| 1 | 1 | Annual routine maintenance of all hydro-mechanical & elctro-mechenical components, equipments, machines and other related structure of Joshiyara Barrage as per operation and maintenance manual, including arrangement of all skilled manpower of routine maintenance in general duty hours, arrangement of all T&P and general consumables etc. required for proper completion of the work as per direction of Engineer-in-charge. ( One Job means arrangement of all manpower, T&P and general consumable in one month) | b1 | 12 | Job |
|---|
| 2 | 2 | Daily up keeping and gardening in whole barrage complex including supply of desired plants, flower pots, labour, T&P and general consumable manure, medicines for plant etc. It also regular watering pruning & bush cutting etc. (One Job means arrangement of all manpower, T&P and general consumable in one month) | b2 | 12 | Job |
|---|
| 3 | 3 | Daily sweeping & cleaning of whole barrage premises and dead animals in barrage complex and safe disposal of the same in trenching ground as per direction of Engineer-in-charge. It also includes daily sweeping, cleaning of barrage control room & barrage office. (One Job means arrangement of all manpower, T&P and general consumable in one month) | b3 | 12 | Job |
|---|
| 4 | 4 | All indoor areas, staircases, security guard booths, control room, LT Room including furniture, pannels and walls should be mopped with a disinfectant with 1% sodium hypochlorite or chloroxylenol or parachlorometaxylenol disinfectants atleast twice in a week.High contact surfaces such pannel buttons, handrails / handles and other office machines should be cleaned twice daily by mopping with a linen/absorbable cloth soaked in 1% sodium hypochlorite.For metallic surfaces like door handles, security locks, keys etc. 70% alcohol can be used to wipe down surfaces (One Job means arrangement of all manpower, T&P and general consumable in one month) | | 12 | Job |
|---|
| 5 | 5 | Deployment of helper as and when required as per the instruction of Engineer-in-Charge. | b4 | 50 | ManDays |
|---|
| 6 | 6 | Engaging of Hydraulic excavator (3D) with driver, helper & fuel as and when required as per the instruction of Engineer-in-Charge. | b5 | 20 | Hours |
|---|
| 7 | 7 | Rewinding of 1 HP three phase induction motor, including cartage, varnishing of winding etc. complete in all respect and after deducting cost of old winding. | b6 | 2 | Nos |
|---|
| 8 | 8 | Rewinding of 7.5 HP three phase induction motor, including cartage, varnishing of winding etc. complete in all respect and after deducting cost of old winding. | b7 | 3 | Nos |
|---|
| 9 | 9 | Rewinding of 15 HP three phase induction motor, including cartage, varnishing of winding etc. complete in all respect and after deducting cost of old winding. | b8 | 2 | Nos |
|---|
| 10 | 10 | Rewinding of 25 HP three phase induction motor, including cartage, varnishing of winding etc. complete in all respect and after deducting cost of old winding. | b9 | 2 | Nos |
|---|
| 11 | 11 | Rewinding of 30 HP three phase induction motor with High quality insulated copper wire original Gauge, including cartage, varnishing of winding etc. complete in all respect and after deducting cost of old winding. | b10 | 2 | Nos |
|---|
| 12 | 12 | Rewinding of 50 HP three phase induction motor with High quality insulated copper wire original gauge , including cartage, varnishing of winding etc. complete in all respect and after deducting cost of old winding. | b11 | 4 | Nos |
|---|
| 13 | 13 | Operation Of Hoppers Flushing Pump and other works at Joshiyara Barrage in Evening shift / Night Shift | b12 | 154 | job |
|---|