Indian Oil Corporation Limited-IOCL has published Lining Up Of Agency For Cooling Water And Fire Water Treatment Programme For A Period Of Two Years Lining Up Of Agency For Cooling Water And Fire Water Treatment Programme For A Period Of Two Years At Barauni Refinery. Submission Date for this Tender is 18-06-2020. Water Treatment Service Tenders in Barauni Bihar. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 14-May-2020 | Pre Bid Meeting | Other | 04-06-2020 |
2 | 20-May-2020 | Date extension_submission | Date | 04-06-2020 |
3 | 22-May-2020 | Date Extension_3 | Date | 04-06-2020 |
4 | 27-May-2020 | BoQ Amended | BOQ | 04-06-2020 |
5 | 29-May-2020 | Clarification on Pre Bid minutes | Technical Bid | 04-06-2020 |
6 | 01-Jun-2020 | Date Extension | Date | 11-06-2020 |
7 | 11-Jun-2020 | Date Extension_4 | Date | 18-06-2020 |
Name of Work: LINING UP OF AGENCY FOR COOLING WATER AND FIRE WATER TREATMENT PROGRAMME FOR A PERIOD OF TWO YEARS AT BARAUNI REFINERY | |||||
---|---|---|---|---|---|
Sl. No. | Item Description (Bidder to quote names of Chemicals required and corresponding qty. & unit rate) | Item Code / Make | Quantity (Pl quote qty. for items 1.11 to 14.28) | Units | |
1 | 1 | List of item(s) / work(s) as per tender documents | |||
2 | 1.1 | One time chemical (If Required) for all Cooling Towers TPS-CT | |||
3 | 1.11 | Bidder to mention chemical details here | Item 10/1 | 1 | KG |
4 | 1.12 | Bidder to mention chemical details here | Item 10/2 | 1 | KG |
5 | 1.13 | Bidder to mention chemical details here | Item 10/3 | 1 | KG |
6 | 1.14 | Bidder to mention chemical details here | Item 10/4 | 1 | KG |
7 | 1.15 | Bidder to mention chemical details here | Item 10/5 | 1 | KG |
8 | 1.16 | Bidder to mention chemical details here | Item 10/6 | 1 | KG |
9 | 1.17 | Bidder to mention chemical details here | Item 10/7 | 1 | KG |
10 | 1.18 | Bidder to mention chemical details here | Item 10/8 | 1 | KG |
11 | 1.19 | Bidder to mention chemical details here | Item 10/9 | 1 | KG |
12 | 1.2 | Bidder to mention chemical details here | Item 10/10 | 1 | KG |
13 | 2 | Regular treatment chemical for all Cooling Towers TPS-CT | |||
14 | 2.11 | Bidder to mention chemical details here | Item 20/1 | 1 | KG |
15 | 2.12 | Bidder to mention chemical details here | Item 20/2 | 1 | KG |
16 | 2.13 | Bidder to mention chemical details here | Item 20/3 | 1 | KG |
17 | 2.14 | Bidder to mention chemical details here | Item 20/4 | 1 | KG |
18 | 2.15 | Bidder to mention chemical details here | Item 20/5 | 1 | KG |
19 | 2.16 | Bidder to mention chemical details here | Item 20/6 | 1 | KG |
20 | 2.17 | Bidder to mention chemical details here | Item 20/7 | 1 | KG |
21 | 2.18 | Bidder to mention chemical details here | Item 20/8 | 1 | KG |
22 | 2.19 | Bidder to mention chemical details here | Item 20/9 | 1 | KG |
23 | 2.2 | Bidder to mention chemical details here | Item 20/10 | 1 | KG |
24 | 2.21 | Bidder to mention chemical details here | Item 20/11 | 1 | KG |
25 | 2.22 | Bidder to mention chemical details here | Item 20/12 | 1 | KG |
26 | 2.23 | Bidder to mention chemical details here | Item 20/13 | 1 | KG |
27 | 2.24 | Bidder to mention chemical details here | Item 20/14 | 1 | KG |
28 | 2.25 | Bidder to mention chemical details here | Item 20/15 | 1 | KG |
29 | 3 | Contingency Chemicals for all Cooling Towers TPS-CT | |||
30 | 3.11 | Bidder to mention chemical details here | Item 30/1 | 1 | KG |
31 | 3.12 | Bidder to mention chemical details here | Item 30/2 | 1 | KG |
32 | 3.13 | Bidder to mention chemical details here | Item 30/3 | 1 | KG |
33 | 3.14 | Bidder to mention chemical details here | Item 30/4 | 1 | KG |
34 | 3.15 | Bidder to mention chemical details here | Item 30/5 | 1 | KG |
35 | 3.16 | Bidder to mention chemical details here | Item 30/6 | 1 | KG |
36 | 3.17 | Bidder to mention chemical details here | Item 30/7 | 1 | KG |
37 | 3.18 | Bidder to mention chemical details here | Item 30/8 | 1 | KG |
38 | 3.19 | Bidder to mention chemical details here | Item 30/9 | 1 | KG |
39 | 3.2 | Bidder to mention chemical details here | Item 30/10 | 1 | KG |
40 | 4 | One time chemical (If Required) for all Cooling Towers for Process-CT | |||
41 | 4.11 | Bidder to mention chemical details here | Item 40/1 | 1 | KG |
42 | 4.12 | Bidder to mention chemical details here | Item 40/2 | 1 | KG |
43 | 4.13 | Bidder to mention chemical details here | Item 40/3 | 1 | KG |
44 | 4.14 | Bidder to mention chemical details here | Item 40/4 | 1 | KG |
45 | 4.15 | Bidder to mention chemical details here | Item 40/5 | 1 | KG |
46 | 4.16 | Bidder to mention chemical details here | Item 40/6 | 1 | KG |
47 | 4.17 | Bidder to mention chemical details here | Item 40/7 | 1 | KG |
48 | 4.18 | Bidder to mention chemical details here | Item 40/8 | 1 | KG |
49 | 4.19 | Bidder to mention chemical details here | Item 40/9 | 1 | KG |
50 | 4.2 | Bidder to mention chemical details here | Item 40/10 | 1 | KG |
51 | 5 | Regular treatment chemical for all Cooling Towers for Process-CT | |||
52 | 5.11 | Bidder to mention chemical details here | Item 50/1 | 1 | KG |
53 | 5.12 | Bidder to mention chemical details here | Item 50/2 | 1 | KG |
54 | 5.13 | Bidder to mention chemical details here | Item 50/3 | 1 | KG |
55 | 5.14 | Bidder to mention chemical details here | Item 50/4 | 1 | KG |
56 | 5.15 | Bidder to mention chemical details here | Item 50/5 | 1 | KG |
57 | 5.16 | Bidder to mention chemical details here | Item 50/6 | 1 | KG |
58 | 5.17 | Bidder to mention chemical details here | Item 50/7 | 1 | KG |
59 | 5.18 | Bidder to mention chemical details here | Item 50/8 | 1 | KG |
60 | 5.19 | Bidder to mention chemical details here | Item 50/9 | 1 | KG |
61 | 5.2 | Bidder to mention chemical details here | Item 50/10 | 1 | KG |
62 | 5.21 | Bidder to mention chemical details here | Item 50/11 | 1 | KG |
63 | 5.22 | Bidder to mention chemical details here | Item 50/12 | 1 | KG |
64 | 5.23 | Bidder to mention chemical details here | Item 50/13 | 1 | KG |
65 | 5.24 | Bidder to mention chemical details here | Item 50/14 | 1 | KG |
66 | 5.25 | Bidder to mention chemical details here | Item 50/15 | 1 | KG |
67 | 6 | Contingency Chemicals for all Cooling Towers for Process-CT | |||
68 | 6.11 | Bidder to mention chemical details here | Item 60/1 | 1 | KG |
69 | 6.12 | Bidder to mention chemical details here | Item 60/2 | 1 | KG |
70 | 6.13 | Bidder to mention chemical details here | Item 60/3 | 1 | KG |
71 | 6.14 | Bidder to mention chemical details here | Item 60/4 | 1 | KG |
72 | 6.15 | Bidder to mention chemical details here | Item 60/5 | 1 | KG |
73 | 6.16 | Bidder to mention chemical details here | Item 60/6 | 1 | KG |
74 | 6.17 | Bidder to mention chemical details here | Item 60/7 | 1 | KG |
75 | 6.18 | Bidder to mention chemical details here | Item 60/8 | 1 | KG |
76 | 6.19 | Bidder to mention chemical details here | Item 60/9 | 1 | KG |
77 | 6.2 | Bidder to mention chemical details here | Item 60/10 | 1 | KG |
78 | 7 | One time chemical (If Required) for all Cooling Towers for BXP-CT | |||
79 | 7.11 | Bidder to mention chemical details here | Item 70/1 | 1 | KG |
80 | 7.12 | Bidder to mention chemical details here | Item 70/2 | 1 | KG |
81 | 7.13 | Bidder to mention chemical details here | Item 70/3 | 1 | KG |
82 | 7.14 | Bidder to mention chemical details here | Item 70/4 | 1 | KG |
83 | 7.15 | Bidder to mention chemical details here | Item 70/5 | 1 | KG |
84 | 7.16 | Bidder to mention chemical details here | Item 70/6 | 1 | KG |
85 | 7.17 | Bidder to mention chemical details here | Item 70/7 | 1 | KG |
86 | 7.18 | Bidder to mention chemical details here | Item 70/8 | 1 | KG |
87 | 7.19 | Bidder to mention chemical details here | Item 70/9 | 1 | KG |
88 | 7.2 | Bidder to mention chemical details here | Item 70/10 | 1 | KG |
89 | 8 | Regular treatment chemical for all Cooling Towers for BXP-CT | |||
90 | 8.11 | Bidder to mention chemical details here | Item 80/1 | 1 | KG |
91 | 8.12 | Bidder to mention chemical details here | Item 80/2 | 1 | KG |
92 | 8.13 | Bidder to mention chemical details here | Item 80/3 | 1 | KG |
93 | 8.14 | Bidder to mention chemical details here | Item 80/4 | 1 | KG |
94 | 8.15 | Bidder to mention chemical details here | Item 80/5 | 1 | KG |
95 | 8.16 | Bidder to mention chemical details here | Item 80/6 | 1 | KG |
96 | 8.17 | Bidder to mention chemical details here | Item 80/7 | 1 | KG |
97 | 8.18 | Bidder to mention chemical details here | Item 80/8 | 1 | KG |
98 | 8.19 | Bidder to mention chemical details here | Item 80/9 | 1 | KG |
99 | 8.2 | Bidder to mention chemical details here | Item 80/10 | 1 | KG |
100 | 8.21 | Bidder to mention chemical details here | Item 80/11 | 1 | KG |
101 | 8.22 | Bidder to mention chemical details here | Item 80/12 | 1 | KG |
102 | 8.23 | Bidder to mention chemical details here | Item 80/13 | 1 | KG |
103 | 8.24 | Bidder to mention chemical details here | Item 80/14 | 1 | KG |
104 | 8.25 | Bidder to mention chemical details here | Item 80/15 | 1 | KG |
105 | 9 | Contingency Chemicals for all Cooling Towers for BXP-CT | |||
106 | 9.11 | Bidder to mention chemical details here | Item 90/1 | 1 | KG |
107 | 9.12 | Bidder to mention chemical details here | Item 90/2 | 1 | KG |
108 | 9.13 | Bidder to mention chemical details here | Item 90/3 | 1 | KG |
109 | 9.14 | Bidder to mention chemical details here | Item 90/4 | 1 | KG |
110 | 9.15 | Bidder to mention chemical details here | Item 90/5 | 1 | KG |
111 | 9.16 | Bidder to mention chemical details here | Item 90/6 | 1 | KG |
112 | 9.17 | Bidder to mention chemical details here | Item 90/7 | 1 | KG |
113 | 9.18 | Bidder to mention chemical details here | Item 90/8 | 1 | KG |
114 | 9.19 | Bidder to mention chemical details here | Item 90/9 | 1 | KG |
115 | 9.2 | Bidder to mention chemical details here | Item 90/10 | 1 | KG |
116 | 10 | One time chemical (If Required) for all Cooling Towers for BS-VI Cell | |||
117 | 10.11 | Bidder to mention chemical details here | Item 100/1 | 1 | KG |
118 | 10.12 | Bidder to mention chemical details here | Item 100/2 | 1 | KG |
119 | 10.13 | Bidder to mention chemical details here | Item 100/3 | 1 | KG |
120 | 10.14 | Bidder to mention chemical details here | Item 100/4 | 1 | KG |
121 | 10.15 | Bidder to mention chemical details here | Item 100/5 | 1 | KG |
122 | 10.16 | Bidder to mention chemical details here | Item 100/6 | 1 | KG |
123 | 10.17 | Bidder to mention chemical details here | Item 100/7 | 1 | KG |
124 | 10.18 | Bidder to mention chemical details here | Item 100/8 | 1 | KG |
125 | 10.19 | Bidder to mention chemical details here | Item 100/9 | 1 | KG |
126 | 10.2 | Bidder to mention chemical details here | Item 100/10 | 1 | KG |
127 | 11 | Regular treatment chemical for all Cooling Towers for BS-VI Cell | |||
128 | 11.11 | Bidder to mention chemical details here | Item 110/1 | 1 | KG |
129 | 11.12 | Bidder to mention chemical details here | Item 110/2 | 1 | KG |
130 | 11.13 | Bidder to mention chemical details here | Item 110/3 | 1 | KG |
131 | 11.14 | Bidder to mention chemical details here | Item 110/4 | 1 | KG |
132 | 11.15 | Bidder to mention chemical details here | Item 110/5 | 1 | KG |
133 | 11.16 | Bidder to mention chemical details here | Item 110/6 | 1 | KG |
134 | 11.17 | Bidder to mention chemical details here | Item 110/7 | 1 | KG |
135 | 11.18 | Bidder to mention chemical details here | Item 110/8 | 1 | KG |
136 | 11.19 | Bidder to mention chemical details here | Item 110/9 | 1 | KG |
137 | 11.2 | Bidder to mention chemical details here | Item 110/10 | 1 | KG |
138 | 11.21 | Bidder to mention chemical details here | Item 110/11 | 1 | KG |
139 | 11.22 | Bidder to mention chemical details here | Item 110/12 | 1 | KG |
140 | 11.23 | Bidder to mention chemical details here | Item 110/13 | 1 | KG |
141 | 11.24 | Bidder to mention chemical details here | Item 110/14 | 1 | KG |
142 | 11.25 | Bidder to mention chemical details here | Item 110/15 | 1 | KG |
143 | 12 | Contingency Chemicals for all Cooling Towers for BS-VI Cell | |||
144 | 12.11 | Bidder to mention chemical details here | Item 120/1 | 1 | KG |
145 | 12.12 | Bidder to mention chemical details here | Item 120/2 | 1 | KG |
146 | 12.13 | Bidder to mention chemical details here | Item 120/3 | 1 | KG |
147 | 12.14 | Bidder to mention chemical details here | Item 120/4 | 1 | KG |
148 | 12.15 | Bidder to mention chemical details here | Item 120/5 | 1 | KG |
149 | 12.16 | Bidder to mention chemical details here | Item 120/6 | 1 | KG |
150 | 12.17 | Bidder to mention chemical details here | Item 120/7 | 1 | KG |
151 | 12.18 | Bidder to mention chemical details here | Item 120/8 | 1 | KG |
152 | 12.19 | Bidder to mention chemical details here | Item 120/9 | 1 | KG |
153 | 12.2 | Bidder to mention chemical details here | Item 120/10 | 1 | KG |
154 | 13 | Regular Treatment Chemicals for Fire Water Treatment Program | |||
155 | 13.11 | Bidder to mention chemical details here | Item 130/1 | 1 | KG |
156 | 13.12 | Bidder to mention chemical details here | Item 130/2 | 1 | KG |
157 | 13.13 | Bidder to mention chemical details here | Item 130/3 | 1 | KG |
158 | 13.14 | Bidder to mention chemical details here | Item 130/4 | 1 | KG |
159 | 13.15 | Bidder to mention chemical details here | Item 130/5 | 1 | KG |
160 | 13.16 | Bidder to mention chemical details here | Item 130/6 | 1 | KG |
161 | 13.17 | Bidder to mention chemical details here | Item 130/7 | 1 | KG |
162 | 13.18 | Bidder to mention chemical details here | Item 130/8 | 1 | KG |
163 | 13.19 | Bidder to mention chemical details here | Item 130/9 | 1 | KG |
164 | 13.2 | Bidder to mention chemical details here | Item 130/10 | 1 | KG |
165 | 14 | HIRE CHARGES for Equipments/ Instruments for Complete Program | |||
166 | 14.11 | CS corrosion coupon | Item 140/1 | 648 | EA |
167 | 14.12 | Admirality Brass corrosion coupon | Item 140/2 | 432 | EA |
168 | 14.13 | Duplex steel | Item 140/3 | 288 | EA |
169 | 14.14 | SS Corrosion coupon | Item 140/4 | 288 | EA |
170 | 14.15 | Corrosion coupons rack assembly | Item 140/5 | 18 | EA |
171 | 14.16 | LPR probes for CS & Admirality Brass | Item 140/6 | 4 | EA |
172 | 14.17 | Online Corrosion meters | Item 140/7 | 2 | EA |
173 | 14.18 | Bio Film probes | Item 140/8 | 4 | EA |
174 | 14.19 | Deposit Monitors: CS + Admiralty Brass | Item 140/9 | 4 | EA |
175 | 14.2 | Bio Fouling Monitors | Item 140/10 | 4 | EA |
176 | 14.21 | Online Chlorine Analyser | Item 140/11 | 2 | EA |
177 | 14.22 | Online pH Analyser | Item 140/12 | 2 | EA |
178 | 14.23 | Test Coolers | Item 140/13 | 4 | EA |
179 | 14.24 | Portable Ultrasonic flow meter | Item 140/14 | 1 | EA |
180 | 14.25 | Pen type ORP testers | Item 140/15 | 3 | EA |
181 | 14.26 | Pen type pH testers | Item 140/16 | 1 | EA |
182 | 14.27 | Spectrophotometer for Testing (DR 2800) | Item 140/17 | 1 | EA |
183 | 14.28 | Hach Test kit for testing of ClO2 | Item 140/18 | 1 | EA |
184 | 15 | Maintenance & Monitoring Cost for BR CT (MANPOWER COST) | |||
185 | 15.1 | Providing manpower (Min 12 nos. as per tender scope).\n\nFIXED Manpower charges (as per category - Minimum wages published by Ministry of Labour & Employment for Bihar, as per latest circular as per tender) shall be reimbursed by IOCL . Wages to manpower shall not be lower than this value. Hence this rate is kept non editable. FIXED | Item 150/1 | 624 | Days |
186 | 15.2 | Pradhan Mantri Jeevan Jyoti Bhima Yogana for the 12 manpower involved in acitivites for two years. This shall be madatorily taken for the manpower working inside refinery. This charges shall be released up on submission of documentary proof. Present charges are considered for 2 years. Actual charges shall be reimbursed. Hence this rate is kept non editable. FIXED | Item 150/2 | 24 | EA |
187 | 15.3 | Pradhan Mantri Surakha Bima yojana for the 12 manpower involved in acitivites for two years. This shall be madatorily taken for the manpower working inside refinery. This charges shall be released up on submission of documentary proof. Present charges are considered for 2 years. Actual charges shall be reimbursed. Hence this rate is kept non editable. FIXED | Item 150/3 | 24 | EA |
188 | 15.4 | Contract profit margin for executing the job as per tender %scope and specification. 15% contractor margin is considered. Contractor may increase or decrease or keep it at par at Cell I 200 & M 200. (VARIABLE)\nIf you keep it as "at par", you will get 15 % of Manpower cost as Contractor Profit - the value is indicated at F200 Cell. If you increase or decrease the % at I 200 / M200, the same will get increased or decreased. For example, if you select "+ excess" at I200 and 1% at M200, the contractor profit will become 16% of the Manpower cost . | Item 150/4 | 1 | LS |