}

Fabrication , Erection And Commissioning Of Western Side Clean Sulphur Pit Coils In Sa Plant , Fact-Cd . , AMBALAMEDU-Kerala

Fertilisers And Chemicals Travancore Limited has published Fabrication , Erection And Commissioning Of Western Side Clean Sulphur Pit Coils In Sa Plant , Fact-Cd . . Submission Date for this Tender is 17-06-2020. Coats and Jackets Tenders in AMBALAMEDU Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

24458434
Fabrication , Erection And Commissioning Of Western Side Clean Sulphur Pit Coils In Sa Plant , Fact-Cd .
Auction
Indian
Kerala
Ambalamedu
17-06-2020

Tender Details

Fabrication , Erection And Commissioning Of Western Side Clean Sulphur Pit Coils In Sa Plant , Fact-Cd . , Fabrication , Erection And Commissioning Of Western Side Clean Sulphur Pit Coils In Sa Plant , Fact-Cd . , Fabrication Of Clean Pit Coils : Collect The Required Materials From Store And Transport To Work Site . Make Necessary Site Arrangements For The Work . Prefabricate The Coils As Per Drawings / Instructions From Engineer In Charge And Considering The Site Measurements . Any Required Modifications By The Competent Authority Shall Be Incorporated . Structural Support For The Coils Shall Be Fabricated As Per Site Conditions And Instructions From Engineer In Charge . All Weldings Shall Be Full Welding Only . All Weld Joints Shall Be Dp Tested And Witnessed By The Concerned Engineer In Charge . Pressure Test The Fabricated Coils With Steam At A Pressure Of 6 Kg/Cm2 . Clear The Site And Transport The Scrap To Scrapyard . , Erection And Hooking Up Of New Coils : Make Necessary Site Arrangements For The Work . Erect The Newly Fabricated Coils In Clean Storage Pit As Per Instructions Of The Engineer In Charge . Connect The Inlet And Outlet Headers Of Steam Coils To Existing Steam Network With New Isolation Valves , Steam Traps Etc . Any Additional Modification Required In The Steam Lines / Replacement Of Existing Steam Valves Shall Be Done By The Contractor . Additional Steam Line Tapping If Required Shall Be Done By The Contractor . All Weld Joints Shall Be Full Welding . Ensure Leak Proof Joints . Providing Proper Supports For The System Wherever Necessary As Per Instruction Of Engineer In Charge . , Fabrication And Erection Of Cover Plate For Clean Pit With Structural Supports: Collect And Transport Required Materials / Structurals From Store To Work Site . Make Necessary Arrangements For The Work . Fabricate And Erect Structural Supports Over Clean Pit Area As Per Instructions From Engineer In Charge . Structural Foundation Frame For Clean Pit Pumps Shall Also Be Fabricated And Erected Along With The Structural Supports As Per Instructions From Competent Authority . Fabricate And Erect Clean Pit Cover Plate From 6/8Mm Ms Plate As Per Instructions And Welding To Supports . Fabrication And Erection Of Hand Rails , Pit Level Indicator , Stair Case , Opening / Inspection Covers On The Cover Plate Etc . Is Also Under Contractors Scope . After Successful Completion Of Work , Clear The Site And Transport The Scrap To Scrapyard . All Structures Fabricated Shall Be Painted With Two ( 02 ) Coats Of Zinc Chromate Yellow Primer Of Approved Make / Quality And Two ( 02 ) Coats Of Synthetic Enamel Paint Of Distinct Colours Of Approved Make / Quality After Proper Mechanical Cleaning Using Wire Brush . All Costs Incurred In Painting Including Cost Of Paints , Primers , Painting Equipments , Cleaning Equipments , Handling Charges , Scaffolding And Any Other Incidental Expenses Will Be Under Contractors Scope . , Erection And Hooking Up Of Clean Pit Pumps : Make Necessary Site Arrangements For The Work . Transport The Pumps And Motors To Worksite From Concerned Workshops . Erect The Pump On The New Foundations . Align The Pump With The Foundation And Provide Base Bolts And Full Tighten The Bolts . Erect The Motor On The Motor Base , Align Motor With Pump , Provide Base Bolts And Full Tighten . Couple The Pump And Motor , Provide Coupling Guards . Fabricate And Provide Steam Jacketing Lines And Condensate Lines For The Pump With Required Valves , Steam Traps Etc . As Per The Instructions From Engineer In Charge And Site Conditions .

Key Value

Document Fees
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail