Highways Department-HD has published Package No 74 Tn No 5 2020 21 Hdo Dated 28 05 2020 Package 74 Widening And Improvements Of Government Roads In Kamuthi Highways C And M Sub Division Including Cd Works And Upkeeping For A Period Of 60 Months. Submission Date for this Tender is 07-07-2020. Road Work Tenders in Ramanathpuram Tamil Nadu. Bidders can get complete Tender details and download the document.
Schedule of quantities to accompany the Tender for the work of Package-74- Widening and Improvements of Government roads in Kamuthi (Highways) C&M Sub-Division including CD works and Upkeeping for a period of 60 Months LIST OF ROAD ATTACHED IN PRICE BID DOCUMENT. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Excavation \nExcavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer including compaction by power roller rolling as per MORTH Specification no.111,112,301,305,900 for Box Cutting & PROTECTIVE WALL | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | ROAD A | 825.3 | Cubic Metre | |
3 | 1.02 | ROAD B | 598.97 | Cubic Metre | |
4 | 1.03 | ROAD C | 880 | Cubic Metre | |
5 | 1.04 | ROAD D | 351.08 | Cubic Metre | |
6 | 1.05 | ROAD E | 446.26 | Cubic Metre | |
7 | 1.06 | ROAD H (FOR RETAINING WALL) | 46.76 | Cubic Metre | |
8 | 1.07 | ROAD I (FOR RETAINING WALL) | 143.17 | Cubic Metre | |
9 | 2 | Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for pickig and all other tools and plants employed of the work and including all other incidental charges etc., complete as per MORTH Specification no.111,112,202 | |||
10 | 2.01 | ROAD A | 1984.5 | Square Metre | |
11 | 2.02 | ROAD B | 1386.5 | Square Metre | |
12 | 2.03 | ROAD C | 2500 | Square Metre | |
13 | 2.04 | ROAD D | 1015.52 | Square Metre | |
14 | 2.05 | ROAD E | 1096 | Square Metre | |
15 | 2.06 | ROAD F | 2211.77 | Square Metre | |
16 | 2.07 | ROAD G | 3730.62 | Square Metre | |
17 | 3 | Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification No.111, 112, 401,900 - for grading- III Material | |||
18 | 3.01 | ROAD E | 139.46 | Cubic Metre | |
19 | 4 | Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification No.111, 112, 401,900 - for grading- V Material | |||
20 | 4.01 | ROAD A | 501.5 | Cubic Metre | |
21 | 4.02 | ROAD B | 503.46 | Cubic Metre | |
22 | 4.03 | ROAD C | 525 | Cubic Metre | |
23 | 4.04 | ROAD D | 209.45 | Cubic Metre | |
24 | 4.05 | ROAD E | 153.4 | Cubic Metre | |
25 | 5 | Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406 of MORTH Vth Revision Specification no.111,112,406,900 | |||
26 | 5.01 | ROAD A | 1770.96 | Cubic Metre | |
27 | 5.02 | ROAD B | 1312.05 | Cubic Metre | |
28 | 5.03 | ROAD C | 2225 | Cubic Metre | |
29 | 5.04 | ROAD D | 898.91 | Cubic Metre | |
30 | 5.05 | ROAD E | 940.48 | Cubic Metre | |
31 | 5.06 | ROAD F | 796.23 | Cubic Metre | |
32 | 5.07 | ROAD G | 1380.29 | Cubic Metre | |
33 | 6 | Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification no.111,112, 501,502,900- over WMM | |||
34 | 6.01 | ROAD A | 7665.35 | Square Metre | |
35 | 6.02 | ROAD B | 7004.4 | Square Metre | |
36 | 6.03 | ROAD C | 11000 | Square Metre | |
37 | 6.04 | ROAD D | 4450.95 | Square Metre | |
38 | 6.05 | ROAD E | 4687.8 | Square Metre | |
39 | 6.06 | ROAD F | 6635.32 | Square Metre | |
40 | 6.07 | ROAD G | 11191.9 | Square Metre | |
41 | 7 | Tack coat - Providing and applying tack coat with bitumen emulsion(RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification no.111,112,501, 503,900- over granular surfaces treated with primer | |||
42 | 7.01 | ROAD A | 7665.35 | Square Metre | |
43 | 7.02 | ROAD B | 7004.4 | Square Metre | |
44 | 7.03 | ROAD C | 11000 | Square Metre | |
45 | 7.04 | ROAD D | 4450.95 | Square Metre | |
46 | 7.05 | ROAD E | 4687.8 | Square Metre | |
47 | 7.06 | ROAD F | 6635.32 | Square Metre | |
48 | 7.07 | ROAD G | 11191.9 | Square Metre | |
49 | 8 | Bituminous Macadam Providing and laying bituminous macadam with Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade- 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 of MORTH Specification no.111,112,501,503,900 - Grading II | |||
50 | 8.01 | ROAD A | 383.27 | Cubic Metre | |
51 | 8.02 | ROAD B | 350.21 | Cubic Metre | |
52 | 8.03 | ROAD C | 550 | Cubic Metre | |
53 | 8.04 | ROAD D | 222.55 | Cubic Metre | |
54 | 8.05 | ROAD E | 234.39 | Cubic Metre | |
55 | 8.06 | ROAD F | 331.78 | Cubic Metre | |
56 | 8.07 | ROAD G | 559.6 | Cubic Metre | |
57 | 9 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specificationno.111,112,507,900 complete in all respects - Grading II | |||
58 | 9.01 | ROAD A | 229.96 | Cubic Metre | |
59 | 9.02 | ROAD B | 210.13 | Cubic Metre | |
60 | 9.03 | ROAD C | 330 | Cubic Metre | |
61 | 9.04 | ROAD D | 133.53 | Cubic Metre | |
62 | 9.05 | ROAD E | 140.63 | Cubic Metre | |
63 | 9.06 | ROAD F | 199.06 | Cubic Metre | |
64 | 9.07 | ROAD G | 335.75 | Cubic Metre | |
65 | 10 | Vibrated Cement Concrete M15 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., as per MORTH Specification no. 111,112,1000, 1500, 1700,2100,900 complete for FOUNDATION BELOW SILL LEVEL | |||
66 | 10.01 | ROAD A | 4.55 | Cubic Metre | |
67 | 11 | Vibrated Cement Concrete M15 using 20mm ISS HBG metal including cost of material, laying, compacting, finishing and curing etc., complete as per standard specification and as directed by the departmental officers for side walls of Paverblock pavement. | |||
68 | 11.01 | ROAD A | 40.97 | Cubic Metre | |
69 | 12 | Quarry Dust Filling behind the abutments, Wings and pipe portion with Quarry fines including cost and conveyance to site including labour charges for filling in layers watering tamping under optimum moisture content to get the maximum density including of all other incidental charges etc., complete as per MORT & H specification no.304,900 | |||
70 | 12.01 | ROAD A | 32.65 | Cubic Metre | |
71 | 12.02 | ROAD H (FOR RETAINING WALL) | 7.88 | Cubic Metre | |
72 | 12.03 | ROAD I (FOR RETAINING WALL) | 23.18 | Cubic Metre | |
73 | 13 | Providing and laying 83mm thick Hi strength type of interlocking colour paver block of minimum compressive strength 40 N sq.mm in uniform shape of approved make to be laid in harring bone patern with approved non skitting surface in top as diected by the engineer the rate in inclusive of providing transporting loading and unloading and laying as per standard specification etc.,complete for paver blocked portion as per MORTH specification No.IRC SP 63:2004 | |||
74 | 13.01 | ROAD A | 1088.45 | Square Metre | |
75 | 14 | Excavation \nExcavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer including compaction by power roller rolling as per SS20B MORTH Specification no.111,112,301,305,900 for Making up the berms. | |||
76 | 14.01 | ROAD A | 320.84 | Cubic Metre | |
77 | 14.02 | ROAD C | 940 | Cubic Metre | |
78 | 14.03 | ROAD D | 63.83 | Cubic Metre | |
79 | 14.04 | ROAD F | 698.76 | Cubic Metre | |
80 | 14.05 | ROAD G | 1196.28 | Cubic Metre | |
81 | 15 | Refilling for making up berms with box cutting earth and side earth obtained from the box cutting portion and available earth including removal and satisfactory disposal of all materials etc complete as directed by the engineer as per MORTH Specification No. 111, 112, 301, 305, 900 | |||
82 | 15.01 | ROAD A | 825.3 | Cubic Metre | |
83 | 15.02 | ROAD B | 511.93 | Cubic Metre | |
84 | 15.03 | ROAD C | 880 | Cubic Metre | |
85 | 15.04 | ROAD D | 351.08 | Cubic Metre | |
86 | 15.05 | ROAD E | 414.39 | Cubic Metre | |
87 | 15.06 | ROAD H (FOR RETAINING WALL) | 31.5 | Cubic Metre | |
88 | 15.07 | ROAD I (FOR RETAINING WALL) | 113.3 | Cubic Metre | |
89 | 16 | Providing RCC M15 Grade precast KM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete as per MORT & H Specification No. 804 | |||
90 | 16.01 | ROAD A | 1 | Number | |
91 | 16.02 | ROAD B | 1 | Number | |
92 | 16.03 | ROAD C | 2 | Number | |
93 | 16.04 | ROAD F | 1 | Numbers | |
94 | 16.05 | ROAD G | 3 | Number | |
95 | 17 | Providing RCC M15 Grade precast HM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete as per MORT & H Specification No. 804 | |||
96 | 17.01 | ROAD A | 7 | Numbers | |
97 | 17.02 | ROAD B | 5 | Numbers | |
98 | 17.03 | ROAD C | 8 | Number | |
99 | 17.04 | ROAD D | 4 | Number | |
100 | 17.05 | ROAD E | 4 | Numbers | |
101 | 17.06 | ROAD F | 7 | Numbers | |
102 | 17.07 | ROAD G | 12 | Number | |
103 | 18 | Providing RCC M.15 grade Precast Boundary stones / Guid postof standard design as per IRC 8-1980 and fixing in position including painting and printing etc., complete (as per MORT & H specification | |||
104 | 18.01 | ROAD A | 88 | Numbers | |
105 | 18.02 | ROAD B | 56 | Numbers | |
106 | 18.03 | ROAD C | 96 | Number | |
107 | 18.04 | ROAD D | 40 | Number | |
108 | 18.05 | ROAD E | 44 | Numbers | |
109 | 18.06 | ROAD F | 76 | Numbers | |
110 | 18.07 | ROAD G | 150 | Number | |
111 | 19 | Vibrated Cement Concrete M15 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., as per MORTH Specification no. 111,112,1000, 1500, 1700,2100,900 complete for FOUNDATION BELOW SILL LEVEL | |||
112 | 19.01 | ROAD H (FOR RETAINING WALL) | 42.49 | Cubic Metre | |
113 | 19.02 | ROAD I (FOR RETAINING WALL) | 125.46 | Cubic Metre | |
114 | 20 | Vibrated Cement Concrete M15 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., as per MORTH Specification no. 111,112,1000, 1500, 1700,2100,900 complete for Above Sill Level | |||
115 | 20.01 | ROAD H (FOR RETAINING WALL) | 59.22 | Cubic Metre | |
116 | 20.02 | ROAD I (FOR RETAINING WALL) | 216.4 | Cubic Metre | |
117 | 21 | Providing and fixing SEEPAGE PIPES of 100mm dia with 4.00 kg per Cm2 of PVC pipes of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite cost and labour for 900mms diaganite chis at theperiphery and labour charges for fixing etc., complete to drain the back fill the RETAINING WALL | |||
118 | 21.01 | ROAD H (FOR RETAINING WALL) | 18 | RM | |
119 | 21.02 | ROAD I (FOR RETAINING WALL) | 52 | RM | |
120 | 22 | Dismantling\nDismantling the salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc,as per MORTH Specification no.111,112,202 SI.No.14 | |||
121 | 22.01 | P.CC.Walls | |||
122 | 22.02 | ROAD A (FOR BOX CULVERT) | 59.4 | Cubic Metre | |
123 | 22.03 | ROAD B (FOR BOX CULVERT) | 14.85 | Cubic Metre | |
124 | 22.04 | ROAD D (FOR BOX CULVERT) | 14.85 | Cubic Metre | |
125 | 22.05 | ROAD E (FOR BOX CULVERT) | 14.85 | Cubic Metre | |
126 | 22.06 | ROAD F (FOR BOX CULVERT) | 14.85 | Cubic Metre | |
127 | 22.07 | ROAD G (FOR BOX CULVERT) | 74.25 | Cubic Metre | |
128 | 23 | Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per standard specification 111,112,304 for dressing the bed upto sill level | |||
129 | 23.01 | ROAD B (FOR MINOR BRIDGE) | 81.91 | Cubic Metre | |
130 | 24 | Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per standard specification 111,112,304 for foundation | |||
131 | 24.01 | ROAD A (FOR BOX CULVERT) | 477.92 | Cubic Metre | |
132 | 24.02 | ROAD B (FOR BOX CULVERT) | 119.48 | Cubic Metre | |
133 | 24.03 | ROAD B (FOR RETAINING WALL) | 139 | Cubic Metre | |
134 | 24.04 | ROAD B (FOR MINOR BRIDGE) | 282.7 | Cubic Metre | |
135 | 24.05 | ROAD D (FOR BOX CULVERT) | 119.48 | Cubic Metre | |
136 | 24.06 | ROAD D (FOR RETAINING WALL) | 61.16 | Cubic Metre | |
137 | 24.07 | ROAD E (FOR BOX CULVERT) | 193.26 | Cubic Metre | |
138 | 24.08 | ROAD F (FOR BOX CULVERT) | 119.48 | Cubic Metre | |
139 | 24.09 | ROAD G (FOR RETAINING WALL) | 55.6 | Cubic Metre | |
140 | 24.1 | ROAD G (FOR BOX CULVERT) | 597.4 | Cubic Metre | |
141 | 24.11 | ROAD H (FOR PROTECTIVE WALL) | 52.08 | Cubic Metre | |
142 | 25 | Vibrated Cement Concrete M15 using 40mm ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication for steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete as per MORTH Specification no.111,112,1000, 1500, 1700,2200,900 For foundation Concrete | |||
143 | 25.01 | ROAD A (FOR BOX CULVERT) | 27.16 | Cubic Metre | |
144 | 25.02 | ROAD B (FOR BOX CULVERT) | 6.79 | Cubic Metre | |
145 | 25.03 | ROAD D (FOR BOX CULVERT) | 6.79 | Cubic Metre | |
146 | 25.04 | ROAD E (FOR BOX CULVERT) | 11.44 | Cubic Metre | |
147 | 25.05 | ROAD F (FOR BOX CULVERT) | 6.79 | Cubic Metre | |
148 | 25.06 | ROAD G (FOR BOX CULVERT) | 33.95 | Cubic Metre | |
149 | 25.07 | ROAD H (FOR PROTECTIVE WALL) | 6.72 | Cubic Metre | |
150 | 26 | Vibrated Cement Concrete M10 Nominal mix 1:3:6 using 40mm ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication for steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete as per MORTH Specification no.111,112,1000, 1500, 1700,2200,900 For Below Sill Level | |||
151 | 26.01 | ROAD B (FOR MINOR BRIDGE) | 15.71 | Cubic Metre | |
152 | 27 | Vibrated Cement Concrete M25 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., as per MORTH Specification no. 111,112,1000, 1500, 1700,2100,900 complete for FOUNDATION BELOW SILL LEVEL AND ABOVE SILL LEVEL FOR BOX CULVERT | |||
153 | 27.01 | ROAD A (FOR BOX CULVERT) | 111.28 | Cubic Metre | |
154 | 27.02 | ROAD B (FOR BOX CULVERT) | 27.82 | Cubic Metre | |
155 | 27.03 | ROAD D (FOR BOX CULVERT) | 27.82 | Cubic Metre | |
156 | 27.04 | ROAD E (FOR BOX CULVERT) | 55.64 | Cubic Metre | |
157 | 27.05 | ROAD F (FOR BOX CULVERT) | 27.82 | Cubic Metre | |
158 | 27.06 | ROAD G (FOR BOX CULVERT) | 139.1 | Cubic Metre | |
159 | 28 | Vibrated Cement Concrete M15 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., as per MORTH Specification no. 111,112,1000, 1500, 1700,2100,900 complete for FOUNDATION BELOW SILL LEVEL | |||
160 | 28.01 | ROAD B (FOR RETAINING WALL) | 121.26 | Cubic Metre | |
161 | 28.02 | ROAD D (FOR RETAINING WALL) | 53.35 | Cubic Metre | |
162 | 28.03 | ROAD G (FOR RETAINING WALL) | 48.72 | Cubic Metre | |
163 | 28.04 | ROAD H (FOR PROTECTIVEWALL) | 32.45 | Cubic Metre | |
164 | 29 | Vibrated Cement Concrete M15 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., as per MORTH Specification no. 111,112,1000, 1500, 1700,2100,900 complete for SUBSTRUCTURE OF ABUTEMENT WINGS AND PIERS (substructure - Above Sill ) | |||
165 | 29.01 | ROAD B (FOR RETAINING WALL) | 189.2 | Cubic Metre | |
166 | 29.02 | ROAD B (FOR MINOR BRIDGE) | 76.72 | Cubic Metre | |
167 | 29.03 | ROAD D (FOR RETAINING WALL) | 83.25 | Cubic Metre | |
168 | 29.04 | ROAD G (FOR RETAINING WALL) | 76.4 | Cubic Metre | |
169 | 29.05 | ROAD H (FOR PROTECTIVEWALL) | 25.73 | Cubic Metre | |
170 | 30 | Supply and fabrication of steel Grade Fe-500 required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the bars straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per MORTH Vth Revision Specification No. 1000, 1500, 1600, 900 | |||
171 | 30.01 | ROAD A (FOR BOX CULVERT) | 8.56 | Metric tone | |
172 | 30.02 | ROAD B (FOR BOX CULVERT) | 2.141 | Metric tone | |
173 | 30.03 | ROAD B (FOR MINOR BRIDGE) | 8.69 | Metric tone | |
174 | 30.04 | ROAD D (FOR BOX CULVERT) | 2.141 | Metric tone | |
175 | 30.05 | ROAD E (FOR BOX CULVERT) | 4.23 | Metric tone | |
176 | 30.06 | ROAD F (FOR BOX CULVERT) | 2.141 | Metric tone | |
177 | 30.07 | ROAD G (FOR BOX CULVERT) | 10.705 | Metric tone | |
178 | 41 | Providing and fixing of G.I. Drainge spouts 100mm dia as per MOST drawing No.SD/205 with grating arrangements at top as shown in the drawing including cost and conveyance of GI pipes and flats and fixing them in position etc., complete | |||
179 | 41.01 | ROAD B (FOR MINOR BRIDGE) | 4 | Each | |
180 | 42 | Providing and fixing of SEEPAGE PIPES 100mm dia with 4 .00 Kg cm2 of PVC pipes of required length for abutment and wing ,Retaining wall including cost and conveyance of all materials to work site cost and labour for 900 mm diaganite chis at the periphery and labour fixing etc., complete to drain the back fill the retaining wall | |||
181 | 42.01 | ROAD B (FOR RETAINING WALL) | 50 | RM | |
182 | 42.02 | ROAD B (FOR MINOR BRIDGE) | 30 | RM | |
183 | 42.03 | ROAD D (FOR RETAINING WALL) | 22 | RM | |
184 | 42.04 | ROAD G (FOR RETAINING WALL ) | 20 | RM | |
185 | 42.05 | ROAD H (FOR PROTECTIVEWALL) | 16 | RM | |
186 | 43 | Vibrated Reinforced Cement Concrete [Design Mix] M30 grade using ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication for steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete as per MORTH Vth Revision Specification No. 111, 112, 1000, 1500, 1600, 1700, 2200, 2300 900 for BED BLOCK OVER PIER AND DIRT WALL CUM BED BLOCK OVER ABUTMENT | |||
187 | 43.01 | ROAD B (FOR MINOR BRIDGE) | 6.44 | Cubic Metre | |
188 | 44 | Providing and fixing Kraft Paper for full width of seating of deck slab and including cost and conveyance to worksite labour for fixing the same in correct position and all other incidental charges etc., complete as per MORTH Vth Revision Specification No. 2600 | |||
189 | 44.01 | ROAD B (FOR MINOR BRIDGE) | 17.52 | Square metre | |
190 | 45 | Vibrated Cement Concrete M30 Grade (Design mix) Using IRC size hard granite metal including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying compacting curing, including all incidental charges etc., complete as per MORTH Vth Revision Specification No. 1000, 1500, 1600, 1700, 2702, 900 for WEARING COAT 75MM uniform thickness OVER DECK SLAB AND APPROACH SLAB | |||
191 | 45.01 | ROAD A (FOR BOX CULVERT) | 76.44 | Square metre | |
192 | 45.02 | ROAD B (FOR BOX CULVERT) | 19.11 | Square metre | |
193 | 45.03 | ROAD B (FOR MINOR BRIDGE) | 148.5 | Square metre | |
194 | 45.04 | ROAD D (FOR BOX CULVERT) | 19.11 | Square metre | |
195 | 45.05 | ROAD E (FOR BOX CULVERT) | 40.11 | Square metre | |
196 | 45.06 | ROAD F (FOR BOX CULVERT) | 19.11 | Square metre | |
197 | 45.07 | ROAD G (FOR BOX CULVERT) | 95.55 | Square metre | |
198 | 46 | Vibrated Cement Concrete M20 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., as per MORTH Specification no. 111,112,1000, 1500, 1700,2100,900 complete for Wings walls & Parapet wall and footing of abutment and wings below sill level | |||
199 | 46.01 | ROAD A (FOR BOX CULVERT) | 103.88 | Cubic Metre | |
200 | 46.02 | ROAD B (FOR MINOR BRIDGE) | 163.47 | Cubic Metre | |
201 | 46.03 | ROAD B (FOR BOX CULVERT) | 25.97 | Cubic Metre | |
202 | 46.04 | ROAD D (FOR BOX CULVERT) | 25.97 | Cubic Metre | |
203 | 46.05 | ROAD E (FOR BOX CULVERT) | 24.09 | Cubic Metre | |
204 | 46.06 | ROAD F (FOR BOX CULVERT) | 25.97 | Cubic Metre | |
205 | 46.07 | ROAD G (FOR BOX CULVERT) | 129.85 | Cubic Metre | |
206 | 47 | Filling behind the abutments, Wings with clean gritty gravel including cost and coneyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other inciental charges etc., complete. as per MORT & H specification no.304,900 | |||
207 | 47.01 | ROAD B (FOR MINOR BRIDGE) | 89.96 | Cubic Metre | |
208 | 48 | Quarry Dust Filling behind the abutments, Wings and pipe portion with Quarry fines including cost and conveyance to site including labour charges for filling in layers watering tamping under optimum moisture content to get the maximum density including of all other incidental charges etc., complete as per MORT & H specification no.304,900 | |||
209 | 48.01 | ROAD A (FOR BOX CULVERT) | 55 | Cubic Metre | |
210 | 48.02 | ROAD B (FOR BOX CULVERT) | 13.75 | Cubic Metre | |
211 | 48.03 | ROAD B (FOR RETAINING WALL) | 22.5 | Cubic Metre | |
212 | 48.04 | ROAD D (FOR BOX CULVERT) | 13.75 | Cubic Metre | |
213 | 48.05 | ROAD D (FOR RETAINING WALL) | 9.9 | Cubic Metre | |
214 | 48.06 | ROAD E (FOR BOX CULVERT) | 28.13 | Cubic Metre | |
215 | 48.07 | ROAD F (FOR BOX CULVERT) | 13.75 | Cubic Metre | |
216 | 48.08 | ROAD G (FOR BOX CULVERT) | 68.75 | Cubic Metre | |
217 | 48.09 | ROAD G (FOR RETAINING WALL) | 9 | Cubic Metre | |
218 | 49 | Vibrated Reinforced Cement Concrete of grade M30 Design Mix using ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DECK SLAB. | |||
219 | 49.01 | ROAD B (FOR MINOR BRIDGE) | 65.62 | Cubic Metre | |
220 | 50 | Providing FILTER MEDIA behind abutment and wings for 600 mm thickness using filter materials as per Appendix - 6 of IRC: 78-2014 well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance to woksite including all other incidental charges etc., complete. | |||
221 | 50.01 | ROAD B (FOR MINOR BRIDGE) | 40.13 | Cubic Metre | |
222 | 51 | .Providing and fixing PVC EXPANSION JOINT in between deck slabs over abutment and pier as shown in the drawing including cost and conveyance of expansion joints including shalimar pad and joint sealant etc, complete. | |||
223 | 51.01 | ROAD B (FOR MINOR BRIDGE) | 29.85 | RM | |
224 | 52 | Vibrated Cement Concrete M15 grade, Nominal Mix 1:2:4, using 40mm ISS hard granite broken metal including cost and conveyance of all materials to site and cement at site including cost of formwork, lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in heights and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for BASE COURSE BELOW APPROACH SLAB. | |||
225 | 52.01 | ROAD B (FOR MINOR BRIDGE) | 13 | Cubic Metre | |
226 | 53 | Vibrated reinforced cement concrete M30 design mix using ISS graded hard granite broken metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental changes etc., complete for APPROACH SLAB. | |||
227 | 53.01 | ROAD B (FOR MINOR BRIDGE) | 18.27 | Cubic Metre | |
228 | 54 | VRCC M40 (design mix) using 20mm ISS HBG graded metal as the max. size of coarse aggreagates including cost & conveyance of all materials to site and cost of cement at site, but excluding cost & fabrication of steel, but including cost of form work, soft water, labour charges for mixing, transporting, laying, curing concrete working at heights, hire charges for T&P including all other incidental charges etc., complete as per relevant std specification for CRASH BARRIER | |||
229 | 54.01 | ROAD B (FOR MINOR BRIDGE) | 7.27 | RM | |
230 | 55 | Vibrated Cement concrete M 15 (nominal mix) using 40 mm ISS HBG graded metal including cost & conveyance of all materials to site and cost of cement at site, including cost of form work , labour charges for mixing, transporting, laying and curing concrete, soft water, hire charges for T&P, etc., complete for PARAPET OVER RETURNS. | |||
231 | 55.01 | ROAD B (FOR MINOR BRIDGE) | 6.07 | Cubic Metre | |
232 | 56 | Supply and fixing of High Quality of PVC pipes of 150mm dia.. Including cost and conveyance of pipes to the site and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges etc complete., for proving utility services in footpaths. | |||
233 | 56.01 | ROAD B (FOR MINOR BRIDGE) | 79.44 | RM | |
234 | 57 | Supply of NP 3 class RCC 1000 mm dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 2003 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the dapartmental officers etc., for diversion road | |||
235 | 57.01 | ROAD B (FOR MINOR BRIDGE) | 7.5 | RM | |
236 | 58 | Hoisting and fixing of 1000mm dia pipes and collars proper gradient including all labour charges and all other incidental charges etc., complete | |||
237 | 58.01 | ROAD B (FOR MINOR BRIDGE) | 7.5 | RM | |
238 | 59 | Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Formation of embankment using carted earth with a lead of 2 km. having CBR value of more than 8 FOR DIVERSION ROAD & FILLING SIDE\n | |||
239 | 59.01 | ROAD A (FOR BOX CULVERT) | 1250 | Cubic Metre | |
240 | 59.02 | ROAD B (FOR BOX CULVERT) | 312.5 | Cubic Metre | |
241 | 59.03 | ROAD B (FOR MINOR BRIDGE) | 409.5 | Cubic Metre | |
242 | 59.04 | ROAD D (FOR BOX CULVERT) | 312.5 | Cubic Metre | |
243 | 59.05 | ROAD E (FOR BOX CULVERT) | 312.5 | Cubic Metre | |
244 | 59.06 | ROAD F (FOR BOX CULVERT) | 312.5 | Cubic Metre | |
245 | 59.07 | ROAD G (FOR BOX CULVERT) | 1562.5 | Cubic Metre | |
246 | 60 | Refilling excavated Earth work including removal and satisfactory disposal of all materials necessary for the construction of the roadway and side drains in accordance with the specifications and the lines grades and cross sections shown in the drawings or as indicated by the engineer including power roller rolling all the labour charges etc complete as per standard specification No.111,112,202,301,303,900 | |||
247 | 60.01 | ROAD B (FOR RETAINING WALL) | 100 | Cubic Metre | |
248 | 60.02 | ROAD D (FOR RETAINING WALL) | 44 | Cubic Metre | |
249 | 60.03 | ROAD G (FOR RETAINING WALL) | 40 | Cubic Metre | |
250 | 61 | Providing and laying of Gravel including cost and conveyance of the same to work site including stacking the same to departemental gauge for premeasurement including all labour charges for laying, spreading etc., complete and as directed by the departmental engineers for making For diversion road and approch portion filling\n | |||
251 | 61.01 | ROAD B (FOR MINOR BRIDGE) | 2373.45 | Cubic Metre | |
252 | 62 | Clearing the Light jungles including weeding out shrubs bushes, egetables, growth etc., as per spcifications and directions of Engineer in charge (Twice a year) for 60 months | |||
253 | 62.01 | ROAD A (UPKEEPING 1st YEAR) | 5400 | Square metre | |
254 | 62.02 | ROAD A (UPKEEPING 2nd YEAR) | 5400 | Square metre | |
255 | 62.03 | ROAD A (UPKEEPING 3rd YEAR) | 5400 | Square metre | |
256 | 62.04 | ROAD A (UPKEEPING 4th YEAR) | 5400 | Square metre | |
257 | 62.05 | ROAD A (UPKEEPING 5th YEAR) | 5400 | Square metre | |
258 | 62.06 | ROAD B (UPKEEPING 1st YEAR) | 3906 | Square metre | |
259 | 62.07 | ROAD B (UPKEEPING 2nd YEAR) | 3906 | Square metre | |
260 | 62.08 | ROAD B (UPKEEPING 3rd YEAR) | 3906 | Square metre | |
261 | 62.09 | ROAD B (UPKEEPING 4th YEAR) | 3906 | Square metre | |
262 | 62.1 | ROAD B (UPKEEPING 5th YEAR) | 3906 | Square metre | |
263 | 62.11 | ROAD C (UPKEEPING 1st YEAR) | 7200 | Square metre | |
264 | 62.12 | ROAD C (UPKEEPING 2nd YEAR) | 7200 | Square metre | |
265 | 62.13 | ROAD C (UPKEEPING 3rd YEAR) | 7200 | Square metre | |
266 | 62.14 | ROAD C (UPKEEPING 4th YEAR) | 7200 | Square metre | |
267 | 62.15 | ROAD C (UPKEEPING 5th YEAR) | 7200 | Square metre | |
268 | 62.16 | ROAD D (UPKEEPING 1st YEAR) | 2880 | Square metre | |
269 | 62.17 | ROAD D (UPKEEPING 2nd YEAR) | 2880 | Square metre | |
270 | 62.18 | ROAD D (UPKEEPING 3rd YEAR) | 2880 | Square metre | |
271 | 62.19 | ROAD D (UPKEEPING 4th YEAR) | 2880 | Square metre | |
272 | 62.2 | ROAD D (UPKEEPING 5th YEAR) | 2880 | Square metre | |
273 | 62.21 | ROAD E (UPKEEPING 1st YEAR) | 2520 | Square metre | |
274 | 62.22 | ROAD E (UPKEEPING 2nt YEAR) | 2520 | Square metre | |
275 | 62.23 | ROAD E (UPKEEPING 3rd YEAR) | 2520 | Square metre | |
276 | 62.24 | ROAD E (UPKEEPING 4th YEAR) | 2520 | Square metre | |
277 | 62.25 | ROAD E (UPKEEPING 5th YEAR) | 2520 | Square metre | |
278 | 62.26 | ROAD F (UPKEEPING 1st YEAR) | 6300 | Square metre | |
279 | 62.27 | ROAD F (UPKEEPING 2nd YEAR) | 6300 | Square metre | |
280 | 62.28 | ROAD F (UPKEEPING 3rd YEAR) | 6300 | Square metre | |
281 | 62.29 | ROAD F (UPKEEPING 4th YEAR) | 6300 | Square metre | |
282 | 62.3 | ROAD F (UPKEEPING 5th YEAR) | 6300 | Square metre | |
283 | 62.31 | ROAD G (UPKEEPING 1st YEAR) | 10800 | Square metre | |
284 | 62.32 | ROAD G (UPKEEPING 2nd YEAR) | 10800 | Square metre | |
285 | 62.33 | ROAD G (UPKEEPING 3rd YEAR) | 10800 | Square metre | |
286 | 62.34 | ROAD G (UPKEEPING 4th YEAR) | 10800 | Square metre | |
287 | 62.35 | ROAD G (UPKEEPING 5th YEAR) | 10800 | Square metre | |
288 | 63 | Excavation \nExcavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer including compaction by power roller rolling as per SS20B MORTH Specification no.111,112,301,305,900 for Making up the berms. (Yearly Two Times) | |||
289 | 63.01 | ROAD A (UPKEEPING 2nd YEAR) | 687.68 | Cubic Metre | |
290 | 63.02 | ROAD A (UPKEEPING 3rd YEAR) | 687.68 | Cubic Metre | |
291 | 63.03 | ROAD A (UPKEEPING 4th YEAR) | 687.68 | Cubic Metre | |
292 | 63.04 | ROAD A (UPKEEPING 5th YEAR) | 687.68 | Cubic Metre | |
293 | 63.05 | ROAD B (UPKEEPING 2nd YEAR) | 307.16 | Cubic Metre | |
294 | 63.06 | ROAD B (UPKEEPING 3rd YEAR) | 307.16 | Cubic Metre | |
295 | 63.07 | ROAD B (UPKEEPING 4th YEAR) | 307.16 | Cubic Metre | |
296 | 63.08 | ROAD B (UPKEEPING 5th YEAR) | 307.16 | Cubic Metre | |
297 | 63.09 | ROAD C (UPKEEPING 2nd YEAR) | 1092 | Cubic Metre | |
298 | 63.1 | ROAD C (UPKEEPING 3rd YEAR) | 1092 | Cubic Metre | |
299 | 63.11 | ROAD C (UPKEEPING 4th YEAR) | 1092 | Cubic Metre | |
300 | 63.12 | ROAD C (UPKEEPING 5th YEAR) | 1092 | Cubic Metre | |
301 | 63.13 | ROAD D (UPKEEPING 2nd YEAR) | 248.94 | Cubic Metre | |
302 | 63.14 | ROAD D (UPKEEPING 3rd YEAR) | 248.94 | Cubic Metre | |
303 | 63.15 | ROAD D (UPKEEPING 4th YEAR) | 248.94 | Cubic Metre | |
304 | 63.16 | ROAD D (UPKEEPING 5th YEAR) | 248.94 | Cubic Metre | |
305 | 63.17 | ROAD E (UPKEEPING 2nd YEAR) | 248.64 | Cubic Metre | |
306 | 63.18 | ROAD E (UPKEEPING 3rd YEAR) | 248.64 | Cubic Metre | |
307 | 63.19 | ROAD E (UPKEEPING 4th YEAR) | 248.64 | Cubic Metre | |
308 | 63.2 | ROAD E (UPKEEPING 5th YEAR) | 248.64 | Cubic Metre | |
309 | 63.21 | ROAD F (UPKEEPING 2nd YEAR) | 419.26 | Cubic Metre | |
310 | 63.22 | ROAD F (UPKEEPING 3rd YEAR) | 419.26 | Cubic Metre | |
311 | 63.23 | ROAD F (UPKEEPING 4th YEAR) | 419.26 | Cubic Metre | |
312 | 63.24 | ROAD F (UPKEEPING 5th YEAR) | 419.26 | Cubic Metre | |
313 | 63.25 | ROAD G (UPKEEPING 2nd YEAR) | 717.77 | Cubic Metre | |
314 | 63.26 | ROAD G (UPKEEPING 3rd YEAR) | 717.77 | Cubic Metre | |
315 | 63.27 | ROAD G (UPKEEPING 4th YEAR) | 717.77 | Cubic Metre | |
316 | 63.28 | ROAD G (UPKEEPING 5th YEAR) | 717.77 | Cubic Metre | |
317 | 64 | Deploying earth moving machinery for desilting channal and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. For U/s and D/s culvert Clearance using JCB (Sl.No:XI-18) | |||
318 | 64.01 | ROAD A (UPKEEPING 1st YEAR) | 4 | Hours | |
319 | 64.02 | ROAD A (UPKEEPING 2nd YEAR) | 4 | Hours | |
320 | 64.03 | ROAD A (UPKEEPING 3rd YEAR) | 4 | Hours | |
321 | 64.04 | ROAD A (UPKEEPING 4th YEAR) | 4 | Hours | |
322 | 64.05 | ROAD A (UPKEEPING 5th YEAR) | 4 | Hours | |
323 | 64.06 | ROAD B (UPKEEPING 1ST YEAR) | 4 | Hours | |
324 | 64.07 | ROAD B (UPKEEPING 2nd YEAR) | 4 | Hours | |
325 | 64.08 | ROAD B (UPKEEPING 3rd YEAR) | 4 | Hours | |
326 | 64.09 | ROAD B (UPKEEPING 4th YEAR) | 4 | Hours | |
327 | 64.1 | ROAD B (UPKEEPING 5th YEAR) | 4 | Hours | |
328 | 64.11 | ROAD D (UPKEEPING 1st YEAR) | 1 | Hours | |
329 | 64.12 | ROAD D (UPKEEPING 2nd YEAR) | 1 | Hours | |
330 | 64.13 | ROAD D (UPKEEPING 5th YEAR) | 1 | Hours | |
331 | 64.14 | ROAD D (UPKEEPING 5th YEAR) | 1 | Hours | |
332 | 64.15 | ROAD D (UPKEEPING 5th YEAR) | 1 | Hours | |
333 | 64.16 | ROAD E (UPKEEPING 1st YEAR) | 1 | Hours | |
334 | 64.17 | ROAD E (UPKEEPING 2nd YEAR) | 1 | Hours | |
335 | 64.18 | ROAD E (UPKEEPING 3rd YEAR) | 1 | Hours | |
336 | 64.19 | ROAD E (UPKEEPING 4th YEAR) | 1 | Hours | |
337 | 64.2 | ROAD E (UPKEEPING 5th YEAR) | 1 | Hours | |
338 | 64.21 | ROAD F (UPKEEPING 1st YEAR) | 4 | Hours | |
339 | 64.22 | ROAD F (UPKEEPING 2nd YEAR) | 4 | Hours | |
340 | 64.23 | ROAD F (UPKEEPING 3rd YEAR) | 4 | Hours | |
341 | 64.24 | ROAD F (UPKEEPING 4th YEAR) | 4 | Hours | |
342 | 64.25 | ROAD F (UPKEEPING 5th YEAR) | 4 | Hours | |
343 | 64.26 | ROAD G (UPKEEPING 1st YEAR) | 15 | Hours | |
344 | 64.27 | ROAD G (UPKEEPING 2nd YEAR) | 15 | Hours | |
345 | 64.28 | ROAD G (UPKEEPING 3rd YEAR) | 15 | Hours | |
346 | 64.29 | ROAD G (UPKEEPING 4th YEAR) | 15 | Hours | |
347 | 64.3 | ROAD G (UPKEEPING 5th YEAR) | 15 | Hours | |
348 | 65 | White washing two coats with freshly burnt white shell lime inclusing cost of lime, blue powder fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specification and as directed. | |||
349 | 65.01 | ROAD A (UPKEEPING 1ST YEAR) | 32.36 | Square metre | |
350 | 65.02 | ROAD A (UPKEEPING 2nd YEAR) | 32.36 | Square metre | |
351 | 65.03 | ROAD A (UPKEEPING 3rd YEAR) | 32.36 | Square metre | |
352 | 65.04 | ROAD A (UPKEEPING 4th YEAR) | 32.36 | Square metre | |
353 | 65.05 | ROAD A (UPKEEPING 5th YEAR) | 32.36 | Square metre | |
354 | 65.06 | ROAD B (UPKEEPING 1ST YEAR) | 89.96 | Square metre | |
355 | 65.07 | ROAD B (UPKEEPING 2nd YEAR) | 89.96 | Square metre | |
356 | 65.08 | ROAD B (UPKEEPING 3rd YEAR) | 89.96 | Square metre | |
357 | 65.09 | ROAD B (UPKEEPING 4th YEAR) | 89.96 | Square metre | |
358 | 65.1 | ROAD B (UPKEEPING 5th YEAR) | 89.96 | Square metre | |
359 | 65.11 | ROAD D (UPKEEPING 1ST YEAR) | 12.96 | Square metre | |
360 | 65.12 | ROAD D (UPKEEPING 2nd YEAR) | 12.96 | Square metre | |
361 | 65.13 | ROAD D (UPKEEPING 3rd YEAR) | 12.96 | Square metre | |
362 | 65.14 | ROAD D (UPKEEPING 4th YEAR) | 12.96 | Square metre | |
363 | 65.15 | ROAD D (UPKEEPING 5th YEAR) | 12.96 | Square metre | |
364 | 65.16 | ROAD E (UPKEEPING 1ST YEAR) | 6.48 | Square metre | |
365 | 65.17 | ROAD E (UPKEEPING 2nd YEAR) | 6.48 | Square metre | |
366 | 65.18 | ROAD E (UPKEEPING 3rd YEAR) | 6.48 | Square metre | |
367 | 65.19 | ROAD E (UPKEEPING 4th YEAR) | 6.48 | Square metre | |
368 | 65.2 | ROAD E (UPKEEPING 5th YEAR) | 6.48 | Square metre | |
369 | 65.21 | ROAD F (UPKEEPING 1ST YEAR) | 22.36 | Square metre | |
370 | 65.22 | ROAD F (UPKEEPING 2nd YEAR) | 22.36 | Square metre | |
371 | 65.23 | ROAD F (UPKEEPING 3rd YEAR) | 22.36 | Square metre | |
372 | 65.24 | ROAD F (UPKEEPING 4th YEAR) | 22.36 | Square metre | |
373 | 65.25 | ROAD F (UPKEEPING 5th YEAR) | 22.36 | Square metre | |
374 | 65.26 | ROAD G (UPKEEPING 1ST YEAR) | 70.61 | Square metre | |
375 | 65.27 | ROAD G (UPKEEPING 2nd YEAR) | 70.61 | Square metre | |
376 | 65.28 | ROAD G (UPKEEPING 3rd YEAR) | 70.61 | Square metre | |
377 | 65.29 | ROAD G (UPKEEPING 4th YEAR) | 70.61 | Square metre | |
378 | 65.3 | ROAD G (UPKEEPING 5th YEAR) | 70.61 | Square metre | |
379 | 66 | Tree/EB pole /culvert / Retaining wall banding using Coal tar with standard dimension including all matyerials and labour and all other incidental charges etc., | |||
380 | 66.01 | ROAD A (UPKEEPING 1ST YEAR) | 4.57 | Square metre | |
381 | 66.02 | ROAD A (UPKEEPING 2nd YEAR) | 4.57 | Square metre | |
382 | 66.03 | ROAD A (UPKEEPING 3rd YEAR) | 4.57 | Square metre | |
383 | 66.04 | ROAD A (UPKEEPING 4th YEAR) | 4.57 | Square metre | |
384 | 66.05 | ROAD A (UPKEEPING 5th YEAR) | 4.57 | Square metre | |
385 | 66.06 | ROAD B (UPKEEPING 1ST YEAR) | 4.17 | Square metre | |
386 | 66.07 | ROAD B (UPKEEPING 2nd YEAR) | 4.17 | Square metre | |
387 | 66.08 | ROAD B (UPKEEPING 3rd YEAR) | 4.17 | Square metre | |
388 | 66.09 | ROAD B (UPKEEPING 4th YEAR) | 4.17 | Square metre | |
389 | 66.1 | ROAD B (UPKEEPING 5th YEAR) | 4.17 | Square metre | |
390 | 66.11 | ROAD D (UPKEEPING 1ST YEAR) | 0.41 | Square metre | |
391 | 66.12 | ROAD D (UPKEEPING 2nd YEAR) | 0.41 | Square metre | |
392 | 66.13 | ROAD D (UPKEEPING 3rd YEAR) | 0.41 | Square metre | |
393 | 66.14 | ROAD D (UPKEEPING 4th YEAR) | 0.41 | Square metre | |
394 | 66.15 | ROAD D (UPKEEPING 5th YEAR) | 0.41 | Square metre | |
395 | 66.16 | ROAD E (UPKEEPING 1ST YEAR) | 0.1 | Square metre | |
396 | 66.17 | ROAD E (UPKEEPING 2nd YEAR) | 0.1 | Square metre | |
397 | 66.18 | ROAD E (UPKEEPING 3rd YEAR) | 0.1 | Square metre | |
398 | 66.19 | ROAD E (UPKEEPING 4th YEAR) | 0.1 | Square metre | |
399 | 66.2 | ROAD E (UPKEEPING 5th YEAR) | 0.1 | Square metre | |
400 | 66.21 | ROAD F (UPKEEPING 1ST YEAR) | 2.23 | Square metre | |
401 | 66.22 | ROAD F (UPKEEPING 2nd YEAR) | 2.23 | Square metre | |
402 | 66.23 | ROAD F (UPKEEPING 3rd YEAR) | 2.23 | Square metre | |
403 | 66.24 | ROAD F (UPKEEPING 4th YEAR) | 2.23 | Square metre | |
404 | 66.25 | ROAD F (UPKEEPING 5th YEAR) | 2.23 | Square metre | |
405 | 66.26 | ROAD G (UPKEEPING 1ST YEAR) | 8.2 | Square metre | |
406 | 66.27 | ROAD G (UPKEEPING 2nd YEAR) | 8.2 | Square metre | |
407 | 66.28 | ROAD G (UPKEEPING 3rd YEAR) | 8.2 | Square metre | |
408 | 66.29 | ROAD G (UPKEEPING 4th YEAR) | 8.2 | Square metre | |
409 | 66.3 | ROAD G (UPKEEPING 5th YEAR) | 8.2 | Square metre | |
410 | 67 | Painting the Existing Culvert, Parapet as per IRC standard including the cost of Labour charges and material etc., complete | |||
411 | 67.01 | ROAD A (UPKEEPING 1st YEAR) | 6.84 | Square metre | |
412 | 67.02 | ROAD A (UPKEEPING 2nd YEAR) | 6.84 | Square metre | |
413 | 67.03 | ROAD A (UPKEEPING 3rd YEAR) | 6.84 | Square metre | |
414 | 67.04 | ROAD A (UPKEEPING 4th YEAR) | 6.84 | Square metre | |
415 | 67.05 | ROAD A (UPKEEPING 5th YEAR) | 6.84 | Square metre | |
416 | 67.06 | ROAD B (UPKEEPING 1st YEAR) | 5.13 | Square metre | |
417 | 67.07 | ROAD B (UPKEEPING 2nd YEAR) | 5.13 | Square metre | |
418 | 67.08 | ROAD B (UPKEEPING 3rd YEAR) | 5.13 | Square metre | |
419 | 67.09 | ROAD B (UPKEEPING 4th YEAR) | 5.13 | Square metre | |
420 | 67.1 | ROAD B (UPKEEPING 5th YEAR) | 5.13 | Square metre | |
421 | 67.11 | ROAD D (UPKEEPING 1st YEAR) | 1.71 | Square metre | |
422 | 67.12 | ROAD D (UPKEEPING 2nd YEAR) | 1.71 | Square metre | |
423 | 67.13 | ROAD D (UPKEEPING 3rd YEAR) | 1.71 | Square metre | |
424 | 67.14 | ROAD D (UPKEEPING 4th YEAR) | 1.71 | Square metre | |
425 | 67.15 | ROAD D (UPKEEPING 5th YEAR) | 1.71 | Square metre | |
426 | 67.16 | ROAD E (UPKEEPING 1st YEAR) | 1.71 | Square metre | |
427 | 67.17 | ROAD E (UPKEEPING 2nd YEAR) | 1.71 | Square metre | |
428 | 67.18 | ROAD E (UPKEEPING 3rd YEAR) | 1.71 | Square metre | |
429 | 67.19 | ROAD E (UPKEEPING 4th YEAR) | 1.71 | Square metre | |
430 | 67.2 | ROAD E (UPKEEPING 5th YEAR) | 1.71 | Square metre | |
431 | 67.21 | ROAD F (UPKEEPING 1st YEAR) | 3.92 | Square metre | |
432 | 67.22 | ROAD F (UPKEEPING 2nd YEAR) | 3.92 | Square metre | |
433 | 67.23 | ROAD F (UPKEEPING 3rd YEAR) | 3.92 | Square metre | |
434 | 67.24 | ROAD F (UPKEEPING 4th YEAR) | 3.92 | Square metre | |
435 | 67.25 | ROAD F (UPKEEPING 5th YEAR) | 3.92 | Square metre | |
436 | 67.26 | ROAD G (UPKEEPING 1st YEAR) | 13.06 | Square metre | |
437 | 67.27 | ROAD G (UPKEEPING 2nd YEAR) | 13.06 | Square metre | |
438 | 67.28 | ROAD G (UPKEEPING 3rd YEAR) | 13.06 | Square metre | |
439 | 67.29 | ROAD G (UPKEEPING 4th YEAR) | 13.06 | Square metre | |
440 | 67.3 | ROAD G (UPKEEPING 5th YEAR) | 13.06 | Square metre | |
441 | 68 | Painting the KM Stone as per IRC standard including the cost of Labour charges and material etc., complete | |||
442 | 68.01 | ROAD A (UPKEEPING 2nd YEAR) | 0.49 | Square metre | |
443 | 68.02 | ROAD A (UPKEEPING 3rd YEAR) | 0.49 | Square metre | |
444 | 68.03 | ROAD A (UPKEEPING 4th YEAR) | 0.49 | Square metre | |
445 | 68.04 | ROAD A (UPKEEPING 5th YEAR) | 0.49 | Square metre | |
446 | 68.05 | ROAD B (UPKEEPING 2nd YEAR) | 0.49 | Square metre | |
447 | 68.06 | ROAD B (UPKEEPING 3rd YEAR) | 0.49 | Square metre | |
448 | 68.07 | ROAD B (UPKEEPING 4th YEAR) | 0.49 | Square metre | |
449 | 68.08 | ROAD B (UPKEEPING 5th YEAR) | 0.49 | Square metre | |
450 | 68.09 | ROAD C (UPKEEPING 2nd YEAR) | 0.49 | Square metre | |
451 | 68.1 | ROAD C (UPKEEPING 3rd YEAR) | 0.49 | Square metre | |
452 | 68.11 | ROAD C (UPKEEPING 4th YEAR) | 0.49 | Square metre | |
453 | 68.12 | ROAD C (UPKEEPING 5th YEAR) | 0.49 | Square metre | |
454 | 68.13 | ROAD D (UPKEEPING 2nd YEAR) | 0.49 | Square metre | |
455 | 68.14 | ROAD D (UPKEEPING 3rd YEAR) | 0.49 | Square metre | |
456 | 68.15 | ROAD D (UPKEEPING 4th YEAR) | 0.49 | Square metre | |
457 | 68.16 | ROAD D (UPKEEPING 5th YEAR) | 0.49 | Square metre | |
458 | 68.17 | ROAD F (UPKEEPING 2nd YEAR) | 0.49 | Square metre | |
459 | 68.18 | ROAD F (UPKEEPING 3rd YEAR) | 0.49 | Square metre | |
460 | 68.19 | ROAD F (UPKEEPING 4th YEAR) | 0.49 | Square metre | |
461 | 68.2 | ROAD F (UPKEEPING 5th YEAR) | 0.49 | Square metre | |
462 | 68.21 | ROAD G (UPKEEPING 2nd YEAR) | 1.49 | Square metre | |
463 | 68.22 | ROAD G (UPKEEPING 3rd YEAR) | 1.49 | Square metre | |
464 | 68.23 | ROAD G (UPKEEPING 4th YEAR) | 1.49 | Square metre | |
465 | 68.24 | ROAD G (UPKEEPING 5th YEAR) | 1.49 | Square metre | |
466 | 69 | Painting the HM Stone as per IRC standard including the cost of Labour charges and material etc., complete | |||
467 | 69.01 | ROAD A (UPKEEPING 2nd YEAR) | 1.34 | Square metre | |
468 | 69.02 | ROAD A (UPKEEPING 3rd YEAR) | 1.34 | Square metre | |
469 | 69.03 | ROAD A (UPKEEPING 4th YEAR) | 1.34 | Square metre | |
470 | 69.04 | ROAD A (UPKEEPING 5th YEAR) | 1.34 | Square metre | |
471 | 69.05 | ROAD B (UPKEEPING 2nd YEAR) | 1.52 | Square metre | |
472 | 69.06 | ROAD B (UPKEEPING 3rd YEAR) | 1.52 | Square metre | |
473 | 69.07 | ROAD B (UPKEEPING 4th YEAR) | 1.52 | Square metre | |
474 | 69.08 | ROAD B (UPKEEPING 5th YEAR) | 1.52 | Square metre | |
475 | 69.09 | ROAD C (UPKEEPING 2nd YEAR) | 1.52 | Square metre | |
476 | 69.1 | ROAD C (UPKEEPING 3rd YEAR) | 1.52 | Square metre | |
477 | 69.11 | ROAD C (UPKEEPING 4th YEAR) | 1.52 | Square metre | |
478 | 69.12 | ROAD C (UPKEEPING 5th YEAR) | 1.52 | Square metre | |
479 | 69.13 | ROAD D (UPKEEPING 2nd YEAR) | 1.52 | Square metre | |
480 | 69.14 | ROAD D (UPKEEPING 3rd YEAR) | 1.52 | Square metre | |
481 | 69.15 | ROAD D (UPKEEPING 4th YEAR) | 1.52 | Square metre | |
482 | 69.16 | ROAD D (UPKEEPING 5th YEAR) | 1.52 | Square metre | |
483 | 69.17 | ROAD E (UPKEEPING 2nd YEAR) | 0.76 | Square metre | |
484 | 69.18 | ROAD E (UPKEEPING 3rd YEAR) | 0.76 | Square metre | |
485 | 69.19 | ROAD E (UPKEEPING 4th YEAR) | 0.76 | Square metre | |
486 | 69.2 | ROAD E (UPKEEPING 5th YEAR) | 0.76 | Square metre | |
487 | 69.21 | ROAD F (UPKEEPING 2nd YEAR) | 1.34 | Square metre | |
488 | 69.22 | ROAD F (UPKEEPING 3rd YEAR) | 1.34 | Square metre | |
489 | 69.23 | ROAD F (UPKEEPING 4th YEAR) | 1.34 | Square metre | |
490 | 69.24 | ROAD F (UPKEEPING 5th YEAR) | 1.34 | Square metre | |
491 | 69.25 | ROAD G (UPKEEPING 2nd YEAR) | 2.28 | Square metre | |
492 | 69.26 | ROAD G (UPKEEPING 3rd YEAR) | 2.28 | Square metre | |
493 | 69.27 | ROAD G (UPKEEPING 4th YEAR) | 2.28 | Square metre | |
494 | 69.28 | ROAD G (UPKEEPING 5th YEAR) | 2.28 | Square metre | |
495 | 70 | Painting the Boundry Stone as per IRC standard including the cost of Labour charges and material etc., complete | |||
496 | 70.01 | ROAD A (UPKEEPING 2nd YEAR) | 19.91 | Square metre | |
497 | 70.02 | ROAD A (UPKEEPING 3rd YEAR) | 19.91 | Square metre | |
498 | 70.03 | ROAD A (UPKEEPING 4th YEAR) | 19.91 | Square metre | |
499 | 70.04 | ROAD A (UPKEEPING 5th YEAR) | 19.91 | Square metre | |
500 | 70.05 | ROAD B (UPKEEPING 2nd YEAR) | 12.67 | Square metre | |
501 | 70.06 | ROAD B (UPKEEPING 3rd YEAR) | 12.67 | Square metre | |
502 | 70.07 | ROAD B (UPKEEPING 4th YEAR) | 12.67 | Square metre | |
503 | 70.08 | ROAD B (UPKEEPING 5th YEAR) | 12.67 | Square metre | |
504 | 70.09 | ROAD C (UPKEEPING 2nd YEAR) | 21.72 | Square metre | |
505 | 70.1 | ROAD C (UPKEEPING 3rd YEAR) | 21.72 | Square metre | |
506 | 70.11 | ROAD C (UPKEEPING 4th YEAR) | 21.72 | Square metre | |
507 | 70.12 | ROAD C (UPKEEPING 5th YEAR) | 21.72 | Square metre | |
508 | 70.13 | ROAD D (UPKEEPING 2nd YEAR) | 9.05 | Square metre | |
509 | 70.14 | ROAD D (UPKEEPING 3rd YEAR) | 9.05 | Square metre | |
510 | 70.15 | ROAD D (UPKEEPING 4th YEAR) | 9.05 | Square metre | |
511 | 70.16 | ROAD D (UPKEEPING 5th YEAR) | 9.05 | Square metre | |
512 | 70.17 | ROAD E (UPKEEPING 2nd YEAR) | 9.96 | Square metre | |
513 | 70.18 | ROAD E (UPKEEPING 3rd YEAR) | 9.96 | Square metre | |
514 | 70.19 | ROAD E (UPKEEPING 4th YEAR) | 9.96 | Square metre | |
515 | 70.2 | ROAD E (UPKEEPING 5th YEAR) | 9.96 | Square metre | |
516 | 70.21 | ROAD F (UPKEEPING 2nd YEAR) | 17.19 | Square metre | |
517 | 70.22 | ROAD F (UPKEEPING 3rd YEAR) | 17.19 | Square metre | |
518 | 70.23 | ROAD F (UPKEEPING 4th YEAR) | 17.19 | Square metre | |
519 | 70.24 | ROAD F (UPKEEPING 5th YEAR) | 17.19 | Square metre | |
520 | 70.25 | ROAD G (UPKEEPING 2nd YEAR) | 33.93 | Square metre | |
521 | 70.26 | ROAD G (UPKEEPING 3rd YEAR) | 33.93 | Square metre | |
522 | 70.27 | ROAD G (UPKEEPING 4th YEAR) | 33.93 | Square metre | |
523 | 70.28 | ROAD G (UPKEEPING 5th YEAR) | 33.93 | Square metre | |
524 | 71 | Lettering the KM Stone as per IRC standard including the cost of Labour charges and material etc., complete | |||
525 | 71.01 | ROAD A (UPKEEPING 2nd YEAR) (5 to 10 CM) | 15 | Number | |
526 | 71.02 | ROAD A (UPKEEPING 2nd YEAR) (10 to 15 CM) | 2 | Number | |
527 | 71.03 | ROAD A (UPKEEPING 3rd YEAR) (5 to 10 CM) | 15 | Number | |
528 | 71.04 | ROAD A (UPKEEPING 3rd YEAR) (10 to 15 CM) | 2 | Number | |
529 | 71.05 | ROAD A (UPKEEPING 4th YEAR) (5 to 10 CM) | 15 | Number | |
530 | 71.06 | ROAD A (UPKEEPING 4th YEAR) (10 to 15 CM) | 2 | Number | |
531 | 71.07 | ROAD A (UPKEEPING 5th YEAR) (5 to 10 CM) | 15 | Number | |
532 | 71.08 | ROAD A (UPKEEPING 5th YEAR) (10 to 15 CM) | 2 | Number | |
533 | 71.09 | ROAD B (UPKEEPING 2nd YEAR) (5 to 10 CM) | 15 | Number | |
534 | 71.1 | ROAD B (UPKEEPING 2nd YEAR) (10 to 15 CM) | 2 | Number | |
535 | 71.11 | ROAD B (UPKEEPING 3rd YEAR) (5 to 10 CM) | 15 | Number | |
536 | 71.12 | ROAD B (UPKEEPING 3rd YEAR) (10 to 15 CM) | 2 | Number | |
537 | 71.13 | ROAD B (UPKEEPING 4th YEAR) (5 to 10 CM) | 15 | Number | |
538 | 71.14 | ROAD B (UPKEEPING 4th YEAR) (10 to 15 CM) | 2 | Number | |
539 | 71.15 | ROAD B (UPKEEPING 5th YEAR) (5 to 10 CM) | 15 | Number | |
540 | 71.16 | ROAD B (UPKEEPING 5th YEAR) (10 to 15 CM) | 2 | Number | |
541 | 71.17 | ROAD C (UPKEEPING 2nd YEAR) (5 to 10 CM) | 15 | Number | |
542 | 71.18 | ROAD C (UPKEEPING 2nd YEAR) (10 to 15 CM) | 2 | Number | |
543 | 71.19 | ROAD C (UPKEEPING 3rd YEAR) (5 to 10 CM) | 15 | Number | |
544 | 71.2 | ROAD C (UPKEEPING 3rd YEAR) (10 to 15 CM) | 2 | Number | |
545 | 71.21 | ROAD C (UPKEEPING 4th YEAR) (5 to 10 CM) | 15 | Number | |
546 | 71.22 | ROAD C (UPKEEPING 4th YEAR) (10 to 15 CM) | 2 | Number | |
547 | 71.23 | ROAD C (UPKEEPING 5th YEAR) (5 to 10 CM) | 15 | Number | |
548 | 71.24 | ROAD C (UPKEEPING 5th YEAR) (10 to 15 CM) | 2 | Number | |
549 | 71.25 | ROAD D (UPKEEPING 2nd YEAR) (5 to 10 CM) | 15 | Number | |
550 | 71.26 | ROAD D (UPKEEPING 2nd YEAR) (10 to 15 CM) | 2 | Number | |
551 | 71.27 | ROAD D (UPKEEPING 3rd YEAR) (5 to 10 CM) | 15 | Number | |
552 | 71.28 | ROAD D (UPKEEPING 3rd YEAR) (10 to 15 CM) | 2 | Number | |
553 | 71.29 | ROAD D (UPKEEPING 4th YEAR) (5 to 10 CM) | 15 | Number | |
554 | 71.3 | ROAD D (UPKEEPING 4th YEAR) (10 to 15 CM) | 2 | Number | |
555 | 71.31 | ROAD D (UPKEEPING 5th YEAR) (5 to 10 CM) | 15 | Number | |
556 | 71.32 | ROAD D (UPKEEPING 5th YEAR) (10 to 15 CM) | 2 | Number | |
557 | 71.33 | ROAD F (UPKEEPING 2nd YEAR) (5 to 10 CM) | 15 | Number | |
558 | 71.34 | ROAD F (UPKEEPING 2nd YEAR) (10 to 15 CM) | 2 | Number | |
559 | 71.35 | ROAD F (UPKEEPING 3rd YEAR) (5 to 10 CM) | 15 | Number | |
560 | 71.36 | ROAD F (UPKEEPING 3rd YEAR) (10 to 15 CM) | 2 | Number | |
561 | 71.37 | ROAD F (UPKEEPING 4th YEAR) (5 to 10 CM) | 15 | Number | |
562 | 71.38 | ROAD F (UPKEEPING 4th YEAR) (10 to 15 CM) | 2 | Number | |
563 | 71.39 | ROAD F (UPKEEPING 5th YEAR) (5 to 10 CM) | 15 | Number | |
564 | 71.4 | ROAD F (UPKEEPING 5th YEAR) (10 to 15 CM) | 2 | Number | |
565 | 71.41 | ROAD G (UPKEEPING 2nd YEAR) (5 to 10 CM) | 45 | Number | |
566 | 71.42 | ROAD G (UPKEEPING 2nd YEAR) (10 to 15 CM) | 6 | Number | |
567 | 71.43 | ROAD G (UPKEEPING 3rd YEAR) (5 to 10 CM) | 45 | Number | |
568 | 71.44 | ROAD G (UPKEEPING 3rd YEAR) (10 to 15 CM) | 6 | Number | |
569 | 71.45 | ROAD G (UPKEEPING 4th YEAR) (5 to 10 CM) | 45 | Number | |
570 | 71.46 | ROAD G (UPKEEPING 4th YEAR) (10 to 15 CM) | 6 | Number | |
571 | 71.47 | ROAD G (UPKEEPING 5th YEAR) (5 to 10 CM) | 45 | Number | |
572 | 71.48 | ROAD G (UPKEEPING 5th YEAR) (10 to 15 CM) | 6 | Number | |
573 | 72 | Lettering the HM Stone as per IRC standard including the cost of Labour charges and material etc., complete | |||
574 | 72.01 | ROAD A (UPKEEPING 2nd YEAR) (5 to 10 CM) | 14 | Number | |
575 | 72.02 | ROAD A (UPKEEPING 2nd YEAR) (10 to 15 CM) | 14 | Number | |
576 | 72.03 | ROAD A (UPKEEPING 3rd YEAR) (5 to 10 CM) | 14 | Number | |
577 | 72.04 | ROAD A (UPKEEPING 3rd YEAR) (10 to 15 CM) | 14 | Number | |
578 | 72.05 | ROAD A (UPKEEPING 4th YEAR) (5 to 10 CM) | 14 | Number | |
579 | 72.06 | ROAD A (UPKEEPING 4th YEAR) (10 to 15 CM) | 14 | Number | |
580 | 72.07 | ROAD A (UPKEEPING 5th YEAR) (5 to 10 CM) | 14 | Number | |
581 | 72.08 | ROAD A (UPKEEPING 5th YEAR) (10 to 15 CM) | 14 | Number | |
582 | 72.09 | ROAD B (UPKEEPING 2nd YEAR) (5 to 10 CM) | 16 | Number | |
583 | 72.1 | ROAD B (UPKEEPING 2nd YEAR) (10 to 15 CM) | 16 | Number | |
584 | 72.11 | ROAD B (UPKEEPING 3rd YEAR) (5 to 10 CM) | 16 | Number | |
585 | 72.12 | ROAD B (UPKEEPING 3rd YEAR) (10 to 15 CM) | 16 | Number | |
586 | 72.13 | ROAD B (UPKEEPING 4th YEAR) (5 to 10 CM) | 16 | Number | |
587 | 72.14 | ROAD B (UPKEEPING 4th YEAR) (10 to 15 CM) | 16 | Number | |
588 | 72.15 | ROAD B (UPKEEPING 5th YEAR) (5 to 10 CM) | 16 | Number | |
589 | 72.16 | ROAD B (UPKEEPING 5th YEAR) (10 to 15 CM) | 16 | Number | |
590 | 72.17 | ROAD C (UPKEEPING 2nd YEAR) (5 to 10 CM) | 16 | Number | |
591 | 72.18 | ROAD C (UPKEEPING 2nd YEAR) (10 to 15 CM) | 16 | Number | |
592 | 72.19 | ROAD C (UPKEEPING 3rd YEAR) (5 to 10 CM) | 16 | Number | |
593 | 72.2 | ROAD C (UPKEEPING 3rd YEAR) (10 to 15 CM) | 16 | Number | |
594 | 72.21 | ROAD C (UPKEEPING 4th YEAR) (5 to 10 CM) | 16 | Number | |
595 | 72.22 | ROAD C (UPKEEPING 4th YEAR) (10 to 15 CM) | 16 | Number | |
596 | 72.23 | ROAD C (UPKEEPING 5th YEAR) (5 to 10 CM) | 16 | Number | |
597 | 72.24 | ROAD C (UPKEEPING 5th YEAR) (10 to 15 CM) | 16 | Number | |
598 | 72.25 | ROAD D (UPKEEPING 2nd YEAR) (5 to 10 CM) | 16 | Number | |
599 | 72.26 | ROAD D (UPKEEPING 2nd YEAR) (10 to 15 CM) | 16 | Number | |
600 | 72.27 | ROAD D (UPKEEPING 3rd YEAR) (5 to 10 CM) | 16 | Number | |
601 | 72.28 | ROAD D (UPKEEPING 3rd YEAR) (10 to 15 CM) | 16 | Number | |
602 | 72.29 | ROAD D (UPKEEPING 4th YEAR) (5 to 10 CM) | 16 | Number | |
603 | 72.3 | ROAD D (UPKEEPING 4th YEAR) (10 to 15 CM) | 16 | Number | |
604 | 72.31 | ROAD D (UPKEEPING 5th YEAR) (5 to 10 CM) | 16 | Number | |
605 | 72.32 | ROAD D (UPKEEPING 5th YEAR) (10 to 15 CM) | 16 | Number | |
606 | 72.33 | ROAD E (UPKEEPING 2nd YEAR) (5 to 10 CM) | 8 | Number | |
607 | 72.34 | ROAD E (UPKEEPING 2nd YEAR) (10 to 15 CM) | 8 | Number | |
608 | 72.35 | ROAD E (UPKEEPING 3rd YEAR) (5 to 10 CM) | 8 | Number | |
609 | 72.36 | ROAD E (UPKEEPING 3rd YEAR) (10 to 15 CM) | 8 | Number | |
610 | 72.37 | ROAD E (UPKEEPING 4th YEAR) (5 to 10 CM) | 8 | Number | |
611 | 72.38 | ROAD E (UPKEEPING 4th YEAR) (10 to 15 CM) | 8 | Number | |
612 | 72.39 | ROAD E (UPKEEPING 5th YEAR) (5 to 10 CM) | 8 | Number | |
613 | 72.4 | ROAD E (UPKEEPING 5th YEAR) (10 to 15 CM) | 8 | Number | |
614 | 72.41 | ROAD F (UPKEEPING 2nd YEAR) (5 to 10 CM) | 14 | Number | |
615 | 72.42 | ROAD F (UPKEEPING 2nd YEAR) (10 to 15 CM) | 14 | Number | |
616 | 72.43 | ROAD F (UPKEEPING 3rd YEAR) (5 to 10 CM) | 14 | Number | |
617 | 72.44 | ROAD F (UPKEEPING 3rd YEAR) (10 to 15 CM) | 14 | Number | |
618 | 72.45 | ROAD F (UPKEEPING 4th YEAR) (5 to 10 CM) | 14 | Number | |
619 | 72.46 | ROAD F (UPKEEPING 4th YEAR) (10 to 15 CM) | 14 | Number | |
620 | 72.47 | ROAD F (UPKEEPING 5th YEAR) (5 to 10 CM) | 14 | Number | |
621 | 72.48 | ROAD F (UPKEEPING 5th YEAR) (10 to 15 CM) | 14 | Number | |
622 | 72.49 | ROAD G (UPKEEPING 2nd YEAR) (5 to 10 CM) | 24 | Number | |
623 | 72.5 | ROAD G (UPKEEPING 2nd YEAR) (10 to 15 CM) | 24 | Number | |
624 | 72.51 | ROAD G (UPKEEPING 3rd YEAR) (5 to 10 CM) | 24 | Number | |
625 | 72.52 | ROAD G (UPKEEPING 3rd YEAR) (10 to 15 CM) | 24 | Number | |
626 | 72.53 | ROAD G (UPKEEPING 4th YEAR) (5 to 10 CM) | 24 | Number | |
627 | 72.54 | ROAD G (UPKEEPING 4th YEAR) (10 to 15 CM) | 24 | Number | |
628 | 72.55 | ROAD G (UPKEEPING 5th YEAR) (5 to 10 CM) | 24 | Number | |
629 | 72.56 | ROAD G (UPKEEPING 5th YEAR) (10 to 15 CM) | 24 | Number | |
630 | 73 | Lettering the Boundry Stone as per IRC standard including the cost of Labour charges and material etc., complete | |||
631 | 73.01 | ROAD A (UPKEEPING 2nd YEAR) (5 to 10 CM) | 176 | Number | |
632 | 73.02 | ROAD A (UPKEEPING 3rd YEAR) (5 to 10 CM) | 176 | Number | |
633 | 73.03 | ROAD A (UPKEEPING 4th YEAR) (5 to 10 CM) | 176 | Number | |
634 | 73.04 | ROAD A (UPKEEPING 5th YEAR) (5 to 10 CM) | 176 | Number | |
635 | 73.05 | ROAD B (UPKEEPING 2nd YEAR) (5 to 10 CM) | 112 | Number | |
636 | 73.06 | ROAD B (UPKEEPING 3rd YEAR) (5 to 10 CM) | 112 | Number | |
637 | 73.07 | ROAD B (UPKEEPING 4th YEAR) (5 to 10 CM) | 112 | Number | |
638 | 73.08 | ROAD B (UPKEEPING 5th YEAR) (5 to 10 CM) | 112 | Number | |
639 | 73.09 | ROAD C (UPKEEPING 2nd YEAR) (5 to 10 CM) | 192 | Number | |
640 | 73.1 | ROAD C (UPKEEPING 3rd YEAR) (5 to 10 CM) | 192 | Number | |
641 | 73.11 | ROAD C (UPKEEPING 4th YEAR) (5 to 10 CM) | 192 | Number | |
642 | 73.12 | ROAD C (UPKEEPING 5th YEAR) (5 to 10 CM) | 192 | Number | |
643 | 73.13 | ROAD D (UPKEEPING 2nd YEAR) (5 to 10 CM) | 80 | Number | |
644 | 73.14 | ROAD D (UPKEEPING 3rd YEAR) (5 to 10 CM) | 80 | Number | |
645 | 73.15 | ROAD D (UPKEEPING 4th YEAR) (5 to 10 CM) | 80 | Number | |
646 | 73.16 | ROAD D (UPKEEPING 5th YEAR) (5 to 10 CM) | 80 | Number | |
647 | 73.17 | ROAD E (UPKEEPING 2nd YEAR) (5 to 10 CM) | 88 | Number | |
648 | 73.18 | ROAD E (UPKEEPING 3rd YEAR) (5 to 10 CM) | 88 | Number | |
649 | 73.19 | ROAD E (UPKEEPING 4th YEAR) (5 to 10 CM) | 88 | Number | |
650 | 73.2 | ROAD E (UPKEEPING 5th YEAR) (5 to 10 CM) | 88 | Number | |
651 | 73.21 | ROAD F (UPKEEPING 2nd YEAR) (5 to 10 CM) | 152 | Number | |
652 | 73.22 | ROAD F (UPKEEPING 3rd YEAR) (5 to 10 CM) | 152 | Number | |
653 | 73.23 | ROAD F (UPKEEPING 4th YEAR) (5 to 10 CM) | 152 | Number | |
654 | 73.24 | ROAD F (UPKEEPING 5th YEAR) (5 to 10 CM) | 152 | Number | |
655 | 73.25 | ROAD G (UPKEEPING 2nd YEAR) (5 to 10 CM) | 300 | Number | |
656 | 73.26 | ROAD G (UPKEEPING 3rd YEAR) (5 to 10 CM) | 300 | Number | |
657 | 73.27 | ROAD G (UPKEEPING 4th YEAR) (5 to 10 CM) | 300 | Number | |
658 | 73.28 | ROAD G (UPKEEPING 5th YEAR) (5 to 10 CM) | 300 | Number | |
659 | 74 | Lettering the Existing Culvert, Parapet as per IRC standard including the cost of Labour charges and material etc., complete | |||
660 | 74.01 | ROAD A (UPKEEPING 1st YEAR) | 100 | Number | |
661 | 74.02 | ROAD A (UPKEEPING 2nd YEAR) | 100 | Number | |
662 | 74.03 | ROAD A (UPKEEPING 3rd YEAR) | 100 | Number | |
663 | 74.04 | ROAD A (UPKEEPING 4th YEAR) | 100 | Number | |
664 | 74.05 | ROAD A (UPKEEPING 5th YEAR) | 100 | Number | |
665 | 74.06 | ROAD B (UPKEEPING 1st YEAR) | 75 | Number | |
666 | 74.07 | ROAD B (UPKEEPING 2nd YEAR) | 75 | Number | |
667 | 74.08 | ROAD B (UPKEEPING 3rd YEAR) | 75 | Number | |
668 | 74.09 | ROAD B (UPKEEPING 4th YEAR) | 75 | Number | |
669 | 74.1 | ROAD B (UPKEEPING 5th YEAR) | 75 | Number | |
670 | 74.11 | ROAD D (UPKEEPING 1st YEAR) | 25 | Number | |
671 | 74.12 | ROAD D (UPKEEPING 2nd YEAR) | 25 | Number | |
672 | 74.13 | ROAD D (UPKEEPING 3rd YEAR) | 25 | Number | |
673 | 74.14 | ROAD D (UPKEEPING 4th YEAR) | 25 | Number | |
674 | 74.15 | ROAD D (UPKEEPING 5th YEAR) | 25 | Number | |
675 | 74.16 | ROAD E (UPKEEPING 1st YEAR) | 25 | Number | |
676 | 74.17 | ROAD E (UPKEEPING 2nd YEAR) | 25 | Number | |
677 | 74.18 | ROAD E (UPKEEPING 3rd YEAR) | 25 | Number | |
678 | 74.19 | ROAD E (UPKEEPING 4th YEAR) | 25 | Number | |
679 | 74.2 | ROAD E (UPKEEPING 5th YEAR) | 25 | Number | |
680 | 74.21 | ROAD F (UPKEEPING 1st YEAR) | 75 | Number | |
681 | 74.22 | ROAD F (UPKEEPING 2nd YEAR) | 75 | Number | |
682 | 74.23 | ROAD F (UPKEEPING 3rd YEAR) | 75 | Number | |
683 | 74.24 | ROAD F (UPKEEPING 4th YEAR) | 75 | Number | |
684 | 74.25 | ROAD F (UPKEEPING 5th YEAR) | 75 | Number | |
685 | 74.26 | ROAD G (UPKEEPING 1st YEAR) | 250 | Number | |
686 | 74.27 | ROAD G (UPKEEPING 2nd YEAR) | 250 | Number | |
687 | 74.28 | ROAD G (UPKEEPING 3rd YEAR) | 250 | Number | |
688 | 74.29 | ROAD G (UPKEEPING 4th YEAR) | 250 | Number | |
689 | 74.3 | ROAD G (UPKEEPING 5th YEAR) | 250 | Number | |
690 | 75 | Chiseling the tree barks upto a size of 20cm x 20cm and painting with first class enamel wood paint and numbering the trees as per avenue | |||
691 | 75.01 | ROAD F (UPKEEPING 1st YEAR) | 7 | Number | |
692 | 75.02 | ROAD G (UPKEEPING 1st YEAR) | 26 | Number | |
693 | 76 | Painting the tree barks upto a size of 15cm x 15cm with first class enamel paintas per avenue register complete | |||
694 | 76.01 | ROAD F (UPKEEPING 2nd YEAR) | 0.16 | Square metre | |
695 | 76.02 | ROAD F (UPKEEPING 3rd YEAR) | 0.16 | Square metre | |
696 | 76.03 | ROAD F (UPKEEPING 4th YEAR) | 0.16 | Square metre | |
697 | 76.04 | ROAD F (UPKEEPING 5th YEAR) | 0.16 | Square metre | |
698 | 76.05 | ROAD G (UPKEEPING 2nd YEAR) | 0.59 | Square metre | |
699 | 76.06 | ROAD G (UPKEEPING 3rd YEAR) | 0.59 | Square metre | |
700 | 76.07 | ROAD G (UPKEEPING 4th YEAR) | 0.59 | Square metre | |
701 | 76.08 | ROAD G (UPKEEPING 5th YEAR) | 0.59 | Square metre | |
702 | 77 | Lettering the tree barks upto a size of 15cm x 15cm with first class enamel paint as per avenue register complete | |||
703 | 77.01 | ROAD F (UPKEEPING 2nd YEAR) (5 to 10 CM) | 14 | Number | |
704 | 77.02 | ROAD F (UPKEEPING 3rd YEAR) (5 to 10 CM) | 14 | Number | |
705 | 77.03 | ROAD F (UPKEEPING 4th YEAR) (5 to 10 CM) | 14 | Number | |
706 | 77.04 | ROAD F (UPKEEPING 5th YEAR) (5 to 10 CM) | 14 | Number | |
707 | 77.05 | ROAD G (UPKEEPING 2nd YEAR) (5 to 10 CM) | 52 | Number | |
708 | 77.06 | ROAD G (UPKEEPING 3rd YEAR) (5 to 10 CM) | 52 | Number | |
709 | 77.07 | ROAD G (UPKEEPING 4th YEAR) (5 to 10 CM) | 52 | Number | |
710 | 77.08 | ROAD G (UPKEEPING 5th YEAR) (5 to 10 CM) | 52 | Number | |
711 | 78 | Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification no.111,112,501, 503,900 - over bituminous surfaces | |||
712 | 78.01 | ROAD A (UPKEEPING 4th YEAR) | 264 | Square metre | |
713 | 78.02 | ROAD A (UPKEEPING 5th YEAR) | 550 | Square metre | |
714 | 78.03 | ROAD B (UPKEEPING 4th YEAR) | 330 | Square metre | |
715 | 78.04 | ROAD B (UPKEEPING 5th YEAR) | 550 | Square metre | |
716 | 78.05 | ROAD C (UPKEEPING 4th YEAR) | 330 | Square metre | |
717 | 78.06 | ROAD C (UPKEEPING 5th YEAR) | 550 | Square metre | |
718 | 78.07 | ROAD D (UPKEEPING 4th YEAR) | 330 | Square metre | |
719 | 78.08 | ROAD D (UPKEEPING 5th YEAR) | 550 | Square metre | |
720 | 78.09 | ROAD E (UPKEEPING 4th YEAR) | 132 | Square metre | |
721 | 78.1 | ROAD E (UPKEEPING 5th YEAR) | 220 | Square metre | |
722 | 78.11 | ROAD F (UPKEEPING 4th YEAR) | 197 | Square metre | |
723 | 78.12 | ROAD F (UPKEEPING 5th YEAR) | 328.13 | Square metre | |
724 | 78.13 | ROAD G (UPKEEPING 4th YEAR) | 337.67 | Square metre | |
725 | 78.14 | ROAD G (UPKEEPING 5th YEAR) | 562.5 | Square metre | |
726 | 79 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specificationno.111,112,507,900 complete in all respects - Grading II for patch Work | |||
727 | 79.01 | ROAD A (UPKEEPING 4th YEAR) | 7.92 | Cubic Metre | |
728 | 79.02 | ROAD A (UPKEEPING 5th YEAR) | 16.5 | Cubic Metre | |
729 | 79.03 | ROAD B (UPKEEPING 4th YEAR) | 9.9 | Cubic Metre | |
730 | 79.04 | ROAD B (UPKEEPING 5th YEAR) | 16.5 | Cubic Metre | |
731 | 79.05 | ROAD C (UPKEEPING 4th YEAR) | 9.9 | Cubic Metre | |
732 | 79.06 | ROAD C (UPKEEPING 5th YEAR) | 16.5 | Cubic Metre | |
733 | 79.07 | ROAD D (UPKEEPING 4th YEAR) | 9.9 | Cubic Metre | |
734 | 79.08 | ROAD D (UPKEEPING 5th YEAR) | 16.5 | Cubic Metre | |
735 | 79.09 | ROAD E (UPKEEPING 4th YEAR) | 3.96 | Cubic Metre | |
736 | 79.1 | ROAD E (UPKEEPING 5th YEAR) | 6.6 | Cubic Metre | |
737 | 79.11 | ROAD F (UPKEEPING 4th YEAR) | 5.91 | Cubic Metre | |
738 | 79.12 | ROAD F (UPKEEPING 5th YEAR) | 16.41 | Cubic Metre | |
739 | 79.13 | ROAD G (UPKEEPING 4th YEAR) | 10.13 | Cubic Metre | |
740 | 79.14 | ROAD G (UPKEEPING 5th YEAR) | 28.13 | Cubic Metre | |
741 | 79.15 | Calculation of SubTotal, GST and Total Amount carried out by system automatically | |||
742 | 79.16 | Basic cost of value put to tender as per estimate | 1 | (A) | |
743 | 79.17 | Add GST at 12% | 1 | (B) | |
744 | 79.18 | Total Value put to Tender | 1 | (A+B) | |
745 | 79.19 | Excess/Less Percentage | 1 | (D) | |
746 | 79.2 | Final Value | 1 | (E) | |
747 | 79.21 | Add GST at 12% of Final Value | 1 | (F) | |
748 | 79.22 | Total Value of Contract Including 12% of GST | 1 | (E+F) |