Providing Foundation For 230 Kv Yard Ca , Cb , Cc , Cd Tower And Transport , Erection Of Tower With Booms For The Proposed Nanguneri 230 110 Kv Ss .
Tender Value
1.66 Crore
Estimated cost
Bid Submission
02 Jun 2020
0 days left
EMD
1.66 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
NANGUNERI → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Providing Foundation For 230 Kv Yard Ca , Cb , Cc , Cd Tower And Transport , Erection Of Tower With Booms For The Proposed Nanguneri 230 110 Kv Ss .
BOQ
| Name of Work: Providing foundation for 230KV yard \"CA\",\"CB\",\"CC\",\"CD\" tower and transport & erection of tower with booms for the proposed Nanguneri 230 / 110 KV SS. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Civil works | |||
| 2 | 1.01 | Earth work excavation for foundation in hard stiff clay, stiff black cotton hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders with an initial lead, lift, etc, complete. | Item1 | 494 | Cum |
| 3 | 1.02 | Earthwork excavation in SDR not requiring blasting.with an initial lead of 10m and lift of 2m etc complete. | Item2 | 494 | Cum |
| 4 | 1.03 | Earthwork excavation in MR and DMR not requiring blasting.with an initial lead of 10m and lift of 2m etc complete. | Item3 | 494 | Cum |
| 5 | 1.04 | Hard Rock by wedging cheselling, as per standard specification, etc., complete.. | Item4 | 990 | Cum |
| 6 | 2 | PCC 1:3:6 mix using 40mm HBS machine crushed metal for foundation with out form work including cost of all labour ,materials, , lead, lift, curing, etc., complete. | Item5 | 124 | Cum |
| 7 | 3 | RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for raft foundation without formwork including cost of all materials, labour lead, litf, etc., complete. But excluding cost of steel reinforcement (by using mixer machine). | Item6 | 396 | Cum |
| 8 | 4 | RCC 1:1.5:3 using 12 to 20mm HBS metal(machine crushed) for pedestal with formwork including cost of all labour, materials, lead, lift, etc, complete. But excluding cost of steel reinforcement (by using mixer machine). | Item7 | 146 | Cum |
| 9 | 5 | Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete. | Item8 | 81500 | Kg |
| 10 | 6 | Plastering with CM. 1:3 mix 12mm thick including cost of materials, labour, lead, lift, curing, etc., complete. | Item9 | 233 | Sqm |
| 11 | 7 | Painting the plastered wall surface with ready mixed plastic emulsion paint of first class quality over a white cement primer coat of approved colour and quality including cost of all matreials, lead and lift etc., complete. | Item10 | 233 | Sqm |
| 12 | 8 | Supplying of hot dip Galvanising & fabrication of foundation bolt with various sizes of required length including threadingfor 150mm length withGI plateof size 100x100x12mm at the bottom of bolt 3 nos of relavent sizes GI nuts and flat washers and fixing in the position as directed by the engineer at site including assembling of templete etc cost of template all materials labour lead, lift etc complete . | Item11 | 10490 | Kg |
| 13 | 9 | Assembling of bolt & nut for all equipment structure by using supply of template & transport including cost of template & bolt and all labour lead, lift etc complete . | Item12 | 36 | Set |
| 14 | 10 | Removing the excess earth to the nearby bund or low laying area as instructed by field engineer including all lead, lift, etc., complete. | Item13 | 636 | Cum |
| 15 | 11 | Refilling with excavated earth other than sand in foundation and sides of masonry, consolidation as per std.specn.with water including all, labour, lead , lift, etc., complete. | Item14 | 1836 | Cum |
| 16 | 12 | Transport and erection of GI tower angles (\"CA, CB, CC\" & CD type towers), including cost of all T & P's, Hire Charges for Crane, all labour, lead, lift, etc complete as per standard specification and approved drawing . | Item15 | 190 | Mt |
| 17 | 13 | Painting the tower leg with best quality of anti-corrosive black paint for a height of 1.00m from the top level of coping including cost of paint all labour etc., complete. | Item16 | 36 | No |
| 18 | 14 | Clearing scrub jungles and disposed from the site as per the direction of site engineer including cost of all labour ,lead, liftetc complete . | Item17 | 10000 | Sqm |
| 19 | 15 | SGST & CGST (If applicable quote the value, if not enter '0') | Item18 | 1 | Percentage |
| 20 | 16 | IGST (If applicable quote the value, if not enter '0') | Item19 | 1 | Percentage |
AI Tender Summary
Tender Timeline
May 16, 2020
11:30 IST
Tender Published
Tender notice published.
CompletedJun 02, 2020
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJun 03, 2020
Bid Opening Date