| 1 | 1.01 | Dismantling of all damaged switchgears, capacitors, measurement instrument, indicating lights, relay and removing of burnt wiring and connection at site and cleaning of A.P.F.C. panel by CRC. | item1 | 3 | Job |
|---|
| 2 | 1.02 | Shunt capacitors power 3 phase, 415/440V AC 50Hz MPP TYPE: Epcos/L&T | item2 | 750 | KVAR |
|---|
| 3 | 1.03 | MCCB TP 630 Amp. With spreader and handle make:- L&T/ Siemens/ Schneider /GE/HPL | item3 | 1 | Nos |
|---|
| 4 | 1.04 | Automatic powers factor correction relay 12 step 415V digital type with display of power factor Make:- L&T/Siemens/Epcos/Schneider | item4 | 1 | Nos |
|---|
| 5 | 1.05 | MCCB TP 125Amp. With spreader Make: L&T/Siemens/ Schneider | item5 | 2 | Nos |
|---|
| 6 | 1.06 | MCCB 3pole 50Hz 415V 63A Maker: L&T/Siemens/ Schneider | item6 | 3 | Nos |
|---|
| 7 | 1.07 | MCB 3pole 50Hz 415V 32A Maker: L&T/Siemens/ Schneider | item7 | 4 | Nos |
|---|
| 8 | 1.08 | Power contactor 220V AC 95Amp Make: L&T/Siemens/ Schneider | item8 | 2 | Nos |
|---|
| 9 | 1.09 | Power contactor 220V AC 50Amp Make: L&T/Siemens/ Schneider | item9 | 4 | Nos |
|---|
| 10 | 1.1 | Power contactor 220V AC 25Amp Make: L&T/Siemens/ Schneider | item10 | 2 | Nos |
|---|
| 11 | 1.11 | Power contactor 220V AC 12Amp Make: L&T/Siemens/ Schneider | item11 | 3 | Nos |
|---|
| 12 | 1.12 | Switch Fuse unit 125 Amp. FN type with fuse Make: L&T | item12 | 1 | Nos |
|---|
| 13 | 1.13 | Switch Fuse unit 63 Amp. FN type with fuse Make: L&T | item13 | 1 | Nos |
|---|
| 14 | 1.14 | Indicating lights R.Y.B & ON 415V Make: Siemens/Havells/L&T | item14 | 20 | Nos |
|---|
| 15 | 1.15 | Push button with element on/off Make: L&T/SG | item15 | 10 | Nos |
|---|
| 16 | 1.16 | Sensing current transformer of suitable ratio of incomer for current sensing at site | item16 | 1 | Nos |
|---|
| 17 | 1.17 | Banking of capacitors as required at site. | item17 | 750 | KVAR |
|---|
| 18 | 1.18 | Fixing all above switchgears i.e. contactors A.P.F.C. Relay and all measurement components, indicating lights, in their respective space in existing APFC panels as required & de-carbonizing the contacts.. | item18 | 3 | Job |
|---|
| 19 | 1.19 | Changing of cooper control wire of required size with thimble, Ferrule etc in APFC panels | item19 | 3 | Job |
|---|
| 20 | 1.2 | Insulation on bus bar with PVS sleeve/tape after cleaning of the complete bus bar by CRC. | item20 | 3 | Job |
|---|
| 21 | 1.21 | Testing & commissioning of the APFC panels and installed equipment’s, setting of relay, as per required parameters with relevant IS testing of the panel prior to switching on as follow:-\ni) Meggaring of all equipment’s for phase to phase, neutral to body, neutral to earth and phase to earth.\nii) Checking for all tightness of nut and bolts.\niii) All functional tests.\n | item21 | 3 | Nos |
|---|