South Central Railway has published Bza Division- Vijayawada -Visakhapatnam Section - Cleanng Of Tracks Including Cess/Slopes Etc., Upto Railway Boundary On Either Side Along The Track Running Metres By Removing /Picking Up Of Muck, Garbage, Plastic & Paper Waste Strewn And Other Materials . Submission Date for this Tender is 17-06-2020. Track Work Tenders in Andhra Pradesh. Bidders can get complete Tender details and download the document.
0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |
---|---|---|---|---|---|---|---|---|---|
0 | S.No. | Item Code | Item Qty | Qty Unit | Unit Rate | Basic Value | Escl.(%) | Amount | Bidding\rUnit |
1 | Schedule A-List of items of works that are covered by NS P way bank of 2018 of\rS.C.Railway | 3739515.52 | Above/\rBelow/Par | ||||||
2 | 1 | 641180 | 2854592.00 | Track\rmetre | 1.31 | 3739515.52 | AT Par | 3739515.52 | |
3 | Description:- Clearing of tracks including cess/slopes etc. up to Railway boundary on either side along the track\rrunning metre by removing / picking up all muck, garbage, plastic & paper waste strewn and other materials such\ras glass / plastic water bottles, tea cups, plastic cover bags, dead animals, grass etc. and disposing the same\raway from the railway limit without disturbing the cess, ballast, track & track fittings etc. with all contractor's\rmaterials,labour,transportation,tools&plants,lead&lift,consumables,loading&unloadingetc.withall\rcontractors own safety, risk and cost of all labour working in the running track and as per the instructions of\rEngineer-in-Charge Conditions: a) The track should be kept clean. b) The clearing work should be done under\rrunning condition of trains . No block will be provided by the Railways. c) Before commencement of the work, the\rstaff should report to the concerned Section Engineer i.e SSE/P.Way or SSE/Works and take permission /\rendorsement in daily field books d) While on duty proper authority letter / indent card should be carry to avoid\rcomplication during inspection by the higher officials e) No track materials should be removed / carried from the\rtrack. f) Safety of the men who working on the track and surrounds rest with contractors. No compensation will be\rmade by the railway to the staff who met with an accidents during work. g) Track running metre means length\ralong the track up to the railway boundary on both Up & Down line sides Note: Unit Track metre may be read as\rTrack Running metre (TRM) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail