| 1 | 1 | Earth work in excavation in fundations, trenches, etc in all kinds of soils, not exceeding 2 Meter depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsquent filling around masonry in 15 cm layers with compaction, including disposal of all surplus soil as directed with a lead of 30 metes. | | 10 | per 100 /cum |
|---|
| 2 | 2 | Cement lime concrete 1:8:16 with brick blast 40mm nominal size in foundation and plinth. | | 3.4 | P/cum |
|---|
| 3 | 3 | Cement concrete 1:2:4 with slone aggregate 20mm nominal size in foundation and plinth. | | 2.44 | P /cum |
|---|
| 4 | 4 | First Class bricks work laid in cement sand mortar 1:6 in foundation and plinth | | 4.5 | P/cum |
|---|
| 5 | 5 | 11:43 cm thick bricks wall laid in cement sand mortar 1:4 without rainforecement, in foundation and plinth. | | 20.48 | P.sqm |
|---|
| 6 | 6 | Conglomerte floor 50 mm thick CC topping 1:2:4 | | 7.4 | P/sqm |
|---|
| 7 | 7 | 12 mm thick cement plaster 1:6 | | 46 | P /cum |
|---|
| 8 | 8 | Mild steel reinforcement for RCC works where not included in the complete rate of RCC, including bending, binding and placing in position complete | | 4 | P. quintal |
|---|
| 9 | 9 | Suply and erection of moulded case circuit breakers on wall or on existing pedestal including bonding to earth and necessary connections.15 amp.to 60 amp. 415 V ,10 KA 3-phase. | | 3 | Each |
|---|
| 10 | 10 | 100 amp.to 220 amp.415 V,10 KA 3-phase. | | 10 | Each |
|---|
| 11 | 11 | 250 amp. 415 V , 35 KA 3-phase. | | 1 | Each |
|---|
| 12 | 12 | Supply and erection of pipe for wiring purposes including bends inspection boxes etc. where necessary and painting as required. Galvanised iron pipe 65 mm dia on surface. | | 20 | Metre |
|---|
| 13 | 13 | Suply and erection of PVC pipe of 6 kg. pressure laid 1 metre below ground level complete including digging refilling of the trench with jointing etc. PVC pipe 65 mm dia. | | 400 | Metre |
|---|
| 14 | 14 | Earthing with GI earth plate 600 mm x 600 mm x 6 mm thick including accessories and providing masonry enclosures with cover plate having locking arrangement and watering pipe etc. ( but without charcoal or coke and salt ) complete as required. | | 3 | Each |
|---|
| 15 | 15 | Earthing with tinned copper earth plate 600 mm x 600 mm x 3 mm thick including accessories and providing masonry enclosures with cover plate having locking arrangement and watering pipe etc.(but without charcoal or coke and salt) complete as equired. | | 4 | Each |
|---|
| 16 | 16 | Extra for charcoal or coke and salt for G.I. Plate or copper plate earth electrode. | | 7 | Each |
|---|
| 17 | 17 | Supply and erection of copper tape 32 mm x 6 mm thick from earth electrode directly in ground and surface , fixed with suitable copper stapples of same size. | | 60 | Metre |
|---|
| 18 | 18 | Supply and erection of G.I. tape 32 mm x 6 mm thick from earth electrode directly in ground and surface , fixed with G.I. stapples of same size. | | 30 | Metre |
|---|
| 19 | 19 | Suply and erection of under ground cable 1 metre below ground level covered with sand and bricks including necessary connections,digging and refiling of trenches. 70 Sq. mm 3.5 Core Ard. Cable . | | 125 | Metre |
|---|
| 20 | 20 | 95 Sq. mm 3.5 Core Ard. Cable . | | 110 | Metre |
|---|
| 21 | 21 | 150 Sq. mm 3.5 Core Ard. Cable . | | 120 | Metre |
|---|
| 22 | 22 | 400 Sq. mm 3.5 Core Ard. Cable . | | 50 | Metre |
|---|
| 23 | 23 | Suply and erection of under ground cable, loose in existing pipe or trenches complete with necessary connections . 70 Sq. mm 3.5 Core Ard. Cable . | | 20 | Metre |
|---|
| 24 | 24 | 95 Sq. mm 3.5 Core Ard. Cable . | | 30 | Metre |
|---|
| 25 | 25 | 150 Sq. mm 3.5 Core Ard. Cable . | | 35 | Metre |
|---|
| 26 | 26 | 400 Sq. mm 3.5 Core Ard. Cable . | | 20 | Metre |
|---|
| 27 | 27 | Suply and erection of suitable compression type brass cable glands for underground Cable. 70 Sqmm to 95 Sqmm Cable 3 to 3.5 Core . | | 4 | Each |
|---|
| 28 | 28 | 120 Sqmm to 185 Sqmm Cable 3 to 3.5 Core | | 2 | Each |
|---|
| 29 | 29 | 300 Sq mm to 400 Sqmm Cable 3 to 3.5 Core . | | 2 | Each |
|---|
| 30 | 30 | Street Light.Supply and erection of prestressed cement concrete pole as per IS : 1678-1960. 9 metres long 105 mm x 115 mm at top and 105 mm x 315 mm at bottom with working load of 200 Kg. burried 1.80 m in ground. | | 4 | Each |
|---|
| 31 | 31 | Suply and erection of aluminium lugs heavy duty including crimping etc. upto the entire satisfaction of the Engineer-in-charge of the work.70 sqmm . | | 8 | Each |
|---|
| 32 | 32 | 95 sqmm . | | 8 | Each |
|---|
| 33 | 33 | 150 sqmm . | | 8 | Each |
|---|
| 34 | 34 | 400 sqmm . | | 8 | Each |
|---|
| 35 | 35 | Suply , erection, testing and commissioning of wall / free standing floor mounting dust and vermin proof compartmentalized cubical Panel made out of 2.0 mm thick CRCA sheet, equired hardware, 3mm thick bakelite sheet provided all along the bus bar and cable alley separating switches compartment and supporting suitable channel, dully painted by 2 coat of zinc / Red oxide primer followed by 2 coats of powder coating in grey or equired shade after rinsing. The panel having PU/ Neoprene ruBus Barer gasket of not less than 3 mm thickness, separate detachable gland plate MS base channel, hinged door with inter locking arrangemrnt for equipment / switch gear, Transparent acrylic sheet shall be provided in front of bus bar compartment to prevent direct access to bus bars. Extended solid copper bars up to cable alleys shall be provided for outgoing connection which shall be paid as extra items. Side walls and cable alley compartments shall be having bolted type doors with detachable extension type structure. The panel will be complete with control wiring ( copper) and fuse protection. ( only outer area on all sides shall be measured). | | 40 | Sq.m |
|---|
| 36 | 36 | Suply and erection of copper bus bar duly tinned by means of SMC/DMC type insulator high tensile nuts and bolts spring washers fixing to same in existing panel including bending, cutting in equired size and shape and insulation with colour coading heat shrinkable PVC sleeves complete in all respect upto entire satisfaction of Engineer-in-charge of work. | | 180 | P/ K.g |
|---|
| 37 | 37 | Pdg. and fixing degital metering equipment for L.T.Cubical panel consiting of 96 x 96 mm, 0-500 volts, voltmeter with selector switch, Amp meter ( of equired ratio upto 600/5 ampere) with selector switch and equired CT's 3 Nos., a set of 3 phase indicating lamps RYB LED | | 1 | P/Set |
|---|
| 38 | 38 | Suply & fixing of rotary handle for on / off operation of existing MCCB in the LT panel including fixing the same in position with all labour and material equired to complete the job in all respectRotary handle up to 125 A, MCCB | | 7 | Each |
|---|
| 39 | 39 | Rotary handle above 125 A, MCCB | | 8 | Each |
|---|
| 40 | 40 | S/E of mark double walled corrugated (DWC) HDPE pipe laid 1 mtr. Below ground level including diging and refilling of earth including cost of suitable size socket/cuppler for HDPE pipe including the cost of labour and material required to complete the job in all respect upto the entire satisfaction of Engineer-In- Charge of the work. HDPE pipe 63/50 mm outer dia/ inner dia. | | 100 | Mtr. |
|---|
| 41 | 41 | HDPE pipe 145/123 mm outer dia/ inner dia. | | 100 | Mtr. |
|---|
| 42 | 42 | Supply and erection of moulded case circuit breaker single pole/ 4 pole on wall/ on existing pedestal including bounding to earth and making necessary connection rrRrequired to complete the job the job in all respect up to the entire satisfaction of the Engineer -in - Charge of the work.4 pole MCCB 200 amp. | | 1 | Each |
|---|
| 43 | 43 | Supply and erection of XLPE (E) 11 KV HT aluminum conductors armoured cable ISI mark laid in 1 meter below grund level with sand and bricks with all labour and material including digging and refilling of trench required to complete the job in all respect upto the entire satisfaction of the Engineer - In - Chage of the work. 50 sqmm 3 core XLPE cble | | 60 | P. mtr. |
|---|
| 44 | 44 | Supply and erection of XLPE (E) 11 KV HT aluminum conductors armoured cable ISI mark laid in existing pipe/ trenches/ surface with all labour and material including digging and refilling of trench required to complete the job in all respect upto the entire satisfaction of the Engineer - In - Chage of the work.50 sqmm 3 core XLPE cble | | 20 | P. mtr. |
|---|
| 45 | 45 | Supply and erection of heat shrinkage type end termination jointing kit indoor type of suitable to accommodate 3 core 11 KV XLPE aluminum cble/ ABC cable complete with all the kit contents including earth continuing connection along with 3 nos. crimpling type aluminum lugs of suitable capacity including makiing joining etc. complete in all respectSuitable for 16 to 50 sqmm 3 core XLPE cable | | 1 | Each |
|---|
| 46 | 46 | Supply and erection of heat shrinkage type end termination jointing kit outdoor type of suitable to accommodate 3 core 11 KV XLPE aluminum cble/ ABC cable complete with all the kit contents including earth continuing connection along with 3 nos. crimpling type aluminum lugs of suitable capacity including makiing joining etc. complee in all respectSuitable for 16 to 50 sqmm 3 core XLPE cable | | 1 | Each |
|---|
| 47 | 47 | Suply and erection of heavy duty 4 pole ON load changeover load breaker switch comprising of switches 63 amp. To 100 amp. Suitable for operation on 415 V 50 Hz AC Suply complete with handle assembly having door interlook & padlocking arrangemrnt on existing panel/ including making necessary connections with petty material equired to complete the job.200 amp. 4 pole ON load changeover switch | | 1 | Each |
|---|
| 48 | 48 | S/I/T/C of 11kV Package 500 KVA Sub-Station consisting of following, Make : Schneider Electric, ABB, Siemens, C&S Interconnection Between HT switchgear & Transformer using 1Cx3Rx 95Sq.mm XLPE Single core cable & Interconnection between Transformer & LT switchgear using Copper Busbars. Internal earthing connections including transformer neutral by using 50x6 mm GI Strips. = 1 set | | 1 | Each |
|---|
| 49 | 49 | Supply & erection of lightning arestor of W.S./ G.E. make SDU suitable for 11KV 3 Phase 50cycle grounded neutral system comprising of spark gap type quench gap types in series with non lineer register element housed in horizental seals porcelin bushing with line ground terminal alongwith mounting clamp conforming to ISS-3070 part-II of 1985 with latest ammendments with all labour and meterial required up to the entire satisfaction of Engineer -in-charge of work | | 2 | Each |
|---|
| 50 | 50 | Supply & erection of fire existinguishers ISI mark CO2 type 4.5 kg. Capacity as per IS:7285 duly erected/ hang on wall with hooks with all labour and material required to complete the job in all respect to the entire satisfaction of Engineer-in-charge of work. Make : Minimax, Safex, Ceasefire | | 4 | Each |
|---|
| 51 | 51 | Supply and erection of 11 K.V gang operated switch Jayshree make conforming ot IS and latest ammendment including suitable size of copper blade erection of same on existing H-pole with the help of 3 Nos. Channels of size 75x 40 x 6 mm thick 1.8 M long fixed with suitable size of M.S. Clamp, nuts and bolts including cost of 6 Nos 11K.V. Pin insulator with G.I. Pin, RD Fuses and painting with 2 coat of approved paint and one coat of red oxide including all labour and material required to complete the job in all respect to the entire satisfaction of Engineer-in-charge of work. | | 2 | Each |
|---|
| 52 | 52 | Supply and erection of stay wire suitable for 9M long PCC pole made out of 7/3 SWG GI wire with U type M.S. Rod 5/8\" dia duly threaded by means of angle iron of size 50 x 50 x 6 mm x 30 cm 6 feet long M.S. Rod burried in ground after fixing with cross channel size 75 x 40 x 6 mm x 60 cm long the stay wire will be binded on the top of the pole with help of suitable size of double U type M.S. Clamps and stay fixed with nuts and bolts the stay wire shall be insulated in the middle piont with the help of egg insulator including all labour and material required to complete the job in all respect to the entire satisfaction of Engineer-in-charge of work. | | 4 | Each |
|---|
| 53 | 53 | S/E of MS bucket stand suitable for six Nos. fire buckets (but without buckets) including the cost of welding & painting with all cost of red oxide adn two coat of enamelled paint of red colour completion all respect. | | 1 | Each |
|---|
| 54 | 54 | Supply and erection of fire bucket of G.I. sheet of 24 gauge write with \" FIRE\" as per fire specification. | | 6 | Each |
|---|
| 55 | 55 | Supply and erection of Rubber Mat 1mx2mmx 3mm thick suitable for 11/33 KVA as per IS No. 15652C/M/L 3017739 as per approved by Chief Electrical inspector, Govt. of Haryana. | | 2 | Each |
|---|
| 56 | 56 | S/E of 11KV disc insulator (jayshree make) with pin with labour and material required to complete the job including fixing the same on existing chanel complete in all repspect | | 6 | Each |
|---|
| 57 | 57 | S/E of M.S. chanel, MS angle, MS flat & nuts & bolts of required size including painting and cutting etc. with labour and material required to complete the job including fixing the same on existing pole complete in all repspect | | 160 | P/Kg. |
|---|
| 58 | 58 | Supply & erection, Commissioning and testing of 11 KV indoor HT metering panel complete with Ct's PT's cubical & electronics meter with accuracy class 0.5. as par requirement / approved by DHBVN consisting of the followings :Cubical panel box standing floor mounting type made out of sheet steel 14 SWG CRCA sheet with channel iron base frame, spray painted with strong synthetic light grey enemal paint as per size and design aproved by DHBVN. 3 Nos. 11KV CT's of suitable rating for indoor installation (As per - approved make of DHBVN).1 No. 11 KV PT 11000/110 V 10VA burden 0.5 accuracy oil filled suitable for indoor installation of approved make of DHBVN.Electronic meter 3 phase 4 wires, 0.5 accuracy for recording reading in KWH of rating and make approved by DHBVN with push button display operating system for different kind of readings. The cubical panel will be complete in all respect including inter connection internal wiring with PVC copper cable its tasting and approval of all item from DHBVN with a guarantee of one year from the date of comissioning including cost of all labour and material required to complete the job in all respect upto the entire satisfaction of the Engineer in Charge of the work. | | 1 | Each |
|---|
| 59 | 59 | Supply installation testing and commissioning of 1000 Amp. 4 pole 50KA microprocesser based manual drawout type ACB including cost of under voltage release, rotary handle, shunt trip and closing coil including making necessary connection with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer -in- charge of the work. As per approved | | 2 | Each |
|---|