Sales : +91-777 804 8217
| Schedule of quantities to accompany the Tender for the work of Package-72- Widening and Improvements of Government roads in Mudukulathur (Highways) C&M Sub-Division including CD works and Upkeeping for a period of 60 MonthsLIST OF ROAD ATTACHED IN PRICE BID DOCUMENT. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for pickig and all other tools and plants employed of the work and including all other incidental charges etc., complete as per MORTH Specification no.111,112,202 | BI01010001010000000000000515BI0100001112 | ||
| 2 | 1.01 | ROAD A | 2092.12 | Square Metre | |
| 3 | 1.02 | ROAD B | 3061.04 | Square Metre | |
| 4 | 1.03 | ROAD C | 1742.75 | Square Metre | |
| 5 | 1.04 | ROAD D | 2483.62 | Square Metre | |
| 6 | 1.05 | ROAD F | 175 | Square Metre | |
| 7 | 1.06 | ROAD G | 20 | Square Metre | |
| 8 | 1.07 | ROAD K | 10 | Square Metre | |
| 9 | 1.08 | ROAD L | 15 | Square Metre | |
| 10 | 1.09 | ROAD O | 72.5 | Square Metre | |
| 11 | 1.1 | ROAD P | 231.25 | Square Metre | |
| 12 | 1.11 | ROAD Q | 25 | Square Metre | |
| 13 | 1.12 | ROAD R | 30 | Square Metre | |
| 14 | 1.13 | ROAD S | 43.75 | Square Metre | |
| 15 | 1.14 | ROAD T | 220 | Square Metre | |
| 16 | 1.15 | ROAD U | 294 | Square Metre | |
| 17 | 2 | Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer including compaction by power roller rolling as per MORTH Specification no.111,112,301,305,900 for Box Cutting | |||
| 18 | 2.01 | ROAD A | 1084.85 | Cubic Metre | |
| 19 | 3 | Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification No.111, 112, 401,900 - for grading- V Material | |||
| 20 | 3.01 | ROAD A | 438.11 | Cubic Metre | |
| 21 | 4 | Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406 of MORTH Vth Revision Specification no.111,112,406,900 | |||
| 22 | 4.01 | ROAD A | 1200.91 | Cubic Metre | |
| 23 | 4.02 | ROAD B | 918.33 | Cubic Metre | |
| 24 | 4.03 | ROAD C | 813.62 | Cubic Metre | |
| 25 | 4.04 | ROAD D | 777.34 | Cubic Metre | |
| 26 | 4.05 | ROAD F | 82.5 | Cubic Metre | |
| 27 | 4.06 | ROAD G | 17.6 | Cubic Metre | |
| 28 | 4.07 | ROAD I | 56.25 | Cubic Metre | |
| 29 | 4.08 | ROAD K | 7.5 | Cubic Metre | |
| 30 | 4.09 | ROAD L | 11.25 | Cubic Metre | |
| 31 | 4.1 | ROAD O | 87.39 | Cubic Metre | |
| 32 | 4.11 | ROAD P | 82.51 | Cubic Metre | |
| 33 | 4.12 | ROAD Q | 86.4 | Cubic Metre | |
| 34 | 4.13 | ROAD R | 87.9 | Cubic Metre | |
| 35 | 4.14 | ROAD S | 88.06 | Cubic Metre | |
| 36 | 4.15 | ROAD T | 66 | Cubic Metre | |
| 37 | 4.16 | ROAD U | 88.2 | Cubic Metre | |
| 38 | 5 | Advance patch work using 45.00 mm IRC size HBG metal for making the pot holes and patching using VG10 grade bitumen including mixing at the rate of 44 Kg / Cum of chips after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc., complete. as per MORTH Vth Revision Specification No. 111, 112, 501, 900, 3004 | |||
| 39 | 5.01 | ROAD O | 23.97 | Cubic Metre | |
| 40 | 5.02 | ROAD P | 14.99 | Cubic Metre | |
| 41 | 5.03 | ROAD Q | 48.07 | Cubic Metre | |
| 42 | 5.04 | ROAD R | 46.64 | Cubic Metre | |
| 43 | 5.05 | ROAD S | 27.98 | Cubic Metre | |
| 44 | 5.06 | ROAD T | 30.98 | Cubic Metre | |
| 45 | 5.07 | ROAD U | 19.83 | Cubic Metre | |
| 46 | 6 | Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification no.111,112, 501,502,900- over WMM | |||
| 47 | 6.01 | ROAD A | 9197.1 | Square Metre | |
| 48 | 6.02 | ROAD B | 9183.13 | Square Metre | |
| 49 | 6.03 | ROAD C | 5348.15 | Square Metre | |
| 50 | 6.04 | ROAD D | 7589.32 | Square Metre | |
| 51 | 6.05 | ROAD F | 525 | Square Metre | |
| 52 | 6.06 | ROAD G | 88 | Square Metre | |
| 53 | 6.07 | ROAD I | 375 | Square Metre | |
| 54 | 6.08 | ROAD K | 30 | Square Metre | |
| 55 | 6.09 | ROAD L | 45 | Square Metre | |
| 56 | 6.1 | ROAD O | 547.5 | Square Metre | |
| 57 | 6.11 | ROAD P | 746.25 | Square Metre | |
| 58 | 6.12 | ROAD Q | 390.6 | Square Metre | |
| 59 | 6.13 | ROAD R | 405.6 | Square Metre | |
| 60 | 6.14 | ROAD S | 430.95 | Square Metre | |
| 61 | 6.15 | ROAD T | 660 | Square Metre | |
| 62 | 6.16 | ROAD U | 882 | Square Metre | |
| 63 | 7 | Tack coat - Providing and applying tack coat with bitumen emulsion(RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification no.111,112,501, 503,900- over granular surfaces treated with primer | |||
| 64 | 7.01 | ROAD A | 9197.1 | Square Metre | |
| 65 | 7.02 | ROAD B | 9183.13 | Square Metre | |
| 66 | 7.03 | ROAD C | 5348.15 | Square Metre | |
| 67 | 7.04 | ROAD D | 7589.32 | Square Metre | |
| 68 | 7.05 | ROAD F | 525 | Square Metre | |
| 69 | 7.06 | ROAD G | 88 | Square Metre | |
| 70 | 7.07 | ROAD I | 375 | Square Metre | |
| 71 | 7.08 | ROAD K | 30 | Square Metre | |
| 72 | 7.09 | ROAD L | 45 | Square Metre | |
| 73 | 7.1 | ROAD O | 547.5 | Square Metre | |
| 74 | 7.11 | ROAD P | 746.25 | Square Metre | |
| 75 | 7.12 | ROAD Q | 390.6 | Square Metre | |
| 76 | 7.13 | ROAD R | 405.6 | Square Metre | |
| 77 | 7.14 | ROAD S | 430.95 | Square Metre | |
| 78 | 7.15 | ROAD T | 660 | Square Metre | |
| 79 | 7.16 | ROAD U | 882 | Square Metre | |
| 80 | 8 | Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification no.111,112,501, 503,900 - over bituminous surfaces | |||
| 81 | 8.01 | ROAD O | 4880.62 | Square Metre | |
| 82 | 8.02 | ROAD P | 3056.25 | Square Metre | |
| 83 | 8.03 | ROAD Q | 9675 | Square Metre | |
| 84 | 8.04 | ROAD R | 9614.24 | Square Metre | |
| 85 | 8.05 | ROAD S | 5756.25 | Square Metre | |
| 86 | 8.06 | ROAD T | 10340 | Square Metre | |
| 87 | 8.07 | ROAD U | 4578 | Square Metre | |
| 88 | 9 | Bituminous Macadam Providing and laying bituminous macadam with Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade- 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 of MORTH Specification no.111,112,501,503,900 - Grading II | |||
| 89 | 9.01 | ROAD A | 459.85 | Cubic Metre | |
| 90 | 9.02 | ROAD B | 459.17 | Cubic Metre | |
| 91 | 9.03 | ROAD C | 267.41 | Cubic Metre | |
| 92 | 9.04 | ROAD D | 379.47 | Cubic Metre | |
| 93 | 9.05 | ROAD F | 26.25 | Cubic Metre | |
| 94 | 9.06 | ROAD G | 3 | Cubic Metre | |
| 95 | 9.07 | ROAD I | 18.75 | Cubic Metre | |
| 96 | 9.08 | ROAD K | 1.5 | Cubic Metre | |
| 97 | 9.09 | ROAD L | 2.25 | Cubic Metre | |
| 98 | 9.1 | ROAD O | 52.14 | Cubic Metre | |
| 99 | 9.11 | ROAD P | 37.32 | Cubic Metre | |
| 100 | 9.12 | ROAD Q | 94.55 | Cubic Metre | |
| 101 | 9.13 | ROAD R | 96.04 | Cubic Metre | |
| 102 | 9.14 | ROAD S | 58.51 | Cubic Metre | |
| 103 | 9.15 | ROAD T | 99.57 | Cubic Metre | |
| 104 | 9.16 | ROAD U | 49.7 | Cubic Metre | |
| 105 | 10 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-40) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specificationno.111,112,507,900 complete in all respects - Grading II | |||
| 106 | 10.01 | ROAD A | 275.91 | Cubic Metre | |
| 107 | 10.02 | ROAD B | 275.5 | Cubic Metre | |
| 108 | 10.03 | ROAD C | 160.45 | Cubic Metre | |
| 109 | 10.04 | ROAD D | 227.69 | Cubic Metre | |
| 110 | 10.05 | ROAD F | 20.25 | Cubic Metre | |
| 111 | 10.06 | ROAD G | 1.8 | Cubic Metre | |
| 112 | 10.07 | ROAD K | 0.9 | Cubic Metre | |
| 113 | 10.08 | ROAD L | 1.35 | Cubic Metre | |
| 114 | 10.09 | ROAD O | 162.85 | Cubic Metre | |
| 115 | 10.1 | ROAD P | 114.08 | Cubic Metre | |
| 116 | 10.11 | ROAD Q | 301.97 | Cubic Metre | |
| 117 | 10.12 | ROAD R | 300.6 | Cubic Metre | |
| 118 | 10.13 | ROAD S | 185.63 | Cubic Metre | |
| 119 | 10.14 | ROAD T | 330 | Cubic Metre | |
| 120 | 10.15 | ROAD U | 163.8 | Cubic Metre | |
| 121 | 11 | Refilling Excavated Earth work including removal and satisfactory disposal of all materials necessary for the construction of the road way and side drains in accordance with the specifications and the lines grades and cross sections shown in the drawings or as indicated by the engineer including Power Roller rolling all labour charges etc complete as per standard specification No.111,112,202,301,302,303,900 | |||
| 122 | 11.01 | ROAD A | 502.2 | Cubic Metre | |
| 123 | 12 | Refilling Excavated Earth work including removal and satisfactory disposal of all materials necessary for the construction of the road way and side drains in accordance with the specifications and the lines grades and cross sections shown in the drawings or as indicated by the engineerall labour charges etc complete as per standard specification No.111,112,202,301,302,303,900 | |||
| 124 | 12.01 | ROAD E | 165 | Cubic Metre | |
| 125 | 12.02 | ROAD J | 456 | Cubic Metre | |
| 126 | 12.03 | ROAD M | 55 | Cubic Metre | |
| 127 | 13 | Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer including compaction by power roller rolling as per SS20B MORTH Specification no.111,112,301,305,900 for Making up the berms. | |||
| 128 | 13.01 | ROAD B | 367.45 | Cubic Metre | |
| 129 | 13.02 | ROAD C | 418.74 | Cubic Metre | |
| 130 | 13.03 | ROAD D | 450 | Cubic Metre | |
| 131 | 13.04 | ROAD O | 279 | Cubic Metre | |
| 132 | 13.05 | ROAD P | 195 | Cubic Metre | |
| 133 | 13.06 | ROAD Q | 520 | Cubic Metre | |
| 134 | 13.07 | ROAD R | 520 | Cubic Metre | |
| 135 | 13.08 | ROAD S | 471 | Cubic Metre | |
| 136 | 13.09 | ROAD T | 600 | Cubic Metre | |
| 137 | 13.1 | ROAD U | 156 | Cubic Metre | |
| 138 | 14 | Providing RCC M15 Grade precast KM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete as per MORT & H Specification No. 804 | |||
| 139 | 14.01 | ROAD A | 2 | Number | |
| 140 | 14.02 | ROAD B | 2 | Number | |
| 141 | 14.03 | ROAD C | 2 | Number | |
| 142 | 14.04 | ROAD D | 2 | Number | |
| 143 | 14.05 | ROAD O | 2 | Number | |
| 144 | 14.06 | ROAD P | 2 | Number | |
| 145 | 14.07 | ROAD Q | 3 | Number | |
| 146 | 14.08 | ROAD R | 5 | Number | |
| 147 | 14.09 | ROAD S | 2 | Number | |
| 148 | 14.1 | ROAD T | 2 | Number | |
| 149 | 14.11 | ROAD U | 1 | Number | |
| 150 | 15 | Providing RCC M15 Grade precast HM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete as per MORT & H Specification No. 804 | |||
| 151 | 15.01 | ROAD A | 7 | Number | |
| 152 | 15.02 | ROAD B | 10 | Number | |
| 153 | 15.03 | ROAD C | 6 | Number | |
| 154 | 15.04 | ROAD D | 8 | Number | |
| 155 | 15.05 | ROAD O | 6 | Number | |
| 156 | 15.06 | ROAD P | 4 | Number | |
| 157 | 15.07 | ROAD Q | 11 | Number | |
| 158 | 15.08 | ROAD R | 10 | Number | |
| 159 | 15.09 | ROAD S | 6 | Number | |
| 160 | 15.1 | ROAD T | 7 | Number | |
| 161 | 15.11 | ROAD U | 4 | Number | |
| 162 | 16 | Providing RCC M15 Grade precast Boundary stones of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete as per MORT & H Specification No. 804 | |||
| 163 | 16.01 | ROAD A | 84 | Number | |
| 164 | 16.02 | ROAD B | 120 | Number | |
| 165 | 16.03 | ROAD C | 70 | Number | |
| 166 | 16.04 | ROAD D | 100 | Number | |
| 167 | 16.05 | ROAD O | 70 | Number | |
| 168 | 16.06 | ROAD P | 50 | Number | |
| 169 | 16.07 | ROAD Q | 124 | Number | |
| 170 | 16.08 | ROAD R | 124 | Number | |
| 171 | 16.09 | ROAD S | 76 | Number | |
| 172 | 16.1 | ROAD T | 96 | Number | |
| 173 | 16.11 | ROAD U | 36 | Number | |
| 174 | 17 | Dismantling the RR masondry in the existing culvert, clearing away and carefully stacking materials usefule for reuse for any thickness of wall etc., complete. | |||
| 175 | 17.01 | ROAD B | 26.25 | Cubic Metre | |
| 176 | 17.02 | ROAD C | 24.3 | Cubic Metre | |
| 177 | 17.03 | ROAD D | 52.7 | Cubic Metre | |
| 178 | 17.04 | ROAD F | 56.8 | Cubic Metre | |
| 179 | 17.05 | ROAD G | 48.6 | Cubic Metre | |
| 180 | 17.06 | ROAD I | 26.25 | Cubic Metre | |
| 181 | 17.07 | ROAD K | 24.3 | Cubic Metre | |
| 182 | 17.08 | ROAD L | 24.3 | Cubic Metre | |
| 183 | 18 | Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per standard specification 111,112,304 for foundation OF CULVERT | |||
| 184 | 18.01 | ROAD B | 534.5 | Cubic Metre | |
| 185 | 18.02 | ROAD C | 238.96 | Cubic Metre | |
| 186 | 18.03 | ROAD D | 496.7 | Cubic Metre | |
| 187 | 18.04 | ROAD F | 515.48 | Cubic Metre | |
| 188 | 18.05 | ROAD G | 477.92 | Cubic Metre | |
| 189 | 18.06 | ROAD I | 534.5 | Cubic Metre | |
| 190 | 18.07 | ROAD K | 238.96 | Cubic Metre | |
| 191 | 18.08 | ROAD L | 238.96 | Cubic Metre | |
| 192 | 19 | Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per standard specification 111,112,304 for foundation for Retainingwall | |||
| 193 | 19.01 | ROAD E | 213.69 | Cubic Metre | |
| 194 | 19.02 | ROAD J | 486.4 | Cubic Metre | |
| 195 | 19.03 | ROAD M | 71.23 | Cubic Metre | |
| 196 | 20 | Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per standard specification 111,112,304 for foundation of Protective wall | |||
| 197 | 20.01 | ROAD H | 468.06 | Cubic Metre | |
| 198 | 20.02 | ROAD N | 156.6 | Cubic Metre | |
| 199 | 21 | Vibrated Cement Concrete M15 using 40mm ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication for steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete as per MORTH Specification no.111,112,1000, 1500, 1700,2200,900 For foundation Concrete | |||
| 200 | 21.01 | ROAD B | 34.15 | Cubic Metre | |
| 201 | 21.02 | ROAD C | 13.58 | Cubic Metre | |
| 202 | 21.03 | ROAD D | 28.42 | Cubic Metre | |
| 203 | 21.04 | ROAD F | 29.68 | Cubic Metre | |
| 204 | 21.05 | ROAD G | 27.16 | Cubic Metre | |
| 205 | 21.06 | ROAD H | 58.51 | Cubic Metre | |
| 206 | 21.07 | ROAD I | 34.15 | Cubic Metre | |
| 207 | 21.08 | ROAD J | 182.4 | Cubic Metre | |
| 208 | 21.09 | ROAD K | 13.58 | Cubic Metre | |
| 209 | 21.1 | ROAD L | 13.58 | Cubic Metre | |
| 210 | 21.11 | ROAD N | 19.58 | Cubic Metre | |
| 211 | 22 | Vibrated Cement Concrete M15 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., as per MORTH Specification no. 111,112,1000, 1500, 1700,2100,900 complete for FOUNDATION BELOW SILL LEVEL | |||
| 212 | 22.01 | ROAD E | 187.21 | Cubic Metre | |
| 213 | 22.02 | ROAD H | 250.17 | Cubic Metre | |
| 214 | 22.03 | ROAD J | 218.5 | Cubic Metre | |
| 215 | 22.04 | ROAD M | 62.4 | Cubic Metre | |
| 216 | 22.05 | ROAD N | 83.7 | Cubic Metre | |
| 217 | 23 | Vibrated Cement Concrete M15 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., complete for ABOVE SILL LEVEL as per MORTH Specification no. 111,112,1000, 1500, 1700,2200,900 | |||
| 218 | 23.01 | ROAD E | 313.26 | Cubic Metre | |
| 219 | 23.02 | ROAD H | 167.35 | Cubic Metre | |
| 220 | 23.03 | ROAD J | 449.37 | Cubic Metre | |
| 221 | 23.04 | ROAD M | 104.56 | Cubic Metre | |
| 222 | 23.05 | ROAD N | 59.06 | Cubic Metre | |
| 223 | 24 | Providing and fixing 100mm dia with 4 kg/ cm 2 PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite cost and labour for semi-sperical back fill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the back fill as per standard specifications. | |||
| 224 | 24.01 | ROAD E | 82 | RM | |
| 225 | 24.02 | ROAD H | 138 | RM | |
| 226 | 24.03 | ROAD J | 132 | RM | |
| 227 | 24.04 | ROAD M | 27 | RM | |
| 228 | 24.05 | ROAD N | 45 | RM | |
| 229 | 25 | Vibrated Reinforced Cement Concrete M25 (Design Mix) using crushed ISS size HBG graded metal of including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for compacting, finishing and curing including all incidental charges etc., complete as per MORTH Vth Revision Specification No. 1000, 1500, 1600, 1700, 2300 900 for FOR CELL BOX | |||
| 230 | 25.01 | ROAD B | 156 | Cubic Metre | |
| 231 | 25.02 | ROAD C | 55.64 | Cubic Metre | |
| 232 | 25.03 | ROAD D | 115.69 | Cubic Metre | |
| 233 | 25.04 | ROAD F | 120.1 | Cubic Metre | |
| 234 | 25.05 | ROAD G | 111.28 | Cubic Metre | |
| 235 | 25.06 | ROAD I | 156 | Cubic Metre | |
| 236 | 25.07 | ROAD K | 55.64 | Cubic Metre | |
| 237 | 25.08 | ROAD L | 55.64 | Cubic Metre | |
| 238 | 26 | Vibrated Cement Concrete M20 using 40MM crushed ISS size HBG graded metal of including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for compacting, finishing and curing including all incidental charges etc., complete as per MORTH Vth Revision Specification No. 1000, 1500, 1600, 1700, 2300 900 for ABOVE SILL LEVEL FOR WINGS WALLS & PARAPET WALL. | |||
| 239 | 26.01 | ROAD B | 111.6 | Cubic Metre | |
| 240 | 26.02 | ROAD C | 51.94 | Cubic Metre | |
| 241 | 26.03 | ROAD D | 114.06 | Cubic Metre | |
| 242 | 26.04 | ROAD F | 124.24 | Cubic Metre | |
| 243 | 26.05 | ROAD G | 107.36 | Cubic Metre | |
| 244 | 26.06 | ROAD I | 111.6 | Cubic Metre | |
| 245 | 26.07 | ROAD K | 51.94 | Cubic Metre | |
| 246 | 26.08 | ROAD L | 51.94 | Cubic Metre | |
| 247 | 27 | Supply and fabrication of steel Grade Fe-500 required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the bars straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per MORTH Vth Revision Specification No. 1000, 1500, 1600, 900 | |||
| 248 | 27.01 | ROAD B | 11.44 | Metric Tone | |
| 249 | 27.02 | ROAD C | 4.28 | Metric Tone | |
| 250 | 27.03 | ROAD D | 9.234 | Metric Tone | |
| 251 | 27.04 | ROAD F | 9.908 | Metric Tone | |
| 252 | 27.05 | ROAD G | 8.56 | Metric Tone | |
| 253 | 27.06 | ROAD I | 11.44 | Metric Tone | |
| 254 | 27.07 | ROAD K | 4.28 | Metric Tone | |
| 255 | 27.08 | ROAD L | 4.28 | Metric Tone | |
| 256 | 28 | Vibrated Cement Concrete M30 Grade (Design mix) Using IRC size hard granite metal including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying compacting curing, including all incidental charges etc., complete as per MORTH Vth Revision Specification No. 1000, 1500, 1600, 1700, 2702, 900 for WEARING COAT 75MM uniform thickness OVER DECK SLAB AND APPROACH SLAB | |||
| 257 | 28.01 | ROAD B | 95.55 | Square metre | |
| 258 | 28.02 | ROAD C | 38.22 | Square metre | |
| 259 | 28.03 | ROAD D | 80.99 | Square metre | |
| 260 | 28.04 | ROAD F | 85.54 | Square metre | |
| 261 | 28.05 | ROAD G | 76.44 | Square metre | |
| 262 | 28.06 | ROAD I | 95.55 | Square metre | |
| 263 | 28.07 | ROAD K | 38.22 | Square metre | |
| 264 | 28.08 | ROAD L | 38.22 | Square metre | |
| 265 | 29 | Stone Dust Filling hebnind the abutments and Wings with Stone Dust including cost and conveyance to site including labour chrges for filling in layers watering tamping under optimum moisture content to get the maximum density including of all other incidental charges etc., complete as per MORTH VTH Revision Specification No. 304, 900 | |||
| 266 | 29.01 | ROAD B | 66.45 | Cubic Metre | |
| 267 | 29.02 | ROAD C | 27.5 | Cubic Metre | |
| 268 | 29.03 | ROAD D | 55 | Cubic Metre | |
| 269 | 29.04 | ROAD F | 55 | Cubic Metre | |
| 270 | 29.05 | ROAD G | 25.76 | Cubic Metre | |
| 271 | 29.06 | ROAD I | 66.45 | Cubic Metre | |
| 272 | 29.07 | ROAD K | 27.5 | Cubic Metre | |
| 273 | 29.08 | ROAD L | 27.5 | Cubic Metre | |
| 274 | 30 | Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer including compaction by power roller rolling as per MORTH Specification No.111, 112, 301, 305, 900 Formation of Diversion road using Carted earth an average lead of 2 km Lead | |||
| 275 | 30.01 | ROAD C | 312.5 | Cubic Metre | |
| 276 | 30.02 | ROAD D | 843.75 | Cubic Metre | |
| 277 | 30.03 | ROAD F | 625 | Cubic Metre | |
| 278 | 30.04 | ROAD G | 575 | Cubic Metre | |
| 279 | 30.05 | ROAD K | 287.5 | Cubic Metre | |
| 280 | 30.06 | ROAD L | 287.5 | Cubic Metre | |
| 281 | 31 | Quarry Dust Filling behind the abutments, Wings and pipe portion with Quarry fines including cost and conveyance to site including labour charges for filling in layers watering tamping under optimum moisture content to get the maximum density including of all other incidental charges etc., complete as per MORT & H specification no.304,900 | |||
| 282 | 31.01 | ROAD E | 34.65 | Cubic Metre | |
| 283 | 31.02 | ROAD H | 58.51 | Cubic Metre | |
| 284 | 31.03 | ROAD M | 11.55 | Cubic Metre | |
| 285 | 31.04 | ROAD N | 19.58 | Cubic Metre | |
| 286 | 32 | Clearing the Light jungles including weeding out shrubs bushes, egetables, growth etc., as per spcifications and directions of Engineer in charge (Twice a year) for 60 months | |||
| 287 | 32.01 | ROAD A (UPKEEPING 1st YEAR) | 3960 | Square metre | |
| 288 | 32.02 | ROAD A (UPKEEPING 2nd YEAR) | 3960 | Square metre | |
| 289 | 32.03 | ROAD A (UPKEEPING 3rd YEAR) | 3960 | Square metre | |
| 290 | 32.04 | ROAD A (UPKEEPING 4th YEAR) | 3960 | Square metre | |
| 291 | 32.05 | ROAD A (UPKEEPING 5th YEAR) | 3960 | Square metre | |
| 292 | 32.06 | ROAD B (UPKEEPING 1st YEAR) | 7056 | Square metre | |
| 293 | 32.07 | ROAD B (UPKEEPING 2nd YEAR) | 7056 | Square metre | |
| 294 | 32.08 | ROAD B (UPKEEPING 3rd YEAR) | 7056 | Square metre | |
| 295 | 32.09 | ROAD B (UPKEEPING 4th YEAR) | 7056 | Square metre | |
| 296 | 32.1 | ROAD B (UPKEEPING 5th YEAR) | 7056 | Square metre | |
| 297 | 32.11 | ROAD C (UPKEEPING 1st YEAR) | 5040 | Square metre | |
| 298 | 32.12 | ROAD C (UPKEEPING 2nd YEAR) | 5040 | Square metre | |
| 299 | 32.13 | ROAD C (UPKEEPING 3rd YEAR) | 5040 | Square metre | |
| 300 | 32.14 | ROAD C (UPKEEPING 4th YEAR) | 5040 | Square metre | |
| 301 | 32.15 | ROAD C (UPKEEPING 5th YEAR) | 5040 | Square metre | |
| 302 | 32.16 | ROAD D (UPKEEPING 1st YEAR) | 7200 | Square metre | |
| 303 | 32.17 | ROAD D (UPKEEPING 2nd YEAR) | 7200 | Square metre | |
| 304 | 32.18 | ROAD D (UPKEEPING 3rd YEAR) | 7200 | Square metre | |
| 305 | 32.19 | ROAD D (UPKEEPING 4th YEAR) | 7200 | Square metre | |
| 306 | 32.2 | ROAD D (UPKEEPING 5th YEAR) | 7200 | Square metre | |
| 307 | 32.21 | ROAD O (UPKEEPING 1st YEAR | 3780 | Square metre | |
| 308 | 32.22 | ROAD O (UPKEEPING 2nd YEAR) | 3780 | Square metre | |
| 309 | 32.23 | ROAD O (UPKEEPING 3rd YEAR) | 3780 | Square metre | |
| 310 | 32.24 | ROAD O (UPKEEPING 4th YEAR) | 3780 | Square metre | |
| 311 | 32.25 | ROAD O (UPKEEPING 5th YEAR) | 3780 | Square metre | |
| 312 | 32.26 | ROAD P (UPKEEPING 1st YEAR) | 2880 | Square metre | |
| 313 | 32.27 | ROAD P (UPKEEPING 2nd YEAR) | 2880 | Square metre | |
| 314 | 32.28 | ROAD P (UPKEEPING 3rd YEAR) | 2880 | Square metre | |
| 315 | 32.29 | ROAD P (UPKEEPING 4th YEAR) | 2880 | Square metre | |
| 316 | 32.3 | ROAD P (UPKEEPING 5th YEAR) | 2880 | Square metre | |
| 317 | 32.31 | ROAD Q (UPKEEPING 1st YEAR) | 9360 | Square metre | |
| 318 | 32.32 | ROAD Q (UPKEEPING 2nd YEAR) | 9360 | Square metre | |
| 319 | 32.33 | ROAD Q (UPKEEPING 3rd YEAR) | 9360 | Square metre | |
| 320 | 32.34 | ROAD Q (UPKEEPING 4th YEAR) | 9360 | Square metre | |
| 321 | 32.35 | ROAD Q (UPKEEPING 5th YEAR) | 9360 | Square metre | |
| 322 | 32.36 | ROAD R (UPKEEPING 1st YEAR) | 9360 | Square metre | |
| 323 | 32.37 | ROAD R (UPKEEPING 2nd YEAR) | 9360 | Square metre | |
| 324 | 32.38 | ROAD R (UPKEEPING 3rd YEAR) | 9360 | Square metre | |
| 325 | 32.39 | ROAD R (UPKEEPING 4th YEAR) | 9360 | Square metre | |
| 326 | 32.4 | ROAD R (UPKEEPING 5th YEAR) | 9360 | Square metre | |
| 327 | 32.41 | ROAD S (UPKEEPING 1st YEAR) | 5652 | Square metre | |
| 328 | 32.42 | ROAD S (UPKEEPING 2nd YEAR) | 5652 | Square metre | |
| 329 | 32.43 | ROAD S (UPKEEPING 3rd YEAR) | 5652 | Square metre | |
| 330 | 32.44 | ROAD S (UPKEEPING 4th YEAR) | 5652 | Square metre | |
| 331 | 32.45 | ROAD S (UPKEEPING 5th YEAR) | 5652 | Square metre | |
| 332 | 32.46 | ROAD T (UPKEEPING 1st YEAR) | 7200 | Square metre | |
| 333 | 32.47 | ROAD T (UPKEEPING 2nd YEAR) | 7200 | Square metre | |
| 334 | 32.48 | ROAD T (UPKEEPING 3rd YEAR) | 7200 | Square metre | |
| 335 | 32.49 | ROAD T (UPKEEPING 4th YEAR) | 7200 | Square metre | |
| 336 | 32.5 | ROAD T (UPKEEPING 5th YEAR) | 7200 | Square metre | |
| 337 | 32.51 | ROAD U (UPKEEPING 1st YEAR) | 2808 | Square metre | |
| 338 | 32.52 | ROAD U (UPKEEPING 2nd YEAR) | 2808 | Square metre | |
| 339 | 32.53 | ROAD U (UPKEEPING 3rd YEAR) | 2808 | Square metre | |
| 340 | 32.54 | ROAD U (UPKEEPING 4th YEAR) | 2808 | Square metre | |
| 341 | 32.55 | ROAD U (UPKEEPING 5th YEAR) | 2808 | Square metre | |
| 342 | 33 | Excavation \nExcavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer including compaction by power roller rolling as per SS20B MORTH Specification no.111,112,301,305,900 for Making up the berms. (Yearly Two Times) | |||
| 343 | 33.01 | ROAD A (UPKEEPING 2nd YEAR) | 156 | Cubic Metre | |
| 344 | 33.02 | ROAD A (UPKEEPING 3rd YEAR) | 156 | Cubic Metre | |
| 345 | 33.03 | ROAD A (UPKEEPING 4th YEAR) | 156 | Cubic Metre | |
| 346 | 33.04 | ROAD A (UPKEEPING 5th YEAR) | 156 | Cubic Metre | |
| 347 | 33.05 | ROAD B (UPKEEPING 2nd YEAR) | 220.47 | Cubic Metre | |
| 348 | 33.06 | ROAD B (UPKEEPING 3rd YEAR) | 220.47 | Cubic Metre | |
| 349 | 33.07 | ROAD B (UPKEEPING 4th YEAR) | 220.47 | Cubic Metre | |
| 350 | 33.08 | ROAD B (UPKEEPING 5th YEAR) | 220.47 | Cubic Metre | |
| 351 | 33.09 | ROAD C (UPKEEPING 2nd YEAR) | 251.24 | Cubic Metre | |
| 352 | 33.1 | ROAD C (UPKEEPING 3rd YEAR) | 251.24 | Cubic Metre | |
| 353 | 33.11 | ROAD C (UPKEEPING 4th YEAR) | 251.24 | Cubic Metre | |
| 354 | 33.12 | ROAD C (UPKEEPING 5th YEAR) | 251.24 | Cubic Metre | |
| 355 | 33.13 | ROAD D (UPKEEPING 2nd YEAR) | 270 | Cubic Metre | |
| 356 | 33.14 | ROAD D (UPKEEPING 3rd YEAR) | 270 | Cubic Metre | |
| 357 | 33.15 | ROAD D (UPKEEPING 4th YEAR) | 270 | Cubic Metre | |
| 358 | 33.16 | ROAD D (UPKEEPING 5th YEAR) | 270 | Cubic Metre | |
| 359 | 33.17 | ROAD O (UPKEEPING 2nd YEAR) | 167.4 | Cubic Metre | |
| 360 | 33.18 | ROAD O (UPKEEPING 3rd YEAR) | 167.4 | Cubic Metre | |
| 361 | 33.19 | ROAD O (UPKEEPING 4th YEAR) | 167.4 | Cubic Metre | |
| 362 | 33.2 | ROAD O (UPKEEPING 5th YEAR) | 167.4 | Cubic Metre | |
| 363 | 33.21 | ROAD P (UPKEEPING 2nd YEAR) | 117 | Cubic Metre | |
| 364 | 33.22 | ROAD P (UPKEEPING 3rd YEAR) | 117 | Cubic Metre | |
| 365 | 33.23 | ROAD P (UPKEEPING 4th YEAR) | 117 | Cubic Metre | |
| 366 | 33.24 | ROAD P (UPKEEPING 5th YEAR) | 117 | Cubic Metre | |
| 367 | 33.25 | ROAD Q (UPKEEPING 2nd YEAR) | 312 | Cubic Metre | |
| 368 | 33.26 | ROAD Q (UPKEEPING 3rd YEAR) | 312 | Cubic Metre | |
| 369 | 33.27 | ROAD Q (UPKEEPING 4th YEAR) | 312 | Cubic Metre | |
| 370 | 33.28 | ROAD Q (UPKEEPING 5th YEAR) | 312 | Cubic Metre | |
| 371 | 33.29 | ROAD R (UPKEEPING 2nd YEAR) | 312 | Cubic Metre | |
| 372 | 33.3 | ROAD R (UPKEEPING 3rd YEAR) | 312 | Cubic Metre | |
| 373 | 33.31 | ROAD R (UPKEEPING 4th YEAR) | 312 | Cubic Metre | |
| 374 | 33.32 | ROAD R (UPKEEPING 5th YEAR) | 312 | Cubic Metre | |
| 375 | 33.33 | ROAD S (UPKEEPING 2nd YEAR) | 282.6 | Cubic Metre | |
| 376 | 33.34 | ROAD S (UPKEEPING 3rd YEAR) | 282.6 | Cubic Metre | |
| 377 | 33.35 | ROAD S (UPKEEPING 4th YEAR) | 282.6 | Cubic Metre | |
| 378 | 33.36 | ROAD S (UPKEEPING 5th YEAR) | 282.6 | Cubic Metre | |
| 379 | 33.37 | ROAD T (UPKEEPING 2nd YEAR) | 360 | Cubic Metre | |
| 380 | 33.38 | ROAD T (UPKEEPING 3rd YEAR) | 360 | Cubic Metre | |
| 381 | 33.39 | ROAD T (UPKEEPING 4th YEAR) | 360 | Cubic Metre | |
| 382 | 33.4 | ROAD T (UPKEEPING 5th YEAR) | 360 | Cubic Metre | |
| 383 | 33.41 | ROAD U (UPKEEPING 2nd YEAR) | 93.6 | Cubic Metre | |
| 384 | 33.42 | ROAD U (UPKEEPING 3rd YEAR) | 93.6 | Cubic Metre | |
| 385 | 33.43 | ROAD U (UPKEEPING 4th YEAR) | 93.6 | Cubic Metre | |
| 386 | 33.44 | ROAD U (UPKEEPING 5th YEAR) | 93.6 | Cubic Metre | |
| 387 | 34 | Deploying earth moving machinery for desilting channal and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. For U/s and D/s culvert Clearance using JCB (Sl.No:XI-18) | |||
| 388 | 34.01 | ROAD A (UPKEEPING 1st YEAR) | 4 | Hour | |
| 389 | 34.02 | ROAD A (UPKEEPING 2nd YEAR) | 4 | Hour | |
| 390 | 34.03 | ROAD A (UPKEEPING 3rd YEAR) | 4 | Hour | |
| 391 | 34.04 | ROAD A (UPKEEPING 4th YEAR) | 4 | Hour | |
| 392 | 34.05 | ROAD A (UPKEEPING 5th YEAR) | 4 | Hour | |
| 393 | 34.06 | ROAD B (UPKEEPING 1st YEAR) | 1 | Hour | |
| 394 | 34.07 | ROAD B (UPKEEPING 2nd YEAR) | 7 | Hour | |
| 395 | 34.08 | ROAD B (UPKEEPING 3rd YEAR) | 7 | Hour | |
| 396 | 34.09 | ROAD B (UPKEEPING 4th YEAR) | 7 | Hour | |
| 397 | 34.1 | ROAD B (UPKEEPING 5th YEAR) | 7 | Hour | |
| 398 | 34.11 | ROAD C (UPKEEPING 1st YEAR) | 2 | Hour | |
| 399 | 34.12 | ROAD C (UPKEEPING 2nd YEAR) | 2 | Hour | |
| 400 | 34.13 | ROAD C (UPKEEPING 3rd YEAR) | 2 | Hour | |
| 401 | 34.14 | ROAD C (UPKEEPING 4th YEAR) | 2 | Hour | |
| 402 | 34.15 | ROAD C (UPKEEPING 5th YEAR) | 2 | Hour | |
| 403 | 34.16 | ROAD D (UPKEEPING 1st YEAR) | 5 | Hour | |
| 404 | 34.17 | ROAD D (UPKEEPING 2nd YEAR) | 5 | Hour | |
| 405 | 34.18 | ROAD D (UPKEEPING 3rd YEAR) | 5 | Hour | |
| 406 | 34.19 | ROAD D (UPKEEPING 4th YEAR) | 5 | Hour | |
| 407 | 34.2 | ROAD D (UPKEEPING 5th YEAR) | 5 | Hour | |
| 408 | 34.21 | ROAD O (UPKEEPING 2nd YEAR) | 6 | Hour | |
| 409 | 34.22 | ROAD O (UPKEEPING 3rd YEAR) | 6 | Hour | |
| 410 | 34.23 | ROAD O (UPKEEPING 4th YEAR) | 6 | Hour | |
| 411 | 34.24 | ROAD O (UPKEEPING 5th YEAR) | 6 | Hour | |
| 412 | 34.25 | ROAD P (UPKEEPING 1st YEAR) | 3 | Hour | |
| 413 | 34.26 | ROAD P (UPKEEPING 2nd YEAR) | 3 | Hour | |
| 414 | 34.27 | ROAD P (UPKEEPING 3rd YEAR) | 3 | Hour | |
| 415 | 34.28 | ROAD P (UPKEEPING 4th YEAR) | 3 | Hour | |
| 416 | 34.29 | ROAD P (UPKEEPING 5th YEAR) | 3 | Hour | |
| 417 | 34.3 | ROAD Q (UPKEEPING 1st YEAR) | 2 | Hour | |
| 418 | 34.31 | ROAD Q (UPKEEPING 2nd YEAR) | 2 | Hour | |
| 419 | 34.32 | ROAD Q (UPKEEPING 3rd YEAR) | 2 | Hour | |
| 420 | 34.33 | ROAD Q (UPKEEPING 4th YEAR) | 2 | Hour | |
| 421 | 34.34 | ROAD Q (UPKEEPING 5th YEAR) | 2 | Hour | |
| 422 | 34.35 | ROAD R (UPKEEPING 1st YEAR) | 2 | Hour | |
| 423 | 34.36 | ROAD R (UPKEEPING 2nd YEAR) | 2 | Hour | |
| 424 | 34.37 | ROAD R (UPKEEPING 3rd YEAR) | 2 | Hour | |
| 425 | 34.38 | ROAD R (UPKEEPING 4th YEAR) | 2 | Hour | |
| 426 | 34.39 | ROAD R (UPKEEPING 5th YEAR) | 2 | Hour | |
| 427 | 34.4 | ROAD S (UPKEEPING 1st YEAR) | 3 | Hour | |
| 428 | 34.41 | ROAD S (UPKEEPING 2nd YEAR) | 3 | Hour | |
| 429 | 34.42 | ROAD S (UPKEEPING 3rd YEAR) | 3 | Hour | |
| 430 | 34.43 | ROAD S (UPKEEPING 4th YEAR) | 3 | Hour | |
| 431 | 34.44 | ROAD S (UPKEEPING 5th YEAR) | 3 | Hour | |
| 432 | 34.45 | ROAD T (UPKEEPING 1st YEAR) | 4 | Hour | |
| 433 | 34.46 | ROAD T (UPKEEPING 2nd YEAR) | 4 | Hour | |
| 434 | 34.47 | ROAD T (UPKEEPING 3rd YEAR) | 4 | Hour | |
| 435 | 34.48 | ROAD T (UPKEEPING 4th YEAR) | 4 | Hour | |
| 436 | 34.49 | ROAD T (UPKEEPING 5th YEAR) | 4 | Hour | |
| 437 | 35 | White washing two coats with freshly burnt white shell lime inclusing cost of lime, blue powder fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specification and as directed. | |||
| 438 | 35.01 | ROAD A (UPKEEPING 1st YEAR) | 41.99 | Square metre | |
| 439 | 35.02 | ROAD A (UPKEEPING 2nd YEAR) | 41.99 | Square metre | |
| 440 | 35.03 | ROAD A (UPKEEPING 3rd YEAR) | 41.99 | Square metre | |
| 441 | 35.04 | ROAD A (UPKEEPING 4th YEAR) | 41.99 | Square metre | |
| 442 | 35.05 | ROAD A (UPKEEPING 5th YEAR) | 41.99 | Square metre | |
| 443 | 35.06 | ROAD B (UPKEEPING 1st YEAR) | 70.93 | Square metre | |
| 444 | 35.07 | ROAD B (UPKEEPING 2nd YEAR) | 70.93 | Square metre | |
| 445 | 35.08 | ROAD B (UPKEEPING 3rd YEAR) | 70.93 | Square metre | |
| 446 | 35.09 | ROAD B (UPKEEPING 4th YEAR) | 70.93 | Square metre | |
| 447 | 35.1 | ROAD B (UPKEEPING 5th YEAR) | 70.93 | Square metre | |
| 448 | 35.11 | ROAD C (UPKEEPING 1st YEAR) | 31.16 | Square metre | |
| 449 | 35.12 | ROAD C (UPKEEPING 2nd YEAR) | 31.16 | Square metre | |
| 450 | 35.13 | ROAD C (UPKEEPING 3rd YEAR) | 31.16 | Square metre | |
| 451 | 35.14 | ROAD C (UPKEEPING 4th YEAR) | 31.16 | Square metre | |
| 452 | 35.15 | ROAD C (UPKEEPING 5th YEAR) | 31.16 | Square metre | |
| 453 | 35.16 | ROAD D (UPKEEPING 1st YEAR) | 55.68 | Square metre | |
| 454 | 35.17 | ROAD D (UPKEEPING 2nd YEAR) | 55.68 | Square metre | |
| 455 | 35.18 | ROAD D (UPKEEPING 3rd YEAR) | 55.68 | Square metre | |
| 456 | 35.19 | ROAD D (UPKEEPING 4th YEAR) | 55.68 | Square metre | |
| 457 | 35.2 | ROAD D (UPKEEPING 5th YEAR) | 55.68 | Square metre | |
| 458 | 35.21 | ROAD O (UPKEEPING 1st YEAR | 64.13 | Square metre | |
| 459 | 35.22 | ROAD O (UPKEEPING 2nd YEAR) | 64.13 | Square metre | |
| 460 | 35.23 | ROAD O (UPKEEPING 3rd YEAR) | 64.13 | Square metre | |
| 461 | 35.24 | ROAD O (UPKEEPING 4th YEAR) | 64.13 | Square metre | |
| 462 | 35.25 | ROAD O (UPKEEPING 5th YEAR) | 64.13 | Square metre | |
| 463 | 35.26 | ROAD P (UPKEEPING 1st YEAR) | 34.09 | Square metre | |
| 464 | 35.27 | ROAD P (UPKEEPING 2nd YEAR) | 34.09 | Square metre | |
| 465 | 35.28 | ROAD P (UPKEEPING 3rd YEAR) | 34.09 | Square metre | |
| 466 | 35.29 | ROAD P (UPKEEPING 4th YEAR) | 34.09 | Square metre | |
| 467 | 35.3 | ROAD P (UPKEEPING 5th YEAR) | 34.09 | Square metre | |
| 468 | 35.31 | ROAD Q (UPKEEPING 1st YEAR) | 17.82 | Square metre | |
| 469 | 35.32 | ROAD Q (UPKEEPING 2nd YEAR) | 17.82 | Square metre | |
| 470 | 35.33 | ROAD Q (UPKEEPING 3rd YEAR) | 17.82 | Square metre | |
| 471 | 35.34 | ROAD Q (UPKEEPING 4th YEAR) | 17.82 | Square metre | |
| 472 | 35.35 | ROAD Q (UPKEEPING 5th YEAR) | 17.82 | Square metre | |
| 473 | 35.36 | ROAD R (UPKEEPING 1st YEAR) | 34.29 | Square metre | |
| 474 | 35.37 | ROAD R (UPKEEPING 2nd YEAR) | 34.29 | Square metre | |
| 475 | 35.38 | ROAD R (UPKEEPING 3rd YEAR) | 34.29 | Square metre | |
| 476 | 35.39 | ROAD R (UPKEEPING 4th YEAR) | 34.29 | Square metre | |
| 477 | 35.4 | ROAD R (UPKEEPING 5th YEAR) | 34.29 | Square metre | |
| 478 | 35.41 | ROAD S (UPKEEPING 1st YEAR) | 36.62 | Square metre | |
| 479 | 35.42 | ROAD S (UPKEEPING 2nd YEAR) | 36.62 | Square metre | |
| 480 | 35.43 | ROAD S (UPKEEPING 3rd YEAR) | 36.62 | Square metre | |
| 481 | 35.44 | ROAD S (UPKEEPING 4th YEAR) | 36.62 | Square metre | |
| 482 | 35.45 | ROAD S (UPKEEPING 5th YEAR) | 36.62 | Square metre | |
| 483 | 35.46 | ROAD T (UPKEEPING 1st YEAR) | 59.56 | Square metre | |
| 484 | 35.47 | ROAD T (UPKEEPING 2nd YEAR) | 59.56 | Square metre | |
| 485 | 35.48 | ROAD T (UPKEEPING 3rd YEAR) | 59.56 | Square metre | |
| 486 | 35.49 | ROAD T (UPKEEPING 4th YEAR) | 59.56 | Square metre | |
| 487 | 35.5 | ROAD T (UPKEEPING 5th YEAR) | 59.56 | Square metre | |
| 488 | 35.51 | ROAD U (UPKEEPING 1st YEAR) | 12.33 | Square metre | |
| 489 | 35.52 | ROAD U (UPKEEPING 2nd YEAR) | 12.33 | Square metre | |
| 490 | 35.53 | ROAD U (UPKEEPING 3rd YEAR) | 12.33 | Square metre | |
| 491 | 35.54 | ROAD U (UPKEEPING 4th YEAR) | 12.33 | Square metre | |
| 492 | 35.55 | ROAD U (UPKEEPING 5th YEAR) | 12.33 | Square metre | |
| 493 | 36 | Tree/EB pole /culvert / Retaining wall banding using Coal tar with standard dimension including all matyerials and labour and all other incidental charges etc., | |||
| 494 | 36.01 | ROAD A (UPKEEPING 1st YEAR) | 3.98 | Square metre | |
| 495 | 36.02 | ROAD A (UPKEEPING 2nd YEAR) | 3.98 | Square metre | |
| 496 | 36.03 | ROAD A (UPKEEPING 3rd YEAR) | 3.98 | Square metre | |
| 497 | 36.04 | ROAD A (UPKEEPING 4th YEAR) | 3.98 | Square metre | |
| 498 | 36.05 | ROAD A (UPKEEPING 5th YEAR) | 3.98 | Square metre | |
| 499 | 36.06 | ROAD B (UPKEEPING 1st YEAR) | 8.86 | Square metre | |
| 500 | 36.07 | ROAD B (UPKEEPING 2nd YEAR) | 8.86 | Square metre | |
| 501 | 36.08 | ROAD B (UPKEEPING 3rd YEAR) | 8.86 | Square metre | |
| 502 | 36.09 | ROAD B (UPKEEPING 4th YEAR) | 8.86 | Square metre | |
| 503 | 36.1 | ROAD B (UPKEEPING 5th YEAR) | 8.86 | Square metre | |
| 504 | 36.11 | ROAD C (UPKEEPING 1st YEAR) | 7.68 | Square metre | |
| 505 | 36.12 | ROAD C (UPKEEPING 2nd YEAR) | 7.68 | Square metre | |
| 506 | 36.13 | ROAD C (UPKEEPING 3rd YEAR) | 7.68 | Square metre | |
| 507 | 36.14 | ROAD C (UPKEEPING 4th YEAR) | 7.68 | Square metre | |
| 508 | 36.15 | ROAD C (UPKEEPING 5th YEAR) | 7.68 | Square metre | |
| 509 | 36.16 | ROAD D (UPKEEPING 1st YEAR) | 6.58 | Square metre | |
| 510 | 36.17 | ROAD D (UPKEEPING 2nd YEAR) | 6.58 | Square metre | |
| 511 | 36.18 | ROAD D (UPKEEPING 3rd YEAR) | 6.58 | Square metre | |
| 512 | 36.19 | ROAD D (UPKEEPING 4th YEAR) | 6.58 | Square metre | |
| 513 | 36.2 | ROAD D (UPKEEPING 5th YEAR) | 6.58 | Square metre | |
| 514 | 36.21 | ROAD O (UPKEEPING 1st YEAR | 6.55 | Square metre | |
| 515 | 36.22 | ROAD O (UPKEEPING 2nd YEAR) | 6.55 | Square metre | |
| 516 | 36.23 | ROAD O (UPKEEPING 3rd YEAR) | 6.55 | Square metre | |
| 517 | 36.24 | ROAD O (UPKEEPING 4th YEAR) | 6.55 | Square metre | |
| 518 | 36.25 | ROAD O (UPKEEPING 5th YEAR) | 6.55 | Square metre | |
| 519 | 36.26 | ROAD P (UPKEEPING 1st YEAR) | 4.29 | Square metre | |
| 520 | 36.27 | ROAD P (UPKEEPING 2nd YEAR) | 4.29 | Square metre | |
| 521 | 36.28 | ROAD P (UPKEEPING 3rd YEAR) | 4.29 | Square metre | |
| 522 | 36.29 | ROAD P (UPKEEPING 4th YEAR) | 4.29 | Square metre | |
| 523 | 36.3 | ROAD P (UPKEEPING 5th YEAR) | 4.29 | Square metre | |
| 524 | 36.31 | ROAD Q (UPKEEPING 1st YEAR) | 0.82 | Square metre | |
| 525 | 36.32 | ROAD Q (UPKEEPING 2nd YEAR) | 0.82 | Square metre | |
| 526 | 36.33 | ROAD Q (UPKEEPING 3rd YEAR) | 0.82 | Square metre | |
| 527 | 36.34 | ROAD Q (UPKEEPING 4th YEAR) | 0.82 | Square metre | |
| 528 | 36.35 | ROAD Q (UPKEEPING 5th YEAR) | 0.82 | Square metre | |
| 529 | 36.36 | ROAD R (UPKEEPING 1st YEAR) | 9.06 | Square metre | |
| 530 | 36.37 | ROAD R (UPKEEPING 2nd YEAR) | 9.06 | Square metre | |
| 531 | 36.38 | ROAD R (UPKEEPING 3rd YEAR) | 9.06 | Square metre | |
| 532 | 36.39 | ROAD R (UPKEEPING 4th YEAR) | 9.06 | Square metre | |
| 533 | 36.4 | ROAD R (UPKEEPING 5th YEAR) | 9.06 | Square metre | |
| 534 | 36.41 | ROAD S (UPKEEPING 1st YEAR) | 5.56 | Square metre | |
| 535 | 36.42 | ROAD S (UPKEEPING 2nd YEAR) | 5.56 | Square metre | |
| 536 | 36.43 | ROAD S (UPKEEPING 3rd YEAR) | 5.56 | Square metre | |
| 537 | 36.44 | ROAD S (UPKEEPING 4th YEAR) | 5.56 | Square metre | |
| 538 | 36.45 | ROAD S (UPKEEPING 5th YEAR) | 5.56 | Square metre | |
| 539 | 36.46 | ROAD T (UPKEEPING 1st YEAR) | 11.4 | Square metre | |
| 540 | 36.47 | ROAD T (UPKEEPING 2nd YEAR) | 11.4 | Square metre | |
| 541 | 36.48 | ROAD T (UPKEEPING 3rd YEAR) | 11.4 | Square metre | |
| 542 | 36.49 | ROAD T (UPKEEPING 4th YEAR) | 11.4 | Square metre | |
| 543 | 36.5 | ROAD T (UPKEEPING 5th YEAR) | 11.4 | Square metre | |
| 544 | 36.51 | ROAD U (UPKEEPING 1st YEAR) | 6.16 | Square metre | |
| 545 | 36.52 | ROAD U (UPKEEPING 2nd YEAR) | 6.16 | Square metre | |
| 546 | 36.53 | ROAD U (UPKEEPING 3rd YEAR) | 6.16 | Square metre | |
| 547 | 36.54 | ROAD U (UPKEEPING 4th YEAR) | 6.16 | Square metre | |
| 548 | 36.55 | ROAD U (UPKEEPING 5th YEAR) | 6.16 | Square metre | |
| 549 | 37 | Painting the existing CULVERT/ BRDIGE as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete | |||
| 550 | 37.01 | ROAD A (UPKEEPING 1ST YEAR) | 6.84 | Square metre | |
| 551 | 37.02 | ROAD B (UPKEEPING 1ST YEAR) | 11.97 | Square metre | |
| 552 | 37.03 | ROAD C (UPKEEPING 1ST YEAR) | 3.42 | Square metre | |
| 553 | 37.04 | ROAD D (UPKEEPING 1ST YEAR) | 8.55 | Square metre | |
| 554 | 37.05 | ROAD O (UPKEEPING 1ST YEAR) | 34.83 | Square metre | |
| 555 | 37.06 | ROAD P (UPKEEPING 1ST YEAR) | 17.42 | Square metre | |
| 556 | 37.07 | ROAD Q (UPKEEPING 1ST YEAR) | 3.42 | Square metre | |
| 557 | 37.08 | ROAD R (UPKEEPING 1ST YEAR) | 3.42 | Square metre | |
| 558 | 37.09 | ROAD S (UPKEEPING 1ST YEAR) | 5.13 | Square metre | |
| 559 | 37.1 | ROAD T (UPKEEPING 1ST YEAR) | 6.84 | Square metre | |
| 560 | 38 | Lettering the existing culverts as per IRC standard including the cost of Labour charges and material etc., complete | |||
| 561 | 38.01 | ROAD A (UPKEEPING 1ST YEAR) | 100 | Number | |
| 562 | 38.02 | ROAD B (UPKEEPING 1ST YEAR) | 175 | Number | |
| 563 | 38.03 | ROAD C (UPKEEPING 1ST YEAR) | 50 | Number | |
| 564 | 38.04 | ROAD D (UPKEEPING 1ST YEAR) | 125 | Number | |
| 565 | 38.05 | ROAD O (UPKEEPING 1ST YEAR) | 150 | Number | |
| 566 | 38.06 | ROAD P (UPKEEPING 1ST YEAR) | 75 | Number | |
| 567 | 38.07 | ROAD Q (UPKEEPING 1ST YEAR) | 50 | Number | |
| 568 | 38.08 | ROAD R (UPKEEPING 1ST YEAR) | 50 | Number | |
| 569 | 38.09 | ROAD S (UPKEEPING 1ST YEAR) | 75 | Number | |
| 570 | 38.1 | ROAD T (UPKEEPING 1ST YEAR) | 100 | Number | |
| 571 | 39 | Chiseling the tree barks upto a size of 15cm x 15cm and painting with first class enamel paint and numbering the trees as per avenue register complete | |||
| 572 | 39.01 | ROAD A (UPKEEPING 1ST YEAR) | 4 | Number | |
| 573 | 39.02 | ROAD B (UPKEEPING 1ST YEAR) | 9 | Number | |
| 574 | 39.03 | ROAD C (UPKEEPING 1ST YEAR) | 50 | Number | |
| 575 | 39.04 | ROAD D (UPKEEPING 1ST YEAR) | 20 | Number | |
| 576 | 39.05 | ROAD O (UPKEEPING 1ST YEAR) | 10 | Number | |
| 577 | 39.06 | ROAD P (UPKEEPING 1ST YEAR) | 10 | Number | |
| 578 | 39.07 | ROAD R (UPKEEPING 1ST YEAR) | 14 | Number | |
| 579 | 39.08 | ROAD S (UPKEEPING 1ST YEAR) | 15 | Number | |
| 580 | 39.09 | ROAD T (UPKEEPING 1ST YEAR) | 30 | Number | |
| 581 | 39.1 | ROAD U (UPKEEPING 1ST YEAR) | 10 | Number | |
| 582 | 40 | Painting the KM Stone as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete | |||
| 583 | 40.01 | ROAD A (UPKEEPING 2nd YEAR) | 0.99 | Square metre | |
| 584 | 40.02 | ROAD A (UPKEEPING 3rd YEAR) | 0.99 | Square metre | |
| 585 | 40.03 | ROAD A (UPKEEPING 4th YEAR) | 0.99 | Square metre | |
| 586 | 40.04 | ROAD A (UPKEEPING 5th YEAR) | 0.99 | Square metre | |
| 587 | 40.05 | ROAD B (UPKEEPING 2nd YEAR) | 0.72 | Square metre | |
| 588 | 40.06 | ROAD B (UPKEEPING 3rd YEAR) | 0.72 | Square metre | |
| 589 | 40.07 | ROAD B (UPKEEPING 4th YEAR) | 0.72 | Square metre | |
| 590 | 40.08 | ROAD B (UPKEEPING 5th YEAR) | 0.72 | Square metre | |
| 591 | 40.09 | ROAD C (UPKEEPING 2nd YEAR) | 0.99 | Square metre | |
| 592 | 40.1 | ROAD C (UPKEEPING 3rd YEAR) | 0.99 | Square metre | |
| 593 | 40.11 | ROAD C (UPKEEPING 4th YEAR) | 0.99 | Square metre | |
| 594 | 40.12 | ROAD C (UPKEEPING 5th YEAR) | 0.99 | Square metre | |
| 595 | 40.13 | ROAD D (UPKEEPING 2nd YEAR) | 0.99 | Square metre | |
| 596 | 40.14 | ROAD D (UPKEEPING 3rd YEAR) | 0.99 | Square metre | |
| 597 | 40.15 | ROAD D (UPKEEPING 4th YEAR) | 0.99 | Square metre | |
| 598 | 40.16 | ROAD D (UPKEEPING 5th YEAR) | 0.99 | Square metre | |
| 599 | 40.17 | ROAD O (UPKEEPING 2nd YEAR) | 0.99 | Square metre | |
| 600 | 40.18 | ROAD O (UPKEEPING 3rd YEAR) | 0.99 | Square metre | |
| 601 | 40.19 | ROAD O (UPKEEPING 4th YEAR) | 0.99 | Square metre | |
| 602 | 40.2 | ROAD O (UPKEEPING 5th YEAR) | 0.99 | Square metre | |
| 603 | 40.21 | ROAD P (UPKEEPING 2nd YEAR) | 0.99 | Square metre | |
| 604 | 40.22 | ROAD P (UPKEEPING 3rd YEAR) | 0.99 | Square metre | |
| 605 | 40.23 | ROAD P (UPKEEPING 4th YEAR) | 0.99 | Square metre | |
| 606 | 40.24 | ROAD P (UPKEEPING 5th YEAR) | 0.99 | Square metre | |
| 607 | 40.25 | ROAD Q (UPKEEPING 2nd YEAR) | 1.49 | Square metre | |
| 608 | 40.26 | ROAD Q (UPKEEPING 3rd YEAR) | 1.49 | Square metre | |
| 609 | 40.27 | ROAD Q (UPKEEPING 4th YEAR) | 1.49 | Square metre | |
| 610 | 40.28 | ROAD Q (UPKEEPING 5th YEAR) | 1.49 | Square metre | |
| 611 | 40.29 | ROAD R (UPKEEPING 2nd YEAR) | 2.48 | Square metre | |
| 612 | 40.3 | ROAD R (UPKEEPING 3rd YEAR) | 2.48 | Square metre | |
| 613 | 40.31 | ROAD R (UPKEEPING 4th YEAR) | 2.48 | Square metre | |
| 614 | 40.32 | ROAD R (UPKEEPING 5th YEAR) | 2.48 | Square metre | |
| 615 | 40.33 | ROAD S (UPKEEPING 2nd YEAR) | 0.99 | Square metre | |
| 616 | 40.34 | ROAD S (UPKEEPING 3rd YEAR) | 0.99 | Square metre | |
| 617 | 40.35 | ROAD S (UPKEEPING 4th YEAR) | 0.99 | Square metre | |
| 618 | 40.36 | ROAD S (UPKEEPING 5th YEAR) | 0.99 | Square metre | |
| 619 | 40.37 | ROAD T (UPKEEPING 2nd YEAR) | 0.99 | Square metre | |
| 620 | 40.38 | ROAD T (UPKEEPING 3rd YEAR) | 0.99 | Square metre | |
| 621 | 40.39 | ROAD T (UPKEEPING 4th YEAR) | 0.99 | Square metre | |
| 622 | 40.4 | ROAD T (UPKEEPING 5th YEAR) | 0.99 | Square metre | |
| 623 | 40.41 | ROAD U (UPKEEPING 2nd YEAR) | 0.49 | Square metre | |
| 624 | 40.42 | ROAD U (UPKEEPING 3rd YEAR) | 0.49 | Square metre | |
| 625 | 40.43 | ROAD U (UPKEEPING 4th YEAR) | 0.49 | Square metre | |
| 626 | 40.44 | ROAD U (UPKEEPING 5th YEAR) | 0.49 | Square metre | |
| 627 | 41 | Painting the HM Stone as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete | |||
| 628 | 41.01 | ROAD A (UPKEEPING 2nd YEAR) | 1.34 | Square metre | |
| 629 | 41.02 | ROAD A (UPKEEPING 3rd YEAR) | 1.34 | Square metre | |
| 630 | 41.03 | ROAD A (UPKEEPING 4th YEAR) | 1.34 | Square metre | |
| 631 | 41.04 | ROAD A (UPKEEPING 5th YEAR) | 1.34 | Square metre | |
| 632 | 41.05 | ROAD B (UPKEEPING 2nd YEAR) | 1.9 | Square metre | |
| 633 | 41.06 | ROAD B (UPKEEPING 3rd YEAR) | 1.9 | Square metre | |
| 634 | 41.07 | ROAD B (UPKEEPING 4th YEAR) | 1.9 | Square metre | |
| 635 | 41.08 | ROAD B (UPKEEPING 5th YEAR) | 1.9 | Square metre | |
| 636 | 41.09 | ROAD C (UPKEEPING 2nd YEAR) | 1.14 | Square metre | |
| 637 | 41.1 | ROAD C (UPKEEPING 3rd YEAR) | 1.14 | Square metre | |
| 638 | 41.11 | ROAD C (UPKEEPING 4th YEAR) | 1.14 | Square metre | |
| 639 | 41.12 | ROAD C (UPKEEPING 5th YEAR) | 1.14 | Square metre | |
| 640 | 41.13 | ROAD D (UPKEEPING 2nd YEAR) | 1.52 | Square metre | |
| 641 | 41.14 | ROAD D (UPKEEPING 3rd YEAR) | 1.52 | Square metre | |
| 642 | 41.15 | ROAD D (UPKEEPING 4th YEAR) | 1.52 | Square metre | |
| 643 | 41.16 | ROAD D (UPKEEPING 5th YEAR) | 1.52 | Square metre | |
| 644 | 41.17 | ROAD O (UPKEEPING 2nd YEAR) | 1.14 | Square metre | |
| 645 | 41.18 | ROAD O (UPKEEPING 3rd YEAR) | 1.14 | Square metre | |
| 646 | 41.19 | ROAD O (UPKEEPING 4th YEAR) | 1.14 | Square metre | |
| 647 | 41.2 | ROAD O (UPKEEPING 5th YEAR) | 1.14 | Square metre | |
| 648 | 41.21 | ROAD P (UPKEEPING 2nd YEAR) | 0.76 | Square metre | |
| 649 | 41.22 | ROAD P (UPKEEPING 3rd YEAR) | 0.76 | Square metre | |
| 650 | 41.23 | ROAD P (UPKEEPING 4th YEAR) | 0.76 | Square metre | |
| 651 | 41.24 | ROAD P (UPKEEPING 5th YEAR) | 0.76 | Square metre | |
| 652 | 41.25 | ROAD Q (UPKEEPING 2nd YEAR) | 2.1 | Square metre | |
| 653 | 41.26 | ROAD Q (UPKEEPING 3rd YEAR) | 2.1 | Square metre | |
| 654 | 41.27 | ROAD Q (UPKEEPING 4th YEAR) | 2.1 | Square metre | |
| 655 | 41.28 | ROAD Q (UPKEEPING 5th YEAR) | 2.1 | Square metre | |
| 656 | 41.29 | ROAD R (UPKEEPING 2nd YEAR) | 1.9 | Square metre | |
| 657 | 41.3 | ROAD R (UPKEEPING 3rd YEAR) | 1.9 | Square metre | |
| 658 | 41.31 | ROAD R (UPKEEPING 4th YEAR) | 1.9 | Square metre | |
| 659 | 41.32 | ROAD R (UPKEEPING 5th YEAR) | 1.9 | Square metre | |
| 660 | 41.33 | ROAD S (UPKEEPING 2nd YEAR) | 1.14 | Square metre | |
| 661 | 41.34 | ROAD S (UPKEEPING 3rd YEAR) | 1.14 | Square metre | |
| 662 | 41.35 | ROAD S (UPKEEPING 4th YEAR) | 1.14 | Square metre | |
| 663 | 41.36 | ROAD S (UPKEEPING 5th YEAR) | 1.14 | Square metre | |
| 664 | 41.37 | ROAD T (UPKEEPING 2nd YEAR) | 1.34 | Square metre | |
| 665 | 41.38 | ROAD T (UPKEEPING 3rd YEAR) | 1.34 | Square metre | |
| 666 | 41.39 | ROAD T (UPKEEPING 4th YEAR) | 1.34 | Square metre | |
| 667 | 41.4 | ROAD T (UPKEEPING 5th YEAR) | 1.34 | Square metre | |
| 668 | 41.41 | ROAD U (UPKEEPING 2nd YEAR) | 0.76 | Square metre | |
| 669 | 41.42 | ROAD U (UPKEEPING 3rd YEAR) | 0.76 | Square metre | |
| 670 | 41.43 | ROAD U (UPKEEPING 4th YEAR) | 0.76 | Square metre | |
| 671 | 41.44 | ROAD U (UPKEEPING 5th YEAR) | 0.76 | Square metre | |
| 672 | 42 | Painting the Boundary Pillars as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete | |||
| 673 | 42.01 | ROAD A (UPKEEPING 2nd YEAR) | 19 | Square metre | |
| 674 | 42.02 | ROAD A (UPKEEPING 3rd YEAR) | 19 | Square metre | |
| 675 | 42.03 | ROAD A (UPKEEPING 4th YEAR) | 19 | Square metre | |
| 676 | 42.04 | ROAD A (UPKEEPING 5th YEAR) | 19 | Square metre | |
| 677 | 42.05 | ROAD B (UPKEEPING 2nd YEAR) | 27.14 | Square metre | |
| 678 | 42.06 | ROAD B (UPKEEPING 3rd YEAR) | 27.14 | Square metre | |
| 679 | 42.07 | ROAD B (UPKEEPING 4th YEAR) | 27.14 | Square metre | |
| 680 | 42.08 | ROAD B (UPKEEPING 5th YEAR) | 27.14 | Square metre | |
| 681 | 42.09 | ROAD C (UPKEEPING 2nd YEAR) | 15.83 | Square metre | |
| 682 | 42.1 | ROAD C (UPKEEPING 3rd YEAR) | 15.83 | Square metre | |
| 683 | 42.11 | ROAD C (UPKEEPING 4th YEAR) | 15.83 | Square metre | |
| 684 | 42.12 | ROAD C (UPKEEPING 5th YEAR) | 15.83 | Square metre | |
| 685 | 42.13 | ROAD D (UPKEEPING 2nd YEAR) | 22.62 | Square metre | |
| 686 | 42.14 | ROAD D (UPKEEPING 3rd YEAR) | 22.62 | Square metre | |
| 687 | 42.15 | ROAD D (UPKEEPING 4th YEAR) | 22.62 | Square metre | |
| 688 | 42.16 | ROAD D (UPKEEPING 5th YEAR) | 22.62 | Square metre | |
| 689 | 42.17 | ROAD O (UPKEEPING 2nd YEAR) | 15.83 | Square metre | |
| 690 | 42.18 | ROAD O (UPKEEPING 3rd YEAR) | 15.83 | Square metre | |
| 691 | 42.19 | ROAD O (UPKEEPING 4th YEAR) | 15.83 | Square metre | |
| 692 | 42.2 | ROAD O (UPKEEPING 5th YEAR) | 15.83 | Square metre | |
| 693 | 42.21 | ROAD P (UPKEEPING 2nd YEAR) | 11.31 | Square metre | |
| 694 | 42.22 | ROAD P (UPKEEPING 3rd YEAR) | 11.31 | Square metre | |
| 695 | 42.23 | ROAD P (UPKEEPING 4th YEAR) | 11.31 | Square metre | |
| 696 | 42.24 | ROAD P (UPKEEPING 5th YEAR) | 11.31 | Square metre | |
| 697 | 42.25 | ROAD Q (UPKEEPING 2nd YEAR) | 28.05 | Square metre | |
| 698 | 42.26 | ROAD Q (UPKEEPING 3rd YEAR) | 28.05 | Square metre | |
| 699 | 42.27 | ROAD Q (UPKEEPING 4th YEAR) | 28.05 | Square metre | |
| 700 | 42.28 | ROAD Q (UPKEEPING 5th YEAR) | 28.05 | Square metre | |
| 701 | 42.29 | ROAD R (UPKEEPING 2nd YEAR) | 28.05 | Square metre | |
| 702 | 42.3 | ROAD R (UPKEEPING 3rd YEAR) | 28.05 | Square metre | |
| 703 | 42.31 | ROAD R (UPKEEPING 4th YEAR) | 28.05 | Square metre | |
| 704 | 42.32 | ROAD R (UPKEEPING 5th YEAR) | 28.05 | Square metre | |
| 705 | 42.33 | ROAD S (UPKEEPING 2nd YEAR) | 17.19 | Square metre | |
| 706 | 42.34 | ROAD S (UPKEEPING 3rd YEAR) | 17.19 | Square metre | |
| 707 | 42.35 | ROAD S (UPKEEPING 4th YEAR) | 17.19 | Square metre | |
| 708 | 42.36 | ROAD S (UPKEEPING 5th YEAR) | 17.19 | Square metre | |
| 709 | 42.37 | ROAD T (UPKEEPING 2nd YEAR) | 21.71 | Square metre | |
| 710 | 42.38 | ROAD T (UPKEEPING 3rd YEAR) | 21.71 | Square metre | |
| 711 | 42.39 | ROAD T (UPKEEPING 4th YEAR) | 21.71 | Square metre | |
| 712 | 42.4 | ROAD T (UPKEEPING 5th YEAR) | 21.71 | Square metre | |
| 713 | 42.41 | ROAD U (UPKEEPING 2nd YEAR) | 8.14 | Square metre | |
| 714 | 42.42 | ROAD U (UPKEEPING 3rd YEAR) | 8.14 | Square metre | |
| 715 | 42.43 | ROAD U (UPKEEPING 4th YEAR) | 8.14 | Square metre | |
| 716 | 42.44 | ROAD U (UPKEEPING 5th YEAR) | 8.14 | Square metre | |
| 717 | 43 | Painting the tree barks upto a size of 15cm x 15cm as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete | |||
| 718 | 43.01 | ROAD A (UPKEEPING 2nd YEAR) | 0.09 | Square metre | |
| 719 | 43.02 | ROAD A (UPKEEPING 3rd YEAR) | 0.09 | Square metre | |
| 720 | 43.03 | ROAD A (UPKEEPING 4th YEAR) | 0.09 | Square metre | |
| 721 | 43.04 | ROAD A (UPKEEPING 5th YEAR) | 0.09 | Square metre | |
| 722 | 43.05 | ROAD B (UPKEEPING 2nd YEAR) | 0.2 | Square metre | |
| 723 | 43.06 | ROAD B (UPKEEPING 3rd YEAR) | 0.2 | Square metre | |
| 724 | 43.07 | ROAD B (UPKEEPING 4th YEAR) | 0.2 | Square metre | |
| 725 | 43.08 | ROAD B (UPKEEPING 5th YEAR) | 0.2 | Square metre | |
| 726 | 43.09 | ROAD C (UPKEEPING 2nd YEAR) | 0.45 | Square metre | |
| 727 | 43.1 | ROAD C (UPKEEPING 3rd YEAR) | 0.45 | Square metre | |
| 728 | 43.11 | ROAD C (UPKEEPING 4th YEAR) | 0.45 | Square metre | |
| 729 | 43.12 | ROAD C (UPKEEPING 5th YEAR) | 0.45 | Square metre | |
| 730 | 43.13 | ROAD D (UPKEEPING 2nd YEAR) | 0.45 | Square metre | |
| 731 | 43.14 | ROAD D (UPKEEPING 3rd YEAR) | 0.45 | Square metre | |
| 732 | 43.15 | ROAD D (UPKEEPING 4th YEAR) | 0.45 | Square metre | |
| 733 | 43.16 | ROAD D (UPKEEPING 5th YEAR) | 0.45 | Square metre | |
| 734 | 43.17 | ROAD O (UPKEEPING 2nd YEAR) | 0.23 | Square metre | |
| 735 | 43.18 | ROAD O (UPKEEPING 3rd YEAR) | 0.23 | Square metre | |
| 736 | 43.19 | ROAD O (UPKEEPING 4th YEAR) | 0.23 | Square metre | |
| 737 | 43.2 | ROAD O (UPKEEPING 5th YEAR) | 0.23 | Square metre | |
| 738 | 43.21 | ROAD P (UPKEEPING 2nd YEAR) | 0.23 | Square metre | |
| 739 | 43.22 | ROAD P (UPKEEPING 3rd YEAR) | 0.23 | Square metre | |
| 740 | 43.23 | ROAD P (UPKEEPING 4th YEAR) | 0.23 | Square metre | |
| 741 | 43.24 | ROAD P (UPKEEPING 5th YEAR) | 0.23 | Square metre | |
| 742 | 43.25 | ROAD R (UPKEEPING 2nd YEAR) | 0.54 | Square metre | |
| 743 | 43.26 | ROAD R (UPKEEPING 3rd YEAR) | 0.54 | Square metre | |
| 744 | 43.27 | ROAD R (UPKEEPING 4th YEAR) | 0.54 | Square metre | |
| 745 | 43.28 | ROAD R (UPKEEPING 5th YEAR) | 0.54 | Square metre | |
| 746 | 43.29 | ROAD S (UPKEEPING 2nd YEAR) | 0.34 | Square metre | |
| 747 | 43.3 | ROAD S (UPKEEPING 3rd YEAR) | 0.34 | Square metre | |
| 748 | 43.31 | ROAD S (UPKEEPING 4th YEAR) | 0.34 | Square metre | |
| 749 | 43.32 | ROAD S (UPKEEPING 5th YEAR) | 0.34 | Square metre | |
| 750 | 43.33 | ROAD T (UPKEEPING 2nd YEAR) | 0.68 | Square metre | |
| 751 | 43.34 | ROAD T (UPKEEPING 3rd YEAR) | 0.68 | Square metre | |
| 752 | 43.35 | ROAD T (UPKEEPING 4th YEAR) | 0.68 | Square metre | |
| 753 | 43.36 | ROAD T (UPKEEPING 5th YEAR) | 0.68 | Square metre | |
| 754 | 43.37 | ROAD U (UPKEEPING 2nd YEAR) | 0.23 | Square metre | |
| 755 | 43.38 | ROAD U (UPKEEPING 3rd YEAR) | 0.23 | Square metre | |
| 756 | 43.39 | ROAD U (UPKEEPING 4th YEAR) | 0.23 | Square metre | |
| 757 | 43.4 | ROAD U (UPKEEPING 5th YEAR) | 0.23 | Square metre | |
| 758 | 44 | Lettering the KM Stone as per IRC standard including the cost of Labour charges and material etc., complete | |||
| 759 | 44.01 | ROAD A (UPKEEPING 2nd YEAR)(10-15cm) | 8 | Number | |
| 760 | 44.02 | ROAD A (UPKEEPING 2nd YEAR)(5-10cm) | 60 | Number | |
| 761 | 44.03 | ROAD A (UPKEEPING 3rd YEAR)(10-15cm) | 8 | Number | |
| 762 | 44.04 | ROAD A (UPKEEPING 3rd YEAR)(5-10cm) | 60 | Number | |
| 763 | 44.05 | ROAD A (UPKEEPING 4th YEAR)(10-15cm) | 8 | Number | |
| 764 | 44.06 | ROAD A (UPKEEPING 4th YEAR)(5-10cm) | 60 | Number | |
| 765 | 44.07 | ROAD A (UPKEEPING 5th YEAR)(10-15cm) | 8 | Number | |
| 766 | 44.08 | ROAD A (UPKEEPING 5th YEAR)(5-10cm) | 60 | Number | |
| 767 | 44.09 | ROAD B (UPKEEPING 2nd YEAR)(10-15cm) | 4 | Number | |
| 768 | 44.1 | ROAD B (UPKEEPING 2nd YEAR)(5-10cm) | 30 | Number | |
| 769 | 44.11 | ROAD B (UPKEEPING 3rd YEAR)(10-15cm) | 4 | Number | |
| 770 | 44.12 | ROAD B (UPKEEPING 3rd YEAR)(5-10cm) | 30 | Number | |
| 771 | 44.13 | ROAD B (UPKEEPING 4th YEAR)(10-15cm) | 4 | Number | |
| 772 | 44.14 | ROAD B (UPKEEPING 4th YEAR)(5-10cm) | 30 | Number | |
| 773 | 44.15 | ROAD B (UPKEEPING 5th YEAR)(10-15cm) | 4 | Number | |
| 774 | 44.16 | ROAD B (UPKEEPING 5th YEAR)(5-10cm) | 30 | Number | |
| 775 | 44.17 | ROAD C (UPKEEPING 2nd YEAR)(10-15cm) | 8 | Number | |
| 776 | 44.18 | ROAD C (UPKEEPING 2nd YEAR)(5-10cm) | 60 | Number | |
| 777 | 44.19 | ROAD C (UPKEEPING 3rd YEAR)(10-15cm) | 8 | Number | |
| 778 | 44.2 | ROAD C (UPKEEPING 3rd YEAR)(5-10cm) | 60 | Number | |
| 779 | 44.21 | ROAD C (UPKEEPING 4th YEAR)(10-15cm) | 8 | Number | |
| 780 | 44.22 | ROAD C (UPKEEPING 4th YEAR)(5-10cm) | 60 | Number | |
| 781 | 44.23 | ROAD C (UPKEEPING 5th YEAR)(10-15cm) | 8 | Number | |
| 782 | 44.24 | ROAD C (UPKEEPING 5th YEAR)(5-10cm) | 60 | Number | |
| 783 | 44.25 | ROAD D (UPKEEPING 2nd YEAR)(10-15cm) | 8 | Number | |
| 784 | 44.26 | ROAD D (UPKEEPING 2nd YEAR)(5-10cm) | 60 | Number | |
| 785 | 44.27 | ROAD D (UPKEEPING 3rd YEAR)(10-15cm) | 8 | Number | |
| 786 | 44.28 | ROAD D (UPKEEPING 3rd YEAR)(5-10cm) | 60 | Number | |
| 787 | 44.29 | ROAD D (UPKEEPING 4th YEAR)(10-15cm) | 8 | Number | |
| 788 | 44.3 | ROAD D (UPKEEPING 4th YEAR)(5-10cm) | 60 | Number | |
| 789 | 44.31 | ROAD D (UPKEEPING 5th YEAR)(10-15cm) | 8 | Number | |
| 790 | 44.32 | ROAD D (UPKEEPING 5th YEAR)(5-10cm) | 60 | Number | |
| 791 | 44.33 | ROAD O (UPKEEPING 2nd YEAR)(10-15cm) | 4 | Number | |
| 792 | 44.34 | ROAD O (UPKEEPING 2nd YEAR)(5-10cm) | 30 | Number | |
| 793 | 44.35 | ROAD O (UPKEEPING 3rd YEAR)(10-15cm) | 4 | Number | |
| 794 | 44.36 | ROAD O (UPKEEPING 3rd YEAR)(5-10cm) | 30 | Number | |
| 795 | 44.37 | ROAD O (UPKEEPING 4th YEAR)(10-15cm) | 4 | Number | |
| 796 | 44.38 | ROAD O (UPKEEPING 4th YEAR)(5-10cm) | 30 | Number | |
| 797 | 44.39 | ROAD O (UPKEEPING 5th YEAR)(10-15cm) | 4 | Number | |
| 798 | 44.4 | ROAD O (UPKEEPING 5th YEAR)(5-10cm) | 30 | Number | |
| 799 | 44.41 | ROAD P (UPKEEPING 2nd YEAR)(10-15cm) | 4 | Number | |
| 800 | 44.42 | ROAD P (UPKEEPING 2nd YEAR)(5-10cm) | 30 | Number | |
| 801 | 44.43 | ROAD P (UPKEEPING 3rd YEAR)(10-15cm) | 4 | Number | |
| 802 | 44.44 | ROAD P (UPKEEPING 3rd YEAR)(5-10cm) | 30 | Number | |
| 803 | 44.45 | ROAD P (UPKEEPING 4th YEAR)(10-15cm) | 4 | Number | |
| 804 | 44.46 | ROAD P (UPKEEPING 4th YEAR)(5-10cm) | 30 | Number | |
| 805 | 44.47 | ROAD P (UPKEEPING 5th YEAR)(10-15cm) | 4 | Number | |
| 806 | 44.48 | ROAD P (UPKEEPING 5th YEAR)(5-10cm) | 30 | Number | |
| 807 | 44.49 | ROAD Q (UPKEEPING 2nd YEAR)(10-15cm) | 6 | Number | |
| 808 | 44.5 | ROAD Q (UPKEEPING 2nd YEAR)(5-10cm) | 45 | Number | |
| 809 | 44.51 | ROAD Q (UPKEEPING 3rd YEAR)(10-15cm) | 6 | Number | |
| 810 | 44.52 | ROAD Q (UPKEEPING 3rd YEAR)(5-10cm) | 45 | Number | |
| 811 | 44.53 | ROAD Q (UPKEEPING 4th YEAR)(10-15cm) | 6 | Number | |
| 812 | 44.54 | ROAD Q (UPKEEPING 4th YEAR)(5-10cm) | 45 | Number | |
| 813 | 44.55 | ROAD Q (UPKEEPING 5th YEAR)(10-15cm) | 6 | Number | |
| 814 | 44.56 | ROAD Q (UPKEEPING 5th YEAR)(5-10cm) | 45 | Number | |
| 815 | 44.57 | ROAD R (UPKEEPING 2nd YEAR)(10-15cm) | 10 | Number | |
| 816 | 44.58 | ROAD R (UPKEEPING 2nd YEAR)(5-10cm) | 75 | Number | |
| 817 | 44.59 | ROAD R (UPKEEPING 3rd YEAR)(10-15cm) | 10 | Number | |
| 818 | 44.6 | ROAD R (UPKEEPING 3rd YEAR)(5-10cm) | 75 | Number | |
| 819 | 44.61 | ROAD R (UPKEEPING 4th YEAR)(10-15cm) | 10 | Number | |
| 820 | 44.62 | ROAD R (UPKEEPING 4th YEAR)(5-10cm) | 75 | Number | |
| 821 | 44.63 | ROAD R (UPKEEPING 5th YEAR)(10-15cm) | 10 | Number | |
| 822 | 44.64 | ROAD R (UPKEEPING 5th YEAR)(5-10cm) | 75 | Number | |
| 823 | 44.65 | ROAD S (UPKEEPING 2nd YEAR)(10-15cm) | 4 | Number | |
| 824 | 44.66 | ROAD S (UPKEEPING 2nd YEAR)(5-10cm) | 30 | Number | |
| 825 | 44.67 | ROAD S (UPKEEPING 3rd YEAR)(10-15cm) | 4 | Number | |
| 826 | 44.68 | ROAD S (UPKEEPING 3rd YEAR)(5-10cm) | 30 | Number | |
| 827 | 44.69 | ROAD S (UPKEEPING 4th YEAR)(10-15cm) | 4 | Number | |
| 828 | 44.7 | ROAD S (UPKEEPING 4th YEAR)(5-10cm) | 30 | Number | |
| 829 | 44.71 | ROAD S (UPKEEPING 5th YEAR)(10-15cm) | 4 | Number | |
| 830 | 44.72 | ROAD S (UPKEEPING 5th YEAR)(5-10cm) | 30 | Number | |
| 831 | 44.73 | ROAD T (UPKEEPING 2nd YEAR)(10-15cm) | 8 | Number | |
| 832 | 44.74 | ROAD T (UPKEEPING 2nd YEAR)(5-10cm) | 60 | Number | |
| 833 | 44.75 | ROAD T (UPKEEPING 3rd YEAR)(10-15cm) | 8 | Number | |
| 834 | 44.76 | ROAD T (UPKEEPING 3rd YEAR)(5-10cm) | 60 | Number | |
| 835 | 44.77 | ROAD T (UPKEEPING 4th YEAR)(10-15cm) | 8 | Number | |
| 836 | 44.78 | ROAD T (UPKEEPING 4th YEAR)(5-10cm) | 60 | Number | |
| 837 | 44.79 | ROAD T (UPKEEPING 5th YEAR)(10-15cm) | 8 | Number | |
| 838 | 44.8 | ROAD T (UPKEEPING 5th YEAR)(5-10cm) | 60 | Number | |
| 839 | 44.81 | ROAD U (UPKEEPING 2nd YEAR)(10-15cm) | 2 | Number | |
| 840 | 44.82 | ROAD U (UPKEEPING 2nd YEAR)(5-10cm) | 15 | Number | |
| 841 | 44.83 | ROAD U (UPKEEPING 3rd YEAR)(10-15cm) | 2 | Number | |
| 842 | 44.84 | ROAD U (UPKEEPING 3rd YEAR)(5-10cm) | 15 | Number | |
| 843 | 44.85 | ROAD U (UPKEEPING 4th YEAR)(10-15cm) | 2 | Number | |
| 844 | 44.86 | ROAD U (UPKEEPING 4th YEAR)(5-10cm) | 15 | Number | |
| 845 | 44.87 | ROAD U (UPKEEPING 5th YEAR)(10-15cm) | 2 | Number | |
| 846 | 44.88 | ROAD U (UPKEEPING 5th YEAR)(5-10cm) | 15 | Number | |
| 847 | 45 | Lettering the HM Stone as per IRC standard including the cost of Labour charges and material etc., complete | |||
| 848 | 45.01 | ROAD A (UPKEEPING 2nd YEAR)(10-15cm) | 14 | Number | |
| 849 | 45.02 | ROAD A (UPKEEPING 2nd YEAR)(5-10cm) | 114 | Number | |
| 850 | 45.03 | ROAD A (UPKEEPING 3rd YEAR)(10-15cm) | 14 | Number | |
| 851 | 45.04 | ROAD A (UPKEEPING 3rd YEAR)(5-10cm) | 114 | Number | |
| 852 | 45.05 | ROAD A (UPKEEPING 4th YEAR)(10-15cm) | 14 | Number | |
| 853 | 45.06 | ROAD A (UPKEEPING 4th YEAR)(5-10cm) | 114 | Number | |
| 854 | 45.07 | ROAD A (UPKEEPING 5th YEAR)(10-15cm) | 14 | Number | |
| 855 | 45.08 | ROAD A (UPKEEPING 5th YEAR)(5-10cm) | 114 | Number | |
| 856 | 45.09 | ROAD B (UPKEEPING 2nd YEAR)(10-15cm) | 20 | Number | |
| 857 | 45.1 | ROAD B (UPKEEPING 2nd YEAR)(5-10cm) | 195 | Number | |
| 858 | 45.11 | ROAD B (UPKEEPING 3rd YEAR)(10-15cm) | 20 | Number | |
| 859 | 45.12 | ROAD B (UPKEEPING 3rd YEAR)(5-10cm) | 195 | Number | |
| 860 | 45.13 | ROAD B (UPKEEPING 4th YEAR)(10-15cm) | 20 | Number | |
| 861 | 45.14 | ROAD B (UPKEEPING 4th YEAR)(5-10cm) | 195 | Number | |
| 862 | 45.15 | ROAD B (UPKEEPING 5th YEAR)(10-15cm) | 20 | Number | |
| 863 | 45.16 | ROAD B (UPKEEPING 5th YEAR)(5-10cm) | 195 | Number | |
| 864 | 45.17 | ROAD C (UPKEEPING 2nd YEAR)(10-15cm) | 12 | Number | |
| 865 | 45.18 | ROAD C (UPKEEPING 2nd YEAR)(5-10cm) | 62 | Number | |
| 866 | 45.19 | ROAD C (UPKEEPING 3rd YEAR)(10-15cm) | 12 | Number | |
| 867 | 45.2 | ROAD C (UPKEEPING 3rd YEAR)(5-10cm) | 62 | Number | |
| 868 | 45.21 | ROAD C (UPKEEPING 4th YEAR)(10-15cm) | 12 | Number | |
| 869 | 45.22 | ROAD C (UPKEEPING 4th YEAR)(5-10cm) | 62 | Number | |
| 870 | 45.23 | ROAD C (UPKEEPING 5th YEAR)(10-15cm) | 12 | Number | |
| 871 | 45.24 | ROAD C (UPKEEPING 5th YEAR)(5-10cm) | 62 | Number | |
| 872 | 45.25 | ROAD D (UPKEEPING 2nd YEAR)(10-15cm) | 16 | Number | |
| 873 | 45.26 | ROAD D (UPKEEPING 2nd YEAR)(5-10cm) | 141 | Number | |
| 874 | 45.27 | ROAD D (UPKEEPING 3rd YEAR)(10-15cm) | 16 | Number | |
| 875 | 45.28 | ROAD D (UPKEEPING 3rd YEAR)(5-10cm) | 141 | Number | |
| 876 | 45.29 | ROAD D (UPKEEPING 4th YEAR)(10-15cm) | 16 | Number | |
| 877 | 45.3 | ROAD D (UPKEEPING 4th YEAR)(5-10cm) | 141 | Number | |
| 878 | 45.31 | ROAD D (UPKEEPING 5th YEAR)(10-15cm) | 16 | Number | |
| 879 | 45.32 | ROAD D (UPKEEPING 5th YEAR)(5-10cm) | 141 | Number | |
| 880 | 45.33 | ROAD O (UPKEEPING 2nd YEAR)(10-15cm) | 12 | Number | |
| 881 | 45.34 | ROAD O (UPKEEPING 2nd YEAR)(5-10cm) | 162 | Number | |
| 882 | 45.35 | ROAD O (UPKEEPING 3rd YEAR)(10-15cm) | 12 | Number | |
| 883 | 45.36 | ROAD O (UPKEEPING 3rd YEAR)(5-10cm) | 162 | Number | |
| 884 | 45.37 | ROAD O (UPKEEPING 4th YEAR)(10-15cm) | 12 | Number | |
| 885 | 45.38 | ROAD O (UPKEEPING 4th YEAR)(5-10cm) | 162 | Number | |
| 886 | 45.39 | ROAD O (UPKEEPING 5th YEAR)(10-15cm) | 12 | Number | |
| 887 | 45.4 | ROAD O (UPKEEPING 5th YEAR)(5-10cm) | 162 | Number | |
| 888 | 45.41 | ROAD P (UPKEEPING 2nd YEAR)(10-15cm) | 8 | Number | |
| 889 | 45.42 | ROAD P (UPKEEPING 2nd YEAR)(5-10cm) | 83 | Number | |
| 890 | 45.43 | ROAD P (UPKEEPING 3rd YEAR)(10-15cm) | 8 | Number | |
| 891 | 45.44 | ROAD P (UPKEEPING 3rd YEAR)(5-10cm) | 83 | Number | |
| 892 | 45.45 | ROAD P (UPKEEPING 4th YEAR)(10-15cm) | 8 | Number | |
| 893 | 45.46 | ROAD P (UPKEEPING 4th YEAR)(5-10cm) | 83 | Number | |
| 894 | 45.47 | ROAD P (UPKEEPING 5th YEAR)(10-15cm) | 8 | Number | |
| 895 | 45.48 | ROAD P (UPKEEPING 5th YEAR)(5-10cm) | 83 | Number | |
| 896 | 45.49 | ROAD Q (UPKEEPING 2nd YEAR)(10-15cm) | 22 | Number | |
| 897 | 45.5 | ROAD Q (UPKEEPING 2nd YEAR)(5-10cm) | 72 | Number | |
| 898 | 45.51 | ROAD Q (UPKEEPING 3rd YEAR)(10-15cm) | 22 | Number | |
| 899 | 45.52 | ROAD Q (UPKEEPING 3rd YEAR)(5-10cm) | 72 | Number | |
| 900 | 45.53 | ROAD Q (UPKEEPING 4th YEAR)(10-15cm) | 22 | Number | |
| 901 | 45.54 | ROAD Q (UPKEEPING 4th YEAR)(5-10cm) | 72 | Number | |
| 902 | 45.55 | ROAD Q (UPKEEPING 5th YEAR)(10-15cm) | 22 | Number | |
| 903 | 45.56 | ROAD Q (UPKEEPING 5th YEAR)(5-10cm) | 72 | Number | |
| 904 | 45.57 | ROAD R (UPKEEPING 2nd YEAR)(10-15cm) | 20 | Number | |
| 905 | 45.58 | ROAD R (UPKEEPING 2nd YEAR)(5-10cm) | 70 | Number | |
| 906 | 45.59 | ROAD R (UPKEEPING 3rd YEAR)(10-15cm) | 20 | Number | |
| 907 | 45.6 | ROAD R (UPKEEPING 3rd YEAR)(5-10cm) | 70 | Number | |
| 908 | 45.61 | ROAD R (UPKEEPING 4th YEAR)(10-15cm) | 20 | Number | |
| 909 | 45.62 | ROAD R (UPKEEPING 4th YEAR)(5-10cm) | 70 | Number | |
| 910 | 45.63 | ROAD R (UPKEEPING 5th YEAR)(10-15cm) | 20 | Number | |
| 911 | 45.64 | ROAD R (UPKEEPING 5th YEAR)(5-10cm) | 70 | Number | |
| 912 | 45.65 | ROAD S (UPKEEPING 2nd YEAR)(10-15cm) | 12 | Number | |
| 913 | 45.66 | ROAD S (UPKEEPING 2nd YEAR)(5-10cm) | 87 | Number | |
| 914 | 45.67 | ROAD S (UPKEEPING 3rd YEAR)(10-15cm) | 12 | Number | |
| 915 | 45.68 | ROAD S (UPKEEPING 3rd YEAR)(5-10cm) | 87 | Number | |
| 916 | 45.69 | ROAD S (UPKEEPING 4th YEAR)(10-15cm) | 12 | Number | |
| 917 | 45.7 | ROAD S (UPKEEPING 4th YEAR)(5-10cm) | 87 | Number | |
| 918 | 45.71 | ROAD S (UPKEEPING 5th YEAR)(10-15cm) | 12 | Number | |
| 919 | 45.72 | ROAD S (UPKEEPING 5th YEAR)(5-10cm) | 87 | Number | |
| 920 | 45.73 | ROAD T (UPKEEPING 2nd YEAR)(10-15cm) | 14 | Number | |
| 921 | 45.74 | ROAD T (UPKEEPING 2nd YEAR)(5-10cm) | 114 | Number | |
| 922 | 45.75 | ROAD T (UPKEEPING 3rd YEAR)(10-15cm) | 14 | Number | |
| 923 | 45.76 | ROAD T (UPKEEPING 3rd YEAR)(5-10cm) | 114 | Number | |
| 924 | 45.77 | ROAD T (UPKEEPING 4th YEAR)(10-15cm) | 14 | Number | |
| 925 | 45.78 | ROAD T (UPKEEPING 4th YEAR)(5-10cm) | 114 | Number | |
| 926 | 45.79 | ROAD T (UPKEEPING 5th YEAR)(10-15cm) | 14 | Number | |
| 927 | 45.8 | ROAD T (UPKEEPING 5th YEAR)(5-10cm) | 114 | Number | |
| 928 | 45.81 | ROAD U (UPKEEPING 2nd YEAR)(10-15cm) | 8 | Number | |
| 929 | 45.82 | ROAD U (UPKEEPING 2nd YEAR)(5-10cm) | 8 | Number | |
| 930 | 45.83 | ROAD U (UPKEEPING 3rd YEAR)(10-15cm) | 8 | Number | |
| 931 | 45.84 | ROAD U (UPKEEPING 3rd YEAR)(5-10cm) | 8 | Number | |
| 932 | 45.85 | ROAD U (UPKEEPING 4th YEAR)(10-15cm) | 8 | Number | |
| 933 | 45.86 | ROAD U (UPKEEPING 4th YEAR)(5-10cm) | 8 | Number | |
| 934 | 45.87 | ROAD U (UPKEEPING 5th YEAR)(10-15cm) | 8 | Number | |
| 935 | 45.88 | ROAD U (UPKEEPING 5th YEAR)(5-10cm) | 8 | Number | |
| 936 | 46 | Lettering the Boundary Pillars as per IRC standard including the cost of Labour charges and material etc., complete | |||
| 937 | 46.01 | ROAD A (UPKEEPING 2nd YEAR)(5-10cm) | 168 | Number | |
| 938 | 46.02 | ROAD A (UPKEEPING 3rd YEAR)(5-10cm) | 168 | Number | |
| 939 | 46.03 | ROAD A (UPKEEPING 4th YEAR)(5-10cm) | 168 | Number | |
| 940 | 46.04 | ROAD A (UPKEEPING 5th YEAR)(5-10cm) | 168 | Number | |
| 941 | 46.05 | ROAD B (UPKEEPING 2nd YEAR)(5-10cm) | 240 | Number | |
| 942 | 46.06 | ROAD B (UPKEEPING 3rd YEAR)(5-10cm) | 240 | Number | |
| 943 | 46.07 | ROAD B (UPKEEPING 4th YEAR)(5-10cm) | 240 | Number | |
| 944 | 46.08 | ROAD B (UPKEEPING 5th YEAR)(5-10cm) | 240 | Number | |
| 945 | 46.09 | ROAD C (UPKEEPING 2nd YEAR)(5-10cm) | 140 | Number | |
| 946 | 46.1 | ROAD C (UPKEEPING 3rd YEAR)(5-10cm) | 140 | Number | |
| 947 | 46.11 | ROAD C (UPKEEPING 4th YEAR)(5-10cm) | 140 | Number | |
| 948 | 46.12 | ROAD C (UPKEEPING 5th YEAR)(5-10cm) | 140 | Number | |
| 949 | 46.13 | ROAD D (UPKEEPING 2nd YEAR)(5-10cm) | 200 | Number | |
| 950 | 46.14 | ROAD D (UPKEEPING 3rd YEAR)(5-10cm) | 200 | Number | |
| 951 | 46.15 | ROAD D (UPKEEPING 4th YEAR)(5-10cm) | 200 | Number | |
| 952 | 46.16 | ROAD D (UPKEEPING 5th YEAR)(5-10cm) | 200 | Number | |
| 953 | 46.17 | ROAD O (UPKEEPING 2nd YEAR)(5-10cm) | 140 | Number | |
| 954 | 46.18 | ROAD O (UPKEEPING 3rd YEAR)(5-10cm) | 140 | Number | |
| 955 | 46.19 | ROAD O (UPKEEPING 4th YEAR)(5-10cm) | 140 | Number | |
| 956 | 46.2 | ROAD O (UPKEEPING 5th YEAR)(5-10cm) | 140 | Number | |
| 957 | 46.21 | ROAD P (UPKEEPING 2nd YEAR)(5-10cm) | 100 | Number | |
| 958 | 46.22 | ROAD P (UPKEEPING 3rd YEAR)(5-10cm) | 100 | Number | |
| 959 | 46.23 | ROAD P (UPKEEPING 4th YEAR)(5-10cm) | 100 | Number | |
| 960 | 46.24 | ROAD P (UPKEEPING 5th YEAR)(5-10cm) | 100 | Number | |
| 961 | 46.25 | ROAD Q (UPKEEPING 2nd YEAR)(5-10cm) | 248 | Number | |
| 962 | 46.26 | ROAD Q (UPKEEPING 3rd YEAR)(5-10cm) | 248 | Number | |
| 963 | 46.27 | ROAD Q (UPKEEPING 4th YEAR)(5-10cm) | 248 | Number | |
| 964 | 46.28 | ROAD Q (UPKEEPING 5th YEAR)(5-10cm) | 248 | Number | |
| 965 | 46.29 | ROAD R (UPKEEPING 2nd YEAR)(5-10cm) | 248 | Number | |
| 966 | 46.3 | ROAD R (UPKEEPING 3rd YEAR)(5-10cm) | 248 | Number | |
| 967 | 46.31 | ROAD R (UPKEEPING 4th YEAR)(5-10cm) | 248 | Number | |
| 968 | 46.32 | ROAD R (UPKEEPING 5th YEAR)(5-10cm) | 248 | Number | |
| 969 | 46.33 | ROAD S (UPKEEPING 2nd YEAR)(5-10cm) | 152 | Number | |
| 970 | 46.34 | ROAD S (UPKEEPING 3rd YEAR)(5-10cm) | 152 | Number | |
| 971 | 46.35 | ROAD S (UPKEEPING 4th YEAR)(5-10cm) | 152 | Number | |
| 972 | 46.36 | ROAD S (UPKEEPING 5th YEAR)(5-10cm) | 152 | Number | |
| 973 | 46.37 | ROAD T (UPKEEPING 2nd YEAR)(5-10cm) | 192 | Number | |
| 974 | 46.38 | ROAD T (UPKEEPING 3rd YEAR)(5-10cm) | 192 | Number | |
| 975 | 46.39 | ROAD T (UPKEEPING 4th YEAR)(5-10cm) | 192 | Number | |
| 976 | 46.4 | ROAD T (UPKEEPING 5th YEAR)(5-10cm) | 192 | Number | |
| 977 | 46.41 | ROAD U (UPKEEPING 2nd YEAR)(5-10cm) | 72 | Number | |
| 978 | 46.42 | ROAD U (UPKEEPING 3rd YEAR)(5-10cm) | 72 | Number | |
| 979 | 46.43 | ROAD U (UPKEEPING 4th YEAR)(5-10cm) | 72 | Number | |
| 980 | 46.44 | ROAD U (UPKEEPING 5th YEAR)(5-10cm) | 72 | Number | |
| 981 | 47 | Lettering the tree barks upto a size of 15cm x 15cm as per IRC standard including the cost of Labour charges and material etc., complete | |||
| 982 | 47.01 | ROAD A (UPKEEPING 2nd YEAR)(5-10cm) | 8 | Number | |
| 983 | 47.02 | ROAD A (UPKEEPING 3rd YEAR)(5-10cm) | 8 | Number | |
| 984 | 47.03 | ROAD A (UPKEEPING 4th YEAR)(5-10cm) | 8 | Number | |
| 985 | 47.04 | ROAD A (UPKEEPING 5th YEAR)(5-10cm) | 8 | Number | |
| 986 | 47.05 | ROAD B (UPKEEPING 2nd YEAR)(5-10cm) | 18 | Number | |
| 987 | 47.06 | ROAD B (UPKEEPING 3rd YEAR)(5-10cm) | 18 | Number | |
| 988 | 47.07 | ROAD B (UPKEEPING 4th YEAR)(5-10cm) | 18 | Number | |
| 989 | 47.08 | ROAD B (UPKEEPING 5th YEAR)(5-10cm) | 18 | Number | |
| 990 | 47.09 | ROAD C (UPKEEPING 2nd YEAR)(5-10cm) | 40 | Number | |
| 991 | 47.1 | ROAD C (UPKEEPING 3rd YEAR)(5-10cm) | 40 | Number | |
| 992 | 47.11 | ROAD C (UPKEEPING 4th YEAR)(5-10cm) | 40 | Number | |
| 993 | 47.12 | ROAD C (UPKEEPING 5th YEAR)(5-10cm) | 40 | Number | |
| 994 | 47.13 | ROAD D (UPKEEPING 2nd YEAR)(5-10cm) | 40 | Number | |
| 995 | 47.14 | ROAD D (UPKEEPING 3rd YEAR)(5-10cm) | 40 | Number | |
| 996 | 47.15 | ROAD D (UPKEEPING 4th YEAR)(5-10cm) | 40 | Number | |
| 997 | 47.16 | ROAD D (UPKEEPING 5th YEAR)(5-10cm) | 40 | Number | |
| 998 | 47.17 | ROAD O (UPKEEPING 2nd YEAR)(5-10cm) | 20 | Number | |
| 999 | 47.18 | ROAD O (UPKEEPING 3rd YEAR)(5-10cm) | 20 | Number | |
| 1000 | 47.19 | ROAD O (UPKEEPING 4th YEAR)(5-10cm) | 20 | Number | |
| 1001 | 47.2 | ROAD O (UPKEEPING 5th YEAR)(5-10cm) | 20 | Number | |
| 1002 | 47.21 | ROAD P (UPKEEPING 2nd YEAR)(5-10cm) | 20 | Number | |
| 1003 | 47.22 | ROAD P (UPKEEPING 3rd YEAR)(5-10cm) | 20 | Number | |
| 1004 | 47.23 | ROAD P (UPKEEPING 4th YEAR)(5-10cm) | 20 | Number | |
| 1005 | 47.24 | ROAD P (UPKEEPING 5th YEAR)(5-10cm) | 20 | Number | |
| 1006 | 47.25 | ROAD Q (UPKEEPING 2nd YEAR)(5-10cm) | 48 | Number | |
| 1007 | 47.26 | ROAD Q (UPKEEPING 3rd YEAR)(5-10cm) | 48 | Number | |
| 1008 | 47.27 | ROAD Q (UPKEEPING 4th YEAR)(5-10cm) | 48 | Number | |
| 1009 | 47.28 | ROAD Q (UPKEEPING 5th YEAR)(5-10cm) | 48 | Number | |
| 1010 | 47.29 | ROAD S (UPKEEPING 2nd YEAR)(5-10cm) | 30 | Number | |
| 1011 | 47.3 | ROAD S (UPKEEPING 3rd YEAR)(5-10cm) | 30 | Number | |
| 1012 | 47.31 | ROAD S (UPKEEPING 4th YEAR)(5-10cm) | 30 | Number | |
| 1013 | 47.32 | ROAD S (UPKEEPING 5th YEAR)(5-10cm) | 30 | Number | |
| 1014 | 47.33 | ROAD T (UPKEEPING 2nd YEAR)(5-10cm) | 60 | Number | |
| 1015 | 47.34 | ROAD T (UPKEEPING 3rd YEAR)(5-10cm) | 60 | Number | |
| 1016 | 47.35 | ROAD T (UPKEEPING 4th YEAR)(5-10cm) | 60 | Number | |
| 1017 | 47.36 | ROAD T (UPKEEPING 5th YEAR)(5-10cm) | 60 | Number | |
| 1018 | 47.37 | ROAD U (UPKEEPING 2nd YEAR)(5-10cm) | 20 | Number | |
| 1019 | 47.38 | ROAD U (UPKEEPING 3rd YEAR)(5-10cm) | 20 | Number | |
| 1020 | 47.39 | ROAD U (UPKEEPING 4th YEAR)(5-10cm) | 20 | Number | |
| 1021 | 47.4 | ROAD U (UPKEEPING 5th YEAR)(5-10cm) | 20 | Number | |
| 1022 | 48 | Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification no.111,112,501, 503,900 - over bituminous surfaces | |||
| 1023 | 48.01 | ROAD A (UPKEEPING 4th YEAR) | 275.91 | Square metre | |
| 1024 | 48.02 | ROAD A (UPKEEPING 5th YEAR) | 459.85 | Square metre | |
| 1025 | 48.03 | ROAD B (UPKEEPING 4th YEAR) | 275.49 | Square metre | |
| 1026 | 48.04 | ROAD B (UPKEEPING 5th YEAR) | 459.16 | Square metre | |
| 1027 | 48.05 | ROAD C (UPKEEPING 4th YEAR) | 160.45 | Square metre | |
| 1028 | 48.06 | ROAD C (UPKEEPING 5th YEAR) | 267.42 | Square metre | |
| 1029 | 48.07 | ROAD D (UPKEEPING 4th YEAR) | 227.69 | Square metre | |
| 1030 | 48.08 | ROAD D (UPKEEPING 5th YEAR) | 379.48 | Square metre | |
| 1031 | 48.09 | ROAD O (UPKEEPING 4th YEAR) | 162.84 | Square metre | |
| 1032 | 48.1 | ROAD O (UPKEEPING 5th YEAR) | 271.41 | Square metre | |
| 1033 | 48.11 | ROAD P (UPKEEPING 4th YEAR) | 114.08 | Square metre | |
| 1034 | 48.12 | ROAD P (UPKEEPING 5th YEAR) | 190.13 | Square metre | |
| 1035 | 48.13 | ROAD Q (UPKEEPING 4th YEAR) | 301.97 | Square metre | |
| 1036 | 48.14 | ROAD Q (UPKEEPING 5th YEAR) | 503.28 | Square metre | |
| 1037 | 48.15 | ROAD R (UPKEEPING 4th YEAR) | 300.6 | Square metre | |
| 1038 | 48.16 | ROAD R (UPKEEPING 5th YEAR) | 501 | Square metre | |
| 1039 | 48.17 | ROAD S (UPKEEPING 4th YEAR) | 185.63 | Square metre | |
| 1040 | 48.18 | ROAD S (UPKEEPING 5th YEAR) | 309.38 | Square metre | |
| 1041 | 48.19 | ROAD T (UPKEEPING 4th YEAR) | 330 | Square metre | |
| 1042 | 48.2 | ROAD T (UPKEEPING 5th YEAR) | 550 | Square metre | |
| 1043 | 48.21 | ROAD U (UPKEEPING 4th YEAR) | 163.8 | Square metre | |
| 1044 | 48.22 | ROAD U (UPKEEPING 5th YEAR) | 273 | Square metre | |
| 1045 | 49 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-40) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specificationno.111,112,507,900 complete in all respects - Grading II | |||
| 1046 | 49.01 | ROAD A (UPKEEPING 4th YEAR) | 8.28 | Cubic metre | |
| 1047 | 49.02 | ROAD A (UPKEEPING 5th YEAR) | 13.8 | Cubic metre | |
| 1048 | 49.03 | ROAD B (UPKEEPING 4th YEAR) | 8.26 | Cubic metre | |
| 1049 | 49.04 | ROAD B (UPKEEPING 5th YEAR) | 13.77 | Cubic metre | |
| 1050 | 49.05 | ROAD C (UPKEEPING 4th YEAR) | 4.81 | Cubic metre | |
| 1051 | 49.06 | ROAD C (UPKEEPING 5th YEAR) | 8.02 | Cubic metre | |
| 1052 | 49.07 | ROAD D (UPKEEPING 4th YEAR) | 6.83 | Cubic metre | |
| 1053 | 49.08 | ROAD D (UPKEEPING 5th YEAR) | 11.38 | Cubic metre | |
| 1054 | 49.09 | ROAD O (UPKEEPING 4th YEAR) | 4.89 | Cubic metre | |
| 1055 | 49.1 | ROAD O (UPKEEPING 5th YEAR) | 8.14 | Cubic metre | |
| 1056 | 49.11 | ROAD P (UPKEEPING 4th YEAR) | 3.42 | Cubic metre | |
| 1057 | 49.12 | ROAD P (UPKEEPING 5th YEAR) | 5.7 | Cubic metre | |
| 1058 | 49.13 | ROAD Q (UPKEEPING 4th YEAR) | 9.06 | Cubic metre | |
| 1059 | 49.14 | ROAD Q (UPKEEPING 5th YEAR) | 15.1 | Cubic metre | |
| 1060 | 49.15 | ROAD R (UPKEEPING 4th YEAR) | 9.02 | Cubic metre | |
| 1061 | 49.16 | ROAD R (UPKEEPING 5th YEAR) | 15.03 | Cubic metre | |
| 1062 | 49.17 | ROAD S (UPKEEPING 4th YEAR) | 5.57 | Cubic metre | |
| 1063 | 49.18 | ROAD S (UPKEEPING 5th YEAR) | 9.28 | Cubic metre | |
| 1064 | 49.19 | ROAD T (UPKEEPING 4th YEAR) | 9.9 | Cubic metre | |
| 1065 | 49.2 | ROAD T (UPKEEPING 5th YEAR) | 16.5 | Cubic metre | |
| 1066 | 49.21 | ROAD U (UPKEEPING 4th YEAR) | 4.91 | Cubic metre | |
| 1067 | 49.22 | ROAD U (UPKEEPING 5th YEAR) | 8.19 | Cubic metre | |
| 1068 | 49.23 | Calculation of SubTotal, GST and Total Amount carried out by system automatically | |||
| 1069 | 49.24 | Basic cost of value put to tender as per estimate | 1 | (A) | |
| 1070 | 49.25 | Add GST at 12% | 1 | (B) | |
| 1071 | 49.26 | Total Value put to Tender | 1 | (A+B) | |
| 1072 | 49.27 | Excess/Less Percentage | 1 | (D) | |
| 1073 | 49.28 | Final Value | 1 | (E) | |
| 1074 | 49.29 | Add GST at 12% of Final Value | 1 | (F) | |
| 1075 | 49.3 | Total Value of Contract Including 12% of GST | 1 | (E+F) |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy