Procurement Of Hydromet Equipment For Study Of Behavior Of Flooding And Unexpected Drought Like Situation In Garo Hills Districts Of Meghalaya
Tender Overview
Project Description
Procurement Of Hydromet Equipment For Study Of Behavior Of Flooding And Unexpected Drought Like Situation In Garo Hills Districts Of Meghalaya , Supply Installation Testing & Commissioning Of Automatic Rain Gauge , As Per The Technical Specifications , Supply Installation Testing & Commissioning Of Air Temperature &Relative Humidity Sensor , As Per The Technical Specifications , Supply Installation Testing & Commissioning Of Automatic Water Level Recorder , As Per The Technical Specifications , Supply Installation Testing & Commissioning Of 2 Ai Channel Data Logger With Solar Panel , Battery , Charger , Nema4x Or Equivalent Enclosure Box To Suit Master Unit Equipment With Locking As Per The Technical Specifications
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 02-Jun-2020 | Extension Notice | Date | 12-Jun-2020 |
BOQ
| Name of Work: Procurement of Hydromet equipment for Study of behavior of flooding and unexpected drought like situation in Garo Hills Districts of Meghalaya | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Supply Installation testing & Commissioning of Automatic Rain Gauge, As per the technical Specifications | item2 | 4 | Nos |
| 2 | 2 | Supply Installation testing & Commissioning of Air Temperature &Relative Humidity Sensor, As per the technical Specifications | item3 | 4 | Nos |
| 3 | 3 | Supply Installation testing & Commissioning of Automatic Water Level Recorder, As per the technical Specifications | item4 | 1 | Nos |
| 4 | 4 | Supply Installation testing & Commissioning of 2 AI channel data logger with Solar panel, Battery, charger , NEMA4X OR Equivalent Enclosure box to suit master unit equipment with locking as per the technical specifications | item8 | 5 | Nos |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed