Pre Monsoon Works 2019-20 Cleaning Choked Up Culverts , Light Jungles , Pre Monsoon Works 2019-20 Cleaning Choked Up Culverts , Light Jungles , Removing Of Earth Slips , Deepening/ Cleaning Side Drains And ShoulderMaintenance And Urgent Patch Repa
Tender Overview
Project Description
Pre Monsoon Works 2019-20 Cleaning Choked Up Culverts , Light Jungles , Pre Monsoon Works 2019-20 Cleaning Choked Up Culverts , Light Jungles , Removing Of Earth Slips , Deepening/ Cleaning Side Drains And ShoulderMaintenance And Urgent Patch Repair Work With Using Emulsion/Shelmac In Various Roads Under Roads Section
BOQ
| Work Name:Pre monsoon works 2019-20 Cleaning choked up culverts, light jungles, removing of earth slips, deepening/ cleaning side drains and shoulder maintenance and urgent patch repair work with using Emulsion/ Shelmac in various roads under roads section Peermade. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Road Work | BI01010001010000000000000515BI0100001113 | ||
| 2 | 1.01 | 55.4 : Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | BI01010001010000000000000515BI0100001114 | 22.56 | cum |
| 3 | 1.02 | 55.8.a : Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | BI01010001010000000000000515BI0100001115 | 22.56 | cum |
| 4 | 1.03 | od4471/2020_2021 : Engaging Labours for cutting fallen down trees, rectifying with shelmac. eviction of minor encroachments etc. | BI01010001010000000000000515BI0100001116 | 128 | Day |
| 5 | 1.04 | od4472/2020_2021 : Engaging JCB for removal of raised berm , clearing drain other obstructions and minor land slides in the PWD road including fuel charges ,Bata of driver and other all expenditure etc complete. | BI01010001010000000000000515BI0100001117 | 100 | hour |
| 6 | 1.05 | od4473/2020_2021 : Engaging small Tipper for removing earth and other unusable materials from the PWD road , including fuel charge and all other expenditures etc.complete | BI01010001010000000000000515BI0100001118 | 77 | hour |
| 7 | 1.06 | 2.2 : Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the areaClearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | BI01010001010000000000000515BI0100001119 | 5.575 | Hecter |
| 8 | 1.07 | 55.15 : Refurbishment of existing signboards<br>Refurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete.Refurbishment of existing signboardsRefurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete. | BI01010001010000000000000515BI0100001120 | 55 | no |
| 9 | 1.08 | 10.2 : Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. | BI01010001010000000000000515BI0100001121 | 1457.5 | sqm |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender