| 1 | 1 | Carriage, installation of PVC water storage tanks including carriage of the same from divisional store up to the yatra camp. The job includes making connections including providing and fixing pipe specials 9GI) nut nipple etc, which includes carriage of the material to divisional store after completion of yatra including loading unloading etc. \n1000 ltr capacity = 28 No’s\n500 ltr capacity + 9 No’s (six trips)\n\n\n | BI01010001010000000000000515BI0100001121 | 37 | No |
|---|
| 2 | 2 | Carriage of angle iron stands from Divisional Store upto yatra camp at Panthachowk and returning the same to divisional stores after completion of yatra including loading unloading etc.\n | BI01010001010000000000000515BI0100001122 | 6 | Trip |
|---|
| 3 | 3 | Labour charges for fixing of 25mm dia PPR pipes (excluding cost of pipes) including carriage of the same upto the yatra camp and returning the same to divisional store including loading unloading etc. \n | BI01010001010000000000000515BI0100001123 | 103.65 | RM |
|---|
| 4 | 4 | Providing and fixing 25mm dia PPR pipes (excluding cost of pipe specials) which includes cutting, rethreading and laying in position etc. including all sorts of carriages upto the yatra camp, returning the same to divisional stores.\n | BI01010001010000000000000515BI0100001124 | 24 | RM |
|---|
| 5 | 5 | Making connections to temporarily bath/wash/toilets by way of providing and fixing of pipe specials (GI) as required at site camp including cost of nails and binding wires and returning the material to divisional store after completion of yatra.\n | BI01010001010000000000000515BI0100001125 | 70 | No |
|---|
| 6 | 6 | Carriage and Supply of 65mm PVC (Flexible sized) pipe including returning to divisional stores.\n | BI01010001010000000000000515BI0100001126 | 16 | Mtr |
|---|
| 7 | 7 | Carriage of plain particle board 12mm thick including the laying of same over MS stands which includes returning the same to divisional store loading unloading etc.\n | BI01010001010000000000000515BI0100001127 | 29 | Sqm |
|---|
| 8 | 8 | Providing flex banners (colored) including writing charges and all carriage and returning the same to divisional store.\n | BI01010001010000000000000515BI0100001128 | 96 | Sft |
|---|
| 9 | 9 | Renting/accommodation charges for deployment field staff and tanker drivers during yatra period (one room for four persons including wash/bathroom facility for 45 days. | BI01010001010000000000000515BI0100001129 | 1 | No |
|---|
| 10 | 10 | Refreshment charges for forty five days for four persons | BI01010001010000000000000515BI0100001130 | | |
|---|
| 11 | 10.1 | i. Lunch and dinner for 45 days \n | BI01010001010000000000000515BI0100001131 | 360 | Meal |
|---|
| 12 | 10.2 | ii. Stone Soling avg. lead 15Kms.\n | BI01010001010000000000000515BI0100001132 | 180 | Cup |
|---|