}

953001/Ep/Q/01/E3 Consultancy Service For Design Of Vrf Based Central Air Conditioner At P 28 And Preparation Of Tender Boo Estimate Rate Analysis, HQ CE AF Allahabad-Uttar Pradesh

Military Engineer Services has published 953001/Ep/Q/01/E3 Consultancy Service For Design Of Vrf Based Central Air Conditioner At P 28 And Preparation Of Tender Boo Estimate Rate Analysis. Submission Date for this Tender is 08-06-2020. Electrification Work Tenders in HQ CE AF Allahabad Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

24307915
Corrigendum : 953001/Ep/Q/01/E3 Consultancy Service For Design Of Vrf Based Central Air Conditioner At P 28 And Preparation Of Tender Boo Estimate Rate Analysis
Tender
Indian
Uttar Pradesh
Hq Ce Af Allahabad
08-06-2020

Tender Details

953001/Ep/Q/01/E3 Consultancy Service For Design Of Vrf Based Central Air Conditioner At P 28 And Preparation Of Tender Boo Estimate Rate Analysis , 1 . Consultancy For Design Of Variable Refrigerant Flow Based Central Air Conditioning System Alongwith Selection Of Suitable Capacity Inner And Outer Units And Sizes Of Interconnecting Copper Refrigerant Piping For Each Room As Marked In Building Plan , Preparation Of Tender Document , Boq , Estimate , Rate Analysis As Per Parameters Enclosed . The Rooms To Be Air Conditioned Are On Ground Floor And First Floor . The Following Rooms Of Size Shown Against Each ( L X B X H ) Are To Be Air Conditioned :- ( A ) Room No 1 & 2 9 . 47 Mtr X 6 . 25 Mtr X 4 . 25 Mtr ( B ) Room No 34 6 . 35 Mtr X 6 . 25 Mtr X 4 . 25 Mtr ( C ) Shiv Dev Hall 12 . 95 Mtr X 6 . 24 Mtrx 4 . 25 Mtr ( D ) Sondhi Hall 12 . 95 Mtr X 6 . 24 Mtrx 4 . 25 Mtr ( E ) Room No 71 8 . 65 Mtr X 6 . 25 Mtrx 4 . 25 Mtr ( F ) Room No 72 4 . 85 Mtr X 6 . 25 Mtrx 4 . 25 Mtr ( G ) Confrence Hall 4 . 115 Mtr X 7 . 038 Mtr X 4 . 25 Mtr ( H ) Room No 73 3 . 33 Mtr X 6 . 25 Mtrx 4 . 25 Mtr ( I ) Room No 74 4 . 58Mtr X 6 . 25 Mtrx 4 . 25 Mtr ( J ) Room No 75 4 . 58Mtr X 6 . 25 Mtrx 4 . 25 Mtr ( K ) Room No 76 9 . 9 Mtr X 6 . 25 Mtrx 4 . 25 Mtr ( L ) Room No 77 9 . 9 Mtr X 6 . 25 Mtrx 4 . 25 Mtr ( M ) Room No 85 3 . 12 Mtr X 6 . 09 Mtrx 4 . 25 Mtr ( N ) Room No 85A 3 . 12 Mtr X 6 . 09 Mtrx 4 . 25 Mtr ( O ) Room No 86 4 . 58 Mtr X 6 . 09 Mtrx 4 . 25 Mtr ( P ) Room No 87 8 . 42 Mtr X 6 . 09 Mtrx 4 . 25 Mtr ( Q ) Room No 89 3 . 12 Mtr X 6 . 09 Mtrx 4 . 25 Mtr ( R ) Room No 89A 3 . 12 Mtr X 6 . 09 Mtrx 4 . 25 Mtr ( S ) Room No 90 8 . 65 Mtr X 6 . 09 Mtrx 4 . 25 Mtr , ( T ) Room No 90A 4 . 58Mtr X 6 . 09 Mtr X 4 . 25 Mtr ( U ) Room No 93 6 . 85 Mtr X 6 . 25 Mtr X 4 . 25 Mtr ( V ) Room No 94 6 . 08 Mtr X 6 . 25 Mtr X 4 . 25 Mtr ( W ) Room No 99 6 . 24 Mtr X 6 . 25 Mtr X 4 . 25 Mtr ( X ) Room No 100 9 . 37 Mtr X 6 . 25 Mtr X 4 . 25 Mtr ( Y ) Room No 101 6 . 24 Mtr X 6 . 25 Mtr X 4 . 25 Mtr ( Z ) Jaswant Hall 18 . 59 Mtr X 10 . 58 Mtr X 4 . 25 Mtr ( Aa ) Room No 112 6 . 24 Mtr X 6 . 25 Mtr X 4 . 25 Mtr ( Ab ) Room No 113 3 . 12 Mtr X 6 . 25 Mtr X 4 . 25 Mtr ( Ac ) Room No 114 9 . 52 Mtr X 6 . 25 Mtr X 4 . 25 Mtr ( Ad ) Room No 115 3 . 12 Mtr X 6 . 25 Mtr X 4 . 25 Mtr ( Ae ) Room No 116 3 . 12 Mtr X 6 . 25 Mtr X 4 . 25 Mtr ( Af ) Room No 117 3 . 12 Mtr X 6 . 25 Mtr X 4 . 25 Mtr ( Ag ) Room No 118 3 . 12 Mtr X 6 . 25 Mtr X 4 . 25 Mtr ( Ah ) Room No 119 6 . 35 Mtr X 6 . 25 Mtr X 4 . 25 Mtr ( Ai ) Room No 120-121 9 . 64 Mtr X 6 . 25 Mtr X 4 . 25 Mtr ( Aj ) Room No 122 7 . 32 Mtr X 6 . 25 Mtr X 4 . 25 Mtr ( Ak ) Room No 127 7 . 32 Mtr X 6 . 25 Mtr X 4 . 25 Mtr ( Al ) Room No 129 4 . 82 Mtr X 6 . 25 Mtr X 4 . 25 Mtr ( Am ) Room No 128 9 . 64 Mtr X 4 . 58 Mtr X 4 . 25 Mtr ( An ) Room No 126 7 . 32 Mtr X 4 . 58 Mtr X 4 . 25 Mtr ( Ao ) Room No 125 4 . 82 Mtr X 4 . 58 Mtr X 4 . 25 Mtr ( Ap ) Room No 124 7 . 32 Mtr X 4 . 58 Mtr X 4 . 25 Mtr ( Aq ) Room No 123 6 . 35 Mtr X 4 . 58 Mtr X 4 . 25 Mtr2 . The Following Details Are Required To Be Submitted Alongwith Design Of Vrf Based Central Air Contitioning System Of The Building Duly Vetted By Iit/Nit :- ( A ) Detailed Head Load Calculation For Summer , Winter And Monsoon For Each Room To Be Air Conditioned . ( B ) Layout Plan Of All Equipments And Sub System Of The Air Conditioning System Viz Outer Units , Inner Units , Interconnecting Refrigerant Pipes Running On Cable Tray , Drain Piping , Electric Cables . Layout Proposed Should Be Compatible And In Harmony With Building Existing Plan And Should Not Mar Front Facade Of The Building . ( C ) Detailed Electric Load Calculation For Air Conditioning System , Schematic Diagram And Design Of Electrical Cabling , Electric Panels , Their Interconnection And Connection With Existing Electric Panels In Consultation With Engineer-In-Charge . , 2 . The Following Details Are Required To Be Submitted Alongwith Design Of Vrf Based Central Air Contitioning System Of The Building Duly Vetted By Iit/Nit :- ( A ) Detailed Head Load Calculation For Summer , Winter And Monsoon For Each Room To Be Air Conditioned . ( B ) Layout Plan Of All Equipments And Sub System Of The Air Conditioning System Viz Outer Units , Inner Units , Interconnecting Refrigerant Pipes Running On Cable Tray , Drain Piping , Electric Cables . Layout Proposed Should Be Compatible And In Harmony With Building Existing Plan And Should Not Mar Front Facade Of The Building . ( C ) Detailed Electric Load Calculation For Air Conditioning System , Schematic Diagram And Design Of Electrical Cabling , Electric Panels , Their Interconnection And Connection With Existing Electric Panels In Consultation With Engineer-In-Charge . ( D ) Design And Selection Of Inner Units , Outer Units , Refrigerant Piping With Capacity/ Size Along With Layout Drawing Indicating Electric Cabling , Refrigerant Piping System , Drain Piping System In Consultation With Engineer-In-Charge . ( E ) Siting Layout And Foundation Design For Outer Units ( As Selected Above ) As Per Manufacture Recommendation Alongwith Scheme For Providing Electric Supply To Outer Units . ( F ) Detail Drawings Indicating Openings To Be Made In The Wall Of Existing Rooms For Providing Inner Units Alongwith Refregerant Piping , Fixing Of Cable Trays Etc . The Structural Condition Of Existing Rooms Should Be Taken Into Consideration While Suggesting Opening/ Cut Outs And Their Strengthening . ( G ) Making Of Tender Document , Drawings For Vrf Based Air Conditioning Of Identified Rooms Of The Building . ( H ) Preparation Of Boq For Air Conditioning System Alongwith Rate Analysis Of The Equipments And Misc Items . ( I ) Preparation Of Market Analysis Of The Air Conditioning Covered In The Above Mentioned Work Alongwith Supporting Details/Documents To Analysis Quoted Rate For Reasonability . ( J ) Any Other Technical Support/Clarification To Be Provided As And When Required . ( K ) Sld Diagram For Complete Air Conditioning System . , ( G ) Making Of Tender Document , Drawings For Vrf Based Air Conditioning Of Identified Rooms Of The Building . ( H ) P

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 23-05-2020 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 30-05-2020
2 29-05-2020 corrigendum Date Date 08-06-2020

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
INR 12 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail