National Highways and Infrastructure Development Corporation Limited-NHIDCL has published Nhidcl/Meghalaya/Tura Bypass/Nh-51/2020 Consultancy Services For Preparation Of Detailed Project Report For Construction To 2-Lane Tura Bypass Between Existing Km 95 . 00 To Km 101 . 00 Of Nh-51 On Epc Mode In The State Of Meghalaya. Submission Date for this Tender is 09-06-2020. Feasibility Studies Tenders in Meghalaya Meghalaya. Bidders can get complete Tender details and download the document.
Consultancy Services for Preparation of Detailed Project Report for “construction to 2-Lane Tura Bypass between existing km 95+00 to km 101+00 of NH-51 on EPC mode in the State of Meghalaya | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Remuneration for Local Staff (inclusive of per diem allowance) | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | Team Leader cum Sr. Highway Engineer | BI01010001010000000000000515BI0100001113 | 9 | Month |
3 | 1.02 | Highway cum Pavement Engineer | BI01010001010000000000000515BI0100001114 | 5 | Month |
4 | 1.03 | Senior Bridge Engineer | BI01010001010000000000000515BI0100001115 | 5 | Month |
5 | 1.04 | Traffic and Safety Expert | BI01010001010000000000000515BI0100001116 | 4 | Month |
6 | 1.05 | Material cum GeoTechnical Engineer cum Geologist | 6 | Month | |
7 | 1.06 | Senior Survey Engineer | 7 | Month | |
8 | 1.07 | Environment Specialist | 3 | Month | |
9 | 1.08 | Quantity Surveyor/Documentation Expert | 6 | Month | |
10 | 1.09 | Land Acquisition Expert | 10 | Month | |
11 | 1.1 | Utility Expert | 4 | Month | |
12 | 2 | Sub Professional Staff (To be assessed by consultant as per requirement of assignment) | |||
13 | 2.01 | Position | 1 | Month | |
14 | 2.02 | Position | 1 | Month | |
15 | 2.03 | Position | 1 | Month | |
16 | 3 | Support Staff (inclusive of per diem allowance) | |||
17 | 3.01 | Office Manager | 300 | Days | |
18 | 3.02 | Typist | 300 | Days | |
19 | 3.03 | Office Boy | 300 | Days | |
20 | 4 | Transportation (Fixed Costs) | |||
21 | 4.01 | The vehicles hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc. | 300 | Days | |
22 | 5 | Duty Travel to Site (Fixed Costs) | |||
23 | 5.01 | Trips | 10 | Trips | |
24 | 6 | Office Rent (Fixed Costs) \nThe rent cost includes maintenance, cleaning, repairs, etc. | |||
25 | 6.01 | Office Rent | 300 | Days | |
26 | 7 | Office Supplies, Utilities and Communication (Fixed Costs) | |||
27 | 7.01 | Office Supplies | 300 | Days | |
28 | 7.02 | Drafting Supplies | 300 | Days | |
29 | 7.03 | Computer Running Costs | 300 | Days | |
30 | 7.04 | Domestic and International Communication | 300 | Days | |
31 | 8 | Office Furniture and Equipment (Rental) | |||
32 | 8.01 | Office Furniture and Equipment | 300 | Days | |
33 | 9 | Reports and Document Printing | |||
34 | 9.01 | Monthly Report (3 copies per month) | 30 | Nos | |
35 | 9.02 | Inception Report & QAP | 3 | Nos | |
36 | 9.03 | Environment and Social Impact Screening Report | 4 | Nos | |
37 | 9.04 | Draft Feasibility Report | 4 | Nos | |
38 | 9.05 | Final Feasibility Report | 6 | Nos | |
39 | 9.06 | Strip Plan with L.A. Reports | 6 | Nos | |
40 | 9.07 | Draft LA and Clearances I Report | 4 | Nos | |
41 | 9.08 | Final LA and Clearances I Report | 4 | Nos | |
42 | 9.09 | Draft Environmental Assessment report& RAP | 4 | Nos | |
43 | 9.1 | Final Environmental Assessment report& RAP | 6 | Nos | |
44 | 9.11 | Draft Detailed Design Report & Drawings etc. Draft EMP | 4 | Nos | |
45 | 9.12 | Draft Bidding Documents | 4 | Nos | |
46 | 9.13 | Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. Final EMP | 6 | Nos | |
47 | 9.14 | Final Bidding Documents | 6 | Nos | |
48 | 9.15 | Draft 3(a) ,3(A) and 3(D)& 3G notification for land acquisition (3 copies each) | 9 | Nos | |
49 | 9.16 | LA & Clearances II Report | 6 | Nos | |
50 | 10 | Survey and Investigation A. Topographical Survey (Fixed Rate) | |||
51 | 10.01 | Topographic Survey including hire charges for equipment (GPS, Total Station, Auto Level etc.) and supply of survey Teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer. | 580 | Km | |
52 | 10.02 | Detailed topographic surveys using mobile/ aerial LiDAR or equivalent technology | 580 | Km | |
53 | 10.03 | Sub-surface utilities detection using Ground Penetrating Radar, Induction Locator or better technologies | 1 | Lumpsum | |
54 | 10.04 | Survey/Investigation using Network Survey Vehicle as per TOR | 580 | Km | |
55 | 11 | Investigation (Fixed cost)(lumpsum) | |||
56 | 11.01 | Road and Bridge Inventory | 1 | LumpSum | |
57 | 11.02 | BBD Test and Pavement Evaluation | 1 | LumpSum | |
58 | 11.03 | Roughness Survey | 1 | LumpSum | |
59 | 11.04 | Axle Load Survey | 1 | LumpSum | |
60 | 11.05 | Material Survey and Investigation | 1 | LumpSum | |
61 | 11.06 | Sub-grade Investigation | 1 | LumpSum | |
62 | 11.07 | Traffic Survey | 1 | LumpSum | |
63 | 11.08 | Socio-economic & Census Survey/Studies | 1 | LumpSum | |
64 | 11.09 | Land Acquisition Studies | 1 | LumpSum | |
65 | 11.1 | Any other investigations/surveys | 1 | LumpSum | |
66 | 11.11 | Sub-Soil Investigation (Boring) (Rate/m) | |||
67 | 11.12 | a) In soil other than hard rock | 2000 | Meter | |
68 | 11.13 | b) In hard rock | 300 | Meter | |
69 | 12 | Fixing Boundary pillars | |||
70 | 12.01 | Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval | 1 | Lumpsum | |
71 | 13.16 | Other Miscellaneous expenses (Like DA, internal travel expenses other incidentals)(Fixed Cost) | 1 | LumpSum |