Appointment Of Consultant For Pre-Consultancy And Post-Consultancy Rehabilitation Of Old Sewer In Ndmc Area , De-Silting And Rehabilitation Of Old Sewer Twin Barrel Of 2100Mm Dia Np-2 Class Rcc Pipe From C-Hexagon To Lodhi Road Through Zakir Hussain Marg, NDMC area-Delhi

New Delhi Municipal Council-NDMC has published Appointment Of Consultant For Pre-Consultancy And Post-Consultancy Rehabilitation Of Old Sewer In Ndmc Area , De-Silting And Rehabilitation Of Old Sewer Twin Barrel Of 2100Mm Dia Np-2 Class Rcc Pipe From C-Hexagon To Lodhi Road Through Zakir Hussain Marg. Submission Date for this Tender is 17-07-2020. Desilting Tenders in NDMC area Delhi. Bidders can get complete Tender details and download the document.




Tender Notice

24355172
Corrigendum : Appointment Of Consultant For Pre-Consultancy And Post-Consultancy Rehabilitation Of Old Sewer In Ndmc Area , De-Silting And Rehabilitation Of Old Sewer Twin Barrel Of 2100Mm Dia Np-2 Class Rcc Pipe From C-Hexagon To Lodhi Road Through Zakir Hussain Marg
Open Tender
Indian
Delhi
NDMC area
17-07-2020

Tender Details

Appointment Of Consultant For Pre-Consultancy And Post-Consultancy Rehabilitation Of Old Sewer In Ndmc Area , De-Silting And Rehabilitation Of Old Sewer Twin Barrel Of 2100Mm Dia Np-2 Class Rcc Pipe From C-Hexagon To Lodhi Road Through Zakir Hussain Marg- Golf Course Subramanium Bharti Marg

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 21-May-2020 pre-bid Meeting and tender opening date is extended Date 18-06-2020
2 12-Jun-2020 Tender Opening date is extended Date 26-06-2020
3 25-Jun-2020 opening date is extend Date 17-07-2020

Key Value

Document Fees
Refer document
EMD
INR 490980.0 /-
Tender Value
INR 2.45 Crore /-

BOQ Items

Name of Work:-Rehabilitation of sewer in NDMC area, De-silting and rehabilitation of old sewer twin barrel of 2100 mm dia NP-2 class RCC pipe from C- Hexagon to Lodhi Road through Zakir Husain marg- Golf Course- Subramanium Bharti marg SH:-Appointment of consultant for pre-consultancy and post consultancy.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Part-A : Pre-Consultancy.\nPre constract Engineering Works:- Providing Consultancy Services for Rehabilitation of sewer line by using best suitable latest technology including investigation of work comprising field investigation of sewer line present status of sewer line, detailed reasons of its malfunctioning sewer capacity (Hydraulic) assessment (present and after rehabilitation), measures to enhance structural capacity of sewer line and construction constraints and its solutions, providing design of liner as per WRC, ASTM or based on international specification for liner design, preparation of technical specification of sewer rehabilitation works (includes technical specification) preparation of detailed estimate, condition of contract for execution of work (review of COC to be used by clients). Preparation of detailed tender document, technical and financial evaluation of outcome of pre-bid conference to recommendation in NIT, tender evaluation, justification and recommendation of award of work to entire satisfaction of Engineer-in-charge of the work. Three set of hard copy of all documents shall be submitted with soft copy on CD. (proposed length of Sewer line for rehabilitation:- 6000 metre appox. of dia 2100mm). \n\nThe scope of services of this assignment is as follows:- \n1. Detailed Survey:-Present status of sewer, reasons for malfunctioning , sewer capacity (hydraulic) assessment (present and after rehabilitation), measures to enhance structural capacity of the sewer line , construction constraints and its solutions, preparation of suitable packages for calling of tenders. 2. Preparation of detailed estimate and estimate cost put to tender.\n3. Tender documentations:- Preparation of comprehensive technical specification of sewer rehabilitation works (includes technical specification for suitable liner methodologies), conditions of contract for execution of work (review of COC to be used by clients) , detailed bills of quantity for sewer rehabilitation works.\n4. Tender evaluation, analysis of rates, justification of cost on prevailing market rates and recommendation for negotiation and recommendation of award. BI01010001010000000000000515BI0100001112 1 Each Job
2 2 Part - B : Post-Consultancy\nProject Management service, post contract Engineering works:- Periodic supervision visits by the P.M.C/Project Consultant Rehabilitation Experts during the implementation of the sewer rehabilitation work, provide a full time project engineer as required for the management of contract and construction supervision of the rehabilitation work executed by the contractor, Scrutinize contractors submittal, proposal and drawings, check and approve liner designs in co-ordination with client, monitor contractor’s progress and to take appropriate action, Organize collection of samples and testing of materials and ensure quality of material and workmanship, Liaise with contractor and process monthly progress report to client, Assist in the testing of sewer with complete satisfaction of Engineer in charge of the work. (proposed length of Sewer line for rehabilitation:- 6000 metre appox. of dia 2100mm).\n\nScope of services of this assignment is as follows :- \n1. Periodic supervision visits by the Project Consultant Rehabilitation Experts during the implementation of the sewer rehabilitation work. However, site Engineer will be available during the currency of the contract period +2 working months of extended period.\n2. Provide support service by key professionals, as required for the management of contract and construction supervision of the rehabilitation work executed by the contractor. \n3. Scrutinize contractor’s submittals, proposal and drawings. \n4. Review and vetting liner designs submitted by contractor.\n5. Monitor contractor’s progress and to suggest appropriate action.\n6. Review test results of samples and materials and suggest appropriate action.\n7. Preparation and submission of monthly progress report to client.\n8. Assist in the commissioning of sewer after rehabilitation of sewer line.\n9. Monitoring & reporting of progress, contractual issues, co-ordinate and consult on safety and quality standard.\n10. Preparation of project completion reports of completed works depicting final status work done. BI01010001010000000000000515BI0100001113 1 Each Job
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail