Travancore Cochin Chemicals Limited has published Construction Of Rcc Foundation And Dyke Wall For 2 Nos . Hcl Acid Storage Tank Having Capacity 350 Cu . M. Submission Date for this Tender is 10-06-2020. Acid Storage Tank Tenders in THE TRAVANCORE COCHIN CHEMICALS UDYOGAMANDAL Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

24424223
Construction Of Rcc Foundation And Dyke Wall For 2 Nos . Hcl Acid Storage Tank Having Capacity 350 Cu . M
Open Tender
Indian
Kerala
THE TRAVANCORE COCHIN CHEMICALS UDYOGAMANDAL
10-06-2020

Tender Details

Construction Of Rcc Foundation And Dyke Wall For 2 Nos . Hcl Acid Storage Tank Having Capacity 350 Cu . M

Key Value

Document Fees
INR 2500 /-
EMD
INR 50000.0 /-
Tender Value
INR 47.50 Lakhs /-

BOQ Items

Name of Work:Construction of RCC foundation and dyke wall for 2 Nos. Hcl Acid storage tank having capacity 350 Cu.M.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Site clearance by earth work not exeeding 30 cm depth and waste removal, vegetations removal etc at proposed location of HCL Acid storage foundation and dyke wall 28Mx12.5M to 1M around the dye wall up to proposed ground level of cooling tower structure by suitable methods either by man power or with mechanical methods like earth moving equipment’s like JCB, HITACHI,Poclain, tipper etc and disposing the earth/ waste materials with in 1KM inside factory compound as directed by engineer in charge including labour charges, hire for tools and plants, cost of consumables, safety measures like, helmet, goggles / face shield, safety shoes, etc at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day etc.., complete. 435 Sq.M
2 2 Earthwork excavation for foundation up to a depth of 1.5 M and with in a lead upto 1 KM from the ground level by suitable methods either by manual or mechanical means like earth moving equipments like JCB, Poclain, Tipper etc and disposing and levelling the earth/ waste materials with in lead of 1 KM inside factory compound after back filling the earth at required portions, demolishing of any masonry work plain cement concrete with in the earthwork will be treated as earth work and additional rate will not be given for demolishing of these type masonry etc, as directed by engineer in charge including bailing or pumping out of water with required fuel driven pumpset and arranging delivery lines in such a way that it is not to interfere with existing drain system in the pollution control point of view includes shoring/struting as necessary in the work, all labour charges, hire for tools and plants, cost of consumables, safety measures like, helmet, goggles / face shield, safety shoes, etc at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining work permit approval from concerned sections before work starts on each day etc.., complete. 748 Cu.M
3 3 Supplying and Filing inside foundation with material sound, clean, durable well graded granular (mix of graded granite and best quality Sand / M-Sand of POABS make) and free of vegetation, organic matter, cinders, lumps of clay, roacks, paper, plastic, wood etc., and any material that will cause corrosion of the tank bottom. The grade and type of fill material shall be capable of being compacted with standard industry compaction techniques (with heavy duty external vibrator) to a density (dry density of the fill material shall be 1.8g/cm2 or more) sufficient to provide appropriate bearing capacity and acceptable settlements, including cost of all materials, labour charges, hire for tools, plants and,consumables, all safety measures like helmet, goggles / face shield, safety shoes, at contractors risk and cost, approved by engineer in charge including obtaining work permit approval from concerned sections before work starts on each day etc.., complete. 228 Cu.M
4 4 Cement concrete 1:3:6 using 40 mm size approved quality hard blue granite broken stone for foundation and floor below RCC to a thickness of 75 mm including cost of all materials, labour charges, hire for tools, plants and , cost of consumables, all safety measures like helmet, goggles / face shield, safety shoes, at contractors risk and cost, approved by engineer in charge including obtaining work permit approval from concerned sections before work starts on each day etc.., complete. (Required quantity of cement will be issued free of cost by TCC) 41 Cu.M
5 5 Reinforced cement concrete M30 grade using 20mm and down grade approved quality hard blue granite broken stone and a minimumquantity of cement (432kg/cement per Cu.M) for foundation footings, equipment foundations, circular footings, plinth, beams, columns, tie beams, slabs, drains, vertical walls, stairs, cover slabs, curved walls of all sizes and shapes, including bailing/pumping out all sorts of water, ground water, seepage water, water leaking nearby drains etc., with required number of diesel driven pumpsets of adequate capacities, including all materials, labour charges, hire for tools, plants and , cost of consumables, including all safety measures like helmet, goggles / face shield, safety shoes, at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining work permit approval from concerned sections before work starts on each day including making and testing charges of concrete cubes for 7 day and 28 days test , certified from Cochin University or other agency approved by engineer-in-charge etc.., complete. (Required quantity of cement will be issued free of cost except for operating item 6) 227 Cu.M
6 6 Do..do M-30 grade design Ready mix concrete with minimum cement of grade OPC 432 Kg per CuM including cost of conveyance , pumping cost for, levelling, consolidating with vibrator ,curing etc including making and testing charges of concrete cubes for 7 day and 28 days test , certified from Cochin University or other agency , approved by engineer-in-charge. one set cube for every load of 6 Cu.M of cement concrete including cost of cement In this case contractor should quote only additional charges TCC has to pay to him other than the rate in Item No: 5 considering cost of cement, conveyance charge etc, if TCC permit him to use designed ready mix concrete from outside TCC and TCC will not issue cement to contractor for this item depending on quantity of work in Item No:5) 227 Cu.M
7 7 Reinforcement work with M.S/Tor steel rods, corrosion resistant steel rods of all dia for foundation footings, circular footings, walls, columns, beams, slabs, stair cases, equipment foundations, curved walls, floors etc., of all sizes and shapes, excluding cost of all reinforcement rods (which will be issued free of cost by TCC), but including cost of 16g G.I. binding wire, straightening, marking, bending, placing in position, tying with required binding wire, providing required number of cover blocks as per instructions and standard practices for work up to 3M above ground level, including all labour charges, hire for tools and plants, cost of consumables, all conveyance charges, bailing/pumping out all sorts of water including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining work permit approval from concerned sections before work starts on each day etc.., complete. 21000 Kg
8 8 Formwork using plywood sheets, M.S. sheets, wooden plants, wooden/M.S. props, struts, bracings etc., for foundation , of all sizes, shapes and thickness at all locations and elevations up to 1M from existing ground level as per standard practices, dissembling the formwork and cleaning the area after the required period, including all labour charges, hire for formwork materials, cost of consumables, bailing/pumping out all sorts of water all safety precautions etc. Including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, at contractors’ risk and cost, approved by engineer in charge including obtaining work permit approval from concerned sections before work starts on each day etc., complete. 742 Sq.M
9 9 Plastering with cement sand mortar 1:4, 12 mm thick using approved branded M-Sand of POABS make for all surface like wall, floors etc after preparation of surface for getting proper grip of cement mortar, curing charges, providing floating coat of neat cement wherever necessary including cost of all materials, labour charges, hire for tools and plants, cost of consumables, including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, at contractors risk and cost, approved by engineer in charge including obtaining work permit approval from concerned sections before work starts on each day etc including mixing of suitable water proofing materials supplied separately.., complete. (Required quantity of cement will be issued free of cost) 489 Sq.M
10 10 Grouting the anchor bolts of all dia up to 25 mm bolt having sufficient anchorage length with rich cement sand mortar 1:2 using approved branded M-Sand of POABS make and wall after preparation of surface for getting proper grip of cement mortar including cost of all materials, labour charges, hire for tools and plants, cost of consumables, including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, at contractors risk and cost, approved by engineer in charge including obtaining work permit approval from concerned sections before work starts on each day, including mixing of suitable adhesives and admixes supplied separately by TCC free of cost complete. (Required quantity of anchor bolt, cement will be issued free of cost by TCC) 12 Nos
11 11 Masonry work with solid concrete blocks of size 30x20x15cm or 30x20x10cm available size for walls in cement mortar 1:4 for all thickness, sizes and shapes using approved quality and size solid concrete blocks at all elevations and locations, including racking and hacking the surface for proper grip, including all labour charges, cost of all materials, hire for tools and plants, curing, all safety precautions etc., complete. (Cement will be issued free of cost by TCC) 2 Cu.M
12 12 Supplying and fixing expansion joint filler material of 12mm thick bitumen impregnated fibre board conforming to IS 1838, including cost of primer ,sealing compound grade -In expansion joints, including cost of all materials, labour charges, hire for tools and plants cost of consumables, including all safety measures like safety belt, helmet, goggles / face shield, safety shoes, at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining work permit approval from concerned sections before work starts on each day etc as per standared practice and approved by engineer-in-charge 30 Sq.M
13 13 Supplying and fixing expansion joint filler material of 20 mm thick bitumen impregnated fibre bond conforming to IS 1838, including cost of primer ,sealing compound grade -A in expansion joints, including cost of all materials, labour charges, hire for tools and plants cost of consumables, including all safety measures like safety belt, helmet, goggles / face shield, safety shoes, at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining work permit approval from concerned sections before work starts on each day etc as per standared practice and approved by engineer-in-charge 42 Sq.M
14 14 Providing acid resistant tile lining at all locations up to an elevation of 1.5M from ground level in horizontal, vertical and curved surface with approved quality acid resistant tiles of size 230x114x38mm or nearest size set in CNSL bedding over a base of one coat of 90/15 grade bituminous paint and 12 mm thick bitumastic membrane set in with 6mm wide 8 to 10 mm deep joints pointing with CNSL, including cost of AR tiles,all materials cost, labour charges, conveyance chrges,all safety precautions etc like safety net, safety belt, helmet, goggles / face shield, safety shoes, at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining work permit approval from concerned sections before work starts on each day etc.., complete 396 Sq.M
15 15 Providing bitumen sand mix (bitumen 85/25) with clean gritty sand (6% to 10% of sand weight of bitumen to have proper mix) levelled, trowelled and fnished to a minimum thickness of 50mm to get uniform sruface level at top of bitumen bed at all elevations and locations to the required line, level etc., including cost of all materials, bitumen, sand, wastage, cost of fuel, all labour charges, hire for tools and safety precautions etc., complete for 10M dia (approx.) of tank foundation 7.5 Cu.M
16 16 Engaging following labourers for executing miscellaneous items of work l at all locations and elevations, including all labour charges, ESI, PF, KCWWF contributions and all other benefits payable, hire for tools and plants, all safety precautions etc., complete.\na) Skilled Worker 2 Day
17 17 b) Man Mazdoor 2 Day
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail