Selection Of System Integrator For Design , Develop , Implement And Maintain The Scada System For Selection Of System Integrator For Design , Develop , Implement And Maintain The Scada System ForSolid Waste Management Vehicle Tracking For Pan City C
Tender Overview
Project Description
Selection Of System Integrator For Design , Develop , Implement And Maintain The Scada System For Selection Of System Integrator For Design , Develop , Implement And Maintain The Scada System ForSolid Waste Management Vehicle Tracking For Pan City Chandigarh Under Chandigarh Smart City Project
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 22-Jun-2020 | Date Extension | Date | 03-Jul-2020 |
| 2 | 23-Jun-2020 | Corrigendum II | Technical Bid | 03-Jul-2020 |
BOQ
| Name of Work:Selection of System Integrator for Design, Develop, Implement and Maintain the SCADA System for Solid Waste Management Vehicle Tracking for Pan City Chandigarh under Chandigarh Smart City Project | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | PART-A CAP-EX | BI01010001010000000000000515BI0100001112 | ||
| 2 | 1.01 | GPS Device for SWM Vehicles as per specifications with one year warranty | BI01010001010000000000000515BI0100001113 | 450 | Nos |
| 3 | 1.02 | Installation of GPS Devices | BI01010001010000000000000515BI0100001114 | 450 | Nos |
| 4 | 1.03 | SWM Application Including: Tracking Software, Fuel Management, Workforce Attendance Module, Complaint Management Module, Asset Management. | BI01010001010000000000000515BI0100001115 | 1 | Job |
| 5 | 1.04 | Citizen Mobile App | BI01010001010000000000000515BI0100001116 | 1 | Job |
| 6 | 1.05 | Department Staff Mobile App | BI01010001010000000000000515BI0100001117 | 1 | Job |
| 7 | 1.06 | One time cost of Cloud based DC and DR Including cloud storage as per scope of work | BI01010001010000000000000515BI0100001118 | 1 | Job |
| 8 | 1.07 | Video Wall (55\" x 4) with Controller Software | BI01010001010000000000000515BI0100001119 | 1 | Nos |
| 9 | 1.08 | Furniture & Fixtures for 10 persons seating including workstation and chair as decided by the EIC. | BI01010001010000000000000515BI0100001120 | 5 | Nos |
| 10 | 1.09 | Desktop System with one year warranty. i5 processor, 8GB RAM, 1TB HDD, Windows 10 professional with 24\" UDH screen | BI01010001010000000000000515BI0100001121 | 10 | Nos |
| 11 | 1.1 | Desktop System with one year warranty. i7 processor, 16GB RAM, 1TB HDD, Windows 10 professional with 4GB graphic card Samsung/ HP | BI01010001010000000000000515BI0100001122 | 1 | Nos |
| 12 | 1.11 | Air Conditioner 1.5ton split with 5star rating (Working 2 Nos and Stand-by 1No) Samsung/ Blue star/ Voltas | BI01010001010000000000000515BI0100001123 | 3 | Nos |
| 13 | 1.12 | Printer colored laser A3 all-in-one printer with network port make Canon/ HP | BI01010001010000000000000515BI0100001124 | 1 | Nos |
| 14 | 1.13 | Wiring electrical for work stations, video wall, Air- conditioning system, room lighting, printer from UPS and raw power and Electrical control panel reputed make. | BI01010001010000000000000515BI0100001125 | 1 | Job |
| 15 | 1.14 | LED 2x2 light fitting Philips/ Bajaj/ Havells | BI01010001010000000000000515BI0100001126 | 4 | Nos |
| 16 | 1.15 | Face plate , 6A socket 2 Nos and Switch 2 Nos. Back box for workstations 5Nos, video wall 2 Nos, printer 1nos, network rack 1 No make Philips/ Anchor | BI01010001010000000000000515BI0100001127 | 9 | Nos |
| 17 | 1.16 | UPS on-line 5KAV with 1hour back- up on full load with battery bank and battery rack make Exide. | BI01010001010000000000000515BI0100001128 | 1 | Nos |
| 18 | 1.17 | Networking, including 10 Data points, 24-port web-managed gigabit switch 1No, network rack 9U 1No, power strip 5 Socket 1No, two fans. | BI01010001010000000000000515BI0100001129 | 1 | LS |
| 19 | 1.18 | Project Implementation ( including maping of devices, routes, geo tagging, allocation of vehicles, optimization of software) | BI01010001010000000000000515BI0100001130 | 1 | Job |
| 20 | 2 | PART-B MAINTAINANCE EXPENDITURE | BI01010001010000000000000515BI0100001131 | ||
| 21 | 2.01 | AMC Charges for Cloud based DC and DR with management and monitoring of cloud VM instances, storage and security. | BI01010001010000000000000515BI0100001132 | ||
| 22 | 2.02 | First Year | BI01010001010000000000000515BI0100001133 | 1 | Job |
| 23 | 2.03 | Second Year | BI01010001010000000000000515BI0100001134 | 1 | Job |
| 24 | 2.04 | Third Year | BI01010001010000000000000515BI0100001135 | 1 | Job |
| 25 | 2.05 | Forth Year | BI01010001010000000000000515BI0100001136 | 1 | Job |
| 26 | 2.06 | Fifth Year | BI01010001010000000000000515BI0100001137 | 1 | Job |
| 27 | 2.07 | AMC (Annual Maintenance Contract) for GPS Devices for 4 year. 1 year after \"Go Live\" of project. | BI01010001010000000000000515BI0100001138 | ||
| 28 | 2.08 | Second Year | BI01010001010000000000000515BI0100001139 | 450 | Each |
| 29 | 2.09 | Third Year | BI01010001010000000000000515BI0100001140 | 450 | Each |
| 30 | 2.1 | Forth Year | BI01010001010000000000000515BI0100001141 | 450 | Each |
| 31 | 2.11 | Fifth Year | BI01010001010000000000000515BI0100001142 | 450 | Each |
| 32 | 2.12 | Internet Bandwidth Charges and SIM (for GPS Devices) charges for: | BI01010001010000000000000515BI0100001149 | ||
| 33 | 2.13 | First Year | BI01010001010000000000000515BI0100001150 | 1 | Job |
| 34 | 2.14 | Second Year | BI01010001010000000000000515BI0100001151 | 1 | Job |
| 35 | 2.15 | Third Year | BI01010001010000000000000515BI0100001152 | 1 | Job |
| 36 | 2.16 | Forth Year | BI01010001010000000000000515BI0100001153 | 1 | Job |
| 37 | 2.17 | Fifth Year | BI01010001010000000000000515BI0100001154 | 1 | Job |
| 38 | 2.18 | Stationery (Papers + Printer Cartridge) for reporting and MIS for | BI01010001010000000000000515BI0100001155 | ||
| 39 | 2.19 | First Year | BI01010001010000000000000515BI0100001156 | 1 | Job |
| 40 | 2.2 | Second Year | BI01010001010000000000000515BI0100001157 | 1 | Job |
| 41 | 2.21 | Third Year | BI01010001010000000000000515BI0100001158 | 1 | Job |
| 42 | 2.22 | Forth Year | BI01010001010000000000000515BI0100001159 | 1 | Job |
| 43 | 2.23 | Fifth Year | BI01010001010000000000000515BI0100001160 | 1 | Job |
| 44 | 2.24 | AMC charges for video wall, networking components, Air- conditioning system, UPS including battery bank | BI01010001010000000000000515BI0100001161 | ||
| 45 | 2.25 | First Year | BI01010001010000000000000515BI0100001162 | 1 | Job |
| 46 | 2.26 | Second Year | BI01010001010000000000000515BI0100001163 | 1 | Job |
| 47 | 2.27 | Third Year | BI01010001010000000000000515BI0100001164 | 1 | Job |
| 48 | 2.28 | Forth Year | BI01010001010000000000000515BI0100001165 | 1 | Job |
| 49 | 2.29 | Fifth Year | BI01010001010000000000000515BI0100001166 | 1 | Job |
| 50 | 3 | PART-C MANPOWER COST | BI01010001010000000000000515BI0100001143 | ||
| 51 | 3.01 | First Year | BI01010001010000000000000515BI0100001144 | 1 | Job |
| 52 | 3.02 | Second Year | BI01010001010000000000000515BI0100001145 | 1 | Job |
| 53 | 3.03 | Third Year | BI01010001010000000000000515BI0100001146 | 1 | Job |
| 54 | 3.04 | Forth Year | BI01010001010000000000000515BI0100001147 | 1 | Job |
| 55 | 3.05 | Fifth Year | BI01010001010000000000000515BI0100001148 | 1 | Job |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender