}

Wbso_Imprve_Floor__Sgu_Tml Development Of Impervious Flooring , Circular And Main Drain Inside Tank Farm Area At Siliguri Terminal Under West Bengal State Office, IOCL SILIGURI TERMINAL-West Bengal

Indian Oil Corporation Limited-IOCL has published Wbso_Imprve_Floor__Sgu_Tml Development Of Impervious Flooring , Circular And Main Drain Inside Tank Farm Area At Siliguri Terminal Under West Bengal State Office. Submission Date for this Tender is 29-06-2020. Drainage Tenders in IOCL SILIGURI TERMINAL West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

24501729
Wbso_Imprve_Floor__Sgu_Tml Development Of Impervious Flooring , Circular And Main Drain Inside Tank Farm Area At Siliguri Terminal Under West Bengal State Office
Open Tender
Indian
West Bengal
IOCL SILIGURI TERMINAL
29-06-2020

Tender Details

Wbso_Imprve_Floor__Sgu_Tml Development Of Impervious Flooring , Circular And Main Drain Inside Tank Farm Area At Siliguri Terminal Under West Bengal State Office

Key Value

Document Fees
Refer document
EMD
INR 550000.0 /-
Tender Value
INR 5.98 Crore /-

BOQ Items

Name of Work: DEVELOPMENT OF IMPERVIOUS FLOORING, CIRCULAR AND MAIN DRAIN INSIDE TANK FARM AREA AT SILIGURI TERMINAL UNDER WEST BENGAL STATE OFFICE.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 IMPERVIOUS FLOORING TNK FRM SILIGURI TML-Part A 1
2 2 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil & disposal of surplus excavated soil as directed, within or outside the site at an unobjectionable place. 2
3 3 i) All kinds of Soil 3 4038 M3
4 4 Extra for every additional lift of 1.5m or part thereof in excavation or banking excavated or stacked materials in all kinds of soil 4 50 M3
5 5 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, within premises and lift upto 1.5m 5 443 M3
6 6 Supplying and filling in plinth with sand within specified grading zone of fine aggregates specified in table 3.1, clause 3.1.3 of attached specifications under floors, etc. in layers not exceeding 20cm in depth, each deposited layer to be compacted by ramming including watering, consolidating and dressing complete. 6
7 7 i) Local Fine Sand within grading zone IV 7 2309 M3
8 8 Carriage charge for disposal of earth by mechanical means, including loading, transporting, stacking, unloading to approved municipal dumping ground / unobjectionable place as per direction of Engineer- in-Charge beyond IOCL Premises for all leads and including all lifts. 8
9 9 i) Distance upto 1 km 9 3617 M3
10 10 Providing & laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc. UP TO FLOOR V LEVEL excluding the cost of centering, shuttering and finishing : 10
11 11 ii) PCC 1 Cement:1½ Coarse Sand:3 Graded Stone Aggregate 20mm 11 20 M3
12 12 iii) PCC 1 Cement:2 Coarse Sand:4 Graded Stone Aggregate 20mm 12 25 M3
13 13 Centering and shuttering including strutting, propping etc. and removal of form work for: 13
14 14 i) Foundations,footings,bases of column 14 700 M2
15 15 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 15
16 16 ii) RCC 1 Cement :1½ Coarse Sand: 3 Graded Stone Aggregate 20mm 16 50 M3
17 17 Providing & Laying Reinforced cement concrete work in walls (Any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level UP TO FLOOR V LEVEL excluding cost of centering, shuttering, finishing and reinforcement : 17
18 18 ii) RCC 1 Cement :1½ Coarse Sand: 3 Graded Stone Aggregate 20mm 18 50 M3
19 19 Centering and shuttering including strutting, propping etc. and removal of form for : 19
20 20 i) Foundations,footings,bases of columns, etc. for mass concrete 20 100 M2
21 21 ii) Walls (any thickness) including attached pilasters, buttress, plinth and string courses etc. 21 100 M2
22 22 Supply of Steel reinforcement for R.C.C. including straightening, cutting, bending, placing in position and binding all complete at all levels 22
23 23 ii) Thermo Mechanically Treated Bars of Fe- 500D grade or more, conforming to IS1786 23 2000 KG
24 24 Providing and laying Brick work with common burnt clay F.P.S (non Modular) bricks of class designation 7.5 in foundation & plinth 24
25 25 i) Brick work in Cement mortar 1:4 (1 cement : 4 coarse sand) IN FOUNDATION AND PLINTH 25 783 M3
26 26 ii) Brick work in Cement mortar 1:6 (1 cement: 6 coarse sand ) IN FOUNDATION AND PLINTH 26 32 M3
27 27 iii) Brick work in Cement mortar 1:4 (1 cement: 4 coarse sand) in superstructure in all shapes & sizes in superstructure ABOVE PLINTH & UP TO FLOOR V LEVEL 27 20 M3
28 28 iv) Brick work in Cement mortar 1:6 (1 cement: 6 coarse sand) in superstructure in all shapes & sizes in superstructure ABOVE PLINTH & UP TO FLOOR V LEVEL 28 37 M3
29 29 Structural steel work in single section fixed with or without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. 29 1000 KG
30 30 Structural steel work riveted,bolted or welded in built up sections, trusses & framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: 30 1000 KG
31 31 Fabrication & Erection of IOC supplied structural steel work riveted, bolted or welded in single/ built up sections,trusses & framed work hoisting, fixing in position and applying a priming coat of approved steel primer all including cutting, complete 31 1000 KG
32 32 Providing and laying 6mm thick cement plaster on surfaces with fine sand including curing etc. 32
33 33 i) 6mm thick plaster of mix 1:3 (1 cement: 3 fine sand) 33 1091 M2
34 34 Providing and laying cement plaster on surfaces with fine sand including curing etc. 34
35 35 i) 12 mm cement plaster of mix 1:4 (1 cement: 4 fine sand) 35 1988 M2
36 36 iii) 15mm Cement plaster of mix 1:4 (1 cement: 4 fine sand) on rough side of half or single brick wall 36 6040 M2
37 37 Providing Neat cement punning 37 5494 M2
38 38 Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within premises 38 983 M2
39 39 Finishing walls with Acrylic Smooth exterior paint of required shade (2 or more coat applied @ 1.67 ltr/10 sqm over & including priming coat of exterior Primer applied @ 2.20kg/10 sqm) 39 1214 M2
40 40 Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand or manufacture 40 200 M2
41 41 Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer-in-charge. 41 817 M2
42 42 Demolishing brick work manually/mechanical means including stacking of serviceable material & disposal of unserviceable material outside premises at an unobjectionable place as / direction of Engg-in-charge 42 493 M3
43 43 Dismantling Steel work in single sections including dismembering and stacking within premises 43
44 44 i) R.S Joists 44 1000 KG
45 45 ii) Channels, angles, tees and flats etc 45 1000 KG
46 46 Dismantling Steel work in built up sections in angles, tees, flats channels etc. including all gusset plates, bolts nuts, cutting rivets welding etc. including dismembering and stacking within premises 46 1000 KG
47 47 Demolishing dry brick pitching in floors, drains etc. including stacking serviceable material and disposal of unserviceable material within premises 47 2758 M3
48 48 Demolishing C.C./R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1000 m, stacking serviceable and unserviceable material separately including cutting reinforcement bars. 48 2509 M3
49 49 Carriage charge for disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, stacking, unloading to approved municipal dumping ground/unobjectionable place as/direction of Engg- in-Charge beyond IOCL Premises for all leads and including all lifts 49
50 50 i) Distance upto 1 km 50 1131 M3
51 51 ii) Distance > 1 km< 3 km 51 3520 M3
52 52 iii) Distance > 3 km< 5 km 52 3520 M3
53 53 iv) Distance > 5 km< 10 km 53 3520 M3
54 54 Constructing masonry Chamber 120x120x100 cm, inside in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for valves etc, with C.I. surface box 100 mm. top diameter, 160 mm bottom diameter and 180 mm deep ( inside) with chained lid and RCC top slab 1:2:4 mix (1 cement :2 coarse sand : 4 graded stone aggregate 20 mm nominal size) necessary excavation foundation concrete 1:5:10 (1 cement : 5 fine sand:10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick finished with a floating coat of neat cement complete as per standard design : With Common burnt clay F.P.S. (non modular) bricks of class designation 7.5 54 13 EA
55 55 Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : Light Duty 55
56 56 iv) 300 mm dia. R.C.C. pipe 56 30 M
57 57 Providing and laying non-pressure NP3 class (Medium class) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc.complete 57
58 58 i) 600 mm dia. R.C.C. pipe 58 20 M
59 59 CONCRETE AND LDPE WORK FOR IMPERVIOUS- Part B 59
60 60 Providing and laying in position cement concrete of specified grade excluding cost of centering & shuttering. All work up to plinth level: 60
61 61 iii) 1:2:4(1 Cement : 2 Coarse Sand :4 Graded stone aggregate of 20mm) 61 1154 M3
62 62 v) 1:3:6(1 Cement : 3 Coarse Sand : 6 Graded stone aggregate of 20mm) 62 1154 M3
63 63 Supplying and laying black LDPE film, (1000 MICRON/1MM thick ) as per IS 2508- 1984; joints in the film shall be heat sealed in situ during laying of the film using a 3 sealer iron and checked carefully. The material shall be bought from M/s. IPCL/ approved manufacturers. Anchoring the LDPE film at the periphery of the tank pad as per detailes including earthwork, brickwork in CM 1:5 below ground level using best quality chamber burnt bricks etc.& as per site instructions. Note: The LDPE film shall be measured for the area laid as per drawing requirements. No extra payment for the overlaps, wastages shall be made. 63 23112 M2
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail