| 1 | 1 | Clearing and grubbing road land including uprooting wild vegetation, grass,bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stackin of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.( SOR ITEM NO.2.2) Subwork No. 1: NH9 to Hingani | BI01010001010000000000000515BI0100001113 | 1.48 | Hect. |
|---|
| 2 | 1.1 | Subwork No. 2: ODR22 to Khandobachiwadi | BI01010001010000000000000515BI0100001114 | 1.23 | Hect. |
|---|
| 3 | 1.2 | Subwork No. 3: T2 to Mundewadi | BI01010001010000000000000515BI0100001115 | 0.765 | Hect. |
|---|
| 4 | 2 | Making up loss of material / irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at per technical specification Clause 190. Subwork No. 1: NH9 to Hingani | BI01010001010000000000000515BI0100001117 | 1740 | Sqm |
|---|
| 5 | 2.1 | Subwork No. 2: ODR22 to Khandobachiwadi | BI01010001010000000000000515BI0100001118 | 2000 | Sqm |
|---|
| 6 | 2.2 | Subwork No. 3: T2 to Mundewadi | BI01010001010000000000000515BI0100001119 | 2850 | Sqm |
|---|
| 7 | 3 | Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903 Subwork No. 1: NH9 to Hingani | BI01010001010000000000000515BI0100001121 | 7100 | Sqm |
|---|
| 8 | 3.1 | Subwork No. 2: ODR22 to Khandobachiwadi | BI01010001010000000000000515BI0100001122 | 3300 | Sqm |
|---|
| 9 | 3.2 | Subwork No. 3: T2 to Mundewadi | BI01010001010000000000000515BI0100001123 | 5017.5 | Sqm |
|---|
| 10 | 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405 Subwork No. 1: NH9 to Hingani | BI01010001010000000000000515BI0100001127 | 55.13 | Sqm |
|---|
| 11 | 5 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.225 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. (SOR Item no. 5.2 ( iii ) Subwork No. 1: NH9 to Hingani | BI01010001010000000000000515BI0100001124 | 2812.5 | Sqm |
|---|
| 12 | 5.1 | Subwork No. 2: ODR22 to Khandobachiwadi | BI01010001010000000000000515BI0100001125 | 1875 | Sqm |
|---|
| 13 | 5.2 | Subwork No. 3: T2 to Mundewadi | BI01010001010000000000000515BI0100001126 | 1536 | Sqm |
|---|
| 14 | 6 | Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggrgate using chips spreder with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 KN static roller to achieve the desired degree of compcation as per Technical Specification Clause 506 SOR ITEM NO.5.5 A Subwork No. 1: NH9 to Hingani | BI01010001010000000000000515BI0100001128 | 3547.5 | Sqm |
|---|
| 15 | 6.1 | Subwork No. 2: ODR22 to Khandobachiwadi | BI01010001010000000000000515BI0100001129 | 1875 | Sqm |
|---|
| 16 | 6.2 | Subwork No. 3: T2 to Mundewadi | BI01010001010000000000000515BI0100001130 | 1536 | Sqm |
|---|
| 17 | 7 | Providing and laying surface dressing as wearing course consisting of a layer of bituminous binder laid on the prepared surface, followed by a cover of crushed stone aggregates of specified size and rolling with three wheel 80-100 kN static roller including cleaning the road surface as per Technical Specification Clause 507. Subwork No. 1: NH9 to Hingani | BI01010001010000000000000515BI0100001131 | 3547.5 | Sqm |
|---|
| 18 | 7.1 | Subwork No. 2: ODR22 to Khandobachiwadi | BI01010001010000000000000515BI0100001132 | 1875 | No |
|---|
| 19 | 7.2 | Subwork No. 3: T2 to Mundewadi | BI01010001010000000000000515BI0100001133 | 1536 | No |
|---|
| 20 | 8 | Royalty Subwork No. 1: NH9 to Hingani | BI01010001010000000000000515BI0100001135 | 1 | No |
|---|
| 21 | 8.1 | Subwork No. 2: ODR22 to Khandobachiwadi | BI01010001010000000000000515BI0100001136 | 1 | No |
|---|
| 22 | 8.2 | Subwork No. 3: T2 to Mundewadi | BI01010001010000000000000515BI0100001137 | 1 | No |
|---|