Water Resources and Irrigation Local Bodies Closing in 0 days TDR #24499670

Annual Maintenance Contract 2020-21-Leak Rectification Works In Various Schemes Under Ph Section Ponkunnam

Issued by Local Bodies · Ponkunnam, Kerala
Tender Value
12.05 Lakhs
Estimated cost
Bid Submission
12 Jun 2020
0 days left
EMD
30200
Bank guarantee accepted
Document Fee
2800
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Ponkunnam → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Annual Maintenance Contract 2020-21-Leak Rectification Works In Various Schemes Under Ph Section Ponkunnam

BOQ

Name of Work : Annual Maintenance contract 2020 -21 - Leak rectification works in various schemes under PH Section, Ponkunnam
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Appendix A - Leak rectificaitn in PVC pipe - Leak rectification work in 50 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers including the cost of pipe and PVC specials; PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.BI01010001010000000000000515BI010000115425Leak
22Leak rectification work in 63 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers including the cost of pipe and PVC specials; PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.BI01010001010000000000000515BI010000115570Leak
33Leak rectification work in 75 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers including the cost of pipe and PVC specials; PVC Pipes and specials shall be of good quality and conforming to relevant standards; PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.BI01010001010000000000000515BI010000115660Leak
44Leak rectification work in 90 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers including the cost of pipe and PVC specials; PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.BI01010001010000000000000515BI010000115730Leak
55Leak rectification work in 90 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting, ribbon fencing, watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of CIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & CIR Jointing.BI01010001010000000000000515BI010000115840Leak
66Leak rectification work in 90 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting,watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of CIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: CIR Jointing.BI01010001010000000000000515BI010000115930Leak
77Leak rectification work in 110 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting,watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of CIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: CIR Jointing.BI01010001010000000000000515BI010000116020Leak
88Leak rectification work in 110 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting, ribbon fencing, watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of CIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & CIR Jointing.BI01010001010000000000000515BI010000116160Leak
99Leak rectification work in 140 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting,watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of CIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: CIR Jointing.BI01010001010000000000000515BI010000116215Leak
1010Leak rectification work in 140 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting, ribbon fencing, watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of CIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & CIR Jointing.BI01010001010000000000000515BI010000116310Leak
1111Leak rectification work in 160 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting,watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of CIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: CIR Jointing.BI01010001010000000000000515BI010000116415Leak
1212Leak rectification work in 200 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting,watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of CIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: CIR Jointing.BI01010001010000000000000515BI010000116530Leak
1313Appendix B :- Leak rectification in AC pipes- Repairing leakage/breakage of 80 mm AC pipe line by cutting and dismantling the damaged pipe portion (up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints.BI01010001010000000000000515BI010000116640Leak
1414Repairing leakage/breakage of 100 mm AC pipe line by cutting and dismantling the damaged pipe portion (Up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints.BI01010001010000000000000515BI010000116740Leak
1515Repairing leakage/breakage of 125 mm AC pipe line by cutting and dismantling the damaged pipe portion (Up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints.BI01010001010000000000000515BI010000116815Leak
1616Appendix C :- Leak rectification in CI pipes- Rectification of leakages in 200mm CI Pipe of all kinds by replacing a length up to 1.5m including earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting and removing and stacking the damaged portion from the existing line without causing any damages to the line and specials and conveying and replacing with the CI pipe and conveying and jointing with CID joint / suitable mechanical joint of suitable size or any other available size suitable joints after cleaning the ends, grinding if necessary, centering the pipe inserting the joints tightening to make a water tight joint charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing,providing caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.BI01010001010000000000000515BI01000011693Leak
1717Rectification of leakages in 100mm CI Pipe of all kinds by replacing a length up to 1.5m including earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting and removing and stacking the damaged portion from the existing line without causing any damages to the line and specials and conveying and replacing with the CI pipe and conveying and jointing with CID joint / suitable mechanical joint of suitable size or any other available size suitable joints after cleaning the ends, grinding if necessary, centering the pipe inserting the joints tightening to make a water tight joint charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing,providing caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.BI01010001010000000000000515BI01000011703Leak
1818Rectification of minor joint leakages in 100mm CI Pipe including earth work excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged lead wool, conveying and inserting hemp and lead wool and caulking after cleaning the ends, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc. complete.BI01010001010000000000000515BI01000011713Leak
1919Rectification of minor joint leakages in 200mm CI Pipe including earth work excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged lead wool, conveying and inserting hemp and lead wool and caulking after cleaning the ends, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc. complete.BI01010001010000000000000515BI01000011724Leak
2020Appendix D :- Leak rectification in GI pipes- Rectification of leakages of 32 mm, 40mm & 50mm GI Pipes by replacing lengths up to 1.0m including earth work excavation in all kindss of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc. complete.BI01010001010000000000000515BI01000011732Leak
2121Rectification of leakages of 65 mm GI Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignement, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc. complete.BI01010001010000000000000515BI01000011743Leak
2222Rectification of leakages of 65 mm GI Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing by three run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc. complete.BI01010001010000000000000515BI010000117510Leak
2323Rectification of leakages of 80 mm GI Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing by three run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc. complete.BI01010001010000000000000515BI01000011763Leak
2424Rectification of leakages of 80 mm GI Pipes by replacing lengths up to 1.0m including earth work excavation in all kindss of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc. complete.BI01010001010000000000000515BI01000011775Leak
2525Rectification of leakages of 80 mm GI Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignement, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc. complete.BI01010001010000000000000515BI01000011785Leak
2626Rectification of leakages of 100 mm GI Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignement, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc. complete.BI01010001010000000000000515BI01000011795Leak
2727Rectification of leakages of 100 mm GI Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing by three run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc. complete.BI01010001010000000000000515BI01000011805Leak
2828Appendix F :- Leak rectification at vertical pipe of public tap- Rectifying the leakages in vertical pipe of public tap connection including earth work excavation in all kinds of soil for exposing the pipeline including concrete / tar cutting,cutting and removing damaged portion of pipe, fixing new 20/25 mm GI pipe and specials in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and specials and as per the direction of departmental officers etc. complete.BI01010001010000000000000515BI010000118110Leak
2929Appendix G :- Replacing public water taps- Supplying and fixing 15 / 20 mm PVC public tap after dismantling the damaged tap including all cost of materials, labour charges, hire for tools and as per the direction of the department officers etc complete.BI01010001010000000000000515BI010000118210Nos
3030Appendix H :- Leak rectification at boring point - Rectifying the leakages in boring point of public tap connection including earth work excavation in all kinds of soil for exposing the boring point including concrete / tar cutting, dismantling the damaged saddle piece,cutting and removing damaged portion of pipe line,fixing new saddle piece,laying 20/25 mm PVC 10Kg/cm2 pipe in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and saddle piece and as per the direction of departmental officers etc. complete.BI01010001010000000000000515BI010000118310Leak
3131Appendix J :- Cost of materials - Supply of PVC Pipe, 8kg/cm2, 90mm Dia.BI01010001010000000000000515BI010000118440metre
3232Supply of PVC Pipe, 8kg/cm2, 110mm Dia.BI01010001010000000000000515BI010000118540metre
3333Supply of PVC Pipe, 8kg/cm2, 140mm Dia.BI01010001010000000000000515BI010000118615metre
343450mm GI pipe mediumBI01010001010000000000000515BI01000011874metre
353565mm GI pipe mediumBI01010001010000000000000515BI010000118813metre
363680mm GI pipe mediumBI01010001010000000000000515BI01000011899metre
3737150mm GI pipe mediumBI01010001010000000000000515BI01000011905metre
3838Tank cleaning - Washing OHSR/GLSR using brooms, brushes and bleaching powder by engaging coolies, scrubbing twice, washing and cleaning using fresh water, including side wall, floor slab and columns, disposing the the slurry / waste materilas away from the immediate premises and within the initial lead of 50m from the periphery of the tank, without causing any damage to the exististing strucutre and installations, charges including the operation of valves, conveyance and hire charges of tools and as per the direction of the department officers etc. complete.BI01010001010000000000000515BI01000011911261.2sqm
3939Valve repairing - Conveying and fixing C I Single acting Air Valve of approved quality with bolts,nuts,rubber insertions etc . excluding the cost of air valve(the tail pieces if required will be paid seperately): 25 mm Single acting Air Valve Observed Data derived from item no.18.59.of DARBI01010001010000000000000515BI01000011925Nos
4040Quarry macku filling and concreting - Supply ,stacking,spreading and consolidating of Quarry Muck in the trench of pipe line, including carriage, loading ,unloading & stacking up to any lead.BI01010001010000000000000515BI010000119318cum
4141Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)BI01010001010000000000000515BI01000011947.2cum

AI Tender Summary

OUR REF NO 24499670
AUTHORITY Local Bodies
TENDER VALUE 12.05 Lakhs
LAST DATE 12-06-2020
Authority
Authority Name Kerala Water Authority
Work Description Annual Maintenance Contract 2020-21-Leak Rectification Works In Various Schemes Under Ph Section Ponkunnam
Basic Detail
Tender No 6/EE/PHK/2020-21
Bidding Type Tender
Location
City Ponkunnam
State Kerala
Key Dates
Publish Date 05 Jun 2020
Submission Date 12 Jun 2020
Open Date 15 Jun 2020
Finance
Tender Value 12.05 Lakhs
Tender Fee 2800
EMD 30200
Exemption Not Available
Document List
D99DE912-C6B1-4DD8-8EED-85AFFA3035BD.html
Tendernotice_1.pdf
BOQ_511628.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 05, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
Jun 12, 2020
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jun 15, 2020

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

D99DE912-C6B1-4DD8-8EED-85AFFA3035BD.html

pdf

Tendernotice_1.pdf

xls

BOQ_511628.xls

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders