Mahanadi Coalfields Limited has published Wbm Approach Road From C . T . Road To Lng-3 Coal Stock At Lingaraj Ocp , Lingaraj Area . . Submission Date for this Tender is 29-05-2020. Road Work Tenders in LINGARAJ OCP Odisha. Bidders can get complete Tender details and download the document.
Name of the Work / Contract No: | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Earth Work in rough excavation over area in all kinds of soil by mechanical means including mechanical loading into the tippers and transportation of excavated earth within a lead of 1 KM including dressing of disposed soil wherever required etc. all complete as per the instruction of EIC. | BI01010001010000000000000515BI0100001113 | 1012.5 | Cum |
2 | 2 | Supplying and stacking at work site hard granite or equivalent as approved by EIC, hand broken stone metal 90mm to 45mm size I.e. IRC GR-I of approved quality including screening & stacking along road side equidistantly and uniformly including royalty, octrroi, and all other taxes complete with all leads and lifts ( A deduction of 7.5% is to be made on account of voids in stone metal. Measurement of material is to be taken just before laying work starts and payment shall be made only after laying of the material) | BI01010001010000000000000515BI0100001114 | 549.45 | Cum |
3 | 3 | Supplying and stacking at work site hard granite or equivalent as approved by EIC, hand broken stone metal 63mm to 45mm size I.e. IRC GR-II of approved quality including screening & stacking along road side equidistantly and uniformly including royalty, octrroi, and all other taxes complete with all leads and lifts ( A deduction of 7.5% is to be made on account of voids in stone metal. Measurement of material is to be taken just before laying work starts and payment shall be made only after laying of the material) | BI01010001010000000000000515BI0100001115 | 412.09 | Cum |
4 | 4 | Laying Gr-I (90mm-45mm) or Gr-II (63mm-45mm) metal in WBM sub base/base course I/c screening, sorting, spreading to template, packing with smaller stones, blinding with moorum, watering and consolidation with power roller-80/100 KN capacity i/c hire charges and running cost of road roller, pay of driver, khalasi&chowkidar and providing proper signals, road barriers etc. complete but excluding the cost of material like stone metal, packing stone and moorum (Payment to be made for compacted\nvolume of WBM layer actually laid. For estimation purpose, loose quantity of stone metal for 1 cu.m. compacted volume of WBM will be 1.221 cu.m. i.e. 1.00 cu.m + 32% for looseness factor.- 7.5% for void = 1.221 cu.m.). | BI01010001010000000000000515BI0100001116 | 787.5 | Cum |
5 | 5 | Supplying and stacking at work site crusher stone dust including royalty, octrroi, and all other taxes complete with all leads and lifts. | BI01010001010000000000000515BI0100001117 | 159.34 | Cum |
6 | 6 | Supplying and stacking good quality moorum at work site with all lead and royalty, all complete. | BI01010001010000000000000515BI0100001118 | 317.09 | Cum |
7 | 7 | Spreading moorum/sand/ stone dust etc. in layers not exceeding 150mm in thickness, levelling to required gradient and camber, watering and consolidation of each layer with power roller 80/100 KN capacity\n(Payment to be made for compacted volume of the moorum/sand) | BI01010001010000000000000515BI0100001119 | 232.5 | Cum |
8 | 8 | Total impact of GST for the purpose of CTC | BI01010001010000000000000515BI0100001129 | 1 | Nos |