| 1 | 1.1 | Schedule A :- 63 KVA X-mer on PCC Pole\nSchedule B :- 11KV Line on 13Mtr. Long H-Beam\nSchedule C :- 11KV Tapping Structure on 13Mtr. Long H-Beam\nSchedule D :- New X-Mer Structure Without X-mer | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.2 | DTR 63KVA 11/0.4KV BIS Certified Level-II | | 1 | No. |
|---|
| 3 | 1.3 | 11KV Gapless Type polymer Lightening arrestor (1Set=3No.) | | 3 | Kg. |
|---|
| 4 | 1.4 | Transformer Mounting channel(100x50x6MM) | | 3 | Set |
|---|
| 5 | 1.5 | Trans.Mounting with Belting with 50x50x6MM angle with two cross fixing channel | | 3 | No. |
|---|
| 6 | 1.6 | Stay set 16mm Complete without stay wire (painted) | | 12 | No. |
|---|
| 7 | 1.7 | Stay wire 7/3.15mm (7/10SWG) | | 66 | No. |
|---|
| 8 | 1.8 | Stone Block/Pre cast block for Base pedding (450x450x75MM) | | 14 | No. |
|---|
| 9 | 1.9 | AAAC conductor rabbit for Jumper | | 0.09 | No. |
|---|
| 10 | 2 | Danger Boards Enamalled type 11KV. | | 10 | No. |
|---|
| 11 | 2.1 | Bimetalic clamp distribution transformers Bushing | | 9 | No. |
|---|
| 12 | 2.2 | Bi-metallic clamps suitable for 12mm dia stud and 80sqmm AAAC | | 12 | No. |
|---|
| 13 | 2.3 | Anti climbing devices | | 14 | No. |
|---|
| 14 | 2.4 | Red oxide paint | | 14 | No. |
|---|
| 15 | 2.5 | Aluminium Paint | | 14 | No. |
|---|
| 16 | 2.6 | M.S. Nut and bolts | | 62 | No. |
|---|
| 17 | 2.7 | DC Cross-arms 8' Channel (100x50x6MM) | | 5 | No. |
|---|
| 18 | 2.8 | 11KV. Composite Disc insulator (Polymer) | | 15 | No. |
|---|
| 19 | 2.9 | 11KV. Strain Hardware fitting | | 15 | No. |
|---|
| 20 | 3 | D.O.Mounting channel 75x40x6mm | | 9 | No. |
|---|
| 21 | 3.1 | 11 Kv. D.O. fuse Unit (1Set=3No.) | | 3 | No. |
|---|
| 22 | 3.2 | Concreting of H-Beam 0.65Cmt/pole including Muffing of Pole | | 7.15 | No. |
|---|
| 23 | 3.3 | Concreting of stay @ 0.2 Cmt. per stay | | 2.4 | No. |
|---|
| 24 | 3.4 | Earthing of DTR as per G1 Schedule G1 for Black Cotton Soil (Earthing of DTR as per G1 Schedule) | | 3 | No. |
|---|
| 25 | 3.5 | H-Beams 152x152Mm 37.1KG/mtr. 13Mtr long | | 14 | No. |
|---|
| 26 | 3.6 | H-Beams Clamps 65x8MM Flat | | 43 | No. |
|---|
| 27 | 3.7 | H-Beam Back clamps 65x8MM Flat (In Numbers) | | 30 | No. |
|---|
| 28 | 3.8 | LT Distribution Box with Isolator & HRC Fuse- 63KVA DTR (200A & 6SP of 60A) | | 3 | No. |
|---|
| 29 | 3.9 | Three Phase Static enengy Meters 20-80 Amps. With LS & TOD Facility with Box | | 3 | No. |
|---|
| 30 | 4 | XLPE 1Core unarmoured 50Sqmm aluminium condt.1100Volts | | 0.24 | No. |
|---|
| 31 | 4.1 | XLPE 1Core unarmoured 70Sqmm aluminium condt.1100Volts | | 0.12 | No. |
|---|
| 32 | 4.2 | Concreting of Stay 20MM @0.3Cmt/Stay | | 0.5 | No. |
|---|
| 33 | 4.3 | Stay wire 7/4.00mm (7/8SWG) | | 62 | No. |
|---|
| 34 | 4.4 | Stay set 20mm Complete without stay wire(painted) | | 8 | No. |
|---|
| 35 | 4.5 | 11KV V-cross arm 65x65x6mm angle type | | 5 | No. |
|---|
| 36 | 4.6 | 11KV Top clamp 65x65x6mm angle type | | 5 | No. |
|---|
| 37 | 4.7 | Earthing Coil of 115 Turns of 50MM Dia and 2.5Mtr. Lead of 4.0mm G.I. Wire | | 8 | No. |
|---|
| 38 | 4.8 | 11KV Polymer Pin Insulator | | 19 | No. |
|---|
| 39 | 4.9 | Stringing of AAAC Raccoon condt.. 0.075Sq. Inch (03No. Condt.) | | 0.56 | No. |
|---|
| 40 | 5 | Survey of 11KV Line during execution of Work | | 0.56 | No. |
|---|
| 41 | 5.1 | Bracing/support angle of 65x65x6mm for 8' (2.4 mtr) centre DP | | 2 | No. |
|---|
| 42 | 5.2 | Concreting of Structure & Foundation (1:3:6) | | 3.6 | No. |
|---|
| 43 | 5.3 | Labour and Transportation Charge | | 1 | INR |
|---|
| 44 | 5.4 | GST @ 18% | | 1 | INR |
|---|