}

Hiring Of Hemm For Removal Of Ob , Extraction And Transportation Of Coal With Firefighting From Xvih , Xvie , Xvic , Xvib , Xvia/Xvi And Xv Seams Of Oc Patch B Of Katras Choitodih Section Of Amalgamated Gaslitand Katras Choitodih Colliery Of Katras A, CMC DEPARTMENT, BCCL HQ-Jharkhand

Bharat Coking Coal Limited-BCCL has published Hiring Of Hemm For Removal Of Ob , Extraction And Transportation Of Coal With Firefighting From Xvih , Xvie , Xvic , Xvib , Xvia/Xvi And Xv Seams Of Oc Patch B Of Katras Choitodih Section Of Amalgamated Gaslitand Katras Choitodih Colliery Of Katras A. Submission Date for this Tender is 24-06-2020. Machine Tools Tenders in CMC DEPARTMENT, BCCL HQ Jharkhand. Bidders can get complete Tender details and download the document.




Tender Notice

24440565
Corrigendum : Hiring Of Hemm For Removal Of Ob , Extraction And Transportation Of Coal With Firefighting From Xvih , Xvie , Xvic , Xvib , Xvia/Xvi And Xv Seams Of Oc Patch B Of Katras Choitodih Section Of Amalgamated Gaslitand Katras Choitodih Colliery Of Katras A
Open Tender
Indian
Jharkhand
CMC DEPARTMENT, BCCL HQ
24-06-2020

Tender Details

Hiring Of Hemm For Removal Of Ob , Extraction And Transportation Of Coal With Firefighting From Xvih , Xvie , Xvic , Xvib , Xvia/Xvi And Xv Seams Of Oc Patch B Of Katras Choitodih Section Of Amalgamated Gaslitand Katras Choitodih Colliery Of Katras Area , Excavation In Benches ( In-Situ ) By Mechanical Means At Any Depth In All Kinds Of Soil , Rock , Including Mixed Soil , Mixed Hard Soil I . E . Clay Soils Mixed With Pebbles / Laterite / Stone Boulders , Soft Or Hard Rock Etc . , Removal Of Slushy Earth , Mud And Slurry As Required , Loading , Transporting And Unloading The Excavated Materials Mechanically And Disposed Off Outside The Working Zone/In-Pit Dump In Proper Manner Including Spreading , Dozing , Lighting , Water Sprinkling , Grading And Other Ancillary Mining Activities Etc . All Complete As Per Instructions/Directions Of Engineer-In-Charge . The Job Involves Making Access Trench/Haul Roads , Dozing , Grading As Required For Excavation Operation And For Transportation Of Excavated Materials Etc . , All Complete . ( Blasting Shall Be Done By Department Free Of Cost , As And When Required . Supply Of Explosives , Detonators And Related Materials Will Be Made Available By Bccl And The Services Of Statutory Supervisory Personnel As Required For The Work Will Be Provided As And When Considered Necessary By The Management Free Of Cost . ) Removal And Disposal Of Overburden Also Includes Fire-Fighting For Which The Tenderer Has To Provide Adequate Number Of Pumps Of Suitable Capacity Including Electricals Along With M . S . Pipes Of Required Lengths & Dia . Including All Required Fittings Etc . For Proper Fire-Fighting At Ob Faces And Ob Dumps As Per Instructions/Directions Of Engineer In-Charge . The Tenderer Has To Make Arrangements Of Manpower And Fire-Fighting Including Hoses To Deal With Fire During All Operations Such As Drilling In Hot Strata At Any Depth , Cooling The Blast Holes With Water Before Charging Them With Explosives , Charging Of Explosives In Blast Holes , Digging And Loading Of Ob , Continuously Spraying Water Over The Blasted Ob To Quench Fire Etc . Tenderer Has To Ensure That Fire Is Absolutely Quenched Before Loading Of Ob Etc . Carriage Lead: ( 0-1 ) Km From Face To Surface/In-Pit Ob Dump . , Excavation In Benches ( In-Situ ) By Mechanical Means At Any Depth In All Kinds Of Soil , Rock , Including Mixed Soil , Mixed Hard Soil I . E . Clay Soils Mixed With Pebbles / Laterite / Stone Boulders , Soft Or Hard Rock Etc . , Removal Of Slushy Earth , Mud And Slurry As Required , Loading , Transporting And Unloading The Excavated Materials Mechanically And Disposed Off Outside The Working Zone/In-Pit Dump In Proper Manner Including Spreading , Dozing , Lighting , Water Sprinkling , Grading And Other Ancillary Mining Activities Etc . All Complete As Per Instructions/Directions Of Engineer-In-Charge . The Job Involves Making Access Trench/Haul Roads , Dozing , Grading As Required For Excavation Operation And For Transportation Of Excavated Materials Etc . , All Complete . ( Blasting Shall Be Done By Department Free Of Cost , As And When Required . Supply Of Explosives , Detonators And Related Materials Will Be Made Available By Bccl And The Services Of Statutory Supervisory Personnel As Required For The Work Will Be Provided As And When Considered Necessary By The Management Free Of Cost . ) Removal And Disposal Of Overburden Also Includes Fire-Fighting For Which The Tenderer Has To Provide Adequate Number Of Pumps Of Suitable Capacity Including Electricals Along With M . S . Pipes Of Required Lengths & Dia . Including All Required Fittings Etc . For Proper Fire-Fighting At Ob Faces And Ob Dumps As Per Instructions/Directions Of Engineer In-Charge . The Tenderer Has To Make Arrangements Of Manpower And Fire-Fighting Including Hoses To Deal With Fire During All Operations Such As Drilling In Hot Strata At Any Depth , Cooling The Blast Holes With Water Before Charging Them With Explosives , Charging Of Explosives In Blast Holes , Digging And Loading Of Ob , Continuously Spraying Water Over The Blasted Ob To Quench Fire Etc . Tenderer Has To Ensure That Fire Is Absolutely Quenched Before Loading Of Ob Etc . Carriage Lead: ( 1-2 ) Km From Face To Surface/In-Pit Ob Dump . , Excavation In Benches ( In-Situ ) By Mechanical Means At Any Depth In All Kinds Of Soil , Rock , Including Mixed Soil , Mixed Hard Soil I . E . Clay Soils Mixed With Pebbles / Laterite / Stone Boulders , Soft Or Hard Rock Etc . , Removal Of Slushy Earth , Mud And Slurry As Required , Loading , Transporting And Unloading The Excavated Materials Mechanically And Disposed Off Outside The Working Zone/In-Pit Dump In Proper Manner Including Spreading , Dozing , Lighting , Water Sprinkling , Grading And Other Ancillary Mining Activities Etc . All Complete As Per Instructions/Directions Of Engineer-In-Charge . The Job Involves Making Access Trench/Haul Roads , Dozing , Grading As Required For Excavation Operation And For Transportation Of Excavated Materials Etc . , All Complete . ( Blasting Shall Be Done By Department Free Of Cost , As And When Required . Supply Of Explosives , Detonators And Related Materials Will Be Made Available By Bccl And The Services Of Statutory Supervisory Personnel As Required For The Work Will Be Provided As And When Considered Necessary By The Management Free Of Cost . ) Removal And Disposal Of Overburden Also Includes Fire-Fighting For Which The Tenderer Has To Provide Adequate Number Of Pumps Of Suitable Capacity Including Electricals Along With M . S . Pipes Of Required Lengths & Dia . Including All Required Fittings Etc . For Proper Fire-Fighting At Ob Faces And Ob Dumps As Per Instructions/Directions Of Engineer In-Charge . The Tenderer Has To Make Arrangements Of Manpower And Fire-Fighting Including Hoses To Deal With Fire During All Operations Such As Drilling In Hot Strata At Any Depth , Cooling The Blast Holes With Water Before Charging Them With Explosives , Charging Of Explosives In Blast Holes , Digging And Loading Of Ob , Continuously Spraying Water Over The Blasted Ob To Quench Fire Etc . Tenderer Has To Ensure That Fire Is Absolutely Quenched Before Loading Of Ob Etc . Carriage Lead: ( 2-3 ) Km From Face To Surface/In-Pit Ob Dump . , Removal Of Dumped Loose Overburden By Mechanical Means In All Kinds Of Soil , Rock Including Mixed Soil , Mixed Hard Soil I . E . Clay Soils Mixed With Pebbles / Laterite/ Stone Boulders , Soft Or Hard Rock Etc . , Removal Of Slushy Earth , Mud & Slurry As Required , Loading , Transporting & Unloading The Excavated Materials Mechanically And Disposed Off Outside The Working Zone In Proper Manner On The Dumping Yard Including Spreading , Dozing , Lighting , Water Sprinkling , Grading & Other Ancillary Mining Activities Etc . , All Complete As Per Instructions/Directions Of Engineer- In Charge . The Job Involves Making Access Trench/Haul Roads , Dozing , Grading As Required For Excavation Operation And For Transportation Of Excavated Materials Etc . , All Complete . Removal And Disposal Of Overburden Also Includes Firefighting For Which The Tenderer Has To Provide Adequate Number Of Pumps Of Suitable Capacity Including Electricals Along With M . S . Pipes Of Required Lengths & Dia . Including All Required Fittings Etc . For Proper Firefighting At Ob Faces And Ob Dumps As Per Instruction Of Engineer In-Charge . The Tenderer Has To Make Arrangements Of Manpower And Firefighting Including Hoses To Deal With Fire During All Operations Such As Digging And Loading Of Loose Dumped Overburden , Continuously Spraying Water Over The Loose Dumped Overburden To Quench Fire Etc . Tenderer Has To Ensure That Fire Is Absolutely Quenched Before Loading Of Loose Dumped Overburden Etc . Carriage Lead: ( 0-1 ) Km From Face

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 17-Jun-2020 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 19-06-2020
2 19-Jun-2020 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 24-06-2020

Key Value

Document Fees
Refer document
EMD
INR 5000000.0 /-
Tender Value
INR 337.07 Crore /-

BOQ Items

Name of the Work / Contract No:
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off outside the working zone/in-pit dump in proper manner including spreading, dozing, lighting, water sprinkling, grading and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\n(Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.)\nRemoval and disposal of overburden also includes fire-fighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper fire-fighting at OB faces and OB dumps as per instructions/directions of Engineer In-charge.\nThe tenderer has to make arrangements of manpower and fire-fighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of OB, continuously spraying water over the blasted OB to quench fire etc.\nTenderer has to ensure that fire is absolutely quenched before loading of OB etc.\nCarriage Lead: (0-1) KM from face to surface/in-pit OB dump.\n Item 1 7.55e+06 CuM
2 1.1 Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off outside the working zone/in-pit dump in proper manner including spreading, dozing, lighting, water sprinkling, grading and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\n(Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.)\nRemoval and disposal of overburden also includes fire-fighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper fire-fighting at OB faces and OB dumps as per instructions/directions of Engineer In-charge.\nThe tenderer has to make arrangements of manpower and fire-fighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of OB, continuously spraying water over the blasted OB to quench fire etc. \nTenderer has to ensure that fire is absolutely quenched before loading of OB etc.\nCarriage Lead: (1-2) KM from face to surface/in-pit OB dump.\n Item 2 1.4718e+07 CuM
3 1.2 Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off outside the working zone/in-pit dump in proper manner including spreading, dozing, lighting, water sprinkling, grading and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\n(Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.)\n\nRemoval and disposal of overburden also includes fire-fighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper fire-fighting at OB faces and OB dumps as per instructions/directions of Engineer In-charge.\nThe tenderer has to make arrangements of manpower and fire-fighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of OB, continuously spraying water over the blasted OB to quench fire etc. \nTenderer has to ensure that fire is absolutely quenched before loading of OB etc.\nCarriage Lead: (2-3) KM from face to surface/in-pit OB dump.\n Item 3 7.418e+06 CuM
4 2 Removal of dumped loose overburden by mechanical means in all kinds of soil, rock including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite/ stone boulders, soft or hard rock etc., removal of slushy earth, mud & slurry as required, loading, transporting & unloading the excavated materials mechanically and disposed off outside the working zone in proper manner on the dumping yard including spreading, dozing, lighting, water sprinkling, grading & other ancillary mining activities etc., all complete as per instructions/directions of Engineer- in charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\n\nRemoval and disposal of overburden also includes firefighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at OB faces and OB dumps as per instruction of Engineer In-charge.\n The tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as digging and loading of loose dumped overburden, continuously spraying water over the loose dumped overburden to quench fire etc. \nTenderer has to ensure that fire is absolutely quenched before loading of loose dumped overburden etc. \n\nCarriage Lead:(0-1) KM from face to surface OB dump.\n Item 4 900000 CuM
5 2.1 Removal of dumped loose overburden by mechanical means in all kinds of soil, rock including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite/ stone boulders, soft or hard rock etc., removal of slushy earth, mud & slurry as required, loading, transporting & unloading the excavated materials mechanically and disposed off outside the working zone in proper manner on the dumping yard including spreading, dozing, lighting, water sprinkling, grading & other ancillary mining activities etc., all complete as per instructions/directions of Engineer- in charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\n\nRemoval and disposal of overburden also includes firefighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at OB faces and OB dumps as per instruction of Engineer In-charge.\n The tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as digging and loading of loose dumped overburden, continuously spraying water over the loose dumped overburden to quench fire etc. \nTenderer has to ensure that fire is absolutely quenched before loading of loose dumped overburden etc. \n\nCarriage Lead:(1-2) KM from face to surface OB dump.\n Item 5 2.65e+06 CuM
6 2.2 Removal of dumped loose overburden by mechanical means in all kinds of soil, rock including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite/ stone boulders, soft or hard rock etc., removal of slushy earth, mud & slurry as required, loading, transporting & unloading the excavated materials mechanically and disposed off outside the working zone in proper manner on the dumping yard including spreading, dozing, lighting, water sprinkling, grading & other ancillary mining activities etc., all complete as per instructions/directions of Engineer- in charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\n\nRemoval and disposal of overburden also includes firefighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at OB faces and OB dumps as per instruction of Engineer In-charge.\n The tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as digging and loading of loose dumped overburden, continuously spraying water over the loose dumped overburden to quench fire etc. \nTenderer has to ensure that fire is absolutely quenched before loading of loose dumped overburden etc. \n\nCarriage Lead:(2-3) KM from face to surface OB dump.\n Item 6 2.65e+06 CuM
7 2.3 Removal of dumped loose overburden by mechanical means in all kinds of soil, rock including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite/ stone boulders, soft or hard rock etc., removal of slushy earth, mud & slurry as required, loading, transporting & unloading the excavated materials mechanically and disposed off outside the working zone in proper manner on the dumping yard including spreading, dozing, lighting, water sprinkling, grading & other ancillary mining activities etc., all complete as per instructions/directions of Engineer- in charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\nRemoval and disposal of overburden also includes firefighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at OB faces and OB dumps as per instruction of Engineer In-charge.\nThe tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as digging and loading of loose dumped overburden, continuously spraying water over the loose dumped overburden to quench fire etc. \nTenderer has to ensure that fire is absolutely quenched before loading of loose dumped overburden etc. \n\nCarriage Lead:(3-4) KM from face to surface OB dump.\n Item 7 942000 CuM
8 3 Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.) including mechanical loading of coal free from extraneous materials into tippers/ dumpers including removal of slushy earth / slurry and removal/ segregating/picking and removal of unwanted band stones/ extraneous materials, lighting, water sprinkling, dozing, grading and other ancillary mining activities and transportation of coal from face to surface coal dump etc. complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal. Extraction and transportation of coal also includes fire-fighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at coal faces as per instructions/directions of Engineer In-charge.\nThe tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of coal, continuously spraying water over the blasted coal to quench fire etc. \nTenderer has to ensure that fire is absolutely quenched before transportation of coal from face and fire does not reappear subsequently. \nCarriage Lead: (0-1) KM from face to surface coal dump.\n Item 8 765000 MT
9 3.1 Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.) including mechanical loading of coal free from extraneous materials into tippers/ dumpers including removal of slushy earth / slurry and removal/ segregating/picking and removal of unwanted band stones/ extraneous materials, lighting, water sprinkling, dozing, grading and other ancillary mining activities and transportation of coal from face to surface coal dump etc. complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal. Extraction and transportation of coal also includes fire-fighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at coal faces as per instructions/directions of Engineer In-charge.\nThe tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of coal, continuously spraying water over the blasted coal to quench fire etc.\nTenderer has to ensure that fire is absolutely quenched before transportation of coal from face and fire does not reappear subsequently. \n\nCarriage Lead: (1-2) KM from face to surface coal dump.\n Item 9 1.173e+06 MT
10 3.2 Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.) including mechanical loading of coal free from extraneous materials into tippers/ dumpers including removal of slushy earth / slurry and removal/ segregating/picking and removal of unwanted band stones/ extraneous materials, lighting, water sprinkling, dozing, grading and other ancillary mining activities and transportation of coal from face to surface coal dump etc. complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal. Extraction and transportation of coal also includes fire-fighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at coal faces as per instructions/directions of Engineer In-charge.\nThe tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of coal, continuously spraying water over the blasted coal to quench fire etc. \nTenderer has to ensure that fire is absolutely quenched before transportation of coal from face and fire does not reappear subsequently. \n\nCarriage Lead: (2-3) KM from face to surface coal dump.\n Item 10 202000 MT
11 4 Drilling in Coal and OB by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil or hard rock, coal etc. water sprinkling, dozing and other ancillary mining activities etc. all complete. Tenderer has to make all necessary arrangement also for firefighting as per instruction of Engineer-in-charge. Item 11 2.28733e+06 Mtr.
12 5 Total impact of GST for the purpose of CTC Item 12 1 Nos
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail