Border Roads Organisation-BRO has published Consultancy Services For Feasibility Study And Preparation Of Dpr For Construction Of Viaduct Between Km 5 Pt 20 To Km 8 Pt 70 On Road Manali Sarchu In 70 Rcc Sector Under 38 Brtf Project Deepak In Himachal Pradesh State. Submission Date for this Tender is 08-06-2020. Feasibility Studies Tenders in KM 5 PT 20 TO KM 8 PT 70 ON ROAD MANALI SARCHU Himachal Pradesh. Bidders can get complete Tender details and download the document.
Name of Work: CONSULTANCY SERVICES FOR FEASIBILITY STUDY AND PREPARATION OF DPR FOR CONSTRUCTION OF VIADUCT BETWEEN KM 5.20 TO KM 8.70 ON ROAD MANALI-SARCHU IN 70 RCC SECTOR UNDER 38 BRTF / PROJECT DEEPAK IN HIMACHAL PRADESH STATE | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Remuneration for Local Staff (Standalone Bridge/ Viaduct Project) | item1 | ||
2 | 1.01 | Team Leader cum Sr. Bridge Engineer | item2 | 6 | Month |
3 | 1.02 | Highway cum Pavement Engineer | item3 | 5 | Month |
4 | 1.03 | Bridge / Structural Engineer | item4 | 6 | Month |
5 | 1.04 | Material-cum-Geo-technical Engineer-Geologist | item5 | 6 | Month |
6 | 1.05 | Senior Survey Engineer | item6 | 6 | Month |
7 | 1.06 | Senior Geologist | item7 | 6 | Month |
8 | 1.07 | Environmental Specialist | item8 | 4 | Month |
9 | 1.08 | Quantity surveyor /Documentation Expert | item9 | 4 | Month |
10 | 1.09 | Land Acquisition FC Expert | item10 | 6 | Month |
11 | 1.1 | Utility Expert | item11 | 4 | Month |
12 | 1.11 | Traffic Engineer cum safety expert | item12 | 2 | Month |
13 | 2 | Sub Professional Staff (To be assessed by consultant as per requirement of assignment) | item13 | ||
14 | 2.01 | Position | item14 | 1 | Month |
15 | 2.02 | Position | item15 | 1 | Month |
16 | 2.03 | Position | item16 | 1 | Month |
17 | 2.04 | Position | item17 | 1 | Month |
18 | 2.05 | Position | item18 | 1 | Month |
19 | 2.06 | Position | item19 | 1 | Month |
20 | 2.07 | Position | item20 | 1 | Month |
21 | 3 | Support Staff Note : To be assessed by consultant as per requirement of assignment) | item21 | ||
22 | 3.01 | Office Manager | item22 | 6 | Month |
23 | 3.02 | Typist | item23 | 6 | Month |
24 | 3.03 | Office Boy | item24 | 6 | Month |
25 | 3.04 | Night Watchman | item25 | 6 | Month |
26 | 4 | Transportation (Fixed Cost) | item26 | ||
27 | 4.01 | The Vehicle provided by the consultant shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc A. For use of Consultants | item27 | 6 | Month |
28 | 5 | Duty travel to Site (Fixed Cost) | item28 | ||
29 | 5.01 | Trips | item29 | 12 | Trips |
30 | 6 | Office Rent (Fixed Costs) | item30 | ||
31 | 6.01 | The rent cost includes maintenance, cleaning, repairs, etc | item31 | 6 | Month |
32 | 7 | Office Supplies, Utilities and Communication (Fixed Costs) | item32 | ||
33 | 7.01 | Office Supplies Drafting | item33 | 6 | Month |
34 | 7.02 | Supplies Computer | item34 | 6 | Month |
35 | 7.03 | Running Costs | item35 | 6 | Month |
36 | 7.04 | Domestic and International Communication | item36 | 6 | Month |
37 | 8 | Office Furniture and Equipment (Rental) | item37 | ||
38 | 8.01 | Office Furniture and Equipment | item38 | 1 | Lumpsum |
39 | 9 | Reports and Document Printing | item39 | ||
40 | 9.01 | Monthly Reports (3 Copies per month) | item40 | 18 | Nos |
41 | 9.02 | Inception Report & QAP | item41 | 3 | Nos |
42 | 9.03 | Environment and Social Impact Screening Report | item42 | 4 | Nos |
43 | 9.04 | Draft Feasibility Report | item43 | 4 | Nos |
44 | 9.05 | Final Feasibility Report | item44 | 6 | Nos |
45 | 9.06 | Strip Plan with L.A. Reports | item45 | 6 | Nos |
46 | 9.07 | Draft LA and Clearances I Report | item46 | 4 | Nos |
47 | 9.08 | Final LA and Clearances I Report | item47 | 4 | Nos |
48 | 9.09 | Draft Enviroment Assessment report & RAP | item48 | 4 | Nos |
49 | 9.1 | Final Enviroment Assessment report & RAP | item49 | 6 | Nos |
50 | 9.11 | Draft Detailed Design Report & Drawings etc. | item50 | 4 | Nos |
51 | 9.12 | Draft EMP | item51 | 4 | Nos |
52 | 9.13 | Draft Bidding Document | item52 | 4 | Nos |
53 | 9.14 | Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. | item53 | 6 | Nos |
54 | 9.15 | Final EMP | item54 | 6 | Nos |
55 | 9.16 | Final Bidding Documents | item55 | 6 | Nos |
56 | 9.17 | Draft 3(a), 3(A) and 3(D) notification for land acquisition (03 copies each) | item56 | 9 | Nos |
57 | 9.18 | LA & Clearances II Report | item57 | 6 | Nos |
58 | 10 | Survey and Investigation | item58 | ||
59 | 10.01 | A. Tropographical Survey (Fixed Cost) | item59 | ||
60 | 10.02 | Tropographical Survey including hire charges for eqipment and supply of survey team comprising of project survey field staff etc. inclusive of cost of materials, labourer | item60 | 3.5 | Kms |
61 | 10.03 | Detailed topograhic surveys using mobile/aerial LiDAR or equivalent technology | item61 | 3.5 | Kms |
62 | 10.04 | B. Investigation (Fixed Cost) | item62 | ||
63 | 10.05 | Road and Bridge Inventory | item63 | 1 | Lumpsum |
64 | 10.06 | FWD Test and Pavement Evaluation | item64 | 1 | Lumpsum |
65 | 10.07 | Roughness Survey | item65 | 1 | Lumpsum |
66 | 10.08 | Axle Load Survey | item66 | 1 | Lumpsum |
67 | 10.09 | Material Survey and Investigation | item67 | 1 | Lumpsum |
68 | 10.1 | Sub-grade Investigation | item68 | 1 | Lumpsum |
69 | 10.11 | Traffic Survey | item69 | 1 | Lumpsum |
70 | 10.12 | Socio-economic & Census Survey/Studies | item70 | 1 | Lumpsum |
71 | 10.13 | Land Acquisition Studies | item71 | 1 | Lumpsum |
72 | 10.14 | Any other Investigation/Surveys | item72 | 1 | Lumpsum |
73 | 10.15 | Sub-soil Investigation | item73 | ||
74 | 10.16 | Boring in all type of soils (Other than hard rock) | item74 | 1000 | Meter |
75 | 10.17 | Boring in hard rock | item75 | 440 | Meter |
76 | 10.18 | Net Work Survey and GPR | item76 | ||
77 | 10.19 | Net work Survey of the existing Highways as a repository for civil work as per directions from Authority. | item77 | 1 | Job |
78 | 10.2 | GPR Survey for detection of under ground utilities | item78 | 1 | Job |
79 | 11 | Cost of supply and fixing Boundary Pillars | item79 | ||
80 | 11.01 | Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. | item80 | 1 | Lumpsum |
81 | 12 | Land Acquisition and Forest Clearance Team including support staff and logistics/ transportation | item81 | ||
82 | 12.01 | (A) Land acquisition and Forest ClearanceTeam including support staff: | item82 | ||
83 | 12.02 | Ex-Land Revenue Inspector/Officer or equivalent | item83 | 5 | Month |
84 | 12.03 | Ex-Kanoogo/ Girdwar or equivalent | item84 | 5 | Month |
85 | 12.04 | Ex-Patwari or equivalent | item85 | 5 | Month |
86 | 12.05 | Typist | item86 | 5 | Month |
87 | 12.06 | Peon | item87 | 5 | Month |
88 | 12.07 | (B) Logistics for Land acquisition and Forest Clearance Team: | item88 | ||
89 | 12.08 | Computer including necessary peripherals | item89 | 1 | Lumpsum |
90 | 12.09 | Printers | item90 | 1 | Lumpsum |
91 | 12.1 | Vehicles (Bolero or equivalent) with monthly running limit of 4000 km | item91 | 1 | Lumpsum |
92 | 13 | Estimate of Cost for Expatriate Consultants ( Name and Position to be filled in below columns by the bidder) Renumeratrion of Expatriate Satff including per diem allowance | item92 | ||
93 | 13.01 | Position | item93 | 1 | Month |
94 | 13.02 | Position | item94 | 1 | Month |
95 | 13.03 | Position | item95 | 1 | Month |
96 | 13.04 | Position | item96 | 1 | Month |
97 | 13.05 | Position | item97 | 1 | Month |
98 | 13.06 | Position | item98 | 1 | Month |
99 | 14 | Mobilization and Demobilization - International Airfares (Fixed Cost) (To be filled by the bidder in below columns) | item99 | ||
100 | 14.01 | Position | item100 | 1 | Month |
101 | 14.02 | Position | item101 | 1 | Month |
102 | 14.03 | Position | item102 | 1 | Month |
103 | 14.04 | Position | item103 | 1 | Month |
104 | 14.05 | Position | item104 | 1 | Month |
105 | 14.06 | Position | item105 | 1 | Month |
106 | 15 | Mobilization and Demobilization -Inland Travel in Home Country (Fixed Costs) | item106 | 1 | Lumpsum |
107 | 16 | Other Miscellaneous expenses (Like DA, Internal travel expenses other than incidentals) (Fixed Cost) | item107 | 1 | Lumpsum |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail