 162 | 162 | Providing and Laying of Gravel Filling behind the core wall with clean good gritty gravel including cost and conveyance to site including labour charges for filling in layers, watering tamping under optimum moisture content to get the maximum density including watering, with all leads for Filling, Laying & Tamping charges etc., complete for Core Wall.Morth 304,2907 | Item Code / Make 162 | ||
| 163 | 163 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 163 | 29.69 | Cubic\nMetre |
| 164 | 164 | Providing colour designed concrete paver block floor used with concrete block of 40mm which has a compressive strength of 16.00 Mt/aqm. The rate including the cost concrete block loading and conveyance to site and cost of ;abourforfixing inposition the joints shouldbe filled with sand including compacting by using power compactor etc., complete complyling with standard specification and also the rate including the labourcharges forclearing the heavy and scrub, jungle , leveling the sites, diversion or water and sanitary pipe lines, dismantling the existing masonry structures etc., complete complying as directed by the departmental officers as per MORTH Rev. V Clause No. 1000, 1500, 1700 & 2100. | Item Code / Make 164 | ||
| 165 | 165 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 165 | 981.25 | Square\nMetre |
| 166 | 166 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials tool and equipments and all other incidental charges such as baling our water,sheeting, shoring, bracing and their subsequent removal, removal and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., indicated by the Engineer as per DRESSING THE BED UPTO SILL LEVEL. MORTH Rev. V Clause No. 111, 112, 202, 301 to 305, 900ORTH Rev. V Clause No. 111, 112, 202, 301 to 305, 900 | Item Code / Make 166 | ||
| 167 | 167 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 167 | 103.67 | Cubic\nMetre |
| 168 | 168 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 168 | 100.92 | Cubic\nMetre |
| 169 | 169 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 169 | 2.27 | Cubic\nMetre |
| 170 | 170 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 170 | 2.27 | Cubic\nMetre |
| 171 | 171 | Earthwork excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials tool and equipments and all other incidental charges such as baling our water,sheeting, shoring, bracing and their subsequent removal, removal and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Foundation of Abutment. MORTH Rev. V Clause No. 111, 112, 202, 301 to 305, 900 | Item Code / Make 171 | ||
| 172 | 172 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 172 | 218.44 | Cubic\nMetre |
| 173 | 173 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 173 | 307.28 | Cubic\nMetre |
| 174 | 174 | Plain Cement Concrete of grade M 10 Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for LEVELLING COURSE OF ABUTMENT AND WINGS | Item Code / Make 174 | ||
| 175 | 175 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 175 | 15.06 | Cubic\nMetre |
| 176 | 176 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 176 | 17.56 | Cubic\nMetre |
| 177 | 177 | Vibrated Cement Concrete of Grade M20 1:1:5:3 Nominal Mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for Body wall (Below sill level).MORTH Rev. V Clause No. 1000,1500, 1700,2100,2104 | Item Code / Make 177 | ||
| 178 | 178 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 178 | 161.18 | Cubic\nMetre |
| 179 | 179 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 179 | 206.93 | Cubic\nMetre |
| 180 | 180 | Vibrated Cement Concrete of Grade M20 1:1:5:3 Nominal Mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for Body wall (Above sill level).MORTH Rev. V Clause No. 1000,1500, 1700,2100,2104 | Item Code / Make 180 | ||
| 181 | 181 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 181 | 79.03 | Cubic\nMetre |
| 182 | 182 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 182 | 63.77 | Cubic\nMetre |
| 183 | 183 | Vibrated Reinforced Cement Concrete of Grade M30 Design mix using 20mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost and fabrication of steel and cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for DIRT WALL CUM BED BLOCK.MORTH Rev. V Clause No. 1000,1500, 1700,2100,2200 | Item Code / Make 183 | ||
| 184 | 184 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 184 | 7.52 | Cubic\nMetre |
| 185 | 185 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 185 | 6.98 | Cubic\nMetre |
| 186 | 186 | Providing and Fixing 110mm dia PVC Seepage Pipes of required length for abutment and wings, including cost and conveyance of all materials to work site, cost and labour for semispherical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain of the backfill in ABUTMENTS AND WINGS as per MORTH Rev. V Clause No. 2700.,2705,2706. | Item Code / Make 186 | ||
| 187 | 187 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 187 | 30 | RM |
| 188 | 188 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 188 | 30 | RM |
| 189 | 189 | Providing and Fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to work site labour for fixing the same in correct position and all other incidental charges etc., complete as per MORTH Rev. V Clause No. 2600. | Item Code / Make 189 | ||
| 190 | 190 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 190 | 17.52 | square meter |
| 191 | 191 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 191 | 17.52 | square meter |
| 192 | 192 | Vibrated Reinforced Cement Concrete of Grade M30 Design mix using 20mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost and fabrication of steel and cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for DECK SLAB.MORTH Rev. V Clause No. 1000,1500, 1700,2100,2200 | Item Code / Make 192 | ||
| 193 | 193 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 193 | 133.78 | Cubic\nMetre |
| 194 | 194 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 194 | 102.84 | cubic meter |
| 195 | 195 | Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges \" Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc. complete. as per MORTH 2501;2502; 2503;2504; | Item Code / Make 195 | ||
| 196 | 196 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 196 | 41.41 | Cubic\nMetre |
| 197 | 197 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 197 | 36.8 | cubic meter |
| 198 | 198 | Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite,laying,handling charges and filling in layers,tamping under optimum moisture content to get the maximum density including watering,with all leads for water and all other incidental charges etc,complete for filling behind the abutment and wings. | Item Code / Make 198 | ||
| 199 | 199 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 199 | 87.6 | Cubic\nMetre |
| 200 | 200 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 200 | 80.41 | cubic meter |
| 201 | 201 | Providing and fixing PVC Expansion Joints including cost and conveyance of expansion joints, shamiler pad and joint sealants and fixing them in position etc., complete in deck slab over abutment and pier as per MORTH Rev. V Clause No. 2600. | Item Code / Make 201 | ||
| 202 | 202 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 202 | 29.85 | RM |
| 203 | 203 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 203 | 29.85 | RM |
| 204 | 204 | Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule and cost of TOR steel conforming to IS:1786 at site, including fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings,including cost of binding wire, provision of spacer bars, cover blocks and all other incidential charges etc., complete as per standard specifications Slab culvert. Fe-500 Grade as per MORTH Rev. V Clause No. 100,1000,1600 | Item Code / Make 204 | ||
| 205 | 205 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 205 | 13.49 | MT |
| 206 | 206 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 206 | 11.71 | MT |
| 207 | 207 | Vibrated Cement Concrete of Grade M M20 Grade (Nominal Mix 1:1.5:3) Nominal mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for Base Course Below Approach Slab MORTH Rev. V Clause No. 1000,1500, 1700,2100,2200 | Item Code / Make 207 | ||
| 208 | 208 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 208 | 13 | Cubic\nMetre |
| 209 | 209 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 209 | 13 | Cubic\nMetre |
| 210 | 210 | Vibrated Reinforced Cement Concrete of Grade M30 Design mix using 20mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost and fabrication of steel and cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for Approach Slab.MORTH Rev. V Clause No. 1000,1500, 1700,2100,2200 | Item Code / Make 210 | ||
| 211 | 211 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 211 | 18.27 | Cubic\nMetre |
| 212 | 212 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 212 | 18.27 | Cubic\nMetre |
| 213 | 213 | Vibrated Cement Concrete of M30 Grade design mix using ISS graded hard granite broken metal including cost and conveyance of all materials to site including cost of cement at site, cost of formwork, soft water, labour charges for mixing, transporting, laying and curing of concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for wearing cost of 75mm uniform thickness over deck slab . MORTH Rev. V Clause No. 1000,1500, 1700,2100,2200 | Item Code / Make 213 | ||
| 214 | 214 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 214 | 193.5 | Square Meter |
| 215 | 215 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 215 | 178.5 | Square Meter |
| 216 | 216 | Vibrated Reinforced Cement Concrete of Grade M40 Design mix using ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost and fabrication of steel and cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for Crash Barrier.MORTH Rev. V Clause No. 1000,1500, 1700,2100,2200 | Item Code / Make 216 | ||
| 217 | 217 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 217 | 10.68 | Cubic\nMetre |
| 218 | 218 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 218 | 9.54 | Cubic\nMetre |
| 219 | 219 | Vibrated Cement Concrete of Grade M20 Grade (Nominal Mix 1:1.5:3) Nominal mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for PCC PARPET OVER RETURNS Clause No. 1000,1500, 1700,2100,2200 | Item Code / Make 219 | ||
| 220 | 220 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 220 | 6.07 | Cubic\nMetre |
| 221 | 221 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 221 | 6.07 | Cubic\nMetre |
| 222 | 222 | Providing and fixing of GI drainage spouts 100mm dia as per GOI drawig SD / 205th grating arrangements at top as shown in the drawing and 100mm dia drainage spouts projecting atleast 300mm beyond the bottom of Deck slab as shown in the drawing including cost and conveyance of Galvanized Iron pipes and flats and fixing them in position etc., complete. MORTH 2705 | Item Code / Make 222 | ||
| 223 | 223 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 223 | 4 | Nos |
| 224 | 224 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 224 | 4 | Nos |
| 225 | 225 | Supply and fixing of High Quality of PVC pipes of 160mm dia.. Including cost and conveyance of pipes to the site and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges etc complete., for proving utility services in footpaths. | Item Code / Make 225 | ||
| 226 | 226 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 226 | 103.44 | RM |
| 227 | 227 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 227 | 95.44 | RM |
| 228 | 228 | Dismantling Culvert and other structures \nDismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc., as per MORTH Rev, V Clause No.111, 112 & 202. \na) Dismantling existing RR Masonry. | Item Code / Make 228 | ||
| 229 | 229 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 229 | 48.16 | Cubic\nMetre |
| 230 | 230 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 230 | 49.79 | Cubic\nMetre |
| 231 | 231 | Dismantling Culvert and other structures \nDismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc., as per MORTH Rev, V Clause No.111, 112 & 202. \na) Dismantling existing R.C.C Slab | Item Code / Make 231 | ||
| 232 | 232 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 232 | 23.21 | Cubic\nMetre |
| 233 | 233 | Dismantling Culvert and other structures \nDismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc., as per MORTH Rev, V Clause No.111, 112 & 202. \na) Dismantling existing Cut stone Slab | Item Code / Make 233 | ||
| 234 | 234 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 234 | 26.33 | Cubic\nMetre |
| 235 | 235 | Dismantling Culvert and other structures \nDismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc., as per MORTH Rev, V Clause No.111, 112 & 202. \na) Dismantling existing PCC Parapet | Item Code / Make 235 | ||
| 236 | 236 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 236 | 5.94 | Cubic\nMetre |
| 237 | 237 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 237 | 12.15 | Cubic\nMetre |
| 238 | 238 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 238 | 12.15 | Cubic\nMetre |
| 239 | 239 | Providing and Laying of PC & SC Type-A using Mini Hot Mix Plant to a compacted thichkness of 20 mmcomposed of 13.2mm to 0.09 mm (Type-A) aggregates using 22 kg Viscosity Grade-30 bitumen for 10sqm to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to required level and grade as per clause 508 of MORTH Specification. | Item Code / Make 239 | ||
| 240 | 240 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 240 | 281.25 | Square\nMetre |
| 241 | 241 | Reconstruction of Minor bridge at Km 1/6 of Manaloor Road ;Including Construction of Protective works | Item Code / Make 241 | 187.5 | Square\nMetre |
| 242 | 242 | Up keeping Component : | Item Code / Make 242 | ||
| 243 | 243 | Forming and raising the Berms with side earth with a lead of 5 km from the approved source to work site including cost of earth, conveyance charges and filling levelling to the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for making up the berms as directed by the dept. officers (during South west & North east monsoon) as per MORT&H Rev. V specifications No. 100, 111, 112, 202, 301, to 305, 900 - Ist Year | Item Code / Make 243 | ||
| 244 | 244 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 244 | 151.56 | Cubic\nMetre |
| 245 | 245 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 245 | 247.05 | Cubic Metre |
| 246 | 246 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 246 | 155.94 | Cubic Metre |
| 247 | 247 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 247 | 8.91 | Cubic Metre |
| 248 | 248 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 248 | 117.6 | Cubic Metre |
| 249 | 249 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 249 | 189 | Cubic Metre |
| 250 | 250 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 250 | 101.7 | Cubic Metre |
| 251 | 251 | Forming and raising the Berms with side earth with a lead of 5 km from the approved source to work site including cost of earth, conveyance charges and filling levelling to the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for making up the berms as directed by the dept. officers (during South west & North east monsoon) as per MORT&H Rev. V specifications No. 100, 111, 112, 202, 301, to 305, 900 - IInd Year | Item Code / Make 251 | ||
| 252 | 252 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 252 | 151.56 | Cubic\nMetre |
| 253 | 253 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 253 | 247.05 | Cubic Metre |
| 254 | 254 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 254 | 155.94 | Cubic Metre |
| 255 | 255 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 255 | 8.91 | Cubic Metre |
| 256 | 256 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 256 | 117.6 | Cubic Metre |
| 257 | 257 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 257 | 189 | Cubic Metre |
| 258 | 258 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 258 | 101.7 | Cubic Metre |
| 259 | 259 | Forming and raising the Berms with side earth with a lead of 5 km from the approved source to work site including cost of earth, conveyance charges and filling levelling to the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for making up the berms as directed by the dept. officers (during South west & North east monsoon) as per MORT&H Rev. V specifications No. 100, 111, 112, 202, 301, to 305, 900 - IIIrd Year | Item Code / Make 259 | ||
| 260 | 260 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 260 | 151.56 | Cubic\nMetre |
| 261 | 261 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 261 | 247.05 | Cubic Metre |
| 262 | 262 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 262 | 155.94 | Cubic Metre |
| 263 | 263 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 263 | 8.91 | Cubic Metre |
| 264 | 264 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 264 | 117.6 | Cubic Metre |
| 265 | 265 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 265 | 189 | Cubic Metre |
| 266 | 266 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 266 | 101.7 | Cubic Metre |
| 267 | 267 | Forming and raising the Berms with side earth with a lead of 5 km from the approved source to work site including cost of earth, conveyance charges and filling levelling to the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for making up the berms as directed by the dept. officers (during South west & North east monsoon) as per MORT&H Rev. V specifications No. 100, 111, 112, 202, 301, to 305, 900 - IVth Year | Item Code / Make 267 | ||
| 268 | 268 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 268 | 151.56 | Cubic\nMetre |
| 269 | 269 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 269 | 247.05 | Cubic Metre |
| 270 | 270 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 270 | 155.94 | Cubic Metre |
| 271 | 271 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 271 | 8.91 | Cubic Metre |
| 272 | 272 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 272 | 117.6 | Cubic Metre |
| 273 | 273 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 273 | 189 | Cubic Metre |
| 274 | 274 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 274 | 101.7 | Cubic Metre |
| 275 | 275 | Forming and raising the Berms with side earth with a lead of 5 km from the approved source to work site including cost of earth, conveyance charges and filling levelling to the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for making up the berms as directed by the dept. officers (during South west & North east monsoon) as per MORT&H Rev. V specifications No. 100, 111, 112, 202, 301, to 305, 900 - Vth Year | Item Code / Make 275 | ||
| 276 | 276 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 276 | 151.56 | Cubic\nMetre |
| 277 | 277 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 277 | 247.05 | Cubic Metre |
| 278 | 278 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 278 | 155.94 | Cubic Metre |
| 279 | 279 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 279 | 8.91 | Cubic Metre |
| 280 | 280 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 280 | 117.6 | Cubic Metre |
| 281 | 281 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 281 | 189 | Cubic Metre |
| 282 | 282 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 282 | 101.7 | Cubic Metre |
| 283 | 283 | Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bricking and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc. complete as per standard specification for Earthern Drain-Ist Year | Item Code / Make 283 | ||
| 284 | 284 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 284 | 269.81 | Cubic Metre |
| 285 | 285 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 285 | 698.4 | Cubic Metre |
| 286 | 286 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 286 | 321.9 | Cubic Metre |
| 287 | 287 | Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bricking and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc. complete as per standard specification for Earthern Drain-IInd Year | Item Code / Make 287 | ||
| 288 | 288 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 288 | 269.81 | Cubic Metre |
| 289 | 289 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 289 | 698.4 | Cubic Metre |
| 290 | 290 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 290 | 321.9 | Cubic Metre |
| 291 | 291 | Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bricking and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc. complete as per standard specification for Earthern Drain-IIIrd Year | Item Code / Make 291 | ||
| 292 | 292 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 292 | 269.81 | Cubic Metre |
| 293 | 293 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 293 | 698.4 | Cubic Metre |
| 294 | 294 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 294 | 321.9 | Cubic Metre |
| 295 | 295 | Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bricking and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc. complete as per standard specification for Earthern Drain-IVth Year | Item Code / Make 295 | ||
| 296 | 296 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 296 | 269.81 | Cubic Metre |
| 297 | 297 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 297 | 698.4 | Cubic Metre |
| 298 | 298 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 298 | 321.9 | Cubic Metre |
| 299 | 299 | Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bricking and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc. complete as per standard specification for Earthern Drain-Vth Year | Item Code / Make 299 | ||
| 300 | 300 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 300 | 269.81 | Cubic Metre |
| 301 | 301 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 301 | 698.4 | Cubic Metre |
| 302 | 302 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 302 | 321.9 | Cubic Metre |
| 303 | 303 | Clearing the Light jungles including weeding out shrubs, bushes, vegetable growth, etc. as per specifications & directions of Engineer-in-charge -Ist Year | Item Code / Make 303 | ||
| 304 | 304 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 304 | 864 | Square\nMetre |
| 305 | 305 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 305 | 2682 | Square\nMetre |
| 306 | 306 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 306 | 864 | Square\nMetre |
| 307 | 307 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 307 | 1152 | Square\nMetre |
| 308 | 308 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 308 | 1680 | Square\nMetre |
| 309 | 309 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 309 | 1613.4 | Square\nMetre |
| 310 | 310 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 310 | 4560 | Square\nMetre |
| 311 | 311 | Clearing the Light jungles including weeding out shrubs, bushes, vegetable growth, etc. as per specifications & directions of Engineer-in-charge - IInd Year | Item Code / Make 311 | ||
| 312 | 312 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 312 | 864 | Square\nMetre |
| 313 | 313 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 313 | 2682 | Square\nMetre |
| 314 | 314 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 314 | 864 | Square\nMetre |
| 315 | 315 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 315 | 1152 | Square\nMetre |
| 316 | 316 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 316 | 1680 | Square\nMetre |
| 317 | 317 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 317 | 1613.4 | Square\nMetre |
| 318 | 318 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 318 | 4560 | Square\nMetre |
| 319 | 319 | Clearing the Light jungles including weeding out shrubs, bushes, vegetable growth, etc. as per specifications & directions of Engineer-in-charge - IIIrd Year | Item Code / Make 319 | ||
| 320 | 320 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 320 | 864 | Square\nMetre |
| 321 | 321 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 321 | 2682 | Square\nMetre |
| 322 | 322 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 322 | 864 | Square\nMetre |
| 323 | 323 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 323 | 1152 | Square\nMetre |
| 324 | 324 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 324 | 1680 | Square\nMetre |
| 325 | 325 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 325 | 1613.4 | Square\nMetre |
| 326 | 326 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 326 | 4560 | Square\nMetre |
| 327 | 327 | Clearing the Light jungles including weeding out shrubs, bushes, vegetable growth, etc. as per specifications & directions of Engineer-in-charge - IVth Year | Item Code / Make 327 | ||
| 328 | 328 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 328 | 864 | Square\nMetre |
| 329 | 329 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 329 | 2682 | Square\nMetre |
| 330 | 330 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 330 | 864 | Square\nMetre |
| 331 | 331 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 331 | 1152 | Square\nMetre |
| 332 | 332 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 332 | 1680 | Square\nMetre |
| 333 | 333 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 333 | 1613.4 | Square\nMetre |
| 334 | 334 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 334 | 4560 | Square\nMetre |
| 335 | 335 | Clearing the Light jungles including weeding out shrubs, bushes, vegetable growth, etc. as per specifications & directions of Engineer-in-charge - Vth Year | Item Code / Make 335 | ||
| 336 | 336 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 336 | 864 | Square\nMetre |
| 337 | 337 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 337 | 2682 | Square\nMetre |
| 338 | 338 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 338 | 864 | Square\nMetre |
| 339 | 339 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 339 | 1152 | Square\nMetre |
| 340 | 340 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 340 | 1680 | Square\nMetre |
| 341 | 341 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 341 | 1613.4 | Square\nMetre |
| 342 | 342 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 342 | 4560 | Square\nMetre |
| 343 | 343 | Cleaning of the vent way of Cross Drainage works linear water way by using JCB including removing and disposal of debris, conveyance and all other incidental charges- Ist Year | Item Code / Make 343 | ||
| 344 | 344 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 344 | 2 | Hours |
| 345 | 345 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 345 | 1 | Hours |
| 346 | 346 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 346 | 1 | Hours |
| 347 | 347 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 347 | 1 | Hours |
| 348 | 348 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 348 | 3 | Hours |
| 349 | 349 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 349 | 3 | Hours |
| 350 | 350 | Cleaning of the vent way of Cross Drainage works linear water way by using JCB including removing and disposal of debris, conveyance and all other incidental charges- IIndYear | Item Code / Make 350 | ||
| 351 | 351 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 351 | 2 | Hours |
| 352 | 352 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 352 | 1 | Hours |
| 353 | 353 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 353 | 1 | Hours |
| 354 | 354 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 354 | 1 | Hours |
| 355 | 355 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 355 | 3 | Hours |
| 356 | 356 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 356 | 3 | Hours |
| 357 | 357 | Cleaning of the vent way of Cross Drainage works linear water way by using JCB including removing and disposal of debris, conveyance and all other incidental charges- III rdYear | Item Code / Make 357 | ||
| 358 | 358 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 358 | 2 | Hours |
| 359 | 359 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 359 | 1 | Hours |
| 360 | 360 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 360 | 1 | Hours |
| 361 | 361 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 361 | 1 | Hours |
| 362 | 362 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 362 | 3 | Hours |
| 363 | 363 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 363 | 3 | Hours |
| 364 | 364 | Cleaning of the vent way of Cross Drainage works linear water way by using JCB including removing and disposal of debris, conveyance and all other incidental charges- IVth Year | Item Code / Make 364 | ||
| 365 | 365 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 365 | 2 | Hours |
| 366 | 366 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 366 | 1 | Hours |
| 367 | 367 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 367 | 1 | Hours |
| 368 | 368 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 368 | 1 | Hours |
| 369 | 369 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 369 | 3 | Hours |
| 370 | 370 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 370 | 3 | Hours |
| 371 | 371 | Cleaning of the vent way of Cross Drainage works linear water way by using JCB including removing and disposal of debris, conveyance and all other incidental charges- Vth Year | Item Code / Make 371 | ||
| 372 | 372 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 372 | 2 | Hours |
| 373 | 373 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 373 | 1 | Hours |
| 374 | 374 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 374 | 1 | Hours |
| 375 | 375 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 375 | 1 | Hours |
| 376 | 376 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 376 | 3 | Hours |
| 377 | 377 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 377 | 3 | Hours |
| 378 | 378 | Tree/ E.B pole,Culvert parapets,handrails White banding using shell lime with standard dimension including all materials and labour and all other incidental charges etc.. Complete - Ist Year | Item Code / Make 378 | ||
| 379 | 379 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 379 | 14.8 | Square Meter |
| 380 | 380 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 380 | 0.8 | Square Meter |
| 381 | 381 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 381 | 7.4 | Square Meter |
| 382 | 382 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 382 | 6.72 | Square Meter |
| 383 | 383 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 383 | 30.62 | Square Meter |
| 384 | 384 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 384 | 25.64 | Square Meter |
| 385 | 385 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 385 | 19.06 | Square Meter |
| 386 | 386 | Tree/ E.B pole,Culvert parapets,handrails White banding using shell lime with standard dimension including all materials and labour and all other incidental charges etc.. Complete - IInd Year | Item Code / Make 386 | ||
| 387 | 387 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 387 | 14.8 | Square Meter |
| 388 | 388 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 388 | 0.8 | Square Meter |
| 389 | 389 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 389 | 7.4 | Square Meter |
| 390 | 390 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 390 | 6.72 | Square Meter |
| 391 | 391 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 391 | 30.62 | Square Meter |
| 392 | 392 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 392 | 25.64 | Square Meter |
| 393 | 393 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 393 | 19.06 | Square Meter |
| 394 | 394 | Tree/ E.B pole,Culvert parapets,handrails White banding using shell lime with standard dimension including all materials and labour and all other incidental charges etc.. Complete - IIIrd Year | Item Code / Make 394 | ||
| 395 | 395 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 395 | 14.8 | Square Meter |
| 396 | 396 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 396 | 0.8 | Square Meter |
| 397 | 397 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 397 | 7.4 | Square Meter |
| 398 | 398 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 398 | 6.72 | Square Meter |
| 399 | 399 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 399 | 30.62 | Square Meter |
| 400 | 400 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 400 | 25.64 | Square Meter |
| 401 | 401 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 401 | 19.06 | Square Meter |
| 402 | 402 | Tree/ E.B pole,Culvert parapets,handrails White banding using shell lime with standard dimension including all materials and labour and all other incidental charges etc.. Complete - IVth Year | Item Code / Make 402 | ||
| 403 | 403 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 403 | 14.8 | Square Meter |
| 404 | 404 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 404 | 0.8 | Square Meter |
| 405 | 405 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 405 | 7.4 | Square Meter |
| 406 | 406 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 406 | 6.72 | Square Meter |
| 407 | 407 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 407 | 30.62 | Square Meter |
| 408 | 408 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 408 | 25.64 | Square Meter |
| 409 | 409 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 409 | 19.06 | Square Meter |
| 410 | 410 | Tree/ E.B pole,Culvert parapets,handrails White banding using shell lime with standard dimension including all materials and labour and all other incidental charges etc.. Complete - Vth Year | Item Code / Make 410 | ||
| 411 | 411 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 411 | 14.8 | Square Meter |
| 412 | 412 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 412 | 0.8 | Square Meter |
| 413 | 413 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 413 | 7.4 | Square Meter |
| 414 | 414 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 414 | 6.72 | Square Meter |
| 415 | 415 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 415 | 30.62 | Square Meter |
| 416 | 416 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 416 | 25.64 | Square Meter |
| 417 | 417 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 417 | 19.06 | Square Meter |
| 418 | 418 | Tree/ E.B pole,Culvert parapets,handrails Black banding using japan black/Coal tar with standard dimension including all materials and labour and all other incidental charges etc.. Complete - Ist Year | Item Code / Make 418 | ||
| 419 | 419 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 419 | 14.8 | Square Meter |
| 420 | 420 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 420 | 0.4 | Square Meter |
| 421 | 421 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 421 | 3.8 | Square Meter |
| 422 | 422 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 422 | 3.48 | Square Meter |
| 423 | 423 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 423 | 15.4 | Square Meter |
| 424 | 424 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 424 | 13.19 | Square Meter |
| 425 | 425 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 425 | 9.86 | Square Meter |
| 426 | 426 | Tree/ E.B pole,Culvert parapets,handrails Black banding using japan black/Coal tar with standard dimension including all materials and labour and all other incidental charges etc.. Complete - IInd Year | Item Code / Make 426 | ||
| 427 | 427 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 427 | 14.8 | Square Meter |
| 428 | 428 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 428 | 0.4 | Square Meter |
| 429 | 429 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 429 | 3.8 | Square Meter |
| 430 | 430 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 430 | 3.48 | Square Meter |
| 431 | 431 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 431 | 15.4 | Square Meter |
| 432 | 432 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 432 | 13.19 | Square Meter |
| 433 | 433 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 433 | 9.86 | Square Meter |
| 434 | 434 | Tree/ E.B pole,Culvert parapets,handrails Black banding using japan black/Coal tar with standard dimension including all materials and labour and all other incidental charges etc.. Complete - IIIrdYear | Item Code / Make 434 | ||
| 435 | 435 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 435 | 14.8 | Square Meter |
| 436 | 436 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 436 | 0.4 | Square Meter |
| 437 | 437 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 437 | 3.8 | Square Meter |
| 438 | 438 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 438 | 3.48 | Square Meter |
| 439 | 439 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 439 | 15.4 | Square Meter |
| 440 | 440 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 440 | 13.19 | Square Meter |
| 441 | 441 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 441 | 9.86 | Square Meter |
| 442 | 442 | Tree/ E.B pole,Culvert parapets,handrails Black banding using japan black/Coal tar with standard dimension including all materials and labour and all other incidental charges etc.. Complete - IVthYear | Item Code / Make 442 | ||
| 443 | 443 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 443 | 14.8 | Square Meter |
| 444 | 444 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 444 | 0.4 | Square Meter |
| 445 | 445 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 445 | 3.8 | Square Meter |
| 446 | 446 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 446 | 3.48 | Square Meter |
| 447 | 447 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 447 | 15.4 | Square Meter |
| 448 | 448 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 448 | 13.19 | Square Meter |
| 449 | 449 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 449 | 9.86 | Square Meter |
| 450 | 450 | Tree/ E.B pole,Culvert parapets,handrails Black banding using japan black/Coal tar with standard dimension including all materials and labour and all other incidental charges etc.. Complete - VthYear | Item Code / Make 450 | ||
| 451 | 451 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 451 | 14.8 | Square Meter |
| 452 | 452 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 452 | 0.4 | Square Meter |
| 453 | 453 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 453 | 3.8 | Square Meter |
| 454 | 454 | Widening from End to End and CCPavement of Veerasigamani - Arunachalapuram road at km 3/4 - 3/6 Including CD Works. including upkeeping for a period of 60 months | Item Code / Make 454 | 3.48 | Square Meter |
| 455 | 455 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 455 | 15.4 | Square Meter |
| 456 | 456 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 456 | 13.19 | Square Meter |
| 457 | 457 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 457 | 9.86 | Square Meter |
| 458 | 458 | Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces as per MORTH Rev. V Clause No. 111, 112, 501, 503 & 900.-IV th Year | Item Code / Make 458 | ||
| 459 | 459 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 459 | 158.7 | Square Meter |
| 460 | 460 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 460 | 330 | Square Meter |
| 461 | 461 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 461 | 165 | Square Meter |
| 462 | 462 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 462 | 349.95 | Square Meter |
| 463 | 463 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 463 | 202.89 | Square Meter |
| 464 | 464 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 464 | 112.5 | Square Meter |
| 465 | 465 | Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces as per MORTH Rev. V Clause No. 111, 112, 501, 503 & 900.-V th Year | Item Code / Make 465 | ||
| 466 | 466 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 466 | 264.5 | Square Meter |
| 467 | 467 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 467 | 550 | Square Meter |
| 468 | 468 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 468 | 275 | Square Meter |
| 469 | 469 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 469 | 583.25 | Square Meter |
| 470 | 470 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 470 | 338.16 | Square Meter |
| 471 | 471 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 471 | 187.5 | Square Meter |
| 472 | 472 | Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II as per MORTH Rev. V Clause No. 111, 112, 501, 507 & 900.-IVth Year | Item Code / Make 472 | ||
| 473 | 473 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 473 | 4.761 | Cubic Meter |
| 474 | 474 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 474 | 9.9 | Cubic Meter |
| 475 | 475 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 475 | 4.95 | Cubic Meter |
| 476 | 476 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 476 | 13.988 | Cubic Meter |
| 477 | 477 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 477 | 6.087 | Cubic Meter |
| 478 | 478 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 478 | 3.375 | Cubic Meter |
| 479 | 479 | Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II as per MORTH Rev. V Clause No. 111, 112, 501, 507 & 900.-Vth Year | Item Code / Make 479 | ||
| 480 | 480 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 0/0 - 1/0 Including Reconstruction of Minor bridge at Km 0/6, Including CD works , Junction Improvements at Km 0/2. including upkeeping for a period of 60 months | Item Code / Make 480 | 7.94 | Cubic Meter |
| 481 | 481 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 1/0 - 3/0 Including Construction of Protective Works at Km 4/8, 4/10. including upkeeping for a period of 60 months | Item Code / Make 481 | 16.5 | Cubic Meter |
| 482 | 482 | Widening from Single lane to Intermediate lane and Improvements of Karivalamvanthanallur - Panaiyoor road at km 3/0 - 4/0 Including Construction of Protective Works at Km 5/0-5/6. including upkeeping for a period of 60 months | Item Code / Make 482 | 8.25 | Cubic Meter |
| 483 | 483 | Improvements to Riding Quality at km 29/0 - 30/0 of Rajapalayam - Sankarankovil - Tirunelveli Road (SH 41) including upkeeping for a period of 60 months | Item Code / Make 483 | 23.33 | Cubic Meter |
| 484 | 484 | Improvements to Riding Quality at Km 0/0 - 1/8 of Manaloor Road, Including upkeeping for a period of 60 months. | Item Code / Make 484 | 10.145 | Cubic Meter |
| 485 | 485 | Improvements to Riding Quality at Km 1/0-2/0 of Alangulam-Veerasigamani Road, Including upkeeping for a period of 60 months. | Item Code / Make 485 | 5.625 | Cubic Meter |
| 486 | 486 | Calculation of SubTotal, GST and Total Amount carried out by system automatically | |||
| 487 | 487 | Basic cost of value put to tender as per estimate | 1 | (A) | |
| 488 | 488 | Add GST at 12% | 1 | (B) | |
| 489 | 489 | Total Value put to Tender | 1 | (A+B) | |
| 490 | 490 | Negotiated Percentage | 1 | (D) | |
| 491 | 491 | Final Negotiated Value | 1 | (E) | |
| 492 | 492 | Add GST at 12% of Final Negotiated Value | 1 | (F) | |
| 493 | 493 | Total Value of Contract Including 12% of GST | 1 | (E+F) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender