}

Consultancy Services For Feasibility Study And Preparation Of Dpr For Construction Of Viaduct Between Km 5 Pt 20 To Km 8 Pt 70 On Road Manali Sarchu In 70 Rcc Sector Under 38 Brtf Project Deepak In Himachal Pradesh State, KM 5 PT 20 TO KM 8 PT 70 ON ROAD MANALI SARCHU-Himachal Pradesh

Border Roads Organisation-BRO has published Consultancy Services For Feasibility Study And Preparation Of Dpr For Construction Of Viaduct Between Km 5 Pt 20 To Km 8 Pt 70 On Road Manali Sarchu In 70 Rcc Sector Under 38 Brtf Project Deepak In Himachal Pradesh State. Submission Date for this Tender is 08-06-2020. Feasibility Studies Tenders in KM 5 PT 20 TO KM 8 PT 70 ON ROAD MANALI SARCHU Himachal Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

24335786
Consultancy Services For Feasibility Study And Preparation Of Dpr For Construction Of Viaduct Between Km 5 Pt 20 To Km 8 Pt 70 On Road Manali Sarchu In 70 Rcc Sector Under 38 Brtf Project Deepak In Himachal Pradesh State
Open Tender
Indian
Himachal Pradesh
KM 5 PT 20 TO KM 8 PT 70 ON ROAD MANALI SARCHU
08-06-2020

Tender Details

Consultancy Services For Feasibility Study And Preparation Of Dpr For Construction Of Viaduct Between Km 5 Pt 20 To Km 8 Pt 70 On Road Manali Sarchu In 70 Rcc Sector Under 38 Brtf Project Deepak In Himachal Pradesh State , Remuneration For Local Staff ( Standalone Bridge / Viaduct Project ) , Team Leader Cum Sr . Bridge Engineer , Highway Cum Pavement Engineer , Bridge / Structural Engineer , Material-Cum-Geo-Technical Engineer-Geologist , Senior Survey Engineer , Senior Geologist , Environmental Specialist , Quantity Surveyor / Documentation Expert , Land Acquisition Fc Expert , Utility Expert , Traffic Engineer Cum Safety Expert , Sub Professional Staff ( To Be Assessed By Consultant As Per Requirement Of Assignment ) , Position , Position , Position , Position , Position , Position , Position , Support Staff Note : To Be Assessed By Consultant As Per Requirement Of Assignment ) , Office Manager , Typist , Office Boy , Night Watchman , Transportation ( Fixed Cost ) , The Vehicle Provided By The Consultant Shall Include The Cost For Rental , Drivers , Operation , Maintenance , Repairs , Insurance , Etc A . For Use Of Consultants , Duty Travel To Site ( Fixed Cost ) , Trips , Office Rent ( Fixed Costs ) , The Rent Cost Includes Maintenance , Cleaning , Repairs , Etc , Office Supplies , Utilities And Communication ( Fixed Costs ) , Office Supplies Drafting , Supplies Computer , Running Costs , Domestic And International Communication , Office Furniture And Equipment ( Rental ) , Office Furniture And Equipment , Reports And Document Printing , Monthly Reports ( 3 Copies Per Month ) , Inception Report & Qap , Environment And Social Impact Screening Report , Draft Feasibility Report , Final Feasibility Report , Strip Plan With L . A . Reports , Draft La And Clearances I Report , Final La And Clearances I Report , Draft Enviroment Assessment Report & Rap , Final Enviroment Assessment Report & Rap , Draft Detailed Design Report & Drawings Etc . , Draft Emp , Draft Bidding Document , Final Detailed Project Report With Bill Of Quantities , Cost Estimates , Updated Drawings Etc . , Final Emp , Final Bidding Documents , Draft 3 ( A ) , 3 ( A ) And 3 ( D ) Notification For Land Acquisition ( 03 Copies Each ) , La & Clearances Ii Report , Survey And Investigation , A . Tropographical Survey ( Fixed Cost ) , Tropographical Survey Including Hire Charges For Eqipment And Supply Of Survey Team Comprising Of Project Survey Field Staff Etc . Inclusive Of Cost Of Materials , Labourer , Detailed Topograhic Surveys Using Mobile / Aerial Lidar Or Equivalent Technology , B . Investigation ( Fixed Cost ) , Road And Bridge Inventory , Fwd Test And Pavement Evaluation , Roughness Survey , Axle Load Survey , Material Survey And Investigation , Sub-Grade Investigation , Traffic Survey , Socio-Economic & Census Survey / Studies , Land Acquisition Studies , Any Other Investigation / Surveys , Sub-Soil Investigation , Boring In All Type Of Soils ( Other Than Hard Rock ) , Boring In Hard Rock , Net Work Survey And Gpr , Net Work Survey Of The Existing Highways As A Repository For Civil Work As Per Directions From Authority . , Gpr Survey For Detection Of Under Ground Utilities , Cost Of Supply And Fixing Boundary Pillars , Procuring And Fixing Boundary Pillars And Its Installation , Complete In All Respect As Per Irc:25 , 1967: Wherever The Proposed Alignment Follows The Existing Alignment , The Boundary Pillars Shall Be Fixed At An Interval Of 200M On Either Side Of Proposed Right Of Way . Wherever There Is A Proposal Of Realignment Of The Existing Highway And / Or Construction Of New Bypasses , Consultant Shall Fix Boundary Pillars Along The Proposed Alignment On The Extreme Boundary On Either Side Of The Project Highway At 50 M Interval . , Land Acquisition And Forest Clearance Team Including Support Staff And Logistics / Transportation , ( A ) Land Acquisition And Forest Clearanceteam Including Support Staff: , Ex-Land Revenue Inspector / Officer Or Equivalent , Ex-Kanoogo / Girdwar Or Equivalent , Ex-Patwari Or Equivalent , Typist , Peon , ( B ) Logistics For Land Acquisition And Forest Clearance Team: , Computer Including Necessary Peripherals , Printers , Vehicles ( Bolero Or Equivalent ) With Monthly Running Limit Of 4000 Km , Estimate Of Cost For Expatriate Consultants ( Name And Position To Be Filled In Below Columns By The Bidder ) Renumeratrion Of Expatriate Satff Including Per Diem Allowance , Position , Position , Position , Position , Position , Position , Mobilization And Demobilization - International Airfares ( Fixed Cost ) ( To Be Filled By The Bidder In Below Columns ) , Position , Position , Position , Position , Position , Position , Mobilization And Demobilization -Inland Travel In Home Country ( Fixed Costs ) , Other Miscellaneous Expenses ( Like Da , Internal Travel Expenses Other Than Incidentals ) ( Fixed Cost )

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
INR 12 Lakhs /-

BOQ Items

Name of Work: CONSULTANCY SERVICES FOR FEASIBILITY STUDY AND PREPARATION OF DPR FOR CONSTRUCTION OF VIADUCT BETWEEN KM 5.20 TO KM 8.70 ON ROAD MANALI-SARCHU IN 70 RCC SECTOR UNDER 38 BRTF / PROJECT DEEPAK IN HIMACHAL PRADESH STATE
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Remuneration for Local Staff (Standalone Bridge/ Viaduct Project) item1
2 1.01 Team Leader cum Sr. Bridge Engineer item2 6 Month
3 1.02 Highway cum Pavement Engineer item3 5 Month
4 1.03 Bridge / Structural Engineer item4 6 Month
5 1.04 Material-cum-Geo-technical Engineer-Geologist item5 6 Month
6 1.05 Senior Survey Engineer item6 6 Month
7 1.06 Senior Geologist item7 6 Month
8 1.07 Environmental Specialist item8 4 Month
9 1.08 Quantity surveyor /Documentation Expert item9 4 Month
10 1.09 Land Acquisition FC Expert item10 6 Month
11 1.1 Utility Expert item11 4 Month
12 1.11 Traffic Engineer cum safety expert item12 2 Month
13 2 Sub Professional Staff (To be assessed by consultant as per requirement of assignment) item13
14 2.01 Position item14 1 Month
15 2.02 Position item15 1 Month
16 2.03 Position item16 1 Month
17 2.04 Position item17 1 Month
18 2.05 Position item18 1 Month
19 2.06 Position item19 1 Month
20 2.07 Position item20 1 Month
21 3 Support Staff Note : To be assessed by consultant as per requirement of assignment) item21
22 3.01 Office Manager item22 6 Month
23 3.02 Typist item23 6 Month
24 3.03 Office Boy item24 6 Month
25 3.04 Night Watchman item25 6 Month
26 4 Transportation (Fixed Cost) item26
27 4.01 The Vehicle provided by the consultant shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc A. For use of Consultants item27 6 Month
28 5 Duty travel to Site (Fixed Cost) item28
29 5.01 Trips item29 12 Trips
30 6 Office Rent (Fixed Costs) item30
31 6.01 The rent cost includes maintenance, cleaning, repairs, etc item31 6 Month
32 7 Office Supplies, Utilities and Communication (Fixed Costs) item32
33 7.01 Office Supplies Drafting item33 6 Month
34 7.02 Supplies Computer item34 6 Month
35 7.03 Running Costs item35 6 Month
36 7.04 Domestic and International Communication item36 6 Month
37 8 Office Furniture and Equipment (Rental) item37
38 8.01 Office Furniture and Equipment item38 1 Lumpsum
39 9 Reports and Document Printing item39
40 9.01 Monthly Reports (3 Copies per month) item40 18 Nos
41 9.02 Inception Report & QAP item41 3 Nos
42 9.03 Environment and Social Impact Screening Report item42 4 Nos
43 9.04 Draft Feasibility Report item43 4 Nos
44 9.05 Final Feasibility Report item44 6 Nos
45 9.06 Strip Plan with L.A. Reports item45 6 Nos
46 9.07 Draft LA and Clearances I Report item46 4 Nos
47 9.08 Final LA and Clearances I Report item47 4 Nos
48 9.09 Draft Enviroment Assessment report & RAP item48 4 Nos
49 9.1 Final Enviroment Assessment report & RAP item49 6 Nos
50 9.11 Draft Detailed Design Report & Drawings etc. item50 4 Nos
51 9.12 Draft EMP item51 4 Nos
52 9.13 Draft Bidding Document item52 4 Nos
53 9.14 Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. item53 6 Nos
54 9.15 Final EMP item54 6 Nos
55 9.16 Final Bidding Documents item55 6 Nos
56 9.17 Draft 3(a), 3(A) and 3(D) notification for land acquisition (03 copies each) item56 9 Nos
57 9.18 LA & Clearances II Report item57 6 Nos
58 10 Survey and Investigation item58
59 10.01 A. Tropographical Survey (Fixed Cost) item59
60 10.02 Tropographical Survey including hire charges for eqipment and supply of survey team comprising of project survey field staff etc. inclusive of cost of materials, labourer item60 3.5 Kms
61 10.03 Detailed topograhic surveys using mobile/aerial LiDAR or equivalent technology item61 3.5 Kms
62 10.04 B. Investigation (Fixed Cost) item62
63 10.05 Road and Bridge Inventory item63 1 Lumpsum
64 10.06 FWD Test and Pavement Evaluation item64 1 Lumpsum
65 10.07 Roughness Survey item65 1 Lumpsum
66 10.08 Axle Load Survey item66 1 Lumpsum
67 10.09 Material Survey and Investigation item67 1 Lumpsum
68 10.1 Sub-grade Investigation item68 1 Lumpsum
69 10.11 Traffic Survey item69 1 Lumpsum
70 10.12 Socio-economic & Census Survey/Studies item70 1 Lumpsum
71 10.13 Land Acquisition Studies item71 1 Lumpsum
72 10.14 Any other Investigation/Surveys item72 1 Lumpsum
73 10.15 Sub-soil Investigation item73
74 10.16 Boring in all type of soils (Other than hard rock) item74 1000 Meter
75 10.17 Boring in hard rock item75 440 Meter
76 10.18 Net Work Survey and GPR item76
77 10.19 Net work Survey of the existing Highways as a repository for civil work as per directions from Authority. item77 1 Job
78 10.2 GPR Survey for detection of under ground utilities item78 1 Job
79 11 Cost of supply and fixing Boundary Pillars item79
80 11.01 Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. item80 1 Lumpsum
81 12 Land Acquisition and Forest Clearance Team including support staff and logistics/ transportation item81
82 12.01 (A) Land acquisition and Forest ClearanceTeam including support staff: item82
83 12.02 Ex-Land Revenue Inspector/Officer or equivalent item83 5 Month
84 12.03 Ex-Kanoogo/ Girdwar or equivalent item84 5 Month
85 12.04 Ex-Patwari or equivalent item85 5 Month
86 12.05 Typist item86 5 Month
87 12.06 Peon item87 5 Month
88 12.07 (B) Logistics for Land acquisition and Forest Clearance Team: item88
89 12.08 Computer including necessary peripherals item89 1 Lumpsum
90 12.09 Printers item90 1 Lumpsum
91 12.1 Vehicles (Bolero or equivalent) with monthly running limit of 4000 km item91 1 Lumpsum
92 13 Estimate of Cost for Expatriate Consultants ( Name and Position to be filled in below columns by the bidder) Renumeratrion of Expatriate Satff including per diem allowance item92
93 13.01 Position item93 1 Month
94 13.02 Position item94 1 Month
95 13.03 Position item95 1 Month
96 13.04 Position item96 1 Month
97 13.05 Position item97 1 Month
98 13.06 Position item98 1 Month
99 14 Mobilization and Demobilization - International Airfares (Fixed Cost) (To be filled by the bidder in below columns) item99
100 14.01 Position item100 1 Month
101 14.02 Position item101 1 Month
102 14.03 Position item102 1 Month
103 14.04 Position item103 1 Month
104 14.05 Position item104 1 Month
105 14.06 Position item105 1 Month
106 15 Mobilization and Demobilization -Inland Travel in Home Country (Fixed Costs) item106 1 Lumpsum
107 16 Other Miscellaneous expenses (Like DA, Internal travel expenses other than incidentals) (Fixed Cost) item107 1 Lumpsum
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail