Package No 74 Tn No 5 2020 21 Hdo Dated 28 05 2020 Package 74 Widening And Improvements Of Government Roads In Kamuthi Highways C And M Sub Division Including Cd Works And Upkeeping For A Period Of 60 Months, Ramanathpuram-Tamil Nadu

Highways Department-HD has published Package No 74 Tn No 5 2020 21 Hdo Dated 28 05 2020 Package 74 Widening And Improvements Of Government Roads In Kamuthi Highways C And M Sub Division Including Cd Works And Upkeeping For A Period Of 60 Months. Submission Date for this Tender is 07-07-2020. Road Work Tenders in Ramanathpuram Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

24502100
Package No 74 Tn No 5 2020 21 Hdo Dated 28 05 2020 Package 74 Widening And Improvements Of Government Roads In Kamuthi Highways C And M Sub Division Including Cd Works And Upkeeping For A Period Of 60 Months
Open Tender
Indian
Tamil Nadu
Ramanathpuram
07-07-2020

Tender Details

Package No 74 Tn No 5 2020 21 Hdo Dated 28 05 2020 Package 74 Widening And Improvements Of Government Roads In Kamuthi Highways C And M Sub Division Including Cd Works And Upkeeping For A Period Of 60 Months

Key Value

Document Fees
Refer document
EMD
INR 474000.0 /-
Tender Value
INR 9.27 Crore /-

BOQ Items

Schedule of quantities to accompany the Tender for the work of Package-74- Widening and Improvements of Government roads in Kamuthi (Highways) C&M Sub-Division including CD works and Upkeeping for a period of 60 Months LIST OF ROAD ATTACHED IN PRICE BID DOCUMENT.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Excavation \nExcavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer including compaction by power roller rolling as per MORTH Specification no.111,112,301,305,900 for Box Cutting & PROTECTIVE WALL BI01010001010000000000000515BI0100001112
2 1.01 ROAD A 825.3 Cubic Metre
3 1.02 ROAD B 598.97 Cubic Metre
4 1.03 ROAD C 880 Cubic Metre
5 1.04 ROAD D 351.08 Cubic Metre
6 1.05 ROAD E 446.26 Cubic Metre
7 1.06 ROAD H (FOR RETAINING WALL) 46.76 Cubic Metre
8 1.07 ROAD I (FOR RETAINING WALL) 143.17 Cubic Metre
9 2 Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for pickig and all other tools and plants employed of the work and including all other incidental charges etc., complete as per MORTH Specification no.111,112,202
10 2.01 ROAD A 1984.5 Square Metre
11 2.02 ROAD B 1386.5 Square Metre
12 2.03 ROAD C 2500 Square Metre
13 2.04 ROAD D 1015.52 Square Metre
14 2.05 ROAD E 1096 Square Metre
15 2.06 ROAD F 2211.77 Square Metre
16 2.07 ROAD G 3730.62 Square Metre
17 3 Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification No.111, 112, 401,900 - for grading- III Material
18 3.01 ROAD E 139.46 Cubic Metre
19 4 Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification No.111, 112, 401,900 - for grading- V Material
20 4.01 ROAD A 501.5 Cubic Metre
21 4.02 ROAD B 503.46 Cubic Metre
22 4.03 ROAD C 525 Cubic Metre
23 4.04 ROAD D 209.45 Cubic Metre
24 4.05 ROAD E 153.4 Cubic Metre
25 5 Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406 of MORTH Vth Revision Specification no.111,112,406,900
26 5.01 ROAD A 1770.96 Cubic Metre
27 5.02 ROAD B 1312.05 Cubic Metre
28 5.03 ROAD C 2225 Cubic Metre
29 5.04 ROAD D 898.91 Cubic Metre
30 5.05 ROAD E 940.48 Cubic Metre
31 5.06 ROAD F 796.23 Cubic Metre
32 5.07 ROAD G 1380.29 Cubic Metre
33 6 Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification no.111,112, 501,502,900- over WMM
34 6.01 ROAD A 7665.35 Square Metre
35 6.02 ROAD B 7004.4 Square Metre
36 6.03 ROAD C 11000 Square Metre
37 6.04 ROAD D 4450.95 Square Metre
38 6.05 ROAD E 4687.8 Square Metre
39 6.06 ROAD F 6635.32 Square Metre
40 6.07 ROAD G 11191.9 Square Metre
41 7 Tack coat - Providing and applying tack coat with bitumen emulsion(RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification no.111,112,501, 503,900- over granular surfaces treated with primer
42 7.01 ROAD A 7665.35 Square Metre
43 7.02 ROAD B 7004.4 Square Metre
44 7.03 ROAD C 11000 Square Metre
45 7.04 ROAD D 4450.95 Square Metre
46 7.05 ROAD E 4687.8 Square Metre
47 7.06 ROAD F 6635.32 Square Metre
48 7.07 ROAD G 11191.9 Square Metre
49 8 Bituminous Macadam Providing and laying bituminous macadam with Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade- 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 of MORTH Specification no.111,112,501,503,900 - Grading II
50 8.01 ROAD A 383.27 Cubic Metre
51 8.02 ROAD B 350.21 Cubic Metre
52 8.03 ROAD C 550 Cubic Metre
53 8.04 ROAD D 222.55 Cubic Metre
54 8.05 ROAD E 234.39 Cubic Metre
55 8.06 ROAD F 331.78 Cubic Metre
56 8.07 ROAD G 559.6 Cubic Metre
57 9 Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specificationno.111,112,507,900 complete in all respects - Grading II
58 9.01 ROAD A 229.96 Cubic Metre
59 9.02 ROAD B 210.13 Cubic Metre
60 9.03 ROAD C 330 Cubic Metre
61 9.04 ROAD D 133.53 Cubic Metre
62 9.05 ROAD E 140.63 Cubic Metre
63 9.06 ROAD F 199.06 Cubic Metre
64 9.07 ROAD G 335.75 Cubic Metre
65 10 Vibrated Cement Concrete M15 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., as per MORTH Specification no. 111,112,1000, 1500, 1700,2100,900 complete for FOUNDATION BELOW SILL LEVEL
66 10.01 ROAD A 4.55 Cubic Metre
67 11 Vibrated Cement Concrete M15 using 20mm ISS HBG metal including cost of material, laying, compacting, finishing and curing etc., complete as per standard specification and as directed by the departmental officers for side walls of Paverblock pavement.
68 11.01 ROAD A 40.97 Cubic Metre
69 12 Quarry Dust Filling behind the abutments, Wings and pipe portion with Quarry fines including cost and conveyance to site including labour charges for filling in layers watering tamping under optimum moisture content to get the maximum density including of all other incidental charges etc., complete as per MORT & H specification no.304,900
70 12.01 ROAD A 32.65 Cubic Metre
71 12.02 ROAD H (FOR RETAINING WALL) 7.88 Cubic Metre
72 12.03 ROAD I (FOR RETAINING WALL) 23.18 Cubic Metre
73 13 Providing and laying 83mm thick Hi strength type of interlocking colour paver block of minimum compressive strength 40 N sq.mm in uniform shape of approved make to be laid in harring bone patern with approved non skitting surface in top as diected by the engineer the rate in inclusive of providing transporting loading and unloading and laying as per standard specification etc.,complete for paver blocked portion as per MORTH specification No.IRC SP 63:2004
74 13.01 ROAD A 1088.45 Square Metre
75 14 Excavation \nExcavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer including compaction by power roller rolling as per SS20B MORTH Specification no.111,112,301,305,900 for Making up the berms.
76 14.01 ROAD A 320.84 Cubic Metre
77 14.02 ROAD C 940 Cubic Metre
78 14.03 ROAD D 63.83 Cubic Metre
79 14.04 ROAD F 698.76 Cubic Metre
80 14.05 ROAD G 1196.28 Cubic Metre
81 15 Refilling for making up berms with box cutting earth and side earth obtained from the box cutting portion and available earth including removal and satisfactory disposal of all materials etc complete as directed by the engineer as per MORTH Specification No. 111, 112, 301, 305, 900
82 15.01 ROAD A 825.3 Cubic Metre
83 15.02 ROAD B 511.93 Cubic Metre
84 15.03 ROAD C 880 Cubic Metre
85 15.04 ROAD D 351.08 Cubic Metre
86 15.05 ROAD E 414.39 Cubic Metre
87 15.06 ROAD H (FOR RETAINING WALL) 31.5 Cubic Metre
88 15.07 ROAD I (FOR RETAINING WALL) 113.3 Cubic Metre
89 16 Providing RCC M15 Grade precast KM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete as per MORT & H Specification No. 804
90 16.01 ROAD A 1 Number
91 16.02 ROAD B 1 Number
92 16.03 ROAD C 2 Number
93 16.04 ROAD F 1 Numbers
94 16.05 ROAD G 3 Number
95 17 Providing RCC M15 Grade precast HM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete as per MORT & H Specification No. 804
96 17.01 ROAD A 7 Numbers
97 17.02 ROAD B 5 Numbers
98 17.03 ROAD C 8 Number
99 17.04 ROAD D 4 Number
100 17.05 ROAD E 4 Numbers
101 17.06 ROAD F 7 Numbers
102 17.07 ROAD G 12 Number
103 18 Providing RCC M.15 grade Precast Boundary stones / Guid postof standard design as per IRC 8-1980 and fixing in position including painting and printing etc., complete (as per MORT & H specification
104 18.01 ROAD A 88 Numbers
105 18.02 ROAD B 56 Numbers
106 18.03 ROAD C 96 Number
107 18.04 ROAD D 40 Number
108 18.05 ROAD E 44 Numbers
109 18.06 ROAD F 76 Numbers
110 18.07 ROAD G 150 Number
111 19 Vibrated Cement Concrete M15 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., as per MORTH Specification no. 111,112,1000, 1500, 1700,2100,900 complete for FOUNDATION BELOW SILL LEVEL
112 19.01 ROAD H (FOR RETAINING WALL) 42.49 Cubic Metre
113 19.02 ROAD I (FOR RETAINING WALL) 125.46 Cubic Metre
114 20 Vibrated Cement Concrete M15 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., as per MORTH Specification no. 111,112,1000, 1500, 1700,2100,900 complete for Above Sill Level
115 20.01 ROAD H (FOR RETAINING WALL) 59.22 Cubic Metre
116 20.02 ROAD I (FOR RETAINING WALL) 216.4 Cubic Metre
117 21 Providing and fixing SEEPAGE PIPES of 100mm dia with 4.00 kg per Cm2 of PVC pipes of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite cost and labour for 900mms diaganite chis at theperiphery and labour charges for fixing etc., complete to drain the back fill the RETAINING WALL
118 21.01 ROAD H (FOR RETAINING WALL) 18 RM
119 21.02 ROAD I (FOR RETAINING WALL) 52 RM
120 22 Dismantling\nDismantling the salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc,as per MORTH Specification no.111,112,202 SI.No.14
121 22.01 P.CC.Walls
122 22.02 ROAD A (FOR BOX CULVERT) 59.4 Cubic Metre
123 22.03 ROAD B (FOR BOX CULVERT) 14.85 Cubic Metre
124 22.04 ROAD D (FOR BOX CULVERT) 14.85 Cubic Metre
125 22.05 ROAD E (FOR BOX CULVERT) 14.85 Cubic Metre
126 22.06 ROAD F (FOR BOX CULVERT) 14.85 Cubic Metre
127 22.07 ROAD G (FOR BOX CULVERT) 74.25 Cubic Metre
128 23 Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per standard specification 111,112,304 for dressing the bed upto sill level
129 23.01 ROAD B (FOR MINOR BRIDGE) 81.91 Cubic Metre
130 24 Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per standard specification 111,112,304 for foundation
131 24.01 ROAD A (FOR BOX CULVERT) 477.92 Cubic Metre
132 24.02 ROAD B (FOR BOX CULVERT) 119.48 Cubic Metre
133 24.03 ROAD B (FOR RETAINING WALL) 139 Cubic Metre
134 24.04 ROAD B (FOR MINOR BRIDGE) 282.7 Cubic Metre
135 24.05 ROAD D (FOR BOX CULVERT) 119.48 Cubic Metre
136 24.06 ROAD D (FOR RETAINING WALL) 61.16 Cubic Metre
137 24.07 ROAD E (FOR BOX CULVERT) 193.26 Cubic Metre
138 24.08 ROAD F (FOR BOX CULVERT) 119.48 Cubic Metre
139 24.09 ROAD G (FOR RETAINING WALL) 55.6 Cubic Metre
140 24.1 ROAD G (FOR BOX CULVERT) 597.4 Cubic Metre
141 24.11 ROAD H (FOR PROTECTIVE WALL) 52.08 Cubic Metre
142 25 Vibrated Cement Concrete M15 using 40mm ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication for steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete as per MORTH Specification no.111,112,1000, 1500, 1700,2200,900 For foundation Concrete
143 25.01 ROAD A (FOR BOX CULVERT) 27.16 Cubic Metre
144 25.02 ROAD B (FOR BOX CULVERT) 6.79 Cubic Metre
145 25.03 ROAD D (FOR BOX CULVERT) 6.79 Cubic Metre
146 25.04 ROAD E (FOR BOX CULVERT) 11.44 Cubic Metre
147 25.05 ROAD F (FOR BOX CULVERT) 6.79 Cubic Metre
148 25.06 ROAD G (FOR BOX CULVERT) 33.95 Cubic Metre
149 25.07 ROAD H (FOR PROTECTIVE WALL) 6.72 Cubic Metre
150 26 Vibrated Cement Concrete M10 Nominal mix 1:3:6 using 40mm ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication for steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete as per MORTH Specification no.111,112,1000, 1500, 1700,2200,900 For Below Sill Level
151 26.01 ROAD B (FOR MINOR BRIDGE) 15.71 Cubic Metre
152 27 Vibrated Cement Concrete M25 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., as per MORTH Specification no. 111,112,1000, 1500, 1700,2100,900 complete for FOUNDATION BELOW SILL LEVEL AND ABOVE SILL LEVEL FOR BOX CULVERT
153 27.01 ROAD A (FOR BOX CULVERT) 111.28 Cubic Metre
154 27.02 ROAD B (FOR BOX CULVERT) 27.82 Cubic Metre
155 27.03 ROAD D (FOR BOX CULVERT) 27.82 Cubic Metre
156 27.04 ROAD E (FOR BOX CULVERT) 55.64 Cubic Metre
157 27.05 ROAD F (FOR BOX CULVERT) 27.82 Cubic Metre
158 27.06 ROAD G (FOR BOX CULVERT) 139.1 Cubic Metre
159 28 Vibrated Cement Concrete M15 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., as per MORTH Specification no. 111,112,1000, 1500, 1700,2100,900 complete for FOUNDATION BELOW SILL LEVEL
160 28.01 ROAD B (FOR RETAINING WALL) 121.26 Cubic Metre
161 28.02 ROAD D (FOR RETAINING WALL) 53.35 Cubic Metre
162 28.03 ROAD G (FOR RETAINING WALL) 48.72 Cubic Metre
163 28.04 ROAD H (FOR PROTECTIVEWALL) 32.45 Cubic Metre
164 29 Vibrated Cement Concrete M15 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., as per MORTH Specification no. 111,112,1000, 1500, 1700,2100,900 complete for SUBSTRUCTURE OF ABUTEMENT WINGS AND PIERS (substructure - Above Sill )
165 29.01 ROAD B (FOR RETAINING WALL) 189.2 Cubic Metre
166 29.02 ROAD B (FOR MINOR BRIDGE) 76.72 Cubic Metre
167 29.03 ROAD D (FOR RETAINING WALL) 83.25 Cubic Metre
168 29.04 ROAD G (FOR RETAINING WALL) 76.4 Cubic Metre
169 29.05 ROAD H (FOR PROTECTIVEWALL) 25.73 Cubic Metre
170 30 Supply and fabrication of steel Grade Fe-500 required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the bars straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per MORTH Vth Revision Specification No. 1000, 1500, 1600, 900
171 30.01 ROAD A (FOR BOX CULVERT) 8.56 Metric tone
172 30.02 ROAD B (FOR BOX CULVERT) 2.141 Metric tone
173 30.03 ROAD B (FOR MINOR BRIDGE) 8.69 Metric tone
174 30.04 ROAD D (FOR BOX CULVERT) 2.141 Metric tone
175 30.05 ROAD E (FOR BOX CULVERT) 4.23 Metric tone
176 30.06 ROAD F (FOR BOX CULVERT) 2.141 Metric tone
177 30.07 ROAD G (FOR BOX CULVERT) 10.705 Metric tone
178 41 Providing and fixing of G.I. Drainge spouts 100mm dia as per MOST drawing No.SD/205 with grating arrangements at top as shown in the drawing including cost and conveyance of GI pipes and flats and fixing them in position etc., complete
179 41.01 ROAD B (FOR MINOR BRIDGE) 4 Each
180 42 Providing and fixing of SEEPAGE PIPES 100mm dia with 4 .00 Kg cm2 of PVC pipes of required length for abutment and wing ,Retaining wall including cost and conveyance of all materials to work site cost and labour for 900 mm diaganite chis at the periphery and labour fixing etc., complete to drain the back fill the retaining wall
181 42.01 ROAD B (FOR RETAINING WALL) 50 RM
182 42.02 ROAD B (FOR MINOR BRIDGE) 30 RM
183 42.03 ROAD D (FOR RETAINING WALL) 22 RM
184 42.04 ROAD G (FOR RETAINING WALL ) 20 RM
185 42.05 ROAD H (FOR PROTECTIVEWALL) 16 RM
186 43 Vibrated Reinforced Cement Concrete [Design Mix] M30 grade using ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication for steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete as per MORTH Vth Revision Specification No. 111, 112, 1000, 1500, 1600, 1700, 2200, 2300 900 for BED BLOCK OVER PIER AND DIRT WALL CUM BED BLOCK OVER ABUTMENT
187 43.01 ROAD B (FOR MINOR BRIDGE) 6.44 Cubic Metre
188 44 Providing and fixing Kraft Paper for full width of seating of deck slab and including cost and conveyance to worksite labour for fixing the same in correct position and all other incidental charges etc., complete as per MORTH Vth Revision Specification No. 2600
189 44.01 ROAD B (FOR MINOR BRIDGE) 17.52 Square metre
190 45 Vibrated Cement Concrete M30 Grade (Design mix) Using IRC size hard granite metal including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying compacting curing, including all incidental charges etc., complete as per MORTH Vth Revision Specification No. 1000, 1500, 1600, 1700, 2702, 900 for WEARING COAT 75MM uniform thickness OVER DECK SLAB AND APPROACH SLAB
191 45.01 ROAD A (FOR BOX CULVERT) 76.44 Square metre
192 45.02 ROAD B (FOR BOX CULVERT) 19.11 Square metre
193 45.03 ROAD B (FOR MINOR BRIDGE) 148.5 Square metre
194 45.04 ROAD D (FOR BOX CULVERT) 19.11 Square metre
195 45.05 ROAD E (FOR BOX CULVERT) 40.11 Square metre
196 45.06 ROAD F (FOR BOX CULVERT) 19.11 Square metre
197 45.07 ROAD G (FOR BOX CULVERT) 95.55 Square metre
198 46 Vibrated Cement Concrete M20 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., as per MORTH Specification no. 111,112,1000, 1500, 1700,2100,900 complete for Wings walls & Parapet wall and footing of abutment and wings below sill level
199 46.01 ROAD A (FOR BOX CULVERT) 103.88 Cubic Metre
200 46.02 ROAD B (FOR MINOR BRIDGE) 163.47 Cubic Metre
201 46.03 ROAD B (FOR BOX CULVERT) 25.97 Cubic Metre
202 46.04 ROAD D (FOR BOX CULVERT) 25.97 Cubic Metre
203 46.05 ROAD E (FOR BOX CULVERT) 24.09 Cubic Metre
204 46.06 ROAD F (FOR BOX CULVERT) 25.97 Cubic Metre
205 46.07 ROAD G (FOR BOX CULVERT) 129.85 Cubic Metre
206 47 Filling behind the abutments, Wings with clean gritty gravel including cost and coneyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other inciental charges etc., complete. as per MORT & H specification no.304,900
207 47.01 ROAD B (FOR MINOR BRIDGE) 89.96 Cubic Metre
208 48 Quarry Dust Filling behind the abutments, Wings and pipe portion with Quarry fines including cost and conveyance to site including labour charges for filling in layers watering tamping under optimum moisture content to get the maximum density including of all other incidental charges etc., complete as per MORT & H specification no.304,900
209 48.01 ROAD A (FOR BOX CULVERT) 55 Cubic Metre
210 48.02 ROAD B (FOR BOX CULVERT) 13.75 Cubic Metre
211 48.03 ROAD B (FOR RETAINING WALL) 22.5 Cubic Metre
212 48.04 ROAD D (FOR BOX CULVERT) 13.75 Cubic Metre
213 48.05 ROAD D (FOR RETAINING WALL) 9.9 Cubic Metre
214 48.06 ROAD E (FOR BOX CULVERT) 28.13 Cubic Metre
215 48.07 ROAD F (FOR BOX CULVERT) 13.75 Cubic Metre
216 48.08 ROAD G (FOR BOX CULVERT) 68.75 Cubic Metre
217 48.09 ROAD G (FOR RETAINING WALL) 9 Cubic Metre
218 49 Vibrated Reinforced Cement Concrete of grade M30 Design Mix using ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DECK SLAB.
219 49.01 ROAD B (FOR MINOR BRIDGE) 65.62 Cubic Metre
220 50 Providing FILTER MEDIA behind abutment and wings for 600 mm thickness using filter materials as per Appendix - 6 of IRC: 78-2014 well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance to woksite including all other incidental charges etc., complete.
221 50.01 ROAD B (FOR MINOR BRIDGE) 40.13 Cubic Metre
222 51 .Providing and fixing PVC EXPANSION JOINT in between deck slabs over abutment and pier as shown in the drawing including cost and conveyance of expansion joints including shalimar pad and joint sealant etc, complete.
223 51.01 ROAD B (FOR MINOR BRIDGE) 29.85 RM
224 52 Vibrated Cement Concrete M15 grade, Nominal Mix 1:2:4, using 40mm ISS hard granite broken metal including cost and conveyance of all materials to site and cement at site including cost of formwork, lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in heights and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for BASE COURSE BELOW APPROACH SLAB.
225 52.01 ROAD B (FOR MINOR BRIDGE) 13 Cubic Metre
226 53 Vibrated reinforced cement concrete M30 design mix using ISS graded hard granite broken metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental changes etc., complete for APPROACH SLAB.
227 53.01 ROAD B (FOR MINOR BRIDGE) 18.27 Cubic Metre
228 54 VRCC M40 (design mix) using 20mm ISS HBG graded metal as the max. size of coarse aggreagates including cost & conveyance of all materials to site and cost of cement at site, but excluding cost & fabrication of steel, but including cost of form work, soft water, labour charges for mixing, transporting, laying, curing concrete working at heights, hire charges for T&P including all other incidental charges etc., complete as per relevant std specification for CRASH BARRIER
229 54.01 ROAD B (FOR MINOR BRIDGE) 7.27 RM
230 55 Vibrated Cement concrete M 15 (nominal mix) using 40 mm ISS HBG graded metal including cost & conveyance of all materials to site and cost of cement at site, including cost of form work , labour charges for mixing, transporting, laying and curing concrete, soft water, hire charges for T&P, etc., complete for PARAPET OVER RETURNS.
231 55.01 ROAD B (FOR MINOR BRIDGE) 6.07 Cubic Metre
232 56 Supply and fixing of High Quality of PVC pipes of 150mm dia.. Including cost and conveyance of pipes to the site and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges etc complete., for proving utility services in footpaths.
233 56.01 ROAD B (FOR MINOR BRIDGE) 79.44 RM
234 57 Supply of NP 3 class RCC 1000 mm dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 2003 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the dapartmental officers etc., for diversion road
235 57.01 ROAD B (FOR MINOR BRIDGE) 7.5 RM
236 58 Hoisting and fixing of 1000mm dia pipes and collars proper gradient including all labour charges and all other incidental charges etc., complete
237 58.01 ROAD B (FOR MINOR BRIDGE) 7.5 RM
238 59 Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Formation of embankment using carted earth with a lead of 2 km. having CBR value of more than 8 FOR DIVERSION ROAD & FILLING SIDE\n
239 59.01 ROAD A (FOR BOX CULVERT) 1250 Cubic Metre
240 59.02 ROAD B (FOR BOX CULVERT) 312.5 Cubic Metre
241 59.03 ROAD B (FOR MINOR BRIDGE) 409.5 Cubic Metre
242 59.04 ROAD D (FOR BOX CULVERT) 312.5 Cubic Metre
243 59.05 ROAD E (FOR BOX CULVERT) 312.5 Cubic Metre
244 59.06 ROAD F (FOR BOX CULVERT) 312.5 Cubic Metre
245 59.07 ROAD G (FOR BOX CULVERT) 1562.5 Cubic Metre
246 60 Refilling excavated Earth work including removal and satisfactory disposal of all materials necessary for the construction of the roadway and side drains in accordance with the specifications and the lines grades and cross sections shown in the drawings or as indicated by the engineer including power roller rolling all the labour charges etc complete as per standard specification No.111,112,202,301,303,900
247 60.01 ROAD B (FOR RETAINING WALL) 100 Cubic Metre
248 60.02 ROAD D (FOR RETAINING WALL) 44 Cubic Metre
249 60.03 ROAD G (FOR RETAINING WALL) 40 Cubic Metre
250 61 Providing and laying of Gravel including cost and conveyance of the same to work site including stacking the same to departemental gauge for premeasurement including all labour charges for laying, spreading etc., complete and as directed by the departmental engineers for making For diversion road and approch portion filling\n
251 61.01 ROAD B (FOR MINOR BRIDGE) 2373.45 Cubic Metre
252 62 Clearing the Light jungles including weeding out shrubs bushes, egetables, growth etc., as per spcifications and directions of Engineer in charge (Twice a year) for 60 months
253 62.01 ROAD A (UPKEEPING 1st YEAR) 5400 Square metre
254 62.02 ROAD A (UPKEEPING 2nd YEAR) 5400 Square metre
255 62.03 ROAD A (UPKEEPING 3rd YEAR) 5400 Square metre
256 62.04 ROAD A (UPKEEPING 4th YEAR) 5400 Square metre
257 62.05 ROAD A (UPKEEPING 5th YEAR) 5400 Square metre
258 62.06 ROAD B (UPKEEPING 1st YEAR) 3906 Square metre
259 62.07 ROAD B (UPKEEPING 2nd YEAR) 3906 Square metre
260 62.08 ROAD B (UPKEEPING 3rd YEAR) 3906 Square metre
261 62.09 ROAD B (UPKEEPING 4th YEAR) 3906 Square metre
262 62.1 ROAD B (UPKEEPING 5th YEAR) 3906 Square metre
263 62.11 ROAD C (UPKEEPING 1st YEAR) 7200 Square metre
264 62.12 ROAD C (UPKEEPING 2nd YEAR) 7200 Square metre
265 62.13 ROAD C (UPKEEPING 3rd YEAR) 7200 Square metre
266 62.14 ROAD C (UPKEEPING 4th YEAR) 7200 Square metre
267 62.15 ROAD C (UPKEEPING 5th YEAR) 7200 Square metre
268 62.16 ROAD D (UPKEEPING 1st YEAR) 2880 Square metre
269 62.17 ROAD D (UPKEEPING 2nd YEAR) 2880 Square metre
270 62.18 ROAD D (UPKEEPING 3rd YEAR) 2880 Square metre
271 62.19 ROAD D (UPKEEPING 4th YEAR) 2880 Square metre
272 62.2 ROAD D (UPKEEPING 5th YEAR) 2880 Square metre
273 62.21 ROAD E (UPKEEPING 1st YEAR) 2520 Square metre
274 62.22 ROAD E (UPKEEPING 2nt YEAR) 2520 Square metre
275 62.23 ROAD E (UPKEEPING 3rd YEAR) 2520 Square metre
276 62.24 ROAD E (UPKEEPING 4th YEAR) 2520 Square metre
277 62.25 ROAD E (UPKEEPING 5th YEAR) 2520 Square metre
278 62.26 ROAD F (UPKEEPING 1st YEAR) 6300 Square metre
279 62.27 ROAD F (UPKEEPING 2nd YEAR) 6300 Square metre
280 62.28 ROAD F (UPKEEPING 3rd YEAR) 6300 Square metre
281 62.29 ROAD F (UPKEEPING 4th YEAR) 6300 Square metre
282 62.3 ROAD F (UPKEEPING 5th YEAR) 6300 Square metre
283 62.31 ROAD G (UPKEEPING 1st YEAR) 10800 Square metre
284 62.32 ROAD G (UPKEEPING 2nd YEAR) 10800 Square metre
285 62.33 ROAD G (UPKEEPING 3rd YEAR) 10800 Square metre
286 62.34 ROAD G (UPKEEPING 4th YEAR) 10800 Square metre
287 62.35 ROAD G (UPKEEPING 5th YEAR) 10800 Square metre
288 63 Excavation \nExcavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer including compaction by power roller rolling as per SS20B MORTH Specification no.111,112,301,305,900 for Making up the berms. (Yearly Two Times)
289 63.01 ROAD A (UPKEEPING 2nd YEAR) 687.68 Cubic Metre
290 63.02 ROAD A (UPKEEPING 3rd YEAR) 687.68 Cubic Metre
291 63.03 ROAD A (UPKEEPING 4th YEAR) 687.68 Cubic Metre
292 63.04 ROAD A (UPKEEPING 5th YEAR) 687.68 Cubic Metre
293 63.05 ROAD B (UPKEEPING 2nd YEAR) 307.16 Cubic Metre
294 63.06 ROAD B (UPKEEPING 3rd YEAR) 307.16 Cubic Metre
295 63.07 ROAD B (UPKEEPING 4th YEAR) 307.16 Cubic Metre
296 63.08 ROAD B (UPKEEPING 5th YEAR) 307.16 Cubic Metre
297 63.09 ROAD C (UPKEEPING 2nd YEAR) 1092 Cubic Metre
298 63.1 ROAD C (UPKEEPING 3rd YEAR) 1092 Cubic Metre
299 63.11 ROAD C (UPKEEPING 4th YEAR) 1092 Cubic Metre
300 63.12 ROAD C (UPKEEPING 5th YEAR) 1092 Cubic Metre
301 63.13 ROAD D (UPKEEPING 2nd YEAR) 248.94 Cubic Metre
302 63.14 ROAD D (UPKEEPING 3rd YEAR) 248.94 Cubic Metre
303 63.15 ROAD D (UPKEEPING 4th YEAR) 248.94 Cubic Metre
304 63.16 ROAD D (UPKEEPING 5th YEAR) 248.94 Cubic Metre
305 63.17 ROAD E (UPKEEPING 2nd YEAR) 248.64 Cubic Metre
306 63.18 ROAD E (UPKEEPING 3rd YEAR) 248.64 Cubic Metre
307 63.19 ROAD E (UPKEEPING 4th YEAR) 248.64 Cubic Metre
308 63.2 ROAD E (UPKEEPING 5th YEAR) 248.64 Cubic Metre
309 63.21 ROAD F (UPKEEPING 2nd YEAR) 419.26 Cubic Metre
310 63.22 ROAD F (UPKEEPING 3rd YEAR) 419.26 Cubic Metre
311 63.23 ROAD F (UPKEEPING 4th YEAR) 419.26 Cubic Metre
312 63.24 ROAD F (UPKEEPING 5th YEAR) 419.26 Cubic Metre
313 63.25 ROAD G (UPKEEPING 2nd YEAR) 717.77 Cubic Metre
314 63.26 ROAD G (UPKEEPING 3rd YEAR) 717.77 Cubic Metre
315 63.27 ROAD G (UPKEEPING 4th YEAR) 717.77 Cubic Metre
316 63.28 ROAD G (UPKEEPING 5th YEAR) 717.77 Cubic Metre
317 64 Deploying earth moving machinery for desilting channal and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. For U/s and D/s culvert Clearance using JCB (Sl.No:XI-18)
318 64.01 ROAD A (UPKEEPING 1st YEAR) 4 Hours
319 64.02 ROAD A (UPKEEPING 2nd YEAR) 4 Hours
320 64.03 ROAD A (UPKEEPING 3rd YEAR) 4 Hours
321 64.04 ROAD A (UPKEEPING 4th YEAR) 4 Hours
322 64.05 ROAD A (UPKEEPING 5th YEAR) 4 Hours
323 64.06 ROAD B (UPKEEPING 1ST YEAR) 4 Hours
324 64.07 ROAD B (UPKEEPING 2nd YEAR) 4 Hours
325 64.08 ROAD B (UPKEEPING 3rd YEAR) 4 Hours
326 64.09 ROAD B (UPKEEPING 4th YEAR) 4 Hours
327 64.1 ROAD B (UPKEEPING 5th YEAR) 4 Hours
328 64.11 ROAD D (UPKEEPING 1st YEAR) 1 Hours
329 64.12 ROAD D (UPKEEPING 2nd YEAR) 1 Hours
330 64.13 ROAD D (UPKEEPING 5th YEAR) 1 Hours
331 64.14 ROAD D (UPKEEPING 5th YEAR) 1 Hours
332 64.15 ROAD D (UPKEEPING 5th YEAR) 1 Hours
333 64.16 ROAD E (UPKEEPING 1st YEAR) 1 Hours
334 64.17 ROAD E (UPKEEPING 2nd YEAR) 1 Hours
335 64.18 ROAD E (UPKEEPING 3rd YEAR) 1 Hours
336 64.19 ROAD E (UPKEEPING 4th YEAR) 1 Hours
337 64.2 ROAD E (UPKEEPING 5th YEAR) 1 Hours
338 64.21 ROAD F (UPKEEPING 1st YEAR) 4 Hours
339 64.22 ROAD F (UPKEEPING 2nd YEAR) 4 Hours
340 64.23 ROAD F (UPKEEPING 3rd YEAR) 4 Hours
341 64.24 ROAD F (UPKEEPING 4th YEAR) 4 Hours
342 64.25 ROAD F (UPKEEPING 5th YEAR) 4 Hours
343 64.26 ROAD G (UPKEEPING 1st YEAR) 15 Hours
344 64.27 ROAD G (UPKEEPING 2nd YEAR) 15 Hours
345 64.28 ROAD G (UPKEEPING 3rd YEAR) 15 Hours
346 64.29 ROAD G (UPKEEPING 4th YEAR) 15 Hours
347 64.3 ROAD G (UPKEEPING 5th YEAR) 15 Hours
348 65 White washing two coats with freshly burnt white shell lime inclusing cost of lime, blue powder fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specification and as directed.
349 65.01 ROAD A (UPKEEPING 1ST YEAR) 32.36 Square metre
350 65.02 ROAD A (UPKEEPING 2nd YEAR) 32.36 Square metre
351 65.03 ROAD A (UPKEEPING 3rd YEAR) 32.36 Square metre
352 65.04 ROAD A (UPKEEPING 4th YEAR) 32.36 Square metre
353 65.05 ROAD A (UPKEEPING 5th YEAR) 32.36 Square metre
354 65.06 ROAD B (UPKEEPING 1ST YEAR) 89.96 Square metre
355 65.07 ROAD B (UPKEEPING 2nd YEAR) 89.96 Square metre
356 65.08 ROAD B (UPKEEPING 3rd YEAR) 89.96 Square metre
357 65.09 ROAD B (UPKEEPING 4th YEAR) 89.96 Square metre
358 65.1 ROAD B (UPKEEPING 5th YEAR) 89.96 Square metre
359 65.11 ROAD D (UPKEEPING 1ST YEAR) 12.96 Square metre
360 65.12 ROAD D (UPKEEPING 2nd YEAR) 12.96 Square metre
361 65.13 ROAD D (UPKEEPING 3rd YEAR) 12.96 Square metre
362 65.14 ROAD D (UPKEEPING 4th YEAR) 12.96 Square metre
363 65.15 ROAD D (UPKEEPING 5th YEAR) 12.96 Square metre
364 65.16 ROAD E (UPKEEPING 1ST YEAR) 6.48 Square metre
365 65.17 ROAD E (UPKEEPING 2nd YEAR) 6.48 Square metre
366 65.18 ROAD E (UPKEEPING 3rd YEAR) 6.48 Square metre
367 65.19 ROAD E (UPKEEPING 4th YEAR) 6.48 Square metre
368 65.2 ROAD E (UPKEEPING 5th YEAR) 6.48 Square metre
369 65.21 ROAD F (UPKEEPING 1ST YEAR) 22.36 Square metre
370 65.22 ROAD F (UPKEEPING 2nd YEAR) 22.36 Square metre
371 65.23 ROAD F (UPKEEPING 3rd YEAR) 22.36 Square metre
372 65.24 ROAD F (UPKEEPING 4th YEAR) 22.36 Square metre
373 65.25 ROAD F (UPKEEPING 5th YEAR) 22.36 Square metre
374 65.26 ROAD G (UPKEEPING 1ST YEAR) 70.61 Square metre
375 65.27 ROAD G (UPKEEPING 2nd YEAR) 70.61 Square metre
376 65.28 ROAD G (UPKEEPING 3rd YEAR) 70.61 Square metre
377 65.29 ROAD G (UPKEEPING 4th YEAR) 70.61 Square metre
378 65.3 ROAD G (UPKEEPING 5th YEAR) 70.61 Square metre
379 66 Tree/EB pole /culvert / Retaining wall banding using Coal tar with standard dimension including all matyerials and labour and all other incidental charges etc.,
380 66.01 ROAD A (UPKEEPING 1ST YEAR) 4.57 Square metre
381 66.02 ROAD A (UPKEEPING 2nd YEAR) 4.57 Square metre
382 66.03 ROAD A (UPKEEPING 3rd YEAR) 4.57 Square metre
383 66.04 ROAD A (UPKEEPING 4th YEAR) 4.57 Square metre
384 66.05 ROAD A (UPKEEPING 5th YEAR) 4.57 Square metre
385 66.06 ROAD B (UPKEEPING 1ST YEAR) 4.17 Square metre
386 66.07 ROAD B (UPKEEPING 2nd YEAR) 4.17 Square metre
387 66.08 ROAD B (UPKEEPING 3rd YEAR) 4.17 Square metre
388 66.09 ROAD B (UPKEEPING 4th YEAR) 4.17 Square metre
389 66.1 ROAD B (UPKEEPING 5th YEAR) 4.17 Square metre
390 66.11 ROAD D (UPKEEPING 1ST YEAR) 0.41 Square metre
391 66.12 ROAD D (UPKEEPING 2nd YEAR) 0.41 Square metre
392 66.13 ROAD D (UPKEEPING 3rd YEAR) 0.41 Square metre
393 66.14 ROAD D (UPKEEPING 4th YEAR) 0.41 Square metre
394 66.15 ROAD D (UPKEEPING 5th YEAR) 0.41 Square metre
395 66.16 ROAD E (UPKEEPING 1ST YEAR) 0.1 Square metre
396 66.17 ROAD E (UPKEEPING 2nd YEAR) 0.1 Square metre
397 66.18 ROAD E (UPKEEPING 3rd YEAR) 0.1 Square metre
398 66.19 ROAD E (UPKEEPING 4th YEAR) 0.1 Square metre
399 66.2 ROAD E (UPKEEPING 5th YEAR) 0.1 Square metre
400 66.21 ROAD F (UPKEEPING 1ST YEAR) 2.23 Square metre
401 66.22 ROAD F (UPKEEPING 2nd YEAR) 2.23 Square metre
402 66.23 ROAD F (UPKEEPING 3rd YEAR) 2.23 Square metre
403 66.24 ROAD F (UPKEEPING 4th YEAR) 2.23 Square metre
404 66.25 ROAD F (UPKEEPING 5th YEAR) 2.23 Square metre
405 66.26 ROAD G (UPKEEPING 1ST YEAR) 8.2 Square metre
406 66.27 ROAD G (UPKEEPING 2nd YEAR) 8.2 Square metre
407 66.28 ROAD G (UPKEEPING 3rd YEAR) 8.2 Square metre
408 66.29 ROAD G (UPKEEPING 4th YEAR) 8.2 Square metre
409 66.3 ROAD G (UPKEEPING 5th YEAR) 8.2 Square metre
410 67 Painting the Existing Culvert, Parapet as per IRC standard including the cost of Labour charges and material etc., complete
411 67.01 ROAD A (UPKEEPING 1st YEAR) 6.84 Square metre
412 67.02 ROAD A (UPKEEPING 2nd YEAR) 6.84 Square metre
413 67.03 ROAD A (UPKEEPING 3rd YEAR) 6.84 Square metre
414 67.04 ROAD A (UPKEEPING 4th YEAR) 6.84 Square metre
415 67.05 ROAD A (UPKEEPING 5th YEAR) 6.84 Square metre
416 67.06 ROAD B (UPKEEPING 1st YEAR) 5.13 Square metre
417 67.07 ROAD B (UPKEEPING 2nd YEAR) 5.13 Square metre
418 67.08 ROAD B (UPKEEPING 3rd YEAR) 5.13 Square metre
419 67.09 ROAD B (UPKEEPING 4th YEAR) 5.13 Square metre
420 67.1 ROAD B (UPKEEPING 5th YEAR) 5.13 Square metre
421 67.11 ROAD D (UPKEEPING 1st YEAR) 1.71 Square metre
422 67.12 ROAD D (UPKEEPING 2nd YEAR) 1.71 Square metre
423 67.13 ROAD D (UPKEEPING 3rd YEAR) 1.71 Square metre
424 67.14 ROAD D (UPKEEPING 4th YEAR) 1.71 Square metre
425 67.15 ROAD D (UPKEEPING 5th YEAR) 1.71 Square metre
426 67.16 ROAD E (UPKEEPING 1st YEAR) 1.71 Square metre
427 67.17 ROAD E (UPKEEPING 2nd YEAR) 1.71 Square metre
428 67.18 ROAD E (UPKEEPING 3rd YEAR) 1.71 Square metre
429 67.19 ROAD E (UPKEEPING 4th YEAR) 1.71 Square metre
430 67.2 ROAD E (UPKEEPING 5th YEAR) 1.71 Square metre
431 67.21 ROAD F (UPKEEPING 1st YEAR) 3.92 Square metre
432 67.22 ROAD F (UPKEEPING 2nd YEAR) 3.92 Square metre
433 67.23 ROAD F (UPKEEPING 3rd YEAR) 3.92 Square metre
434 67.24 ROAD F (UPKEEPING 4th YEAR) 3.92 Square metre
435 67.25 ROAD F (UPKEEPING 5th YEAR) 3.92 Square metre
436 67.26 ROAD G (UPKEEPING 1st YEAR) 13.06 Square metre
437 67.27 ROAD G (UPKEEPING 2nd YEAR) 13.06 Square metre
438 67.28 ROAD G (UPKEEPING 3rd YEAR) 13.06 Square metre
439 67.29 ROAD G (UPKEEPING 4th YEAR) 13.06 Square metre
440 67.3 ROAD G (UPKEEPING 5th YEAR) 13.06 Square metre
441 68 Painting the KM Stone as per IRC standard including the cost of Labour charges and material etc., complete
442 68.01 ROAD A (UPKEEPING 2nd YEAR) 0.49 Square metre
443 68.02 ROAD A (UPKEEPING 3rd YEAR) 0.49 Square metre
444 68.03 ROAD A (UPKEEPING 4th YEAR) 0.49 Square metre
445 68.04 ROAD A (UPKEEPING 5th YEAR) 0.49 Square metre
446 68.05 ROAD B (UPKEEPING 2nd YEAR) 0.49 Square metre
447 68.06 ROAD B (UPKEEPING 3rd YEAR) 0.49 Square metre
448 68.07 ROAD B (UPKEEPING 4th YEAR) 0.49 Square metre
449 68.08 ROAD B (UPKEEPING 5th YEAR) 0.49 Square metre
450 68.09 ROAD C (UPKEEPING 2nd YEAR) 0.49 Square metre
451 68.1 ROAD C (UPKEEPING 3rd YEAR) 0.49 Square metre
452 68.11 ROAD C (UPKEEPING 4th YEAR) 0.49 Square metre
453 68.12 ROAD C (UPKEEPING 5th YEAR) 0.49 Square metre
454 68.13 ROAD D (UPKEEPING 2nd YEAR) 0.49 Square metre
455 68.14 ROAD D (UPKEEPING 3rd YEAR) 0.49 Square metre
456 68.15 ROAD D (UPKEEPING 4th YEAR) 0.49 Square metre
457 68.16 ROAD D (UPKEEPING 5th YEAR) 0.49 Square metre
458 68.17 ROAD F (UPKEEPING 2nd YEAR) 0.49 Square metre
459 68.18 ROAD F (UPKEEPING 3rd YEAR) 0.49 Square metre
460 68.19 ROAD F (UPKEEPING 4th YEAR) 0.49 Square metre
461 68.2 ROAD F (UPKEEPING 5th YEAR) 0.49 Square metre
462 68.21 ROAD G (UPKEEPING 2nd YEAR) 1.49 Square metre
463 68.22 ROAD G (UPKEEPING 3rd YEAR) 1.49 Square metre
464 68.23 ROAD G (UPKEEPING 4th YEAR) 1.49 Square metre
465 68.24 ROAD G (UPKEEPING 5th YEAR) 1.49 Square metre
466 69 Painting the HM Stone as per IRC standard including the cost of Labour charges and material etc., complete
467 69.01 ROAD A (UPKEEPING 2nd YEAR) 1.34 Square metre
468 69.02 ROAD A (UPKEEPING 3rd YEAR) 1.34 Square metre
469 69.03 ROAD A (UPKEEPING 4th YEAR) 1.34 Square metre
470 69.04 ROAD A (UPKEEPING 5th YEAR) 1.34 Square metre
471 69.05 ROAD B (UPKEEPING 2nd YEAR) 1.52 Square metre
472 69.06 ROAD B (UPKEEPING 3rd YEAR) 1.52 Square metre
473 69.07 ROAD B (UPKEEPING 4th YEAR) 1.52 Square metre
474 69.08 ROAD B (UPKEEPING 5th YEAR) 1.52 Square metre
475 69.09 ROAD C (UPKEEPING 2nd YEAR) 1.52 Square metre
476 69.1 ROAD C (UPKEEPING 3rd YEAR) 1.52 Square metre
477 69.11 ROAD C (UPKEEPING 4th YEAR) 1.52 Square metre
478 69.12 ROAD C (UPKEEPING 5th YEAR) 1.52 Square metre
479 69.13 ROAD D (UPKEEPING 2nd YEAR) 1.52 Square metre
480 69.14 ROAD D (UPKEEPING 3rd YEAR) 1.52 Square metre
481 69.15 ROAD D (UPKEEPING 4th YEAR) 1.52 Square metre
482 69.16 ROAD D (UPKEEPING 5th YEAR) 1.52 Square metre
483 69.17 ROAD E (UPKEEPING 2nd YEAR) 0.76 Square metre
484 69.18 ROAD E (UPKEEPING 3rd YEAR) 0.76 Square metre
485 69.19 ROAD E (UPKEEPING 4th YEAR) 0.76 Square metre
486 69.2 ROAD E (UPKEEPING 5th YEAR) 0.76 Square metre
487 69.21 ROAD F (UPKEEPING 2nd YEAR) 1.34 Square metre
488 69.22 ROAD F (UPKEEPING 3rd YEAR) 1.34 Square metre
489 69.23 ROAD F (UPKEEPING 4th YEAR) 1.34 Square metre
490 69.24 ROAD F (UPKEEPING 5th YEAR) 1.34 Square metre
491 69.25 ROAD G (UPKEEPING 2nd YEAR) 2.28 Square metre
492 69.26 ROAD G (UPKEEPING 3rd YEAR) 2.28 Square metre
493 69.27 ROAD G (UPKEEPING 4th YEAR) 2.28 Square metre
494 69.28 ROAD G (UPKEEPING 5th YEAR) 2.28 Square metre
495 70 Painting the Boundry Stone as per IRC standard including the cost of Labour charges and material etc., complete
496 70.01 ROAD A (UPKEEPING 2nd YEAR) 19.91 Square metre
497 70.02 ROAD A (UPKEEPING 3rd YEAR) 19.91 Square metre
498 70.03 ROAD A (UPKEEPING 4th YEAR) 19.91 Square metre
499 70.04 ROAD A (UPKEEPING 5th YEAR) 19.91 Square metre
500 70.05 ROAD B (UPKEEPING 2nd YEAR) 12.67 Square metre
501 70.06 ROAD B (UPKEEPING 3rd YEAR) 12.67 Square metre
502 70.07 ROAD B (UPKEEPING 4th YEAR) 12.67 Square metre
503 70.08 ROAD B (UPKEEPING 5th YEAR) 12.67 Square metre
504 70.09 ROAD C (UPKEEPING 2nd YEAR) 21.72 Square metre
505 70.1 ROAD C (UPKEEPING 3rd YEAR) 21.72 Square metre
506 70.11 ROAD C (UPKEEPING 4th YEAR) 21.72 Square metre
507 70.12 ROAD C (UPKEEPING 5th YEAR) 21.72 Square metre
508 70.13 ROAD D (UPKEEPING 2nd YEAR) 9.05 Square metre
509 70.14 ROAD D (UPKEEPING 3rd YEAR) 9.05 Square metre
510 70.15 ROAD D (UPKEEPING 4th YEAR) 9.05 Square metre
511 70.16 ROAD D (UPKEEPING 5th YEAR) 9.05 Square metre
512 70.17 ROAD E (UPKEEPING 2nd YEAR) 9.96 Square metre
513 70.18 ROAD E (UPKEEPING 3rd YEAR) 9.96 Square metre
514 70.19 ROAD E (UPKEEPING 4th YEAR) 9.96 Square metre
515 70.2 ROAD E (UPKEEPING 5th YEAR) 9.96 Square metre
516 70.21 ROAD F (UPKEEPING 2nd YEAR) 17.19 Square metre
517 70.22 ROAD F (UPKEEPING 3rd YEAR) 17.19 Square metre
518 70.23 ROAD F (UPKEEPING 4th YEAR) 17.19 Square metre
519 70.24 ROAD F (UPKEEPING 5th YEAR) 17.19 Square metre
520 70.25 ROAD G (UPKEEPING 2nd YEAR) 33.93 Square metre
521 70.26 ROAD G (UPKEEPING 3rd YEAR) 33.93 Square metre
522 70.27 ROAD G (UPKEEPING 4th YEAR) 33.93 Square metre
523 70.28 ROAD G (UPKEEPING 5th YEAR) 33.93 Square metre
524 71 Lettering the KM Stone as per IRC standard including the cost of Labour charges and material etc., complete
525 71.01 ROAD A (UPKEEPING 2nd YEAR) (5 to 10 CM) 15 Number
526 71.02 ROAD A (UPKEEPING 2nd YEAR) (10 to 15 CM) 2 Number
527 71.03 ROAD A (UPKEEPING 3rd YEAR) (5 to 10 CM) 15 Number
528 71.04 ROAD A (UPKEEPING 3rd YEAR) (10 to 15 CM) 2 Number
529 71.05 ROAD A (UPKEEPING 4th YEAR) (5 to 10 CM) 15 Number
530 71.06 ROAD A (UPKEEPING 4th YEAR) (10 to 15 CM) 2 Number
531 71.07 ROAD A (UPKEEPING 5th YEAR) (5 to 10 CM) 15 Number
532 71.08 ROAD A (UPKEEPING 5th YEAR) (10 to 15 CM) 2 Number
533 71.09 ROAD B (UPKEEPING 2nd YEAR) (5 to 10 CM) 15 Number
534 71.1 ROAD B (UPKEEPING 2nd YEAR) (10 to 15 CM) 2 Number
535 71.11 ROAD B (UPKEEPING 3rd YEAR) (5 to 10 CM) 15 Number
536 71.12 ROAD B (UPKEEPING 3rd YEAR) (10 to 15 CM) 2 Number
537 71.13 ROAD B (UPKEEPING 4th YEAR) (5 to 10 CM) 15 Number
538 71.14 ROAD B (UPKEEPING 4th YEAR) (10 to 15 CM) 2 Number
539 71.15 ROAD B (UPKEEPING 5th YEAR) (5 to 10 CM) 15 Number
540 71.16 ROAD B (UPKEEPING 5th YEAR) (10 to 15 CM) 2 Number
541 71.17 ROAD C (UPKEEPING 2nd YEAR) (5 to 10 CM) 15 Number
542 71.18 ROAD C (UPKEEPING 2nd YEAR) (10 to 15 CM) 2 Number
543 71.19 ROAD C (UPKEEPING 3rd YEAR) (5 to 10 CM) 15 Number
544 71.2 ROAD C (UPKEEPING 3rd YEAR) (10 to 15 CM) 2 Number
545 71.21 ROAD C (UPKEEPING 4th YEAR) (5 to 10 CM) 15 Number
546 71.22 ROAD C (UPKEEPING 4th YEAR) (10 to 15 CM) 2 Number
547 71.23 ROAD C (UPKEEPING 5th YEAR) (5 to 10 CM) 15 Number
548 71.24 ROAD C (UPKEEPING 5th YEAR) (10 to 15 CM) 2 Number
549 71.25 ROAD D (UPKEEPING 2nd YEAR) (5 to 10 CM) 15 Number
550 71.26 ROAD D (UPKEEPING 2nd YEAR) (10 to 15 CM) 2 Number
551 71.27 ROAD D (UPKEEPING 3rd YEAR) (5 to 10 CM) 15 Number
552 71.28 ROAD D (UPKEEPING 3rd YEAR) (10 to 15 CM) 2 Number
553 71.29 ROAD D (UPKEEPING 4th YEAR) (5 to 10 CM) 15 Number
554 71.3 ROAD D (UPKEEPING 4th YEAR) (10 to 15 CM) 2 Number
555 71.31 ROAD D (UPKEEPING 5th YEAR) (5 to 10 CM) 15 Number
556 71.32 ROAD D (UPKEEPING 5th YEAR) (10 to 15 CM) 2 Number
557 71.33 ROAD F (UPKEEPING 2nd YEAR) (5 to 10 CM) 15 Number
558 71.34 ROAD F (UPKEEPING 2nd YEAR) (10 to 15 CM) 2 Number
559 71.35 ROAD F (UPKEEPING 3rd YEAR) (5 to 10 CM) 15 Number
560 71.36 ROAD F (UPKEEPING 3rd YEAR) (10 to 15 CM) 2 Number
561 71.37 ROAD F (UPKEEPING 4th YEAR) (5 to 10 CM) 15 Number
562 71.38 ROAD F (UPKEEPING 4th YEAR) (10 to 15 CM) 2 Number
563 71.39 ROAD F (UPKEEPING 5th YEAR) (5 to 10 CM) 15 Number
564 71.4 ROAD F (UPKEEPING 5th YEAR) (10 to 15 CM) 2 Number
565 71.41 ROAD G (UPKEEPING 2nd YEAR) (5 to 10 CM) 45 Number
566 71.42 ROAD G (UPKEEPING 2nd YEAR) (10 to 15 CM) 6 Number
567 71.43 ROAD G (UPKEEPING 3rd YEAR) (5 to 10 CM) 45 Number
568 71.44 ROAD G (UPKEEPING 3rd YEAR) (10 to 15 CM) 6 Number
569 71.45 ROAD G (UPKEEPING 4th YEAR) (5 to 10 CM) 45 Number
570 71.46 ROAD G (UPKEEPING 4th YEAR) (10 to 15 CM) 6 Number
571 71.47 ROAD G (UPKEEPING 5th YEAR) (5 to 10 CM) 45 Number
572 71.48 ROAD G (UPKEEPING 5th YEAR) (10 to 15 CM) 6 Number
573 72 Lettering the HM Stone as per IRC standard including the cost of Labour charges and material etc., complete
574 72.01 ROAD A (UPKEEPING 2nd YEAR) (5 to 10 CM) 14 Number
575 72.02 ROAD A (UPKEEPING 2nd YEAR) (10 to 15 CM) 14 Number
576 72.03 ROAD A (UPKEEPING 3rd YEAR) (5 to 10 CM) 14 Number
577 72.04 ROAD A (UPKEEPING 3rd YEAR) (10 to 15 CM) 14 Number
578 72.05 ROAD A (UPKEEPING 4th YEAR) (5 to 10 CM) 14 Number
579 72.06 ROAD A (UPKEEPING 4th YEAR) (10 to 15 CM) 14 Number
580 72.07 ROAD A (UPKEEPING 5th YEAR) (5 to 10 CM) 14 Number
581 72.08 ROAD A (UPKEEPING 5th YEAR) (10 to 15 CM) 14 Number
582 72.09 ROAD B (UPKEEPING 2nd YEAR) (5 to 10 CM) 16 Number
583 72.1 ROAD B (UPKEEPING 2nd YEAR) (10 to 15 CM) 16 Number
584 72.11 ROAD B (UPKEEPING 3rd YEAR) (5 to 10 CM) 16 Number
585 72.12 ROAD B (UPKEEPING 3rd YEAR) (10 to 15 CM) 16 Number
586 72.13 ROAD B (UPKEEPING 4th YEAR) (5 to 10 CM) 16 Number
587 72.14 ROAD B (UPKEEPING 4th YEAR) (10 to 15 CM) 16 Number
588 72.15 ROAD B (UPKEEPING 5th YEAR) (5 to 10 CM) 16 Number
589 72.16 ROAD B (UPKEEPING 5th YEAR) (10 to 15 CM) 16 Number
590 72.17 ROAD C (UPKEEPING 2nd YEAR) (5 to 10 CM) 16 Number
591 72.18 ROAD C (UPKEEPING 2nd YEAR) (10 to 15 CM) 16 Number
592 72.19 ROAD C (UPKEEPING 3rd YEAR) (5 to 10 CM) 16 Number
593 72.2 ROAD C (UPKEEPING 3rd YEAR) (10 to 15 CM) 16 Number
594 72.21 ROAD C (UPKEEPING 4th YEAR) (5 to 10 CM) 16 Number
595 72.22 ROAD C (UPKEEPING 4th YEAR) (10 to 15 CM) 16 Number
596 72.23 ROAD C (UPKEEPING 5th YEAR) (5 to 10 CM) 16 Number
597 72.24 ROAD C (UPKEEPING 5th YEAR) (10 to 15 CM) 16 Number
598 72.25 ROAD D (UPKEEPING 2nd YEAR) (5 to 10 CM) 16 Number
599 72.26 ROAD D (UPKEEPING 2nd YEAR) (10 to 15 CM) 16 Number
600 72.27 ROAD D (UPKEEPING 3rd YEAR) (5 to 10 CM) 16 Number
601 72.28 ROAD D (UPKEEPING 3rd YEAR) (10 to 15 CM) 16 Number
602 72.29 ROAD D (UPKEEPING 4th YEAR) (5 to 10 CM) 16 Number
603 72.3 ROAD D (UPKEEPING 4th YEAR) (10 to 15 CM) 16 Number
604 72.31 ROAD D (UPKEEPING 5th YEAR) (5 to 10 CM) 16 Number
605 72.32 ROAD D (UPKEEPING 5th YEAR) (10 to 15 CM) 16 Number
606 72.33 ROAD E (UPKEEPING 2nd YEAR) (5 to 10 CM) 8 Number
607 72.34 ROAD E (UPKEEPING 2nd YEAR) (10 to 15 CM) 8 Number
608 72.35 ROAD E (UPKEEPING 3rd YEAR) (5 to 10 CM) 8 Number
609 72.36 ROAD E (UPKEEPING 3rd YEAR) (10 to 15 CM) 8 Number
610 72.37 ROAD E (UPKEEPING 4th YEAR) (5 to 10 CM) 8 Number
611 72.38 ROAD E (UPKEEPING 4th YEAR) (10 to 15 CM) 8 Number
612 72.39 ROAD E (UPKEEPING 5th YEAR) (5 to 10 CM) 8 Number
613 72.4 ROAD E (UPKEEPING 5th YEAR) (10 to 15 CM) 8 Number
614 72.41 ROAD F (UPKEEPING 2nd YEAR) (5 to 10 CM) 14 Number
615 72.42 ROAD F (UPKEEPING 2nd YEAR) (10 to 15 CM) 14 Number
616 72.43 ROAD F (UPKEEPING 3rd YEAR) (5 to 10 CM) 14 Number
617 72.44 ROAD F (UPKEEPING 3rd YEAR) (10 to 15 CM) 14 Number
618 72.45 ROAD F (UPKEEPING 4th YEAR) (5 to 10 CM) 14 Number
619 72.46 ROAD F (UPKEEPING 4th YEAR) (10 to 15 CM) 14 Number
620 72.47 ROAD F (UPKEEPING 5th YEAR) (5 to 10 CM) 14 Number
621 72.48 ROAD F (UPKEEPING 5th YEAR) (10 to 15 CM) 14 Number
622 72.49 ROAD G (UPKEEPING 2nd YEAR) (5 to 10 CM) 24 Number
623 72.5 ROAD G (UPKEEPING 2nd YEAR) (10 to 15 CM) 24 Number
624 72.51 ROAD G (UPKEEPING 3rd YEAR) (5 to 10 CM) 24 Number
625 72.52 ROAD G (UPKEEPING 3rd YEAR) (10 to 15 CM) 24 Number
626 72.53 ROAD G (UPKEEPING 4th YEAR) (5 to 10 CM) 24 Number
627 72.54 ROAD G (UPKEEPING 4th YEAR) (10 to 15 CM) 24 Number
628 72.55 ROAD G (UPKEEPING 5th YEAR) (5 to 10 CM) 24 Number
629 72.56 ROAD G (UPKEEPING 5th YEAR) (10 to 15 CM) 24 Number
630 73 Lettering the Boundry Stone as per IRC standard including the cost of Labour charges and material etc., complete
631 73.01 ROAD A (UPKEEPING 2nd YEAR) (5 to 10 CM) 176 Number
632 73.02 ROAD A (UPKEEPING 3rd YEAR) (5 to 10 CM) 176 Number
633 73.03 ROAD A (UPKEEPING 4th YEAR) (5 to 10 CM) 176 Number
634 73.04 ROAD A (UPKEEPING 5th YEAR) (5 to 10 CM) 176 Number
635 73.05 ROAD B (UPKEEPING 2nd YEAR) (5 to 10 CM) 112 Number
636 73.06 ROAD B (UPKEEPING 3rd YEAR) (5 to 10 CM) 112 Number
637 73.07 ROAD B (UPKEEPING 4th YEAR) (5 to 10 CM) 112 Number
638 73.08 ROAD B (UPKEEPING 5th YEAR) (5 to 10 CM) 112 Number
639 73.09 ROAD C (UPKEEPING 2nd YEAR) (5 to 10 CM) 192 Number
640 73.1 ROAD C (UPKEEPING 3rd YEAR) (5 to 10 CM) 192 Number
641 73.11 ROAD C (UPKEEPING 4th YEAR) (5 to 10 CM) 192 Number
642 73.12 ROAD C (UPKEEPING 5th YEAR) (5 to 10 CM) 192 Number
643 73.13 ROAD D (UPKEEPING 2nd YEAR) (5 to 10 CM) 80 Number
644 73.14 ROAD D (UPKEEPING 3rd YEAR) (5 to 10 CM) 80 Number
645 73.15 ROAD D (UPKEEPING 4th YEAR) (5 to 10 CM) 80 Number
646 73.16 ROAD D (UPKEEPING 5th YEAR) (5 to 10 CM) 80 Number
647 73.17 ROAD E (UPKEEPING 2nd YEAR) (5 to 10 CM) 88 Number
648 73.18 ROAD E (UPKEEPING 3rd YEAR) (5 to 10 CM) 88 Number
649 73.19 ROAD E (UPKEEPING 4th YEAR) (5 to 10 CM) 88 Number
650 73.2 ROAD E (UPKEEPING 5th YEAR) (5 to 10 CM) 88 Number
651 73.21 ROAD F (UPKEEPING 2nd YEAR) (5 to 10 CM) 152 Number
652 73.22 ROAD F (UPKEEPING 3rd YEAR) (5 to 10 CM) 152 Number
653 73.23 ROAD F (UPKEEPING 4th YEAR) (5 to 10 CM) 152 Number
654 73.24 ROAD F (UPKEEPING 5th YEAR) (5 to 10 CM) 152 Number
655 73.25 ROAD G (UPKEEPING 2nd YEAR) (5 to 10 CM) 300 Number
656 73.26 ROAD G (UPKEEPING 3rd YEAR) (5 to 10 CM) 300 Number
657 73.27 ROAD G (UPKEEPING 4th YEAR) (5 to 10 CM) 300 Number
658 73.28 ROAD G (UPKEEPING 5th YEAR) (5 to 10 CM) 300 Number
659 74 Lettering the Existing Culvert, Parapet as per IRC standard including the cost of Labour charges and material etc., complete
660 74.01 ROAD A (UPKEEPING 1st YEAR) 100 Number
661 74.02 ROAD A (UPKEEPING 2nd YEAR) 100 Number
662 74.03 ROAD A (UPKEEPING 3rd YEAR) 100 Number
663 74.04 ROAD A (UPKEEPING 4th YEAR) 100 Number
664 74.05 ROAD A (UPKEEPING 5th YEAR) 100 Number
665 74.06 ROAD B (UPKEEPING 1st YEAR) 75 Number
666 74.07 ROAD B (UPKEEPING 2nd YEAR) 75 Number
667 74.08 ROAD B (UPKEEPING 3rd YEAR) 75 Number
668 74.09 ROAD B (UPKEEPING 4th YEAR) 75 Number
669 74.1 ROAD B (UPKEEPING 5th YEAR) 75 Number
670 74.11 ROAD D (UPKEEPING 1st YEAR) 25 Number
671 74.12 ROAD D (UPKEEPING 2nd YEAR) 25 Number
672 74.13 ROAD D (UPKEEPING 3rd YEAR) 25 Number
673 74.14 ROAD D (UPKEEPING 4th YEAR) 25 Number
674 74.15 ROAD D (UPKEEPING 5th YEAR) 25 Number
675 74.16 ROAD E (UPKEEPING 1st YEAR) 25 Number
676 74.17 ROAD E (UPKEEPING 2nd YEAR) 25 Number
677 74.18 ROAD E (UPKEEPING 3rd YEAR) 25 Number
678 74.19 ROAD E (UPKEEPING 4th YEAR) 25 Number
679 74.2 ROAD E (UPKEEPING 5th YEAR) 25 Number
680 74.21 ROAD F (UPKEEPING 1st YEAR) 75 Number
681 74.22 ROAD F (UPKEEPING 2nd YEAR) 75 Number
682 74.23 ROAD F (UPKEEPING 3rd YEAR) 75 Number
683 74.24 ROAD F (UPKEEPING 4th YEAR) 75 Number
684 74.25 ROAD F (UPKEEPING 5th YEAR) 75 Number
685 74.26 ROAD G (UPKEEPING 1st YEAR) 250 Number
686 74.27 ROAD G (UPKEEPING 2nd YEAR) 250 Number
687 74.28 ROAD G (UPKEEPING 3rd YEAR) 250 Number
688 74.29 ROAD G (UPKEEPING 4th YEAR) 250 Number
689 74.3 ROAD G (UPKEEPING 5th YEAR) 250 Number
690 75 Chiseling the tree barks upto a size of 20cm x 20cm and painting with first class enamel wood paint and numbering the trees as per avenue
691 75.01 ROAD F (UPKEEPING 1st YEAR) 7 Number
692 75.02 ROAD G (UPKEEPING 1st YEAR) 26 Number
693 76 Painting the tree barks upto a size of 15cm x 15cm with first class enamel paintas per avenue register complete
694 76.01 ROAD F (UPKEEPING 2nd YEAR) 0.16 Square metre
695 76.02 ROAD F (UPKEEPING 3rd YEAR) 0.16 Square metre
696 76.03 ROAD F (UPKEEPING 4th YEAR) 0.16 Square metre
697 76.04 ROAD F (UPKEEPING 5th YEAR) 0.16 Square metre
698 76.05 ROAD G (UPKEEPING 2nd YEAR) 0.59 Square metre
699 76.06 ROAD G (UPKEEPING 3rd YEAR) 0.59 Square metre
700 76.07 ROAD G (UPKEEPING 4th YEAR) 0.59 Square metre
701 76.08 ROAD G (UPKEEPING 5th YEAR) 0.59 Square metre
702 77 Lettering the tree barks upto a size of 15cm x 15cm with first class enamel paint as per avenue register complete
703 77.01 ROAD F (UPKEEPING 2nd YEAR) (5 to 10 CM) 14 Number
704 77.02 ROAD F (UPKEEPING 3rd YEAR) (5 to 10 CM) 14 Number
705 77.03 ROAD F (UPKEEPING 4th YEAR) (5 to 10 CM) 14 Number
706 77.04 ROAD F (UPKEEPING 5th YEAR) (5 to 10 CM) 14 Number
707 77.05 ROAD G (UPKEEPING 2nd YEAR) (5 to 10 CM) 52 Number
708 77.06 ROAD G (UPKEEPING 3rd YEAR) (5 to 10 CM) 52 Number
709 77.07 ROAD G (UPKEEPING 4th YEAR) (5 to 10 CM) 52 Number
710 77.08 ROAD G (UPKEEPING 5th YEAR) (5 to 10 CM) 52 Number
711 78 Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification no.111,112,501, 503,900 - over bituminous surfaces
712 78.01 ROAD A (UPKEEPING 4th YEAR) 264 Square metre
713 78.02 ROAD A (UPKEEPING 5th YEAR) 550 Square metre
714 78.03 ROAD B (UPKEEPING 4th YEAR) 330 Square metre
715 78.04 ROAD B (UPKEEPING 5th YEAR) 550 Square metre
716 78.05 ROAD C (UPKEEPING 4th YEAR) 330 Square metre
717 78.06 ROAD C (UPKEEPING 5th YEAR) 550 Square metre
718 78.07 ROAD D (UPKEEPING 4th YEAR) 330 Square metre
719 78.08 ROAD D (UPKEEPING 5th YEAR) 550 Square metre
720 78.09 ROAD E (UPKEEPING 4th YEAR) 132 Square metre
721 78.1 ROAD E (UPKEEPING 5th YEAR) 220 Square metre
722 78.11 ROAD F (UPKEEPING 4th YEAR) 197 Square metre
723 78.12 ROAD F (UPKEEPING 5th YEAR) 328.13 Square metre
724 78.13 ROAD G (UPKEEPING 4th YEAR) 337.67 Square metre
725 78.14 ROAD G (UPKEEPING 5th YEAR) 562.5 Square metre
726 79 Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specificationno.111,112,507,900 complete in all respects - Grading II for patch Work
727 79.01 ROAD A (UPKEEPING 4th YEAR) 7.92 Cubic Metre
728 79.02 ROAD A (UPKEEPING 5th YEAR) 16.5 Cubic Metre
729 79.03 ROAD B (UPKEEPING 4th YEAR) 9.9 Cubic Metre
730 79.04 ROAD B (UPKEEPING 5th YEAR) 16.5 Cubic Metre
731 79.05 ROAD C (UPKEEPING 4th YEAR) 9.9 Cubic Metre
732 79.06 ROAD C (UPKEEPING 5th YEAR) 16.5 Cubic Metre
733 79.07 ROAD D (UPKEEPING 4th YEAR) 9.9 Cubic Metre
734 79.08 ROAD D (UPKEEPING 5th YEAR) 16.5 Cubic Metre
735 79.09 ROAD E (UPKEEPING 4th YEAR) 3.96 Cubic Metre
736 79.1 ROAD E (UPKEEPING 5th YEAR) 6.6 Cubic Metre
737 79.11 ROAD F (UPKEEPING 4th YEAR) 5.91 Cubic Metre
738 79.12 ROAD F (UPKEEPING 5th YEAR) 16.41 Cubic Metre
739 79.13 ROAD G (UPKEEPING 4th YEAR) 10.13 Cubic Metre
740 79.14 ROAD G (UPKEEPING 5th YEAR) 28.13 Cubic Metre
741 79.15 Calculation of SubTotal, GST and Total Amount carried out by system automatically
742 79.16 Basic cost of value put to tender as per estimate 1 (A)
743 79.17 Add GST at 12% 1 (B)
744 79.18 Total Value put to Tender 1 (A+B)
745 79.19 Excess/Less Percentage 1 (D)
746 79.2 Final Value 1 (E)
747 79.21 Add GST at 12% of Final Value 1 (F)
748 79.22 Total Value of Contract Including 12% of GST 1 (E+F)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail