Maintenance Of Electrically Operated Hoist And Cable Realing Drum Etc Maintenance Of Electrically Operated Hoist , Cable Reeling Drums And Other Associated Equipment , Laying Termination And Jointing Etc . Of Power/Control Cables And Maintenance Of 6 . 6 Kv Vacuum Circuit Breakers Their Overhauling And Cleaning Of Bus Bars ,
BOQ
| Name of Work: Maintenance of (a) Electrically operated hoist (b) cable reeling drums and other associated equipment (c) laying termination and jointing etc. of power/control cables & (d) maintenance of 6.6 KV vacuum circuit breakers and cleaning of bus bars, module connectors of 0.4 KV and 6.6 KV system of SS-1, MSS & SS-2 & MSS of CHP of 2x500MW units. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Maintenance of hoist which includes cleaning of panels, monorails and other electrical equipment, replacement of defective components | BI01010001010000000000000515BI0100001113 | 16 | Job |
| 2 | 2 | Greasing / oiling of wire rope and other moving parts of hoist. | BI01010001010000000000000515BI0100001114 | 16 | Job |
| 3 | 3 | Bringing down the complete hoist unit from mono rail to the respective floor for attending the breakdown and re-positioning. | BI01010001010000000000000515BI0100001115 | 2 | Job |
| 4 | 4 | Repositioning of entangled wire rope of electrically operated hoist after taking out hook for attending fault in control panel or overhead system. | BI01010001010000000000000515BI0100001116 | 20 | Job |
| 5 | 5 | Attending / replacing damaged fuses, contacts, relays or any other electrical part of electrically operated hoist at mono rail level. | BI01010001010000000000000515BI0100001117 | 175 | Job |
| 6 | 6 | Operational and maintenance assistance for electric hoists as per requirement at site. | BI01010001010000000000000515BI0100001118 | 250 | Job |
| 7 | 7 | Shifting and reinstallation of hook pulley of hoist / replacement by new hook pulley. | BI01010001010000000000000515BI0100001119 | 50 | Job |
| 8 | 8 | Disentangling of flexible movable cable and minor repair of cable supporting structure of electrically operated hoist. | BI01010001010000000000000515BI0100001120 | 15 | Job |
| 9 | 9 | Routine checking of slip ring assembly of CRD | BI01010001010000000000000515BI0100001122 | 36 | Job |
| 10 | 10 | Overhauling of slip ring assembly of CRD | BI01010001010000000000000515BI0100001123 | 10 | Job |
| 11 | 11 | Stress releasing of multi core flexible copper cable of slip ring assembly of CRD. | BI01010001010000000000000515BI0100001125 | 36 | Job |
| 12 | 12 | Realignment of cable reeling drum of slip ring assembly. | BI01010001010000000000000515BI0100001126 | 14 | Job |
| 13 | 13 | Setting the torque of coupler of slip ring assembly of CRD | BI01010001010000000000000515BI0100001127 | 14 | Job |
| 14 | 14 | Cable Laying of H.T. Power cable up to 400 mm2 | BI01010001010000000000000515BI0100001128 | 200 | Mtr |
| 15 | 15 | Cable Laying of L. T. Power / control cable up to 10 mm2 | BI01010001010000000000000515BI0100001129 | 400 | Mtr |
| 16 | 16 | Cable Laying of L. T. Power / control cable above 10 mm2 to 50 mm2 | BI01010001010000000000000515BI0100001131 | 300 | Mtr |
| 17 | 17 | Cable Laying of L. T. Power / control cable above 50 mm2 to 300 mm2 | BI01010001010000000000000515BI0100001132 | 200 | Mtr |
| 18 | 18 | Termination of H.T. Power cable up to 400 mm2 | BI01010001010000000000000515BI0100001133 | 6 | No. |
| 19 | 19 | Termination of L. T. Power / control cable up to 10 mm2. | BI01010001010000000000000515BI0100001134 | 30 | No. |
| 20 | 20 | Termination of L. T. Power / control cable above 10 mm2 to 50 mm2. | BI01010001010000000000000515BI0100001136 | 30 | No. |
| 21 | 21 | Termination of L. T. Power / control cable above 50 mm2 to 300 mm2. | BI01010001010000000000000515BI0100001137 | 30 | No. |
| 22 | 22 | Salvaging of H.T. Power cable up to 400 mm2 | BI01010001010000000000000515BI0100001139 | 200 | Mtr |
| 23 | 23 | Salvaging of L. T. Power / control cable up to 10 mm2 | BI01010001010000000000000515BI0100001140 | 300 | Mtr |
| 24 | 24 | Salvaging of L. T. Power / control cable above 10 mm2 to 50 mm2. | BI01010001010000000000000515BI0100001141 | 200 | Mtr |
| 25 | 25 | Salvaging of L. T. Power / control cable above 50 mm2 to 300 mm2. | BI01010001010000000000000515BI0100001142 | 100 | Mtr |
| 26 | 26 | Straight through flexible joint of H.T. Power cable up to 400 mm2 | BI01010001010000000000000515BI0100001143 | 9 | Joint |
| 27 | 27 | Straight through flexible joint of L.T. Power/control cable up to 10 mm2 | BI01010001010000000000000515BI0100001145 | 18 | Joint |
| 28 | 28 | Straight through flexible joint of L. T. Power / control cable above 10 mm2 to 50 mm2 | BI01010001010000000000000515BI0100001146 | 18 | Joint |
| 29 | 29 | Straight through flexible joint of L. T. Power / control cable above 50 mm2 to 300 mm2 | BI01010001010000000000000515BI0100001147 | 18 | Joint |
| 30 | 30 | Erection / re-erection of G.I. / M.S. perforated and ladder type trays of different size. | BI01010001010000000000000515BI0100001148 | 50 | Mtr |
| 31 | 31 | Fixing / re-fixing of tray cover of different size over the cable trays. | BI01010001010000000000000515BI0100001150 | 50 | Mtr |
| 32 | 32 | Erection of junction boxes of size 200 mm2 to 600 mm2. | BI01010001010000000000000515BI0100001151 | 20 | Job |
| 33 | 33 | Erection of conduit pipe in under concrete/cement floors up to 75 mm diameter. | BI01010001010000000000000515BI0100001152 | 100 | Mtr |
| 34 | 34 | Erection of conduit pipe in air of size up to 75 mm diameter. | BI01010001010000000000000515BI0100001153 | 100 | Mtr |
| 35 | 35 | Digging of earth for laying / salvaging of cable | BI01010001010000000000000515BI0100001155 | 100 | M3 |
| 36 | 36 | Installation of welding sockets, MCCB, DB, T.P.N. switches etc. | BI01010001010000000000000515BI0100001156 | 10 | No. |
| 37 | 37 | Repairing of cables by rapping of HT & PVC tape | BI01010001010000000000000515BI0100001157 | 20 | Joint |
| 38 | 38 | Dressing of cables over existing tray | BI01010001010000000000000515BI0100001158 | 500 | Mtr |
| 39 | 39 | Maintenance of 6.6 KV vacuum Circuit Breakers installed in the CHP of 2x500 MW units. | BI01010001010000000000000515BI0100001160 | 27 | No. |
| 40 | 40 | Cleaning of 6.6 KV buses installed in the CHP of 2x500 MW Units | BI01010001010000000000000515BI0100001161 | 2 | Job |
| 41 | 41 | Cleaning of 0.4 KV buses installed in the MSS of CHP of 2x500 MW units. | BI01010001010000000000000515BI0100001162 | 2 | Job |
| 42 | 42 | Cleaning of 0.4 KV buses installed in the SS-1 of CHP of 2x500 MW units. | BI01010001010000000000000515BI0100001163 | 2 | Job |
| 43 | 43 | Cleaning of 0.4 KV buses installed in the SS-2 of CHP of 2x500 MW units. | BI01010001010000000000000515BI0100001164 | 2 | Job |
| 44 | 44 | Dismantling, cleaning, testing & re commissioning / replacement of CT/PT of 6.6 KV switch gear. | BI01010001010000000000000515BI0100001166 | 8 | No. |
| 45 | 45 | Replacement of protection relays / bus CT/ Bus PT etc. of 0.4 KV / 6.6 KV switch gears of MSS, SS-1, SS-2 & Stacker re claimer including rectification of the fault of associated circuit. | BI01010001010000000000000515BI0100001167 | 12 | Job |
| 46 | 46 | Preventive maintenance of 220 V DC Trickle / Boost charger / battery terminal panels including replacement of defective parts and re commissioning. | BI01010001010000000000000515BI0100001168 | 1 | Job |
| 47 | 47 | Up keeping of PLC interface panels installed in CHP control room, SS-1, SS-2 & Stacker-re claimer’s control cabin (One job means once in a day. The job has to be carried out twice a week.) | BI01010001010000000000000515BI0100001170 | 104 | Job |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.