11 Kv Interconnection Line Work For Providing 3 . 2 Km 11 Kv Interconnection Line From Deora ( Godan ) To Chandrol ( Tehdot ) On 140 Kg Pcc Pole For Godan Feeder At Bhander D/C Of Om Seondha Division
Tender Overview
Project Description
11 Kv Interconnection Line Work For Providing 3 . 2 Km 11 Kv Interconnection Line From Deora ( Godan ) To Chandrol ( Tehdot ) On 140 Kg Pcc Pole For Godan Feeder At Bhander D/C Of Om Seondha Division
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 18-May-2020 | Corrigendum date | Date | 22-May-2020 |
BOQ
| Name of Work:- Work for installation of new 1500 KVAR at Pandokar Substation under Salone Dc,O&M DIv.Seondha | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Task Name:-11kv line on 140 kg Pcc pole\nMaterial Supplied by MPMKVVCL | 1 | ||
| 2 | 1.01 | 140 Kg.,8.0 Mtrs. long PCC pole | 212 | 38 | Number |
| 3 | 1.02 | G.I. WIRES 4.0 MM. (8 SWG)1 | 3 | 30.4 | Kilogram |
| 4 | 1.03 | 11 KV Polymer Pin Insulator | 4 | 114 | Number |
| 5 | 1.04 | AAAC Rabbit conductor 0.05 sq. inch. (55 sq.mm. Al.Eq.) | 5 | 9.88 | Kilometer |
| 6 | 2 | Task Name:-11kv line on 140 kg Pcc pole\nMaterial Supplied by Contractor | 6 | ||
| 7 | 2.01 | STAY WIRE 7/3.15 MM.(7/10 SWG) | 7 | 66 | Kilogram |
| 8 | 2.02 | Clamp for 140 Kg PCC Pole MS Flat 50x6 mm1 | 8 | 8 | Set |
| 9 | 2.03 | Stay Insulators 90X65mm | 9 | 12 | Number |
| 10 | 2.04 | Back filling of poles with boulders.1 | 10 | 38 | Number |
| 11 | 2.05 | Stone Block/Pre cast block for base pedding(450X450X75MM) | 11 | 38 | Number |
| 12 | 2.06 | Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay | 12 | 2.4 | Cmt |
| 13 | 2.07 | Red oxide paint | 13 | 1.5 | Litre |
| 14 | 2.08 | Aluminium paint | 14 | 1.5 | Litre |
| 15 | 2.09 | Anti climbing devices | 15 | 38 | Number |
| 16 | 2.1 | 11 KV V cross arm 65X65X6 mm. angle type | 16 | 38 | Number |
| 17 | 2.11 | Danger Boards Enamelled 11 KV | 17 | 38 | Number |
| 18 | 2.12 | Aluminium binding wire and tape | 18 | 2.5 | Kilogram |
| 19 | 2.13 | M.S.Nuts and Bolts | 19 | 57 | Kilogram |
| 20 | 2.14 | Back Clamp for 140 Kg PCC Pole MS Flat 50x6 mm | 20 | 76 | Number |
| 21 | 2.15 | 11 KV Top clamp 65X65X6 mm. angle type | 21 | 38 | Number |
| 22 | 2.16 | Earthing Coil of 115 Turns of 50 MM.Dia and 2.5 Mtr. Lead of 4.0 MM G.I Wire | 22 | 38 | Number |
| 23 | 2.17 | Jointing Sleeves suitable for Rabbit (55Sq.mm.Al. Eq. ) AAAC conductor | 23 | 9 | Number |
| 24 | 2.18 | Stay set complete without Stay wire 16 mm. (Painted) | 24 | 12 | Number |
| 25 | 3 | Task Name:-11kv DP structrue on 140 kg pcc pole\nMaterial Supplied by MPMKVVCL | 25 | ||
| 26 | 3.01 | 140 Kg.,8.0 Mtrs. long PCC pole | 26 | 6 | Number |
| 27 | 3.02 | 11 KV Composite Polymer Disc Insulators | 27 | 18 | Number |
| 28 | 3.03 | 11 KV Strain hardware (T&C type) fittings | 28 | 18 | Number |
| 29 | 3.04 | 11 KV Polymer Pin Insulator | 29 | 6 | Number |
| 30 | 4 | Task Name:-11kv DP structrue on 140 kg pcc pole\nMaterial Supplied by Contractor | 30 | ||
| 31 | 4.01 | STAY WIRE 7/3.15 MM.(7/10 SWG) | 31 | 99 | Kilogram |
| 32 | 4.02 | Clamp for 140 Kg PCC Pole MS Flat 50x6 mm1 | 32 | 18 | Set |
| 33 | 4.03 | Stay Insulators 90X65mm | 33 | 18 | Number |
| 34 | 4.04 | Stone Block/Pre cast block for base pedding(450X450X75MM) | 34 | 6 | Number |
| 35 | 4.05 | Concreting of PCC poles @ 0.45 cmt. (Cubic Metric Ton) per pole | 35 | 2.7 | Cmt |
| 36 | 4.06 | Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay | 36 | 3.6 | Cmt |
| 37 | 4.07 | Earthing Coil of 115 Turns of 50 MM.Dia and 2.5 Mtr. Lead of 4.0 MM G.I Wire | 37 | 6 | Number |
| 38 | 4.08 | Earthing for PCC Pole 4.00 mm-8 SWG G.I wire- 0.8 Kg, per pole | 38 | 4.8 | Kilogram |
| 39 | 4.09 | Red oxide paint | 39 | 1.5 | Litre |
| 40 | 4.1 | Aluminium paint | 40 | 1.5 | Litre |
| 41 | 4.11 | D.C. Cross-arms 8' Channel (100x50x6mm) | 41 | 3 | Set |
| 42 | 4.12 | Anti climbing devices | 42 | 6 | Number |
| 43 | 4.13 | Danger Boards Enamelled 11 KV | 43 | 3 | Number |
| 44 | 4.14 | M.S.Nuts and Bolts | 44 | 18 | Kilogram |
| 45 | 4.15 | Bracing/Support angle of 65x65x6 mm for 8' (2.4 mtr ) centre DP | 45 | 3 | Set |
| 46 | 4.16 | Back Clamp for 140 Kg PCC Pole MS Flat 50x6 mm | 46 | 12 | Number |
| 47 | 4.17 | Stay set complete without Stay wire 16 mm. (Painted) | 47 | 18 | Number |
| 48 | 5 | Task Name:-tapping DP\nMaterial Supplied by MPMKVVCL | 48 | ||
| 49 | 5.01 | 140 Kg.,8.0 Mtrs. long PCC pole | 49 | 1 | Number |
| 50 | 5.02 | 11 KV Composite Polymer Disc Insulators | 50 | 3 | Number |
| 51 | 5.03 | 11 KV Strain hardware (T&C type) fittings | 51 | 3 | Number |
| 52 | 5.04 | 11 KV Polymer Pin Insulator | 52 | 2 | Number |
| 53 | 6 | Task Name:-tapping DP\nMaterial Supplied by Contractor | 53 | ||
| 54 | 6.01 | STAY WIRE 7/3.15 MM.(7/10 SWG) | 54 | 11 | Kilogram |
| 55 | 6.02 | Clamp for 140 Kg PCC Pole MS Flat 50x6 mm1 | 55 | 2 | Set |
| 56 | 6.03 | Stay Insulators 90X65mm | 56 | 2 | Number |
| 57 | 6.04 | Stone Block/Pre cast block for base pedding(450X450X75MM) | 57 | 1 | Number |
| 58 | 6.05 | Concreting of PCC poles @ 0.45 cmt. (Cubic Metric Ton) per pole | 58 | 0.3 | Cmt |
| 59 | 6.06 | Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay | 59 | 0.4 | Cmt |
| 60 | 6.07 | Earthing Coil of 115 Turns of 50 MM.Dia and 2.5 Mtr. Lead of 4.0 MM G.I Wire | 60 | 1 | Number |
| 61 | 6.08 | Earthing for PCC Pole 4.00 mm-8 SWG G.I wire- 0.8 Kg, per pole | 61 | 0.8 | Kilogram |
| 62 | 6.09 | Red oxide paint | 62 | 0.6 | Litre |
| 63 | 6.1 | Aluminium paint | 63 | 0.6 | Litre |
| 64 | 6.11 | Anti climbing devices | 64 | 2 | Number |
| 65 | 6.12 | D.C. Cross-arms 8' Channel (100x50x6mm) | 65 | 1 | Set |
| 66 | 6.13 | Danger Boards Enamelled 11 KV | 66 | 1 | Number |
| 67 | 6.14 | M.S.Nuts and Bolts | 67 | 6 | Kilogram |
| 68 | 6.15 | Bracing/Support angle of 65x65x6 mm for 8' (2.4 mtr ) centre DP | 68 | 1 | Set |
| 69 | 6.16 | Back Clamp for 140 Kg PCC Pole MS Flat 50x6 mm | 69 | 4 | Number |
| 70 | 6.17 | Stay set complete without Stay wire 16 mm. (Painted) | 70 | 2 | Number |
| 71 | 7 | Labour Charge | 71 | 1 | Amt. |
| 72 | 8 | Transportation charges | 72 | 1 | Amt. |
| 73 | 9 | GST | 73 | 1 | Amt. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender