| 1 | 1 | Man Power (PART -A) | | | |
|---|
| 2 | 2 | Detailed Scope of work mentioned in Pg No. 30. | | 1 | Year |
|---|
| 3 | 3 | CONSUMABLES (PART -B) | | | |
|---|
| 4 | 4 | Supply of Sodium Hypo chlorite (more than 100mg/L) including freight charges | | 7200 | Kg / Year |
|---|
| 5 | 5 | Supply of Bio Culture/ Urea including freight charges | | 500 | Kg / Year |
|---|
| 6 | 6 | JCB Hiring charges including all conveyance and diesel | | 30 | Hour / Year |
|---|
| 7 | 7 | Supply, discharging and Refilling of Gear Oil to the Aerator Pump, Blower (320 grade oil) including freight charges | | 150 | Litre / Year |
|---|
| 8 | 8 | Supply and installation of 95mm Rubber spyder washer (RED colour) for motor and pump joints including freight charges, etc., | | 50 | Nos / Year |
|---|
| 9 | 9 | Supply and installation of 100 mm Rubber spyder washer (RED colour) for motor and pump joints including freight charges, etc., | | 50 | Nos / Year |
|---|
| 10 | 10 | Supply and installation of 95mm motor pump MS metal coupling for motor and pump joints including materials cost, lathe works, transport, conveyance etc., | | 10 | Nos / Year |
|---|
| 11 | 11 | Supply and installation of 100mm motor pump MS metal coupling for motor and pump joints including materials cost, lathe works, transport, conveyance etc., | | 10 | Nos / Year |
|---|
| 12 | 12 | Supply and installation of 3mm White Insertion Rubber Sheet for the motor pump joints, valves, including etc., | | 20 | Meter / Year |
|---|
| 13 | 13 | Supply and installation of 8 mm Silicon Oil Gland Rope for the motor, valves, coupling at motor and pump joints including etc., | | 30 | Meter / Year |
|---|
| 14 | 14 | Supply and installation of 10 mm Silicon Oil Gland Rope for the motor, valves, coupling at motor and pump joints including etc., | | 30 | Meter / Year |
|---|
| 15 | 15 | Supply and installation of NLGI 2 grade Grease for applying at the joints of Motor and Mono block pumps including etc., | | 10 | Kg / Year |
|---|
| 16 | 16 | Supply and installation of 65mm x 600mm Fine Diffuser EPDM, 3 cum / Hr for aeration process including etc., | | 50 | Nos/Year |
|---|
| 17 | 17 | Sludge removal from drying bed and transporting to the nearest location (within NIT Campus through vehicle of capacity 120 C.Ft) in Hired Load vehicle including all conveyance etc., | | 10 | Time / Year |
|---|
| 18 | 18 | Sludge removal from Collection Tank and transporting to the nearest location (within NIT Campus through vehicle of capacity 120 C.Ft) in Hired Load vehicle including all conveyance etc., | | 20 | Time / Year |
|---|
| 19 | 19 | Filter Media Change in the 3 Nos of Filter tower with Activated Carbon, Pebbles, including etc., (River Sand will be supplied by NITT) | | 1 | Time / Year |
|---|
| 20 | 20 | Supply and installation of 5mm Neoprene Rubber sheet for Clarifier including etc., | | 20 | Meter / Year |
|---|
| 21 | 21 | Sump Cleaning with Pressure Jet Nozzle cleaning equipment's by own means | | 4 | Time / Year |
|---|
| 22 | 22 | Supply of Bleaching Powder including freight charges | | 100 | Kg / Year |
|---|
| 23 | 23 | Service Charge Per Year ( ---- %) | | 1 | Year |
|---|