![https://www.tenderdetail.com Tender Details](/Content/img/TenderDetail.png)
![Tender Detail](/Content/img/TenderDetail.png)
Northern Coalfields Limited-NCL has published Planning , Design , Engineering , Construction , Fabrication , Erection , Supply , Testing , Trial Run And Commissioning Of Coal Handling Plant For Block B Ocp Consisting Of All Civil , Structural , Electrical And Mechanical Works As Per Nit As . Submission Date for this Tender is 06-08-2020. Coal Handling Plant Tenders in BLOCK-B Madhya Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 09-Jun-2020 | LINK FOR ATTENDING PREBID THROUGH VC | Technical Bid | 07-07-2020 |
2 | 04-Jul-2020 | ADDENDUM | Technical Bid | 21-07-2020 |
3 | 09-Jul-2020 | CORRIGENDUM 09072020 | Technical Bid | 21-07-2020 |
4 | 16-Jul-2020 | DATE | Date | 06-08-2020 |
Name of the Work / Contract No: | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | WORK & SERVICES | |||
2 | 2 | Detailed survey of the area, within the battery limits & submission of reports | 1 | LS | |
3 | 3 | Sub soil exploration, field and laboratory testing of samples & submission of reports | 1 | LS | |
4 | 4 | Design Engineering Cost | |||
5 | 5 | Preparation and submission of system engineering drawings as per system requirements | 1 | LS | |
6 | 6 | GA & detail engineering designs and drawings of all civil and structurals included in the system and scope of works | 1 | LS | |
7 | 7 | G.A. & detailed engineering designs and drawings including working and maintenance manuals of : \ni) all individual equipment ( Mechanical & Electricals)\nii) Dust Control & Pressurisation system. \niii) Fire-fighting and plant cleaning system. \niv) Chutes & Liners \nv) Communication system \nvi) Power Supply System \nvii)Illumination system. \nviii) Plant control system \nix) Any other system/unit to match the scope of work & requirement\n | 1 | LS | |
8 | 8 | Documentation as per tender specification | 1 | LS | |
9 | 9 | CIVIL & STRUCTURAL WORKS | |||
10 | 10 | Civil and structural work ( Crushing stations, Conveyor Gantry, Drive & Transfer Houses, Truck loading station etc.) | |||
11 | 11 | Semi Mobile Crusher House with 170T Receiving Hopper | 1 | LS | |
12 | 12 | Loading platform with ramp, retaining walls, toe walls etc. | 1 | LS | |
13 | 13 | Conveyor structures | 1 | LS | |
14 | 14 | Transfer Houses, Drive Houses | 1 | LS | |
15 | 15 | Truck Loading Hopper (5x100T) | 1 | LS | |
16 | 16 | Dismantling, part construction/reconstruction of existing structures and other dove-tailing measures | 1 | LS | |
17 | 17 | Miscellaneous items of work required to complete the Total Job as per scope of work like boundary wall around required service buildings, barbed wire fencing around the plant with necessary gates as per requirement etc which are not included in any other item of this BOQ | 1 | LS | |
18 | 23 | Developmental work and infra-structure | |||
19 | 24 | Site Development including cutting, filling, levelling, grading, dressing etc. as per requirement | 1 | LS | |
20 | 25 | Service Buildings including CHP Office with rest shelter, First aid centre , canteen , Security post/Time office , Elec. Maint. room, Store Room etc. | 1 | LS | |
21 | 26 | Parking sheds for LMVs and Scooters/cycles | 1 | LS | |
22 | 27 | Sub Station | 1 | LS | |
23 | 28 | Pump House | 1 | LS | |
24 | 29 | Store Shed | 1 | LS | |
25 | 30 | Workshop Shed | 1 | LS | |
26 | 31 | OH Tank | 1 | LS | |
27 | 32 | Ground/Underground Water Reservoir | 1 | LS | |
28 | 33 | Drainage including culverts | 1 | LS | |
29 | 34 | Landscaping and arboriculture | 1 | LS | |
30 | 35 | Water Supply distribution | 1 | LS | |
31 | 36 | Sewerage and sewage (domestic and industrial) treatment | 1 | LS | |
32 | 37 | Internal Road | 1 | LS | |
33 | 38 | WBM road and pavements | 1 | LS | |
34 | 39 | Lighting Towers | 1 | LS | |
35 | 43 | C. PLANT & MACHINERY ( SUPPLY) | |||
36 | 44 | C.(a) SUPPLY : MECHANICAL | |||
37 | 45 | CONVEYORS | 1 | LS | |
38 | 46 | BELTING | 1 | LS | |
39 | 47 | EQUIPMEMT | |||
40 | 48 | Receiving Section Mechanical Equipment | 1 | LS | |
41 | 49 | Equipment involved in Secondary Sizing | 1 | LS | |
42 | 50 | Mechanical Equipment at Loading Section | 1 | LS | |
43 | 51 | Mechanical Equipment at Transfer house | 1 | LS | |
44 | 52 | Mechanical Equipment required for linking to existing system with due modification. | 1 | LS | |
45 | 53 | Other mechanical equipment | 1 | LS | |
46 | 54 | Dust suppression system with piping & other accessories. Condition monitoring system, Safety & firefighting system and other misc. equipment/utility for any more item required to complete the project | 1 | LS | |
47 | 57 | C.(b) SUPPLY : ELECTRICAL | |||
48 | 58 | Substation-A | |||
49 | 59 | Power receiving arrangment after DP structure including Lightning Arrester and Isolator with earth switch as required. \n6.6/0.433 kV, 750 KVA Distribution transformer-2 nos. \n6.6/0.230 V (L-L), 100 kVALighting Transformer-1 no. \n220V Lead Acid Battery complete with Battery Charging unit.-1 no. \n6.6 kV 3 Phase, 3 Wire Switchboard A (Indoor ) Comprising of Incomer VCBs, Buscoupler VCB and Outgoing VCBs/VCPs complete with metering and protection as required 415V,Aluminium Bus-duct as required.\nMCC at Substation-A Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required.\n6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required.\n6.6 kV single Circuit Overhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supply to substation B (1.25 km. Approx.) as required. | 1 | lot | |
50 | 60 | Substation-B | |||
51 | 61 | Power receiving arrangment with Lightning Arrester and Isolator with earth switch as required.\n6.6/0.433 kV, 750 KVA Distribution transformer-2 nos.\n6.6/0.230 V (L-L), 100 kVALighting Transformer-1 no.\n220V Lead Acid Battery complete with Battery Charging unit.-1 no.\n6.6 kV 3 Phase, 3 Wire Switchboard B (Indoor ) Comprising of Incomer VCBs, Buscoupler VCB and Outgoing VCBs/VCPs, Metering and protection as required \n415V,Aluminium Bus-duct as required.\nMCC at Substation-B Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required.\n6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required. | 1 | lot | |
52 | 68 | Cables | |||
53 | 69 | 1) Power Cables\n2)Control & Signalling Cables asrequired\n3) Lighting Cables & wires as required\n4) Communication Cables as required\n\n | 1 | LS | |
54 | 70 | Earthing | |||
55 | 71 | 1) Plant Equipment Earthing as required\n2) Structures Earthing as required\n3)Earthing for Lightning Protection as required\n4)Transformer neutral Earthing as required | 1 | LS | |
56 | 72 | Welding System including Welding transformer and Welding sockets as required. | 1 | LS | |
57 | 73 | PLC System for Control & Automation,Interlocks, Signalling and instrumentation of entire CHP. | 1 | LS | |
58 | 74 | Remote and sequence control equipment & Accessories | 1 | LS | |
59 | 75 | Control Transformers fof AC & DC control Supply | 1 | LS | |
60 | 76 | Cable Trays, Cable Racks, Cable Trenches, Cable Voults etc. | 1 | LS | |
61 | 77 | Illumination System and Luminaires, Lighting poles & Towers, Lighting DBs etc. | 1 | LS | |
62 | 78 | DG sets for Emergency Power Supply.-2 nos. | 1 | LS | |
63 | 79 | Exhaust Fan, Ceiling Fan, CCTV and Camera, Isulating Mats etc. | 1 | LS | |
64 | 80 | Computers and Peripherals | 1 | LS | |
65 | 81 | Communication System | 1 | LS | |
66 | 82 | Miscellaneous Equipment | 1 | LS | |
67 | 84 | C1 . ERECTION, INSTALLATION & COMMISSIONING | |||
68 | 85 | Erection of mechanical equipment | 1 | Lot | |
69 | 86 | Erection of electrical equipment | 1 | Lot | |
70 | 87 | Erection of other plant and machining etc. | 1 | Lot | |
71 | 88 | Trial run, and commissioning of the plant | 1 | Lot | |
72 | 90 | C2 . OTHERS ITEM | |||
73 | 91 | Drinking water system consisting of tanks, pipes, valves, taps etc. | 1 | Lot | |
74 | 92 | Plant cleaning system | 1 | As per req. | |
75 | 93 | Any other item left out for completion of the project | 1 | LS | |
76 | 94 | C3 . MAINTENANCE AND TRAINING | |||
77 | 95 | Operation of the plant for five years as described in tender document | 1 | Lot | |
78 | 96 | Maintenance of the plant for five years as described in tender document | 1 | LS | |
79 | 97 | Training of the employer personnel as per tender document | 1 | As per req. | |
80 | 98 | Total impact of GST for the purpose of CTC | 1 | Nos |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail