Civil Aviation Boards / Undertakings / PSU Closing in 0 days TDR #24479785

Annual Repair Maintenance Of Various E And M Installations Including Water Cooler , Fire Alarm And Fire Fighting System Of Terminal -2 Building And Ancillary Building At Jaipur International Airport ( 2020-21 )

Issued by Boards / Undertakings / PSU · JAIPUR AIRPORT, Rajasthan
Tender Value
1.51 Crore
Estimated cost
Bid Submission
13 Jun 2020
0 days left
EMD
3.03 Lakhs
Bank guarantee accepted
Document Fee
1120
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
JAIPUR AIRPORT → Rajasthan
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Annual Repair Maintenance Of Various E And M Installations Including Water Cooler , Fire Alarm And Fire Fighting System Of Terminal -2 Building And Ancillary Building At Jaipur International Airport ( 2020-21 ) , Providing Four Numbers Highly Skilled Manpower On All Days Including Sundays & Holidays ( Excluding Weekly Off ) For Operation & Maintenance Of All E&M Installations As Per Technical Specifications Etc . Complete As Required . , Providing Twenty Two Numbers Skilled Manpower On All Days Including Sundays & Holidays ( Excluding Weekly Off ) For Operation & Maintenance Of All E&M Installations As Per Technical Specifications Etc . Complete As Required . , Providing Fourteen Numbers Semi Skilled Manpower On All Days Including Sundays & Holidays ( Excluding Weekly Off ) For Operation & Maintenance Of All E&M Installations As Per Technical Specifications Etc . Complete As Required . , Providing Fourteen Numbers Un Skilled Manpower On All Days Including Sundays & Holidays ( Excluding Weekly Off ) For Operation & Maintenance Of All E&M Installations As Per Technical Specifications Etc . Complete As Required . , Comprehensive Maintenance Of Fire Fighting System At Terminal No . 2 Includes Hydrant Pump Set , Sprinkler Pump Set , Jockey Pump Set , Engine Operated Hydrant Pump Set , Power Cum Control Panel , Pressure Switches , Gun Metal Hydrants , Gun Metal Branch Pipe , Hose Cabinet , Fire Brigade Inlet , Fire Brigade Drawl , All Type Of Valves , Flow Switches , Flow Switch Alarm Panel , Pressure Gauge Etc . As Per Inventory Shown In Annexure-A . , Comprehensive Maintenance Of Addressable Fire Detection And Alarm System At Terminal No . 2 Includes Fire Detection Alarm Panel , Addressable Smoke Detectors , Heat Detectors , Hooters , Mannual Call Points , Weather Proof Horns , Response Indicators , Control Modules , Fault Isolators , Pa System , Amplifier Etc . As Per Inventory Shown In Annexure-B . , Half Yearly Visit Of Original Equipment Manufacturer ( Oem ) Of Intelligent Fire Detection & Fire Alarm System To Check Performance And Breakdowns Or As And When Required ( For Siemens Make Intelligent Addressable Fda System ) . , Servicing Of Engine Operated Fire Fighting Pump Set By Oem / Authorized Service Agency As Per Manufacturer Recommendation Including Replacement Of Lubricating Oil And Filters Etc . I / C B Check Of Fire Engine . , Inspection , Repairing , Servicing , Overhauling And Testing Of 800 / 1250 / 1600 / 2500 Amp Ge / C&S Make Air Circuit Breaker From The Manufacturer Or From The Authorised Service Dealer Of Manufacturer . Cost Of Spare ( If Required ) Shall Be Paid Extra By Aai . , Inspection , Repairing , Servicing , Overhauling And Testing Of Crompton Make Vacuum Circuit Breaker ( 11Kv , 800 Amps Capacity ) From The Manufacturer Or From The Authorised Service Dealer Of Manufacturer . Cost Of Spare ( If Required ) Shall Be Paid Extra By Aai . , Checking , Servicing , Callibration & Testing Of Following Protection Relays Provided On 11 Kv Vcb Breaker Panel Complete As Per Site Requirment - A ) Numerical O / C & Earth Fault Relays ( 3 O / C + 1 Ef ) - 5 Nos . B ) Master Trip Relay -5 Nos . C ) Trip Ckt Supervision Relay -5 Nos . D ) Auxilary Relay For Transformer Protect -3 Nos . E ) Aux Relay For Transformer Neutral - 3 Nos . , Ambient Noise Monitoring Of 750 Kva Dg Set From An Iso Certified Laboratory With Following Parameter:- Lday And Lnight Including Collection Of Sample From Site And Submission Of Test Report Etc . Complete As Required . , Stack Emission Monitoring Of 750 Kva Dg Set From An Iso Certified Laboratory With Following Parameters :- Pm , Sulphur Dioxide , No2 Including Collection Of Sample From Site And Submission Of Test Report Etc . Complete As Required . , Painting With Synthetic Enamel Paint Of Approved Brand And Manufacture Of Required Colour To Give An Even Shade , Rewinding Of Fan Motor Of Ceiling Fan / Wall Mounted / Exhaust Fan Etc With Enamelled Copper Wire Of Required Grade Insulation And Providing & Fixing Of Brass Bushes Including Dismantiling The Existing Fan Motor , Transportation To & Fro , Re-Installation , Testing Commissioning Etc Complete As Required . ( Dismantle Copper Wire , Bushes Etc . Need Not To Be Returned ) , Repairing & Rewinding Of 3 Phase 1 . 1 / 2 . 2 Kw Motor Monoblock / Mud Pump Set Including Replacement Of Motor Bush , Oil Seal , Bearings Etc Including Dismantiling The Existing Pump , Transportation To & Fro , Re-Installation , Testing Commissioning Etc Complete As Required . ( Dismantle Copper Wire , Bushes Etc . Need Not To Be Returned ) , Repairing & Rewinding Of 3 Phase 4 . 0 / 5 . 5 Kw Motor Monoblock Pump Set Including Replacement Of Motor Bush , Oil Seal , Bearings Etc Including Dismantiling The Existing Pump , Transportation To & Fro , Re-Installation , Testing Commissioning Etc Complete As Required . ( Dismantle Copper Wire , Bushes Etc . Need Not To Be Returned ) , Repairing & Rewinding Of 3 Phase 9 . 2 / 9 . 3 Kw Motor Monoblock Pump Set Motor Including Replacement Of Motor Bush , Oil Seal , Bearings Etc Including Dismantiling The Existing Pump , Transportation To & Fro , Re-Installation , Testing Commissioning Etc Complete As Required . ( Dismantle Copper Wire , Bushes Etc . Need Not To Be Returned ) , Repairing & Rewinding Of 3 Phase 1 . 1 / 2 . 0 Kw Motor Submersible Pump Set Motor Including Replacement Of Motor Bush , Oil Seal , Bearings Etc Including Dismantiling The Existing Pump , Transportation To & Fro , Re-Installation , Testing Commissioning Etc Complete As Required . ( Dismantle Copper Wire , Bushes Etc . Need Not To Be Returned ) , Repairing & Rewinding Of 3 Phase 5 . 0 / 7 . 5 Hp Motor Submersible Pump Set Motor Including Replacement Of Motor Bush , Oil Seal , Bearings Etc Including Dismantiling The Existing Pump , Transportation To & Fro , Re-Installation , Testing Commissioning Etc Complete As Required . ( Dismantle Copper Wire , Bushes Etc . Need Not To Be Returned ) , Lifting And Lowering Of 5 / 7 . 5 Hp Submersible Pump Set From Bore Well Upto The Depth Of 150 Meter Including Replacement Of Bolts , Gasket , Arrangement Of All Required T&P And Sundaries Etc Complete As Required , Visit Charges Of Service Engineer From Authorized Lab / Specialised Agency As Per Approval Of E-I-C For Inspection Of Sewage Treatment Plant . , Removal Of Dry Sludge From Sludge Bed Of Stp I / C Disposal The Same Outside The Airport Premises Etc As Required . , Cleaning Of All The Tank Of Sewage Treatment Plant ( I / C Collection Tank , Aeriation Tank , Chlorine Contact Tank , Filter Feed Tank , Treated Water Tank Etc . ) By Removing All The Waste Material / Sewage / Mud And Removal / Disposal Of Waste Material From The Airport Premises , Complete As Per Site Requirement . , Complete Servicing & Overhauling Of Twin Lobe Air Blower 200 M3 / Hr Capacity ( Make: Everest , Model: M5075 ) I / C Replacement Of Oil , Oil Seal , Bearing And Internal Worn Out Parts But Excluding Suction Filter Etc . Complete As Required . , Supply & Replacement Of Activated Carbon Of 800 Iv ( Iondine Value ) Grade In Activated Carbon Filter Of Stp . , Supply & Replacement Of Sand & Gravel Media Sand Filter Of Stp . , Supply Of Pressure Gauge ( Upto 14Kg / Cm2 ) . , Supply Of Liquid Chlorine ( Sodium Hypo Chloride ) . , Supply Of Jaggery ( Gud ) , Supply Of Fetilizer Di-Ammonium Phosphate ( Dap ) &Urea . , Supply Of Cow Dung . , Supply Of Tcca-90 ( Trychlo Iso Cynuric Acid ) . , Testing Of Water From The Approved Test Laboratory And Submitting The Test Reports With Following Parameters: Bod , Cod , Tss , O&G , Ph Value Etc . I / C Collecting The Sample Of Incoming Effluent / Treated Water From The Stp . , Cleaning Of The Water Body ( Fountain Tank ) And Keep It Operation By Removing All The Waste M

BOQ

Name of Work: ARMO of various E&M Installations including water cooler, fire alarm & Fire fighting system of Terminal -2 Building & Ancillary Building at Jaipur International Airport (2020-21).
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Providing Four numbers HIGHLY SKILLED Manpower on all days including sundays & holidays (Excluding weekly off) for operation & maintenance of all E&M installations as per technical specifications etc. complete as required.Item 112Month
22Providing Twenty Two numbers SKILLED Manpower on all days including sundays & holidays (Excluding weekly off) for operation & maintenance of all E&M installations as per technical specifications etc. complete as required.Item 212Month
33Providing Fourteen numbers SEMI SKILLED Manpower on all days including sundays & holidays (Excluding weekly off) for operation & maintenance of all E&M installations as per technical specifications etc. complete as required.Item 312Month
44Providing Fourteen numbers UN SKILLED Manpower on all days including sundays & holidays (Excluding weekly off) for operation & maintenance of all E&M installations as per technical specifications etc. complete as required.Item 412Month
55Comprehensive maintenance of fire fighting system at Terminal No. 2 includes hydrant pump set, sprinkler pump set, jockey pump set, engine operated hydrant pump set, power cum control panel, pressure switches, gun metal hydrants, gun metal branch pipe, hose cabinet, fire brigade inlet, fire brigade drawl, all type of valves, flow switches, flow switch alarm panel, pressure gauge etc. as per Inventory shown in Annexure-A.Item 512Month
66Comprehensive maintenance of addressable fire detection and alarm system at Terminal No. 2 includes fire detection alarm panel, addressable smoke detectors, heat detectors, hooters, Mannual call points, weather proof horns, response indicators, control modules, fault isolators, PA system, amplifier etc. as per Inventory shown in Annexure-B.Item 612Month
77Half Yearly visit of original equipment manufacturer(OEM) of intelligent fire detection & fire alarm system to check performance and breakdowns or as and when required (for Siemens make intelligent addressable FDA system).Item 72Job
88Servicing of Engine operated fire fighting pump set by OEM/Authorized Service Agency as per manufacturer recommendation including replacement of lubricating oil and filters etc. i/c B check of fire engine.Item 82Job
99Inspection, repairing, servicing, overhauling and testing of 800/1250/1600/2500 Amp GE/ C&S make Air Circuit Breaker from the manufacturer or from the authorised service dealer of manufacturer. Cost of spare (if required) shall be paid extra by AAI.Item 949Set
1010Inspection, repairing, servicing, overhauling and testing of Crompton make Vacuum Circuit Breaker (11KV, 800 amps capacity) from the manufacturer or from the authorised service dealer of manufacturer. Cost of spare (if required) shall be paid extra by AAI.Item 106Set
1111Checking, servicing, callibration & testing of following protection relays provided on 11 KV VCB Breaker panel complete as per site requirment -\na) Numerical O/C & Earth fault relays (3 O/C + 1 EF) - 5 Nos.\nb) Master trip relay -5 Nos. \nc) Trip ckt supervision relay -5 Nos.\nd) Auxilary relay for transformer protect -3 Nos.\ne) Aux relay for transformer neutral - 3 Nos.Item 111Set
1212Ambient Noise monitoring of 750 KVA DG set from an ISO certified laboratory with following parameter:- Lday and Lnight including collection of sample from site and submission of test report etc. Complete as required.Item 123Job
1313Stack emission monitoring of 750 KVA DG set from an ISO certified laboratory with following parameters :- PM,Sulphur dioxide,NO2 including collection of sample from site and submission of test report etc. Complete as required.Item 133Job
1414Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shadeItem 14500SqMt.
1515Rewinding of fan motor of Ceiling Fan/Wall mounted /Exhaust Fan etc with enamelled copper wire of required grade insulation and Providing & Fixing of brass bushes Including dismantiling the existing fan motor, transportation to & fro, re-installation, testing commissioning etc complete as required. (Dismantle copper wire, bushes etc. need not to be returned)Item 1512Nos.
1616Repairing & Rewinding of 3 Phase 1.1 /2.2 KW Motor monoblock/mud pump set including replacement of Motor bush, Oil seal, bearings etc including dismantiling the existing pump, transportation to & fro, re-installation, testing commissioning etc complete as required. (Dismantle copper wire, bushes etc. need not to be returned)Item 162Job
1717Repairing & Rewinding of 3 Phase 4.0 / 5.5 KW Motor monoblock pump set including replacement of Motor bush, Oil seal, bearings etc including dismantiling the existing pump, transportation to & fro, re-installation, testing commissioning etc complete as required. (Dismantle copper wire, bushes etc. need not to be returned)Item 172Job
1818Repairing & Rewinding of 3 Phase 9.2 / 9.3 KW Motor monoblock pump set motor including replacement of Motor bush, Oil seal, bearings etc including dismantiling the existing pump, transportation to & fro, re-installation, testing commissioning etc complete as required. (Dismantle copper wire, bushes etc. need not to be returned)Item 182Job
1919Repairing & Rewinding of 3 Phase 1.1/ 2.0 KW Motor Submersible pump set motor including replacement of Motor bush, Oil seal, bearings etc including dismantiling the existing pump, transportation to & fro, re-installation, testing commissioning etc complete as required. (Dismantle copper wire, bushes etc. need not to be returned)Item 194Job
2020Repairing & Rewinding of 3 Phase 5.0/ 7.5 Hp Motor Submersible pump set motor including replacement of Motor bush, Oil seal, bearings etc including dismantiling the existing pump, transportation to & fro, re-installation, testing commissioning etc complete as required. (Dismantle copper wire, bushes etc. need not to be returned)Item 204Job
2121Lifting and lowering of 5/7.5 HP submersible pump set from bore well upto the depth of 150 meter including replacement of bolts, gasket, arrangement of all required T&P and sundaries etc complete as requiredItem 215Job
2222Visit charges of service Engineer from Authorized Lab/ Specialised Agency as per approval of E-I-C for inspection of Sewage Treatment Plant.Item 221Job
2323Removal of dry sludge from sludge bed of STP i/c disposal the same outside the airport premises etc as required.Item 2312Job
2424Cleaning of all the tank of sewage treatment plant (i/c Collection tank, aeriation tank, chlorine contact tank, filter feed tank, treated water tank etc.) by removing all the waste material / sewage /mud and removal/disposal of waste material from the airport premises, complete as per site requirement.Item 241Job
2525Complete servicing & overhauling of twin lobe air blower 200 m3/hr Capacity (Make: Everest, Model: M5075) i/c replacement of oil, oil seal, bearing and internal worn out parts but excluding suction filter etc. complete as required.Item 251Job
2626Supply & Replacement of activated carbon of 800 IV (Iondine value) grade in Activated Carbon Filter of STP.Item 26500Kg
2727Supply & Replacement of Sand & Gravel Media Sand Filter of STP.Item 27500Kg
2828Supply of Pressure Gauge (upto 14Kg/cm2) .Item 282Each
2929Supply of liquid chlorine (sodium hypo chloride) .Item 29500Kg
3030Supply of Jaggery(Gud)Item 30100Kg
3131Supply of fetilizer Di-Ammonium Phosphate (DAP) &Urea.Item 31100Kg
3232Supply of Cow Dung.Item 32500Kg
3333Supply of TCCA-90 (Trychlo Iso Cynuric Acid).Item 33200Kg
3434Testing of water from the approved test laboratory and submitting the test reports with following parameters: BOD, COD, TSS, O&G, PH value etc. i/c collecting the sample of incoming effluent/ treated water from the STP.Item 3412Job
3535Cleaning of the water body (fountain tank) and keep it operation by removing all the waste material /mud and removal/disposal of waste material from the airport premises, complete as per site requirement.Item 3512Job
3636Supply of Indian National Flag of size 30 ft X 20 ft made out of 100% shinny knitted polyester , washable and durable conforming to Flag code of India etc complete as required.Item 3610Each
3737Testing of R O water from the approved test laboratory and submitting the test reports with following parameters as per IS 10500: colour, dour, Taste, Turbidity, pH, Total hardness,Fe,CI,residual Chlorine,Fluoride,total Alakanity,TDS including microbiological test(Coli form,E.Coli) etc. i/c collecting the sample of incoming RAW/treated water from the RO.Item 3712Job
3838Servicing of 50 LPH Reverse Osmosis (RO) units ONE UNIT PER MONTH including monthly visit of OEM/authorised service partner and submit report etc. complete as required (Spares parts will be provided by AAI if required.). as per Inventory shown in Annexure-C.Item 38168Job
3939Comprehensive maintenance of different make water cooler of different capacity (upto 150 Ltr/150 Ltr capacity) for ONE UNIT PER MONTH. as per Inventory shown in Annexure-D.Item 39168Job
4040Supply of hand senitizerItem 40100Ltr
4141CPWD - DSR 2018 ( E&M)\nNote:\n(i) The rate for this item has to be quoted carefully.\n(ii) The guidelines for quoting the rate for this item is mentioned in clause 25 (c) of Page GTT-4.Item 41100000Rs.

AI Tender Summary

OUR REF NO 24479785
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 1.51 Crore
LAST DATE 13-06-2020
Authority
Authority Name Airports Authority Of India
Work Description Annual Repair Maintenance Of Various E And M Installations Including Water Cooler , Fire Alarm And Fire Fighting System Of Terminal -2 Building And Ancillary Building At Jaipur International Airport ( 2020-21 ) , Providing Four Numbers Highly Skilled Manpower On All Days Including Sundays & Holidays ( Excluding Weekly Off ) For Operation & Maintenance Of All E&M Installations As Per Technical Specifications Etc . Complete As Required . , Providing Twenty Two Numbers Skilled Manpower On All Days Including Sundays & Holidays ( Excluding Weekly Off ) For Operation & Maintenance Of All E&M Installations As Per Technical Specifications Etc . Complete As Required . , Providing Fourteen Numbers Semi Skilled Manpower On All Days Including Sundays & Holidays ( Excluding Weekly Off ) For Operation & Maintenance Of All E&M Installations As Per Technical Specifications Etc . Complete As Required . , Providing Fourteen Numbers Un Skilled Manpower On All Days Including Sundays & Holidays ( Excluding Weekly Off ) For Operation & Maintenance Of All E&M Installations As Per Technical Specifications Etc . Complete As Required . , Comprehensive Maintenance Of Fire Fighting System At Terminal No . 2 Includes Hydrant Pump Set , Sprinkler Pump Set , Jockey Pump Set , Engine Operated Hydrant Pump Set , Power Cum Control Panel , Pressure Switches , Gun Metal Hydrants , Gun Metal Branch Pipe , Hose Cabinet , Fire Brigade Inlet , Fire Brigade Drawl , All Type Of Valves , Flow Switches , Flow Switch Alarm Panel , Pressure Gauge Etc . As Per Inventory Shown In Annexure-A . , Comprehensive Maintenance Of Addressable Fire Detection And Alarm System At Terminal No . 2 Includes Fire Detection Alarm Panel , Addressable Smoke Detectors , Heat Detectors , Hooters , Mannual Call Points , Weather Proof Horns , Response Indicators , Control Modules , Fault Isolators , Pa System , Amplifier Etc . As Per Inventory Shown In Annexure-B . , Half Yearly Visit Of Original Equipment Manufacturer ( Oem ) Of Intelligent Fire Detection & Fire Alarm System To Check Performance And Breakdowns Or As And When Required ( For Siemens Make Intelligent Addressable Fda System ) . , Servicing Of Engine Operated Fire Fighting Pump Set By Oem / Authorized Service Agency As Per Manufacturer Recommendation Including Replacement Of Lubricating Oil And Filters Etc . I / C B Check Of Fire Engine . , Inspection , Repairing , Servicing , Overhauling And Testing Of 800 / 1250 / 1600 / 2500 Amp Ge / C&S Make Air Circuit Breaker From The Manufacturer Or From The Authorised Service Dealer Of Manufacturer . Cost Of Spare ( If Required ) Shall Be Paid Extra By Aai . , Inspection , Repairing , Servicing , Overhauling And Testing Of Crompton Make Vacuum Circuit Breaker ( 11Kv , 800 Amps Capacity ) From The Manufacturer Or From The Authorised Service Dealer Of Manufacturer . Cost Of Spare ( If Required ) Shall Be Paid Extra By Aai . , Checking , Servicing , Callibration & Testing Of Following Protection Relays Provided On 11 Kv Vcb Breaker Panel Complete As Per Site Requirment - A ) Numerical O / C & Earth Fault Relays ( 3 O / C + 1 Ef ) - 5 Nos . B ) Master Trip Relay -5 Nos . C ) Trip Ckt Supervision Relay -5 Nos . D ) Auxilary Relay For Transformer Protect -3 Nos . E ) Aux Relay For Transformer Neutral - 3 Nos . , Ambient Noise Monitoring Of 750 Kva Dg Set From An Iso Certified Laboratory With Following Parameter:- Lday And Lnight Including Collection Of Sample From Site And Submission Of Test Report Etc . Complete As Required . , Stack Emission Monitoring Of 750 Kva Dg Set From An Iso Certified Laboratory With Following Parameters :- Pm , Sulphur Dioxide , No2 Including Collection Of Sample From Site And Submission Of Test Report Etc . Complete As Required . , Painting With Synthetic Enamel Paint Of Approved Brand And Manufacture Of Required Colour To Give An Even Shade , Rewinding Of Fan Motor Of Ceiling Fan / Wall Mounted / Exhaust Fan Etc With Enamelled Copper Wire Of Required Grade Insulation And Providing & Fixing Of Brass Bushes Including Dismantiling The Existing Fan Motor , Transportation To & Fro , Re-Installation , Testing Commissioning Etc Complete As Required . ( Dismantle Copper Wire , Bushes Etc . Need Not To Be Returned ) , Repairing & Rewinding Of 3 Phase 1 . 1 / 2 . 2 Kw Motor Monoblock / Mud Pump Set Including Replacement Of Motor Bush , Oil Seal , Bearings Etc Including Dismantiling The Existing Pump , Transportation To & Fro , Re-Installation , Testing Commissioning Etc Complete As Required . ( Dismantle Copper Wire , Bushes Etc . Need Not To Be Returned ) , Repairing & Rewinding Of 3 Phase 4 . 0 / 5 . 5 Kw Motor Monoblock Pump Set Including Replacement Of Motor Bush , Oil Seal , Bearings Etc Including Dismantiling The Existing Pump , Transportation To & Fro , Re-Installation , Testing Commissioning Etc Complete As Required . ( Dismantle Copper Wire , Bushes Etc . Need Not To Be Returned ) , Repairing & Rewinding Of 3 Phase 9 . 2 / 9 . 3 Kw Motor Monoblock Pump Set Motor Including Replacement Of Motor Bush , Oil Seal , Bearings Etc Including Dismantiling The Existing Pump , Transportation To & Fro , Re-Installation , Testing Commissioning Etc Complete As Required . ( Dismantle Copper Wire , Bushes Etc . Need Not To Be Returned ) , Repairing & Rewinding Of 3 Phase 1 . 1 / 2 . 0 Kw Motor Submersible Pump Set Motor Including Replacement Of Motor Bush , Oil Seal , Bearings Etc Including Dismantiling The Existing Pump , Transportation To & Fro , Re-Installation , Testing Commissioning Etc Complete As Required . ( Dismantle Copper Wire , Bushes Etc . Need Not To Be Returned ) , Repairing & Rewinding Of 3 Phase 5 . 0 / 7 . 5 Hp Motor Submersible Pump Set Motor Including Replacement Of Motor Bush , Oil Seal , Bearings Etc Including Dismantiling The Existing Pump , Transportation To & Fro , Re-Installation , Testing Commissioning Etc Complete As Required . ( Dismantle Copper Wire , Bushes Etc . Need Not To Be Returned ) , Lifting And Lowering Of 5 / 7 . 5 Hp Submersible Pump Set From Bore Well Upto The Depth Of 150 Meter Including Replacement Of Bolts , Gasket , Arrangement Of All Required T&P And Sundaries Etc Complete As Required , Visit Charges Of Service Engineer From Authorized Lab / Specialised Agency As Per Approval Of E-I-C For Inspection Of Sewage Treatment Plant . , Removal Of Dry Sludge From Sludge Bed Of Stp I / C Disposal The Same Outside The Airport Premises Etc As Required . , Cleaning Of All The Tank Of Sewage Treatment Plant ( I / C Collection Tank , Aeriation Tank , Chlorine Contact Tank , Filter Feed Tank , Treated Water Tank Etc . ) By Removing All The Waste Material / Sewage / Mud And Removal / Disposal Of Waste Material From The Airport Premises , Complete As Per Site Requirement . , Complete Servicing & Overhauling Of Twin Lobe Air Blower 200 M3 / Hr Capacity ( Make: Everest , Model: M5075 ) I / C Replacement Of Oil , Oil Seal , Bearing And Internal Worn Out Parts But Excluding Suction Filter Etc . Complete As Required . , Supply & Replacement Of Activated Carbon Of 800 Iv ( Iondine Value ) Grade In Activated Carbon Filter Of Stp . , Supply & Replacement Of Sand & Gravel Media Sand Filter Of Stp . , Supply Of Pressure Gauge ( Upto 14Kg / Cm2 ) . , Supply Of Liquid Chlorine ( Sodium Hypo Chloride ) . , Supply Of Jaggery ( Gud ) , Supply Of Fetilizer Di-Ammonium Phosphate ( Dap ) &Urea . , Supply Of Cow Dung . , Supply Of Tcca-90 ( Trychlo Iso Cynuric Acid ) . , Testing Of Water From The Approved Test Laboratory And Submitting The Test Reports With Following Parameters: Bod , Cod , Tss , O&G , Ph Value Etc . I / C Collecting The Sample Of Incoming Effluent / Treated Water From The Stp . , Cleaning Of The Water Body ( Fountain Tank ) And Keep It Operation By Removing All The Waste M
Basic Detail
Tender No AAI/JPR/ENGG(E)/F-65/2020-21
Bidding Type Tender
Location
City JAIPUR AIRPORT
State Rajasthan
Key Dates
Publish Date 03 Jun 2020
Submission Date 13 Jun 2020
Open Date 18 Jun 2020
Finance
Tender Value 1.51 Crore
Tender Fee 1120
EMD 3.03 Lakhs
Exemption Not Available
Document List
0ADED32A-2EB7-422B-A3E4-D482C4473F7B.html
FINALDNIT_ARMO.pdf
Tendernotice_1.pdf
BOQ_53375.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 03, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
Jun 13, 2020
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jun 18, 2020

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

0ADED32A-2EB7-422B-A3E4-D482C4473F7B.html

pdf

FINALDNIT_ARMO.pdf

pdf

Tendernotice_1.pdf

xls

BOQ_53375.xls

TenderDetail
Loading tenders