Mahanadi Coalfields Limited has published Providing Temporary Ct Road To Seam Ii From Ob Dump Of Bharatpur Project ( Re Tender ) . . Submission Date for this Tender is 19-06-2020. Road Work Tenders in BHARATPUR PROJECT Odisha. Bidders can get complete Tender details and download the document.
Name of the Work / Contract No: | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Preparation and consolidation of subgrade with road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth,dressing to camber and consolidation with power roller including making\ngood the undulations etc. and re-rolling the sub grade and disposal of surplus earth upto 50 metres. | 56 | 100 sqm | |
2 | 2 | Supplying and stacking good quality moorum at work site with all lead and royalty, all complete. | 2590 | cum | |
3 | 3 | Supplying and stacking at work site hard granite or equivalent as approved by EIC, hand broken stone metal 90mm to 45mm size I.e. IRC GR-I of approved quality including screening & stacking along road side equidistantly and uniformly including royalty, octrroi, and all other taxes complete with all leads and lifts ( A deduction of 7.5% is to be made on account of voids in stone metal. Measurement of material is to be taken\njust before laying work starts and payment shall be made only after laying of the material) | 1368 | cum | |
4 | 4 | Supplying and stacking at work site hard granite or equivalent as approved by EIC, hand broken stone metal 63mm to 45mm size I.e. IRC GR-II of approved quality including screening & stacking along road side\nequidistantly and uniformly including royalty, octrroi, and all other taxes complete with all leads and lifts ( A deduction of 7.5% is to be made on account of voids in stone metal. Measurement of material is to be taken\njust before laying work starts and payment shall be made only after laying of the material) | 1026 | cum | |
5 | 5 | Laying Gr-I (90mm-45mm) or Gr-II (63mm-45mm) metal in WBM sub base/base course I/c screening, sorting, spreading to template, packing with smaller stones, blinding with moorum, watering and consolidation with power roller-80/100 KN capacity i/c hire charges and running cost of road roller, pay of driver, khalasi&chowkidar and providing proper signals,road barriers etc. complete but excluding the cost of material like stone metal, packing stone and moorum (Payment to be made for compacted volume of WBM layer actually laid. For estimation purpose, loose quantity of stone metal for 1 cu.m. compacted volume of WBM will be 1.221 cu.m. i.e. 1.00 cu.m + 32% for looseness factor.- 7.5% for void = 1.221 cu.m.). | 1960 | cum | |
6 | 6 | Spreading moorum/sand/ stone dust etc. in layers not exceeding 150mm in thickness, levelling to required gradient and camber, watering and consolidation of each layer with power roller 80/100 KN capacity (Payment to be made for compacted volume of the moorum/sand) | 1568 | cum | |
7 | 7 | Earth Work in rough excavation over area in all kinds of soil by mechanical means including mechanical loading into the tippers or disposal of the excavated earth within boom length of the excavator all complete as per the instruction of EIC. | 1120 | cum | |
8 | 8 | Providing and laying Reinforced Cement Concrete non-pressure pipes of class NP-3 (medium duty) for culverts including pointing ends and fixing joints with stiff mixture of cement mortar 1:2 (1 cement :2 sand) including testing of joints etc. complete as per direction of Engineer-in-charge.900mm dia RCC NP3-Pipe | 30 | metre | |
9 | 9 | Total impact of GST for the purpose of CTC | BI01010001010000000000000515BI0100001129 | 1 | Nos |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy