Premonsoon Works 2019-2020 Clearing Choked Up Culverts , Light Premonsoon Works 2019-2020 Clearing Choked Up Culverts , LightJungles , Removing Of Earth Slips , Deepening/ Cleaning Side Drains AndShoulder Maintenance And Urgent Patch Repair Works
Tender Overview
Project Description
Premonsoon Works 2019-2020 Clearing Choked Up Culverts , Light Premonsoon Works 2019-2020 Clearing Choked Up Culverts , LightJungles , Removing Of Earth Slips , Deepening/ Cleaning Side Drains AndShoulder Maintenance And Urgent Patch Repair Works With UsingEmulsion Or Shelmac In Various Roads Under Roads Sect
BOQ
| Work Name:PREMONSOON WORKS 2019-2020 clearing choked up culverts, light jungles, removing of earth slips, deepening/ cleaning side drains and shoulder maintenance and urgent patch repair works with using emulsion or shelmac in various roads under roads section Kumily | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Road Work | BI01010001010000000000000515BI0100001113 | ||
| 2 | 1.01 | 55.4 : Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | BI01010001010000000000000515BI0100001114 | 12.906 | cum |
| 3 | 1.02 | 55.8.a : Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | BI01010001010000000000000515BI0100001115 | 12.906 | cum |
| 4 | 1.03 | od4292/2020_2021 : Engaging JCB for clearing deposits on berm etc. complete including all charges for hire , labour and other sundries. | BI01010001010000000000000515BI0100001116 | 33 | hour |
| 5 | 1.04 | od4293/2020_2021 : Engaging tipper for dumping of silt and other deposits from road surface removed using JCB including all charges of fuel, operator etc. | BI01010001010000000000000515BI0100001117 | 20 | hour |
| 6 | 1.05 | od4294/2020_2021 : Engaging Labours for cutting fallen down trees, rectifying with shelmac. refurbishment of signboards, eviction of minor encroachments ,Clearing culverts and drains etc. | BI01010001010000000000000515BI0100001118 | 50 | Day |
| 7 | 1.06 | 2.2 : Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the areaClearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | BI01010001010000000000000515BI0100001119 | 2.83 | Hecter |
| 8 | 1.07 | 10.2 : Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. | BI01010001010000000000000515BI0100001120 | 358.75 | sqm |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender