| 1 | 1 | Chisel Numbering of timber logs | | 1200 | Logs |
|---|
| 2 | 2 | Hand Dragging of Timber logs to a lead of 400 mtrs | | 50 | M3 |
|---|
| 3 | 3 | Dragging timber logs poles upto a initial lead of 200 metres | | 193.958 | M3 |
|---|
| 4 | 4 | Haulage of IIC Poles upto 400 m can be charged only for the quantity which are kept in difficult areas and could not drag by using Elephant/Tractor. Haulage allowed only for 200 poles out total 371 and the quantity of balance 171 poles are included in the provision for dragging | | 200 | Nos |
|---|
| 5 | 5 | Haulage IIIrd class teak poles upto 400 m | | 511 | Nos |
|---|
| 6 | 6 | Haulage IVth class teak poles using manual labour | | 321 | Nos |
|---|
| 7 | 7 | Clearing jungle growth without felling trees at the dumping depot for stacking depot within the plantation | | 1 | Ha |
|---|
| 8 | 8 | Ciearing boundary line to a width of 5.2m | | 0.5 | Km |
|---|
| 9 | 9 | do fire tracing by scrapping 6 ft on either side and making a concrete belt of 5 ft | | 0.5 | Km |
|---|
| 10 | 10 | Loading timber and poles in lories for transporting to the dumping& Govt. timber depot | | 313.79 | M3 |
|---|
| 11 | 11 | Transport of timber in Lorries to Veettoor Depot ( lead- 1 km coupe road & 41 km metal road- total 42 KM) First 10 km (1 k mcoupe raod 33.33% enhancement, 9 km metal road) 17.72+119.61=137.33 Next 15 Km @ 8.78/- =131.70 /- Next 17 Km @ 7.10/- = 120.70/- Total = 389.73 | | 65 | M3 |
|---|
| 12 | 12 | Transport of Teak & Misc Timber in in Lorries to Mudickal Depot ( lead- 1 km coupe road & 44 km metal road- total 45 KM) First 10 km (1 k mcoupe raod 33.33% enhancement, 9 km metal road) 17.72+119.61=137.33 Next 15 Km @ 8.78/- =131.70 /- Next 20 Km @ 7.10/- = 120.70/- Total = 411.03 | | 93.78 | M3 |
|---|
| 13 | 13 | Transport of Timber in in Lorries to Varapuzha Depot ( lead- 1 km coupe road & 69 km metal road- total 70 KM) First 10 km (1 k mcoupe raod 33.33% enhancement, 9 km metal road) 17.72+119.61=137.33 Next 15 Km @ 8.78/- =131.70 /- Next 45 Km @ 7.10/- = 319.5/- Total = 588.53 | | 65 | M3 |
|---|
| 14 | 14 | Transport of Poles in Lorries to Approved dumping depot minimum lead First 10 km (1 k mcoupe raod 33.33% enhancement, 9 km metal road) 17.72+119.61=137.33 | | 90.01 | M3 |
|---|
| 15 | 15 | Unloading all timber and all poles at dumping depot & Govt timber depot | | 313.79 | M3 |
|---|
| 16 | 16 | Stacking teak poles at dumping depot | | 90.01 | M3 |
|---|
| 17 | 17 | Billetting and stacking of firewood billets | | 7 | Mt |
|---|
| 18 | 18 | Transport of firewood and billets by headload 20 m upto 200 mtr | | 7 | Mt |
|---|
| 19 | 19 | Loading Firewood and billets in lorries | | 7 | Mt |
|---|
| 20 | 20 | Transport of firewoood and billets in lorries to dumping depot | | 7 | Mt |
|---|
| 21 | 21 | unloading of firewood and stacking at dumping depot | | 7 | Mt |
|---|
| 22 | 22 | Drystone pitching 22.5cm thick laid in courses and required profile with hammer dressed stones having no side less than 15cm , with minimum depth of 20cm including preparing the bedding surface etc. all compete(payment for stone to be made separately) | | 30 | Mt |
|---|
| 23 | 23 | Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including getting out and disposal of excavated earth up to 50m and lift up to 1.5m , as directed by Engineer in charge: all kinds of soil | | 50 | M3 |
|---|