Balance Mechanical Works Of Offsite Facilities For Indmax Project Balance Mechanical Works Of Offsite Facilities For Indmax Project At Bgr, BGR, Dhaligaon-Assam

Indian Oil Corporation Limited-IOCL has published Balance Mechanical Works Of Offsite Facilities For Indmax Project Balance Mechanical Works Of Offsite Facilities For Indmax Project At Bgr. Submission Date for this Tender is 22-06-2020. Mechanical engineering Service Tenders in BGR, Dhaligaon Assam. Bidders can get complete Tender details and download the document.




Tender Notice

24452491
Balance Mechanical Works Of Offsite Facilities For Indmax Project Balance Mechanical Works Of Offsite Facilities For Indmax Project At Bgr
Open Tender
Indian
Assam
BGR, Dhaligaon
22-06-2020

Tender Details

Balance Mechanical Works Of Offsite Facilities For Indmax Project Balance Mechanical Works Of Offsite Facilities For Indmax Project At Bgr

Key Value

Document Fees
Refer document
EMD
INR 563400.0 /-
Tender Value
INR 6.26 Crore /-

BOQ Items

Name of Work: BALANCE MECHANICAL WORKS OF OFFSITE FACILITIES FOR INDMAX PROJECT AT BGR
Sl. No. Item Description Item Code / Make Quantity Units
1 10 PART-A
2 10.001 WRAPPING & COATING OF UNDERGROUND PIPING ETC. (COLD APPLIED TAPES) 1. The coating system to be supplied shall consist of: i) A liquid adhesive layer i.e. primer -DENSOLEN- MT25 ii) An inner layer tape (3ply type) for corrosion protection -DENSOLEN Tape-AS39P iii) An outer layer tape (2 ply type) for additional mechanical protection- DENSOLEN Tape-R20HT iv) Mastic Putty Filler-DENSIT-MASTIC W to be supplied for filling the irregularities in areas around weld reinforcements. 2. Material Primer (Liquid adhesive) - The primer (DENSOLEN-MT25) shall consist of a mixture of butyl rubber, synthetic compound and a solvent. The primer shall be applied to the appropriately prepared pipe surface before application of inner layer tape. The function of primer is to provide a bonding medium between the pipe surface and the inner layer tape. The primer shall be quick drying type, the maximum drying time shall not be more than 30 minutes. The primer shall be suitable for brush application as well as machine application. The coverage of the primer shall be 7 sq. m per litre and the shelf life of the primer shall be at-least 2 years. The primer shall comply with the requirement of latest DIN EN 12068 (stress class-C) Standard and shall be free from any health hazard during storage and application. The offered primer shall be compatible with the offered tape and shall be suitable for application at temperatures ranging from 0OC to 60OC and operation of the coated pipe from temperatures ranging from 0OC to 50OC. Dry film thickness of the primer shall be 40-80 microns. The offered consumption rate (7 sq. m per litre) shall be demonstrated at site. Pipe with a fairly smooth surface shall be shot blasted at site in presence of the supplier#s representative and the primer shall be applied on the pipe to ascertain the consumption rate of the primer during the initial coating refurbishment with each lot of material. In case, the coverage rate at site is found to be less than specified (7 sq. m per litre), the differential quantity of primer falling short shall be supplied by the supplier free of cost at site. The details about properties of primer are mentioned in Table-5 on page 13 of DIN EN 12068:1999. The supplied primer shall be is line with the requirement of DIN-EN 12068 (Stress class-C). 3. Tape The tape shall be Co-Extruded Polyethylene Tape suitable for cold application OR Extruded hot calendared Polyethylene tape suitable for cold application. The inner tape shall have the butyl rubber adhesive on both the sides (3 PLY TAPE) and the outer tape shall have butyl rubber adhesive on one side only (2 PLY TAPE). A non-sticking separator strip (release film) shall be provided in the rolls to eliminate sticking of adhesives when the tape is in roll form. The consistency of the adhesive layer shall be such that under tension it flows on uneven steel surfaces. The adhesive layer shall be completely compatible with the properties of the primer. The inner tape must be self-amalgamating with the inner layer of outer Tape It shall be a standard product of the supplier having established history of excellent performance. Application Temperature (0°C to + 60°C) - Operating temperature (0°C to + 60°C) - Total coating thickness (2.5 to 3.0 mm) as per ASTM G12 Thickness of inner layer tape (Densolen tape-AS39P - Thickness of adhesive facing the steel pipe (0.44 mm) as per ASTM D1000 - Thickness of backing (carrier film) (0.28 mm) - Thickness of adhesive facing the outer layer tape (0.08 mm) - Total thickness (0.8 mm) Thickness of outer layer tape (Densolen tape-R20HT) - Thickness of adhesive facing the inner layer tape (0.2mm) - Thickness of backing (carrier film) (0.3 mm) - Total thickness (0.5 mm) - Width of the tape (100mm) - Deviation in width (+1.5 mm) Impact resistance (10 impacts at least 30 mm apart on same sample with impact force of > 15J (No holiday with a test voltage of 15 KV should pass) as per EN12068 Annex-H Indentation resistance pressure (test condition at 23 °C (10 N/mm2) as per DIN EN Indentation resistance pressure (test condition) at 50 °C (10 N/mm2) as per 12068 Remaining thickness (0.6 min) mm as per Annex-G Holiday detection (pass) Thermal ageing resistance ratio of (DIN EN 12068 Annex-E) - Tape strength (1.25> S100/So>0.75 S100/S70 >0.8) - Bursting strength (1.25> B100/Bo>0.75 B100/B70 >0.80) - Elongation at break (1.25> E100/Eo>0.75 E100/E70 >0.80) - Peel Strength layer to layer (1.25> E100/Eo>0.75 E100/E70 >0.80) - Peel strength to pipe surface (1.25> A100/Ao>0.75 A100/A70 >0.80) Specific electrical wrapping resistance (DIN EN 12068 Annex-J) Rs100 (108 Ohmxn2) Rs100 (>0.8) Cathodic Disbondment at 23 : °C 15 (max) mm as per DIN EN 12068 Annex-K Adhesion strength at 23 °C as per DIN EN 12068 Annex-C - Inner layer to primed pipe : 0.75 (min) N/mm - Inner layer to existing CTE/ 3LPE/Coal Tar Tape coatings :0.4 (min) N/mm Layer to Layer (as per DIN EN 12068 Annex-B - Inner to Inner : Outer to Inner 1.5 (min) N/mm - Outer to Outer : 0.2 (min) N/mm Adhesion Strength at 50°C as per DIN EN 12068 Annex-C - Inner layer to primed pipe : 0.075 (min) N/mm - Inner layer to existing CTE/ 3LPE/ Coal tar tape coatings : 0.04 (min) N/mm Layer to Layer as per DIN EN 12068 Annex-B - Inner to Inner + Outer to Inner : 0.2 (min) N/mm - Outer to Outer : 0.2 (min) N/mm 4Dimensional Requirement : - The width of the tape (inner as well as outer) shall be 100 mm and core dia meter of 41 mm. Tape shall be supplied in minimum roll lengths of 25 m each for inner and outer wrap rolls. - The inner tape and outer tape shall be supplied in roll form wound on hollow cores having core dia of 41 mm (Inner dia of the core for application with the available machines, with the owner, having shaft dia of 40 mm). 5. Surface finish requirement - Tape shall be able to give adequate adhesion to steel as specified under clause 4.0.2.1 when applied over pipe surface prepared up-to a level of Sa 2 or 2 ½ or St 2/st by sand blasting. Application of the primer over the sand blasted pipe shall ensure adequate adhesion to the pipe surface. 6. Application guidelines - Supplied tape shall be suitable for hand and machine application both. Overlap of 50% of both inner wrap as well as outer wrap shall achieve "As Applied" thickness of 2.5-3.0 mm. The tape rolls (Both inner and outer) shall be supplied in 41mm core dia(Inner dia) for application of the offered tapes.. Prior to back-fill the material shall withstand the following tests: (a) Holiday testing as per NACE RP 01 88-90 and ASTM G62 (b) Adhesion test and Electrical Inspection tests shall be carried out as per stipulations in AWWA-203 and relevant DIN standards. 7. Test Certificate Supplier has to produce documentary evidence (laboratory test certificate) for ensuring that the supplied tape material fully conforms to DIN EN 12068 code. 8. Data to be furnished: - The supplier/ contractor shall submit the following information along the supplied material: 1. Maximum exposure time of applied tape before backfilling. 2. Recommended time lag (Maximum and minimum) between application of primer and tape. 3. Application procedure of the tape system i.e. primer, inner wrap and outer wrap. 4. Application procedure of filler mastic. 5. Application techniques to be followed for weld reinforcements of long seam/helical seam of SAW pipes, girth welds, clamps/sleeves and heavily corroded areas. 6. Coating repair method. 7.Chemical composition of the backing material, adhesive layer, filler mastic and primer. 8.Field test and inspection procedure of the coating including list of instrument for field-testing. 9. Testing and Inspection: All the properties mentioned in the specification under Clause no. 4.0.2.1 shall be tested at manufacturer#s works with their in-house test facilities as per the test method indicated under column "Test methods# (Clause 4.0.2.1, Properties) by third party inspection agency or Owner#s representative except for Long duration tests specified at clause 9.1 below, for which the supplier/ contractor shall submit the copy of test certificates duly witnessed and endorsed by reputed third Party agencies like ABS, LRS; BV, RWTUV, DVGW or GL. The properties of the primer are also to be got tested in the laboratory and got certified by the third party inspection agency. The quality assurance and quality control procedure is to be submitted before inspection and testing. The supplier shall provide all necessary assistance to the third party Inspection agency (ABS, LRS; BV, RWTUV, DVGW, GL) and all the required tools/equipment/instruments to be arranged by Manufacturer for carrying out third party inspection. The test certificates duly signed by third party inspection agency shall be submitted to the Purchaser for their review. Dispatch of consignment shall be affected only after receiving the clearance from the purchaser. Material not conforming to specification shall be rejected. All tests shall be carried out on the basis of the standards mentioned under #Test method# specified in the specification at clause 4.0.2.1 taking the required no. of samples (except for Ageing Tests). These tests/ inspections shall be carried out by third party inspection agency for each lot as per the delivery schedule indicated by the owner. However, in case of break in the production of a particular lot, all the tests are to be carried out for each part of the lot(s). Ageing Tests: The Test comprises of i.) Heat Ageing at 100°C ii) Specific electrical insulation resistance Note: Additional payment for earth excavation and wrapping coating will be made extra for underground piping.
3 10.002 100 MM NB Item 10.20 10 M
4 10.003 150 MM NB Item 10.30 10 M
5 10.004 200 MM NB Item 10.40 10 M
6 10.005 250 MM NB Item 10.50 10 M
7 10.006 300 MM NB Item 10.60 10 M
8 10.007 350 MM NB Item 10.70 30 M
9 10.008 CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7018) Transportation of all piping items from owner's storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edges of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes at ground level i.e. upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches; connecting with equipment, nozzles, steam traps, strainers, orifice assemblies (including tapping upto first block valve), spray nozzles rotameters; tapping for instrument connections like pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings, including preparation small bore isometric upto 1.5 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction including supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects in a workman like manner including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the dire ctions of the Engineer- in-Charge. NOTE: For piping beyond 5 Mtr. elevation above and below ground piping and upto 10Mtr. rates is to be escalated by 20%. For more than 10 Mtr. but upto 15 Mtr. rates is to be escalated by 30%. For more than 15 Mtr but upto 20 Mtr. rates to be escalated by 40% respectively. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. NOTE: For piping where TIG welding is used for root run only, the rates to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. NOTE: Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.
10 10.009 15 mm NB, Schedule above 80 but upto 160 Item 10.90 1280 EA
11 10.01 20 mm NB, Schedule upto 80 Item 10.100 100 EA
12 10.011 20 mm NB, Schedule above 80 but upto 160 Item 10.110 60 EA
13 10.012 25 mm NB, Schedule upto 80 Item 10.120 50 EA
14 10.013 40 mm NB, Schedule upto 80 Item 10.130 50 EA
15 10.014 50 mm NB, Schedule more than 40 but upto 80 Item 10.140 920 EA
16 10.015 80 mm NB, Schedule upto 40 Item 10.150 610 EA
17 10.016 100 mm NB, Schedule upto 40 Item 10.160 286 EA
18 10.017 150 mm NB, Schedule upto 40 Item 10.170 30 EA
19 10.018 200 mm NB, Schedule above 20 but upto 40 Item 10.180 340 EA
20 10.019 250 mm NB, Schedule above 20 but upto 40 Item 10.190 40 EA
21 10.02 300 mm NB, Schedule above 20 but upto 40 Item 10.200 20 EA
22 10.021 350 mm NB, Schedule above 20 but upto 40 Item 10.210 10 EA
23 10.022 400 mm NB, Schedule above 20 but upto 40 Item 10.220 4 EA
24 10.023 450 mm NB, Schedule above 20 but upto 40 Item 10.230 4 EA
25 10.024 600 mm NB, Schedule above 20 but upto 40 Item 10.240 4 EA
26 10.025 Extra beyond 10Mtr elevation upto 15Mtr-
27 10.026 15 mm NB, Schedule above 80 but upto 160 Item 10.260 260 EA
28 10.027 20 mm NB, Schedule upto 80 Item 10.270 40 EA
29 10.028 20 mm NB, Schedule above 80 but upto 160 Item 10.280 60 EA
30 10.029 25 mm NB, Schedule upto 80 Item 10.290 20 EA
31 10.03 40 mm NB, Schedule upto 80 Item 10.300 30 EA
32 10.031 50 mm NB, Schedule more than 40 but upto Item 10.310 128 EA
33 10.032 80 mm NB, Schedule upto 40 Item 10.320 98 EA
34 10.033 100 mm NB, Schedule upto 40 Item 10.330 64 EA
35 10.034 150 mm NB, Schedule upto 40 Item 10.340 30 EA
36 10.035 200 mm NB, Schedule above 20 but upto 40 Item 10.350 20 EA
37 10.036 250 mm NB, Schedule above 20 but upto 40 Item 10.360 10 EA
38 10.037 300 mm NB, Schedule above 20 but upto 40 Item 10.370 10 EA
39 10.038 EXTRA for TIGfull TIG welding upto 50NB
40 10.039 15 mm NB, Schedule above 80 but upto 160 Item 10.390 1280 EA
41 10.04 20 mm NB, Schedule upto 80 Item 10.400 100 EA
42 10.041 20 mm NB, Schedule above 80 but upto 160 Item 10.410 60 EA
43 10.042 25 mm NB, Schedule upto 80 Item 10.420 50 EA
44 10.043 40 mm NB, Schedule upto 80 Item 10.430 50 EA
45 10.044 50 mm NB, Schedule more than 40 but upto Item 10.440 920 EA
46 10.045 80 mm NB, Schedule upto 40 Item 10.450 610 EA
47 10.046 100 mm NB, Schedule upto 40 Item 10.460 286 EA
48 10.047 150 mm NB, Schedule upto 40 Item 10.470 30 EA
49 10.048 200 mm NB, Schedule above 20 but upto 40 Item 10.480 340 EA
50 10.049 250 mm NB, Schedule above 20 but upto 40 Item 10.490 40 EA
51 10.05 300 mm NB, Schedule above 20 but upto 40 Item 10.500 20 EA
52 10.051 350 mm NB, Schedule above 20 but upto 40 Item 10.510 10 EA
53 10.052 400 mm NB, Schedule above 20 but upto 4 Item 10.520 4 EA
54 10.053 450 mm NB, Schedule above 20 but upto 4 Item 10.530 4 EA
55 10.054 600 mm NB, Schedule above 20 but upto 4 Item 10.540 4 EA
56 10.055 PROVISION OF REINFORCEMENT PAD (WITH WELDING ELECTRODE E-6010 / E-7018) Transportation from owner's storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, gri nding, edge preparation as per the instructions of the Engineer-in-Charge to his entire satisfaction including supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects in a workman like manner including area preparation for hot jobs, area cleaning after completion of work, pneumatic testing, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the dire ctions of the Engineer- in-Charge.
57 10.056 Branch size 2 inch Item 10.560 5 EA
58 10.057 Branch size 3 inch Item 10.570 5 EA
59 10.058 Branch size 4 inch Item 10.580 5 EA
60 10.059 Branch size 6 inch Item 10.590 5 EA
61 10.06 Branch size 8 inch Item 10.600 5 EA
62 10.061 Branch size 10 inch Item 10.610 5 EA
63 10.062 Branch size 12 inch Item 10.620 5 EA
64 10.063 EXTRA FOR IBR GRADE CS PIPING JOINTS Extra for IBR grade carbon steel piping joints. For IBR piping jobs, the scope of contractor shall be liasoning with IBR authorities including approval of drawings / documents from IBR authorities and also getting the final approval of the job from IBR authorities including payment of any fee or charges to IBR authorities for this purpose (20% of joints).
65 10.064 15 mm NB, Schedule above 80 but upto 160 Item 10.640 50 EA
66 10.065 20 mm NB, Schedule upto 80 Item 10.650 50 EA
67 10.066 25 mm NB, Schedule upto 80 Item 10.660 50 EA
68 10.067 40 mm NB, Schedule upto 80 Item 10.670 20 EA
69 10.068 50 mm NB, Schedule more than 40 but upto 80 Item 10.680 20 EA
70 10.069 80 mm NB, Schedule upto 40 Item 10.690 445 EA
71 10.07 STAINLESS STEEL PIPING (GR. SS 300) JOINTS Transportation of all piping items from owner's storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edges of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes at ground level i.e. upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches; anchoring wherever required, connecting with equipment, nozzles, steam traps, strainers, orifice assemblies (including tapping upto first block valve), spray nozzles rotameters; tapping for instrument connections like pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings, including preparation of small bore isometric upto 1.5 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction including supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables a nd labour etc. to complete the work in all respects in a workman like manner including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the dire ctions of the Engineer- in-Charge. NOTE: For piping beyond 5 Mtr. elevation above and below ground piping and upto 10Mtr. rates is to be escalated by 20%. For more than 10 Mtr. but upto 15 Mtr. rates is to be escalated by 30%. For more than 15 Mtr but upto 20 Mtr. rates to be escalated by 40% respectively. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. NOTE: For piping where TIG welding is used for root run only, the rates to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. NOTE: Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.
72 10.071 "15 mm NB, Schedule upto 40 " Item 10.710 80 EA
73 10.072 "20 mm NB, Schedule upto 40 " Item 10.720 120 EA
74 10.073 "25 mm NB, Schedule upto 40 " Item 10.730 280 EA
75 10.074 "40 mm NB, Schedule upto 40 " Item 10.740 20 EA
76 10.075 "50 mm NB, Schedule upto 40 " Item 10.750 480 EA
77 10.076 "80 mm NB, Schedule upto 40 " Item 10.760 2 EA
78 10.077 "100 mm NB, Schedule upto 40 " Item 10.770 2 EA
79 10.078 PROVISION OF REINFORCEMENT PAD FOR SS 300 SERIES Transportation from owner's storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, gri nding, edge preparation as per the instructions of the Engineer-in-Charge to his entire satisfaction including supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects in a workman like manner including area preparation for hot jobs, area cleaning after completion of work, pneumatic testing, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the dire ctions of the Engineer- in-Charge.
80 10.079 Branch size 2 inch Item 10.790 5 EA
81 10.08 Branch size 3 inch Item 10.800 5 EA
82 10.081 Branch size 4 inch Item 10.810 5 EA
83 10.082 HDPE PIPE JOINTS(FABRICATION & ERECTION) Fabrication of HDPE pipe joints as per drawings / instructions of Engineer-in-Charge of heavy thickness up to 20 mm thick, cutting of pipe according to size, preparation of edge according to procedure, making of joints including mitre / flange / "T" by a qualified approved fabricator. The joints should be leaky proof. All labours, equipment, tools and tackles, consumables etc. to be arranged by the party and as directed by the Engineer-in-Charge. Note: Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the dire ctions of the Engineer-in-Charge. Note: For piping beyond 5 Mtr. elevation above and below ground piping and upto 10Mtr. rates is to be escalated by 20%. For more than 10 Mtr. but upto 15 Mtr. rates is to be escalated by 30%. For more than 15 Mtr but upto 20 Mtr. rates to be escalated by 40% respectively.
84 10.083 15 mm NB Item 10.830 40 EA
85 10.084 20 mm NB Item 10.840 40 EA
86 10.085 25 mm NB Item 10.850 40 EA
87 10.086 40 mm NB Item 10.860 40 EA
88 10.087 50 mm NB Item 10.870 20 EA
89 10.088 80 mm NB Item 10.880 20 EA
90 10.089 100 mm NB Item 10.890 20 EA
91 10.09 FABRICATION AND ERECTION OF PIPE SUPPORT / PLATFORMS / DEVITS / STAIR CASE ETC. The job includes getting the materials issued, transportation to work site and handling at site, fabrication at the required size and shape using steel pipes, MS structural / plates etc. by cutting, bevelling and welding including fixing of MS gratings / chequered plates on platform at all elevation by welding, bolting or otherwise to existing members or equipment. This also includes fabrication and fixing of pipe clamps, non-standard bolts etc. inclusive of labour, consumables, tools and tackles and materials required for U-clamps, J-bolts etc. and applying one coat of primer and two coats of high built black bituminous paint and complete in all respect as per drawings, specifications and instructions of the Engineer-in-Charge. (Excluding cost of structural steel). Item 10.900 5 TO
92 10.091 DISMANTLING OF STRUCTURALS LIKE PIPE SUPPORT / STAIRWAY / DEVIT ETC. Removal of existing platforms / pipe supports / davits / stairways etc. along with adjacent fittings / members by cutting / debolting or by any other means without damaging the remaining unit and lowering down to the ground including erection of scaffolding, retrieving of all the usable materials and transportation to the storage point as directed by the Engineer-in-Charge. Item 10.910 5 TO
93 10.092 BENDING OF PIPES Bending of pipes: the job includes bending of pipes in the required curvature and supply of all tools, tackles, labour and the supervision to complete the job as per and to the full satisfaction of the Engineer-in-Charge.
94 10.093 15 mm NB Item 10.930 800 EA
95 10.094 20 mm NB Item 10.940 100 EA
96 10.095 DYE PENETRATION TEST FOR PIPING WORKS Performance of dye penetration test including supply of all necessary materials, penetrant, developer etc. along with all equipment#s, labour, for carrying out the work as per specification & direction of engineer -in-charge at all elevations. Test has to be carried out in all metallurgy the test has to carry out on all schedules of pipes. NOTE: Since inch dia unit is not available in SAP, hence for estimate unit is to be taken as " dia.
97 10.096 For Pipes (Per Inch Dia) Item 10.960 3000 "
98 10.097 RADIOGRAPHY OF PIPING WORKS Performance of radiographic inspection on all type & sizing of piping/ pipe fittings in position at all heights inclusive of providing sources, film, chemicals, & all necessary equipment#s, consumables etc. complete in all respect as per specification & instruction of the Engineer-in-Charge. NOTE: Since inch dia unit is not available in SAP, hence for estimate unit is to be taken as " dia.
99 10.098 For Pipes (Per Inch Dia) Item 10.980 6000 "
100 10.099 HYDROTESING OF PIPING WORKS Hydrostatic testing of pipelines at the specified pressure including blinding/deblinding, fabrication and fixing of testing connections, pressure gauge installation. Hose pipe connection and making all other arrangements as required and dewatering, flushing and boxing up after fixing proper gaskets with supply of all labour, tools andtackles, instruments and instruction of the Engineer-in-Charge. The job has to be carried out at all elevations.
101 10.1 15 mm Item 10.1000 20000 M
102 10.101 20 mm Item 10.1010 1000 M
103 10.102 25 mm Item 10.1020 400 M
104 10.103 40 mm Item 10.1030 300 M
105 10.104 50 mm Item 10.1040 11000 M
106 10.105 80 mm Item 10.1050 24000 M
107 10.106 100 mm Item 10.1060 26000 M
108 10.107 150 mm Item 10.1070 6700 M
109 10.108 200 mm Item 10.1080 4500 M
110 10.109 250 mm Item 10.1090 500 M
111 10.11 300 mm Item 10.1100 670 M
112 10.111 350 mm Item 10.1110 400 M
113 10.112 400 mm Item 10.1120 100 M
114 10.113 450 mm Item 10.1130 100 M
115 10.114 PNEUMATIC TESTING OF PIPING Pneumatic test of pipe lines surface to identify leaks after cleaning the surface with wire brush, air jet etc. including all connected jobs of blinding, deblinding etc. and all preparatory jobs as required with all tools, tackles, consumables, air compressor, vacuum box and all other as directed by the Engineer-in-Charge. The job has to be executed at all elevations. Note: Unit of measurement cannot be changed so "EA" is to be read as " Metre"
116 10.115 15 mm Item 10.1150 200 EA
117 10.116 20 mm Item 10.1160 200 EA
118 10.117 25 mm Item 10.1170 200 EA
119 10.118 40 mm Item 10.1180 100 EA
120 10.119 50 mm Item 10.1190 100 EA
121 10.12 80 mm Item 10.1200 100 EA
122 10.121 100 mm Item 10.1210 100 EA
123 10.122 150 mm Item 10.1220 100 EA
124 10.123 200 mm Item 10.1230 100 EA
125 10.124 250 mm Item 10.1240 100 EA
126 10.125 300 mm Item 10.1250 100 EA
127 10.126 350 mm Item 10.1260 100 EA
128 10.127 600 mm Item 10.1270 50 EA
129 10.128 FIXING / REMOVAL OF FLANGES / BLIND FLANGES OF RATING UPTO 300# Opening / fixing etc. of flanges / blind flanges / spool pieces at the two flange joint (rating upto 300#) as and when required for elbow reversing, wedge opening etc. or any other job including handling of flanges and preparation of gaskets from the sheet including tools and tackles, consumables, supervision etc. and as per direction of the Engineer-in-Charge.
130 10.129 15 mm Item 10.1290 100 EA
131 10.13 20 mm Item 10.1300 100 EA
132 10.131 25 mm Item 10.1310 100 EA
133 10.132 40 mm Item 10.1320 50 EA
134 10.133 50 mm Item 10.1330 50 EA
135 10.134 80 mm Item 10.1340 20 EA
136 10.135 100 mm Item 10.1350 20 EA
137 10.136 150 mm Item 10.1360 20 EA
138 10.137 200 mm Item 10.1370 20 EA
139 10.138 250 mm Item 10.1380 20 EA
140 10.139 300 mm Item 10.1390 20 EA
141 10.14 350 mm Item 10.1400 20 EA
142 10.141 HEAT TREATMENT Heat treatment of shop fabricated for already installed piping / static equipment etc. for joints or other operations wherever required. Heating to be carried out in a furnace or by using an electric resistance or induction heating equipment ensuring uniform temperature attainment at all points of the portion being heat-treated. The portion under heat treatment shall be wrapped suitably under insulation to avoid any harmful temperature gradient. The temperature thus attainted in the portion under heat treatment shall be recorded by means of thermocouples, pyrometer and an automatic temperature recorders suitably calibrated should be employed. The calibration chart of each recorder along with hardness test results shall be submitted to the Engineer-in-Charge for approval. The details of heat treatment such as heating rate, soaking temperature pause period and cooling rate etc. to be carried out as per relevant standards / code as instructed by the Engineer-in-Charge. NOTE: Since inch dia unit is not available in SAP, hence for estimate unit is to be taken as " dia.
143 10.142 For Pipes (Per Inch Dia) Item 10.1420 4000 "
144 10.143 SUPPORT PAD WELDING OF PIPES The job involves transportation of all items including all types of structures, pipes etc. from owner's storage point to work site and / or prefabrication yard and welding including cutting / grinding / edge preparing and required testing to prove soundness of welding with supply of all consumables, manpower, tools as per technical specification and direction and satisfaction of the Engineer-in-Charge.
145 10.144 For Pipe Dia up to 25mm Item 10.1440 100 EA
146 10.145 For pipe Dia 40 mm Item 10.1450 100 EA
147 10.146 For pipe Dia 50 mm Item 10.1460 100 EA
148 10.147 For pipe Dia 80 mm Item 10.1470 50 EA
149 10.148 For pipe Dia 100 mm Item 10.1480 50 EA
150 10.149 For pipe Dia 150 mm Item 10.1490 50 EA
151 10.15 For pipe Dia 200 mm Item 10.1500 50 EA
152 10.151 For pipe Dia 250 mm Item 10.1510 50 EA
153 10.152 INSTALLATION OF FLANGED / RTJ VALVES Transportation of all types of flanged / RTJ valves, gaskets, nut bolts etc. either from owner's storage point to workshop and / or worksite and installation of valves at ground level i.e. up to a height of 5 meters on sleepers, pipe racks etc. or up to 5 meters depth in trenches including assembly of valve accessories, cleaning of flanged faces, lapping of RTJ rings, cutting the gaskets to proper size, placing the gaskets / RTJ ring properly, tightening of studs, providing earthing protection by way of fixing strips, all complete as per drawings and direction of the Engineer-in-Charge including all labour, tools, tackles, consumables and supervision etc.
154 10.153 For Valves (other than RTJ) Item 10.1530 5000 KG
155 10.154 For RTJ Valves Item 10.1540 1000 KG
156 10.155 REMOVAL OF FLANGED / RTJ VALVES Dismantling and removal of all types of flanged including RTJ valves from pipelines at ground level i.e. up to a height of 5 meters on sleepers, pipe racks etc. or up to 5 meters depth in trenches including removal of gaskets, nut bolts etc. and transportation either to owner's storage point / workshop and / or scrapyard including loosening of studs, disconnecting earthing protection all complete as per direction of the Engineer-in-Charge including all labour, tools, tackles, consumables and supervision etc. Item 10.1550 500 KG
157 10.156 WELDING OF CS PLATES Transportation of all items including plates etc. from owner's storage point to work site and / or prefabrication yard and welding of CS plates including cutting / grinding / edge preparing and required testing to prove soundness of weld joint with supply of all consumables, manpower, tools as per technical specification and direction of the Engineer-in-Charge.
158 10.157 Above 9mm & upto 11mm thick Item 10.1570 100 M
159 10.158 Above 11mm & upto 12.7mm thick Item 10.1580 100 M
160 10.159 WELDING OF SS / AS PLATES Transportation of all items including plates etc. from owner's storage point to work site and / or prefabrication yard and welding of SS / AS plates / structural etc. including cutting / grinding / edge preparing and required testing to prove soundness of weld joint with supply of all consumables, manpower, tools as per technical specification and direction of the Engineer-in-Charge (Heat treatment and other NDT charges shall be paid extra).
161 10.16 Upto 3mm thick alloy steel (P1) Item 10.1600 5 M
162 10.161 Above 3mm & upto 5 mm thick Alloy Steel (P1) Item 10.1610 5 M
163 10.162 Above 5mm & upto 6mm thick Alloy Steel (P1) Item 10.1620 10 M
164 10.163 Above 9mm & upto 11mm thick Alloy Steel (P1) Item 10.1630 10 M
165 10.164 Above 11mm & upto 12.7mm thick Alloy Steel (P1) Item 10.1640 10 M
166 10.165 Above 12.7mm & upto 15mm thick Alloy Steel (P1) Item 10.1650 10 M
167 10.166 PAINTING SYSTEM Supply All necessary materials like primer/ paint etc., preparing surfaces and application of paint/ primer only one coat system as follows, at height up to 6m and in all position including the cost of scaffolding up to 6m, labour, tools & tackles, PPE, Sundries, Electricity charges, Water charges & Other Utility Charges etc. Surface preparation, Labour charges, scaffolding with material/ SQM has been considered as (Rs.48.61 + Rs.48.61 + Rs.82.79) NOTE: 1. Surface preparation (blast clean to SA 2 1/2), labour charges, scaffolding upto 6m height with material in contractor scope has been considered in the schedule of rates. However in case of repetitive painting only labour charges will be paid. 2. Cost towards PPE, Sundries, Electricity charges, Water charges & Other Utility Charges have been considered in the schedule of rates. 3. For painting above 6m height, differential cost of scaffolding as per Mechanical SOR shall be paid extra accordingly. 4.Supply of Air: Air supply during surface preparation in the unit will be provided by IOCL free of cost but in offsite where contractor is to supply the electrical driven air compressor, the painting rates will be 15% extra and in case of supply of diesel driven air compressor, the painting rates will be 25% extra.
168 10.167 Inorganic Ethyl Zinc Silicate - Primer (Dy film thickness in micron (DFT 75) Item 10.1670 1000 M2
169 10.168 Alkyd Based High Build MIO - Intermediate Paint (Dy film thickness in micron (DFT 100) Item 10.1680 12000 M2
170 10.169 Heat resisting aluminium paint 200 deg to 600 deg centigrade (Silicone resin) (Dy film thickness in micron (DFT 15) Item 10.1690 100 M2
171 10.17 Acrylic Polyurethane Paint (Dy film thickness in micron (DFT 30) Item 10.1700 18000 M2
172 10.171 Catalytically Cured High Build Phenolic Epoxy - Paint (Dy film thickness in micron (DFT 100) Item 10.1710 1000 M2
173 10.172 STEEL SCAFFLODING MATERIALS IN CONTRACTOR'S SCOPE The job includes transportation of scaffolding materials in contractor's scope of supply, erection of scaffolding at site covering the areas specified including providing vertical posts of pipes at inter distance of 1.5 m and horizontal numbers at a inter distance of 0.5 to 0.75 m, providing tie rods at corners to give sufficient strength to the structure, placing the wooden / steel planks / FRP gratings on top for making sufficient area. Dismantling scaffolding after completion of job and returning the scaffolding material to specified place including all tools, tackles, consumables, labours and contractor's supervision as directed by the Engineer-in-Charge 1. For measurement in SQM: 2 (length + width) X height area covered by the scaffolding is to be taken. 2. Scaffolding measurement to be done by breaking the height into parts as per height slab mentioned below and adopting respective rates against mentioned height slabs.
174 10.173 Upto 6 M Item 10.1730 2000 M2
175 10.174 Above 6 m upto 10 m Item 10.1740 2000 M2
176 10.175 Above 10 m upto 20 m Item 10.1750 2000 M2
177 10.176 FABRICATION AND ERECTION OF PIPE SUPPORT / PLATFORMS / DEVITS / STAIR CASE ETC. The job includes getting the materials issued, transportation to work site and handling at site, fabrication at the required size and shape using steel pipes, MS structural / plates etc. by cutting, bevelling and welding including fixing of MS gratings / chequered plates on platform at all elevation by welding, bolting or otherwise to existing members or equipment. This also includes fabrication and fixing of pipe clamps, non-standard bolts etc. inclusive of labour, consumables, tools and tackles and materials required for U-clamps, J-bolts etc. and applying one coat of primer and two coats of high built black bituminous paint and complete in all respect as per drawings, specifications and instructions of the Engineer-in-Charge. (Excluding cost of structural steel). Item 10.1760 52 TO
178 10.177 HANDLING / ERECTION OF FABRICATED PIPES / COIL ASSEMBLIES The job includes getting the materials issued, transportation to work-site, handling and care at work-site, erecting the fabricated item at position and fixing, aligning and making connections to the companion pipe etc. And complete in all respect with all labour, tools, tackles and supervision etc. as per the direction of the Engineer-in-Charge. Item 10.1770 10 TO
179 10.178 Painting of Struture (externally) NOTE: 1. Surface preparation, labour charges, scaffolding with material/ SQM has been considered in the schedule of rates. 2. Cost towards PPE, Sundries, Electricity charges, Water charges & Other Utility Charges have been considered in the schedule of rates.
180 10.179 New Construction Surface Preparation : SA2.5 Primer Generic name : Inorganic zinc silicate + epoxy zinc phosphate. DFT : 65 + 25 Intermediate Coat Generic coat : hb epoxy mio DFT : 75 Finish Coat Generic Name : two pack hb acrylic pu DFT : 60 in 2 coats Total DFT : 225 Item 10.1790 400 M2
181 10.18 Maintenance Primer Generic name : Self priming HB coating. DFT : 100 Intermediate coat Generic coat : hb epoxy mio DFT : 75 Finish Coat Generic Name : two pack hb acrylic pu DFT : 60 in 2 coats Total DFT : 235 Item 10.1800 600 M2
182 10.181 Painting over galvanized surface/pipes. NOTE: 1. Surface preparation, labour charges, scaffolding with material/ SQM has been considered in the schedule of rates. 2. Cost towards PPE, Sundries, Electricity charges, Water charges & Other Utility Charges have been considered in the schedule of rates.
183 10.182 Maintenance Surface Preparation : ST2 Primer Generic name : Two pack phosphoric acid cured poly butyral etch primer. DFT : 8 Intermediate Coat Generic coat : self priming hb coating DFT : 100 Finish Coat Generic Name : two pack hb acrylic pu DFT : 60 in 2 coats Total DFT : 168 Item 10.1820 250 M2
184 20 PART-B
185 20.1 Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
186 20.2 In gratings, frames, guard bar, ladders, railings, brackets, gates & similar works. Item 20.20 10000 KG
187 20.3 Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying a priming coat of approved steel primer.
188 20.4 M.S. tube Item 20.40 500 KG
189 20.5 G.I. Pipes Item 20.50 8000 KG
190 20.6 Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm + 0.05 %, total coated thickness with zinc coating 120 gsm as per IS: 277 in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches while transportation and should be supplied in single length up to 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55mm) with EPDM seal, complete up to any pitch in horizontal/ vertical or curved surfaces excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. Item 20.60 500 M2
191 20.7 Ridges plain (500-600). Item 20.70 180 M
192 20.8 Flashings/ aprons. (upto 600mm) Item 20.80 84 M
193 20.9 Gutter (600 mm over all girth). Item 20.90 355 M
194 30 PART-C
195 30.01 INSTALLATION OF ROTATING EQUIPMENT (PUMPS / MIXERS / COMPRESSORS / TURBINES ETC.) Transportation of rotating equipment with drives (including all types of pumps/ mixers/ compressors/ turbines etc.) and accessories from owner's storage points to worksite, assembly of parts/ sub-assemblies, installation of base plates for foundations, placing the equipment on prepared foundations, levelling with machined and tapered metallic wedges and tack welding grouting, carrying out alignment, trial runs and start up runs and providing manpower for testing, rectifying and defect and completion of works in all respects including earthing protection by way of fixing strips and electrodes as per drawings and specifications. Job also includes supplying of all types of labour, tools, tackles, lifting arrangements, cranes, tractor trolley and equipment, machineries all consumables to complete the job in a workman like manner, erection and removal of steel scaffolding wherever required, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge. Item 30.10 20 TO
196 30.02 INSTALLATION OF VESSELS / COLUMNS / DRUMS / FILTERS UPTO 5 MT Transportation of vessel/ columns/ filters/ drums etc. from owner's storage point to worksite, assembly of parts, sub-assemblies (including internals), erection at all elevations, aligning, tightening of bolts, grouting, cleaning, hydrotesting and flushing by water, draining, drying by compressed air and installation of all mountings and completing the works in all respects including earthing protection by way of fixing strips and electrodes as per drawings and specifications. Job also includes supplying of all types of tools, tackles, lifting arrangements, cranes, tractor trolley and equipment, machineries all consumables and labour to complete the job in a workman like manner, erection and removal of steel scaffolding wherever required, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge. Item 30.20 30 TO
197 30.03 INSTALLATION OF STATIC EQUIPMENT- MOUNDED BULLET SECTIONS UP TO 80MT Transportation of Mounded Bullet section from owners storage point (within 50 m of radius) to works site at various elevations on foundation, levelling, aligning, fitup & completing the job in all respects & prepare the fitup section for welding. Job also includes supplying of all types of tools,tackles,lifting arrangements ,cranes(min 250 MT capacity),tractor trolley and equipment,machineries all consumables and labour to complete the job in a workman like manner ,erection and removal of steel scaffolding wherever required,area preparation for hot job and area cleaning after completion of work. MPT & radiography of fitup/joint shall be paid in separate line item. Item 30.30 600 TO
198 30.04 WELDING OF CS PLATES Transportation of all items including plates etc. from owner's storage point to work site and / or prefabrication yard and welding of CS plates including cutting / grinding / edge preparing and required testing to prove soundness of weld joint with supply of all consumables, manpower, tools as per technical specification and direction of the Engineer-in-Charge.
199 30.05 44mm thick Item 30.50 180 M
200 30.06 24mm thick Item 30.60 80 M
201 30.07 HEAT TREATMENT Heat treatment of shop fabricated for already installed piping / static equipment etc. for joints or other operations wherever required. Heating to be carried out in a furnace or by using an electric resistance or induction heating equipment ensuring uniform temperature attainment at all points of the portion being heat-treated. The portion under heat treatment shall be wrapped suitably under insulation to avoid any harmful temperature gradient. The temperature thus attainted in the portion under heat treatment shall be recorded by means of thermocouples, pyrometer and an automatic temperature recorders suitably calibrated should be employed. The calibration chart of each recorder along with hardness test results shall be submitted to the Engineer-in-Charge for approval. The details of heat treatment such as heating rate, soaking temperature pause period and cooling rate etc. to be carried out as per relevant standards / code as instructed by the Engineer-in-Charge. NOTE: Since inch dia unit is not available in SAP, hence for estimate unit is to be taken as " dia.
202 30.08 For Pipes (Per Inch Dia) Item 30.80 1000 "
203 30.09 For Vessel & Tanks Item 30.90 350 M2
204 30.1 DYE PENETRATION TEST FOR PIPING WORKS Performance of dye penetration test including supply of all necessary materials, penetrant, developer etc. along with all equipment#s, labour, for carrying out the work as per specification & direction of engineer -in-charge at all elevations. Test has to be carried out in all metallurgy the test has to carry out on all schedules of pipes. NOTE: Since inch dia unit is not available in SAP, hence for estimate unit is to be taken as " dia.
205 30.11 For Pipes (Per Inch Dia) Item 30.110 500 "
206 30.12 For Vessels / Tanks (Per Inch) Item 30.120 1000 "
207 30.13 MAGNETIC PARTICLE TESTING Performance of magnetic particle test including supply of all necessary materials, equipment and labour for carrying out the work as per specification and directions of Engineer-in-Charge
208 30.14 For pipes/Nozzles (Per Inch) Item 30.140 1500 "
209 30.15 For Vessels/ Tanks (upto 44mm thk) (Per Inch) Item 30.150 1200 "
210 30.16 RADIOGRAPHY OF PIPING WORKS Performance of radiographic inspection on all type & sizing of piping/ pipe fittings in position at all heights inclusive of providing sources, film, chemicals, & all necessary equipment#s, consumables etc. complete in all respect as per specification & instruction of the Engineer-in-Charge. NOTE: Since inch dia unit is not available in SAP, hence for estimate unit is to be taken as " dia.
211 30.17 For Pipes (Per Inch Dia) Item 30.170 500 "
212 30.18 For Vessel/ tanks etc. (Per Inch) Item 30.180 35000 "
213 30.19 HYDRAULIC TESTING OF THE TANK This includes hydraulic testing of the tank to identify leaks and repairs required including all connected jobs like blinding / de-b linding, temporary piping arrangements to fill in and empty out the water as directed by the Engineer-in-Charge. Repetitive hydrotesting of tank if required on account of repair or for roof float ation test as per inspection requirement. NOTE: Since Lumpsum unit is not available in SAP, hence for estimate unit is to be taken as each.
214 30.2 CAPACITY UPTO 500 M3 Item 30.200 2 EA
215 30.21 Above 3000 up to 4000 M3 Item 30.210 3 EA
216 30.22 Painting (External/Internal)-Bullet Supply All necessary materials like primer/ paint etc., Surface preparation (blast clean to SA 2 1/2),preparing surfaces and application of paint/ primer Internal and External, system as follows, in all position including the cost of, labour, tools & tackles, PPE, Sundries ,Electricity charges, Water charges & Other Utility Charges etc. as per drawing/specification . Note: Cost of scaffolding is excluded and shall be paid against Scaffolding item as per the execution.
217 30.23 External Coating Aluminum filled moisture cured Urethane Primer or Two (2) component chemical cure Urethane primer , 1 coat @ 50 micron DFT +Poly Urethane Finish Paint , 1 coat @ 1000 micron DFT.(Total dry film thickness inclusive primer = 1050 microns ) Item 30.230 4600 M2
218 30.24 One coat of Two component high build solvent-less phenolic epoxy primer cured with polyamine hardener @ 50 – 75 microns DFT per coat+One coat of Two component high build solvent-less phenolic intermediate coat cured with polyamine hardener @ 75 – 100 microns DFT per coat + One coat of Two component high build solvent-less phenolic finish coat cured with polyamine.(Total dry film thickness inclusive primer = 200 -275 microns ) Item 30.240 1600 M2
219 50 CONTRACTORS PROFIT ON PART-D (MANPOWER)
220 50.1 CONTRACTORS PROFIT ON MANPOWER SUPPLY OF PART-D Item 50.10 102481 EA
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail