| 1 | 1 | MS pipeline up to 12\" dia | | | |
|---|
| 2 | 1.01 | a) Dismantling | | 1 | PID/RFt |
|---|
| 3 | 1.02 | b) Fabrication | | 1 | PID/RFt |
|---|
| 4 | 1.03 | c) Erection | | 1 | PID/RFt |
|---|
| 5 | 2 | Pipe line above 12\" dia including vapour/exhaust pipe | | | |
|---|
| 6 | 2.01 | a) Dismantling | | 1 | PID/RFt |
|---|
| 7 | 2.02 | b) Fabrication | | 1 | PID/RFt |
|---|
| 8 | 2.03 | c) Erection | | 1 | PID/RFt |
|---|
| 9 | 3 | Seamless pipeline up to 12\" dia | | | |
|---|
| 10 | 3.01 | a) Dismantling | | 1 | PID/RFt |
|---|
| 11 | 3.02 | b) Fabrication | | 1 | PID/RFt |
|---|
| 12 | 3.03 | c) Erection | | 1 | PID/RFt |
|---|
| 13 | 4 | Seamless bend upto 12\" dia | | | |
|---|
| 14 | 4.01 | a) Dismantling | | 1 | PID/Pcs |
|---|
| 15 | 4.02 | b) Fabrication | | 1 | PID/Pcs |
|---|
| 16 | 4.03 | c) Erection | | 1 | PID/Pcs |
|---|
| 17 | 5 | Cross reducer, tee, Nipple upto 12\" dia | | | |
|---|
| 18 | 5.01 | a) Dismantling | | 1 | PID/Pcs |
|---|
| 19 | 5.02 | b) Fabrication | | 1 | PID/Pcs |
|---|
| 20 | 5.03 | c) Erection | | 1 | PID/Pcs |
|---|
| 21 | 6 | Cross, reducer, tee Nipple above 12\" dia | | | |
|---|
| 22 | 6.01 | a) Dismantling | | 1 | PID/Pcs |
|---|
| 23 | 6.02 | b) Fabrication | | 1 | PID/Pcs |
|---|
| 24 | 6.03 | c) Erection | | 1 | PID/Pcs |
|---|
| 25 | 7 | A) Valve up to 12\" dia | | | |
|---|
| 26 | 7.01 | a) Dismantling | | 1 | PID/Pcs |
|---|
| 27 | 7.02 | b) Erection | | 1 | PID/Pcs |
|---|
| 28 | 8 | B) Valve above 12\" dia | | | |
|---|
| 29 | 8.01 | a) Dismantling | | 1 | PID/Pcs |
|---|
| 30 | 8.02 | b) Erection | | 1 | PID/Pcs |
|---|
| 31 | 9 | Bend upto 12\" dia | | | |
|---|
| 32 | 9.01 | a) Dismantling | | 1 | PID |
|---|
| 33 | 9.02 | b) Fabrication | | 1 | PID |
|---|
| 34 | 9.03 | c) Erection | | 1 | PID |
|---|
| 35 | 10 | Bend above 12\" dia | | | |
|---|
| 36 | 10.01 | a) Dismantling | | 1 | PID |
|---|
| 37 | 10.02 | b) Fabrication | | 1 | PID |
|---|
| 38 | 10.03 | c) Erection | | 1 | PID |
|---|
| 39 | 11 | Flange of all size | | | |
|---|
| 40 | 11.01 | a) Dismantling | | 1 | PID |
|---|
| 41 | 11.02 | b) Fabrication | | 1 | PID |
|---|
| 42 | 11.03 | c) Erection | | 1 | PID |
|---|
| 43 | 12 | Square & round tanks with flat bottom of any size | | | |
|---|
| 44 | 12.01 | a) Dismantling | | 1 | PMT |
|---|
| 45 | 12.02 | b) Fabrication | | 1 | PMT |
|---|
| 46 | 12.03 | c) Erection | | 1 | PMT |
|---|
| 47 | 13 | Round tanks with Conical tank of any size | | | |
|---|
| 48 | 13.01 | a) Dismantling | | 1 | PMT |
|---|
| 49 | 13.02 | b) Fabrication | | 1 | PMT |
|---|
| 50 | 13.03 | c) Erection | | 1 | PMT |
|---|
| 51 | 14 | Cone/Saucer of any Size | | | |
|---|
| 52 | 14.01 | a) Dismantling | | 1 | PMT |
|---|
| 53 | 14.02 | b) Fabrication | | 1 | PMT |
|---|
| 54 | 14.03 | c) Erection | | 1 | PMT |
|---|
| 55 | 15 | Gutters of MS plate of any size | | | |
|---|
| 56 | 15.01 | a) Dismantling | | 1 | P sq. Ft |
|---|
| 57 | 15.02 | b) Fabrication | | 1 | P sq. Ft |
|---|
| 58 | 15.03 | c) Erection | | 1 | P sq. Ft |
|---|
| 59 | 16 | Roof gutter with 3 mm thick plate & 4 ft wide | | | |
|---|
| 60 | 16.01 | a) Dismantling | | 1 | PRFt |
|---|
| 61 | 16.02 | b) Fabrication | | 1 | PRFt |
|---|
| 62 | 16.03 | c) Erection | | 1 | PRFt |
|---|
| 63 | 17 | A) Platform of any size | | | |
|---|
| 64 | 17.01 | a) Dismantling | | 1 | Pft² |
|---|
| 65 | 17.02 | b) Fabrication & Erection | | 1 | Pft² |
|---|
| 66 | 18 | B) M.S Structure | | | |
|---|
| 67 | 18.01 | a) Dismantling | | 1 | PMT |
|---|
| 68 | 18.02 | b) Fabrication & Erection | | 1 | PMT |
|---|
| 69 | 19 | Fabrication of ladder/Stair case from Angle/Channel/Flat/Pipe plate | | 1 | PRFt. |
|---|
| 70 | 20 | Trouses coloumn, beam related to roof | | | |
|---|
| 71 | 20.01 | a) Dismantling | | 1 | PMT |
|---|
| 72 | 20.02 | b) Fabrication | | 1 | PMT |
|---|
| 73 | 20.03 | c) Erection | | 1 | PMT |
|---|
| 74 | 21 | Purlin | | | |
|---|
| 75 | 21.01 | a) Dismantling | | 1 | PRft |
|---|
| 76 | 21.02 | b) Fabrication | | 1 | PRft |
|---|
| 77 | 21.03 | c) Erection | | 1 | PRft |
|---|
| 78 | 22 | Cutting & Straighting of old scrap plates for erection of platform | | 1 | PM |
|---|
| 79 | 23 | Electric panel shed (including structure) | | | |
|---|
| 80 | 23.01 | a) Dismantling | | 1 | Psq. Ft |
|---|
| 81 | 23.02 | b) Fabrication | | 1 | Psq. Ft |
|---|
| 82 | 23.03 | c) Erection | | 1 | Psq. Ft |
|---|
| 83 | 24 | M.S Rubber seated valve/NRV | | | |
|---|
| 84 | 24.01 | a) Dismantling | | 1 | PID |
|---|
| 85 | 24.02 | b) Fabrication | | 1 | PID |
|---|
| 86 | 24.03 | c) Erection | | 1 | PID |
|---|
| 87 | 25 | S.S Rubber seated valve | | | |
|---|
| 88 | 25.01 | a) Dismantling | | 1 | PID |
|---|
| 89 | 25.02 | b) Fabrication | | 1 | PID |
|---|
| 90 | 25.03 | c) Erection | | 1 | PID |
|---|
| 91 | 26 | M.S patch work max. up to 20 sq. ft at individual station (Above this will be taken in MT) | | 1 | Psq. Ft |
|---|
| 92 | 27 | Mill House | | | |
|---|
| 93 | 27.01 | Dismantling and Erection of 2\" square bar/old rail on cane unloader brigdge | | 1 | PRFt |
|---|
| 94 | 28 | Complete repair of cane unloader grab | | 1 | LS |
|---|
| 95 | 29 | Dismantling, Fabrication and Erection of cane cutter hood. | | 1 | LS |
|---|
| 96 | 30 | Replacement of Runner flat of cc, RC, Intercarrier, BE, RBC sugar, seed elevator chain. & Cross carrier. | | | |
|---|
| 97 | 30.01 | a) Dismantling | | 1 | PRM |
|---|
| 98 | 30.02 | b) Fitting of new | | 1 | PRM |
|---|
| 99 | 31 | Replacement of angle/channel of CC, RC, Intercarrier, BE, RBC sugar, seed elevator chain. & Cross carrier. | | | |
|---|
| 100 | 31.01 | a) Dismantling | | 1 | PRM |
|---|
| 101 | 31.02 | b) Fitting of new | | 1 | PRM |
|---|
| 102 | 32 | Repalcement side plate of CC, RC, BE, RBC, Hopper & Cross Car | | 1 | Psq. Ft |
|---|
| 103 | 33 | Replacement of bottom through Hopper, BE, RC. RBC, Cross carr | | 1 | Psq. Ft |
|---|
| 104 | 34 | Dismantling, fabrication and Erection Juice tray of mill | | 1 | L/S |
|---|
| 105 | 35 | Build up of top roller square end as per stand size | | 1 | L/S |
|---|
| 106 | 36 | Build up of crown pinion teeth as per standard | | 1 | L/S |
|---|
| 107 | 37 | Build up Mill roller coupling as per standard size | | 1 | L/s |
|---|
| 108 | 38 | Fabrication mill top roller scrapper assembly | | 1 | L/s |
|---|
| 109 | 39 | Dismantling, Fabrication and Erection of Donnelly chute of mills | | 1 | L/s |
|---|
| 110 | 40 | Replacement of DSM Screen complete | | 1 | L/s |
|---|
| 111 | 41 | DSM screen juice receving Top & Bottom tray | | | |
|---|
| 112 | 41.01 | a) Dismantling | | 1 | L/S |
|---|
| 113 | 41.02 | b) Fabrication | | 1 | L/S |
|---|
| 114 | 42 | Dismantling, Fabrication & Erection of any bed of motor, Pump & gear box | | | |
|---|
| 115 | 42.01 | a) Below 50 HP | | 1 | L/S |
|---|
| 116 | 42.03 | b) Above 50 HP | | 1 | L/S |
|---|
| 117 | 43 | Replacement of Rack-Carrier Boot | | 1 | L/s |
|---|
| 118 | 44 | Shifting of DC motor cooler as per direction along with air ducting of required size | | 1 | L/s |
|---|
| 119 | 45 | M.S Screw Conveyor | | | |
|---|
| 120 | 45.01 | a) Dismantling | | 1 | PRMtr |
|---|
| 121 | 45.02 | b) Fabrication | | 1 | PRMtr |
|---|
| 122 | 45.03 | c) Erection | | 1 | PRMtr |
|---|
| 123 | 46 | Replacement of Cutter/ID Fan motor | | 1 | L/s Each |
|---|
| 124 | 47 | Boiler | | | |
|---|
| 125 | 47.01 | Replacement of Worn out ducting | | 1 | Per Sq.M |
|---|
| 126 | 48 | Replacement of worn out casing | | | |
|---|
| 127 | 48.01 | a) ID Fan | | 1 | L/S Each |
|---|
| 128 | 48.02 | b) FD Fan | | 1 | L/S Each |
|---|
| 129 | 49 | Repair of worn out casing | | | |
|---|
| 130 | 49.01 | a) ID Fan | | 1 | Per Sq. ft² |
|---|
| 131 | 49.02 | b) FD fan | | 1 | Per Sq. ft² |
|---|
| 132 | 50 | Replacement of Boiler Fans | | | |
|---|
| 133 | 50.01 | a) ID Fan | | 1 | Lumspsum |
|---|
| 134 | 50.02 | b) FD Fan | | 1 | L/s |
|---|
| 135 | 50.03 | c) SA | | 1 | L/s |
|---|
| 136 | 51 | Dismantling, Fabrication & Erection of Fan Plumber Block bed including fitting & leveling of plumber block | | | |
|---|
| 137 | 51.01 | a) ID Fan | | 1 | L/s |
|---|
| 138 | 51.02 | b) FD Fan | | 1 | L/s |
|---|
| 139 | 51.03 | c) SA | | 1 | L/s |
|---|
| 140 | 52 | Boiler refractory M.S plate for side wall | | | |
|---|
| 141 | 52.01 | a) Dismantling | | 1 | PSQ.M |
|---|
| 142 | 52.02 | b) Fitting of new/Old | | 1 | PSQ.M |
|---|
| 143 | 53 | Dismantling , Fabrication & Erection of Boiler ID fan damper | | 1 | L/s |
|---|
| 144 | 54 | Dismantling, Repair & Erection of boiler ID fan Damper | | 1 | L/s |
|---|
| 145 | 55 | Dismantling, fabrication and Erection of Worn out portion of wet scrubber | | 1 | PSq.Ft |
|---|
| 146 | 56 | Fitting of New web scrubber internal | | 1 | L/s |
|---|
| 147 | 57 | Replacement/Modification of Venturi | | 1 | L/s |
|---|
| 148 | 58 | M/s frame for ash separator/clarifier of APCD | | | |
|---|
| 149 | 58.01 | a) Dismantling of old | | 1 | Per PCS |
|---|
| 150 | 58.02 | b) Fabrication of new with screen and gutter | | 1 | Per PCS |
|---|
| 151 | 58.03 | c) Erection of New with screen and gutter | | 1 | Per PCS |
|---|
| 152 | 59 | Replacement of top round gutter of clarifier of APCD | | 1 | L.S |
|---|
| 153 | 60 | Dismantling, fabrication and erection of | | | |
|---|
| 154 | 60.01 | a) Clarifier cone | | 1 | L/s Each |
|---|
| 155 | 60.02 | b) Round portion | | 1 | L/s |
|---|
| 156 | 61 | Replacement of worn out furnace door. | | 1 | L/s Each |
|---|
| 157 | 62 | Dismantling & Erection of Air Heater Tubes (812 Nos) | | 1 | Per Tube |
|---|
| 158 | 63 | Boiling House | | | |
|---|
| 159 | 63.01 | Replacement of worn out raw juice/sulphited juice pump. Strainer | | 1 | L/s |
|---|
| 160 | 64 | Replacement of worn out weight juice receiving tank | | 1 | L/s |
|---|
| 161 | 65 | Pan/Evaporator | | | |
|---|
| 162 | 65.01 | Replacement of worn out of saveall of Evaporator | | 1 | L/s |
|---|
| 163 | 66 | Replacement of worn out of saveall of Pans | | 1 | L/s |
|---|
| 164 | 67 | Replacement of impeller of Pns & quad | | 1 | L/s |
|---|
| 165 | 68 | Replacement of Top plate/bottom plate/taper plate of pans & quard | | 1 | L/s |
|---|
| 166 | 69 | Replacement of Vapour pipe of Pan to condenser station. | | 1 | PID/Rmtr |
|---|
| 167 | 70 | Patching/Repair work inside Boiling House Equipment Like Pan, Quard & Clarifier | | 1 | PSq.Ft |
|---|
| 168 | 71 | Dismantling, fab, & Erecti. Of Pan Vapour Pipe Bends | | | |
|---|
| 169 | 71.01 | a) Full Bend | | 1 | L/s |
|---|
| 170 | 71.02 | b) Half Bend | | 1 | L/s |
|---|
| 171 | 72 | Replacement of Umbrella of Pans. | | 1 | L/s |
|---|
| 172 | 73 | Fabrication & Erection of Steam coils for syrup and molasses tank, at pan station | | 1 | PID Ft |
|---|
| 173 | 74 | Any welding work in the factory. | | | |
|---|
| 174 | 74.01 | a) M.S to M.S | | 1 | PRft |
|---|
| 175 | 74.02 | b) S.S to S.S | | 1 | PRft |
|---|
| 176 | 74.03 | c) M.s to S.S | | 1 | PRft |
|---|
| 177 | 75 | Replacement of Umbrella for Evaporator station | | 1 | LS |
|---|
| 178 | 76 | Dismantling, Fabrication & Erection of J-pipe for saveall of any quad | | 1 | L/S |
|---|
| 179 | 77 | Replacement of Tube plate of 4th body of Quad | | 1 | L/s |
|---|
| 180 | 78 | Dismantling, Fabrication & Erection of condensate bottle of any size | | 1 | L/s |
|---|
| 181 | 79 | Fab. & Erection of Side Glass for Pan/Quad | | 1 | L/s |
|---|
| 182 | 80 | Dismantling, Fabrication & Erection of Condensate water receiving pocket for cylindria of pan and quad | | 1 | L/s |
|---|
| 183 | 81 | Replacement of brass/S.S tubes of juice heater/vapour line juice heater | | | |
|---|
| 184 | 81.01 | a) Dismantling | | 1 | Per Tube |
|---|
| 185 | 81.02 | b) Fitting | | 1 | Per Tube |
|---|
| 186 | 82 | Replacement of brass/S.S Tubes of Quad/vapour Cell & Pan Station | | | |
|---|
| 187 | 82.01 | a) Dismantling | | 1 | Per Tube |
|---|
| 188 | 82.02 | b) Fitting | | 1 | Per Tube |
|---|
| 189 | 82.03 | c) Cutting of brass/ S.S Tube any size | | 1 | Per Tube |
|---|
| 190 | 83 | Juice Heater | | | |
|---|
| 191 | 83.01 | a) Replacement of JH partition plate | | 1 | PRft |
|---|
| 192 | 83.02 | b) Replacement of worn out groove out partition plate | | 1 | PRft |
|---|
| 193 | 84 | Dismantling of old juice heater a and dismantled old juice heater to be shifted to scrap yard. | | 1 | Lumsum |
|---|
| 194 | 85 | Dismantling & shifting of juice heater from tarn taran sugar mill to batala sugar mill. (Transport will be provided mills 02 Nos.) | | 1 | Lumsum |
|---|
| 195 | 86 | Erection of juice heater with all connection complete in all respect | | 1 | Lumsum |
|---|
| 196 | 87 | Clarifier | | | |
|---|
| 197 | 87.01 | a) Replacement of compartment tray dorr | | 1 | L/s |
|---|
| 198 | 87.02 | b) Replacement of mud boot of juice clarifier (dorr) | | 1 | Pft² |
|---|
| 199 | 88 | Dismantling, & erection of dorr shaft. | | 1 | L/s |
|---|
| 200 | 89 | Replacement of coils in dorr | | 1 | PRM |
|---|
| 201 | 90 | Oliver filter | | | |
|---|
| 202 | 90.01 | Dismantling, Fabrication & Erection of Bagacillo cyclone. | | 1 | L/s |
|---|
| 203 | 91 | Replacement of worn out baacillo pipeline made out from GI plain Sheet | | 1 | PID/PFT |
|---|
| 204 | 92 | Dismantling, fabrication & erection of agitator of OC filter | | 1 | L/s |
|---|
| 205 | 93 | Impeller of bagacillo blower | | | |
|---|
| 206 | 93.01 | a) Dismantling | | 1 | L/s |
|---|
| 207 | 93.02 | b) Fabrication | | 1 | L/s |
|---|
| 208 | 93.03 | c) Erection with drive system complete | | 1 | L/s |
|---|
| 209 | 94 | M/s casing of Bagacillo blower | | | |
|---|
| 210 | 94.01 | a) Dismantling | | 1 | L/s |
|---|
| 211 | 94.02 | b) Fabrication | | 1 | L/s |
|---|
| 212 | 94.03 | c) Erection | | 1 | L/s |
|---|
| 213 | 95 | Bagacillo Screen | | | |
|---|
| 214 | 95.01 | a) Dismantling | | 1 | L/s |
|---|
| 215 | 95.02 | b) Replacement of New Screen & Erection | | 1 | L/s |
|---|
| 216 | 95.03 | c) Fabrication Frame | | 1 | L/s |
|---|
| 217 | 96 | Sulphur Furnace | | | |
|---|
| 218 | 96.01 | Replacement of cooler of sulphur burners | | 1 | L/s Each |
|---|
| 219 | 97 | Replacement of sulphur cooler burner pipeline | | 1 | L/s Each |
|---|
| 220 | 98 | Replacement of worn out burner of sulphur furnace | | 1 | PSq.Ft |
|---|
| 221 | 99 | Dismantling, fabrication & Erection of sulphur burner melter for sulphur furnace. | | 1 | L/s Each |
|---|
| 222 | 100 | M.S Scrubber of sulphur furnace. | | | |
|---|
| 223 | 100.01 | a) Dismantling | | 1 | Per Pcs |
|---|
| 224 | 100.02 | b) Fabrication | | 1 | Per Pcs |
|---|
| 225 | 100.03 | c) Erection along with connecting valves and pipes etc | | 1 | Per Pcs |
|---|
| 226 | 101 | a) Complete fitting of new sulphur furnace blower | | 1 | L/s |
|---|
| 227 | 101.01 | b) Fabrication, Erection of cooling jackets of sulphur furnace. | | 1 | L/s |
|---|
| 228 | 102 | Crystallzer Crystallizer central shaft with ribbon | | | |
|---|
| 229 | 102.01 | a) Dismantling | | 1 | L/s |
|---|
| 230 | 102.02 | b) Fabrication | | 1 | L/s |
|---|
| 231 | 102.03 | c) Erection | | 1 | L/s |
|---|
| 232 | 103 | M.S ribbon strip in crystallzer | | | |
|---|
| 233 | 103.01 | a) Dismantling | | 1 | PRM |
|---|
| 234 | 103.02 | b) Fabrication | | 1 | PRM |
|---|
| 235 | 103.03 | c) Erection | | 1 | PRM |
|---|
| 236 | 104 | Balancing type arm dismantling by fixing 3\"/4\" pipeline in crystallizer central tube shaft (stirrer) | | 1 | PRM |
|---|
| 237 | 105 | Dismantling, Fabrication & Erection of Central tube shaft with cooling coil for water cooled crystallizer 40 tonns capacity | | 1 | L/s |
|---|
| 238 | 106 | Worm box for crystallizer | | | |
|---|
| 239 | 106.01 | a) Dismantling | | 1 | L/s Per Pcs |
|---|
| 240 | 106.02 | b) Fabrication | | 1 | L/s Per Pcs |
|---|
| 241 | 106.03 | c) Erection | | 1 | L/s Per Pcs |
|---|
| 242 | 107 | a) Dismantling and refiting of big gear of crystallizer | | 1 | L/s |
|---|
| 243 | 107.01 | b) Replacement of bottom partition of crystallizer | | 1 | L/s |
|---|
| 244 | 107.02 | c) Replacement of worn out stirrer arms of ground floor crystalizer | | 1 | L/s |
|---|
| 245 | 108 | Centrifugal Station | | | |
|---|
| 246 | 108.01 | Replacement of hopper trough | | 1 | PMSq. |
|---|
| 247 | 109 | Fabrication of various AI/glass/fibre structure. | | | |
|---|
| 248 | 109.01 | a) Door | | 1 | PSq.ft |
|---|
| 249 | 109.02 | b) Window | | 1 | PSq.ft |
|---|
| 250 | 109.03 | c) Glass | | 1 | PSq.ft |
|---|
| 251 | 109.04 | d) Roof | | 1 | PSq.ft |
|---|
| 252 | 110 | Fabrication of NHEC/CF machine hood | | 1 | L/s Per Pcs |
|---|
| 253 | 111 | Impeller of Hot/cold air blower | | | |
|---|
| 254 | 111.01 | a) Dismantling | | 1 | L/s |
|---|
| 255 | 111.02 | b) Fabrication | | 1 | L/s |
|---|
| 256 | 111.03 | c) Erection with drive system complete | | 1 | L/s |
|---|
| 257 | 112 | M/s casing of Hot/cold air blower | | | |
|---|
| 258 | 112.01 | a) Dismantling | | 1 | L/s |
|---|
| 259 | 112.02 | b) Fabrication | | 1 | L/s |
|---|
| 260 | 112.03 | c) Erection | | 1 | L/s |
|---|
| 261 | 113 | Repair of Continuous machine SS Basket | | 1 | L/s |
|---|
| 262 | 114 | Dismantling, fabrication & Erection of batch type C/F machine discharge chute | | 1 | L/s/Pcs |
|---|
| 263 | 115 | Fabrication of M/s bucket for sugar/seed elevator. | | 1 | L/s |
|---|
| 264 | 116 | Arrangement of jail fitment in sugar hopper | | | |
|---|
| 265 | 116.01 | a) Dismantling | | 1 | L/s |
|---|
| 266 | 116.02 | b) Fabrication | | 1 | L/s |
|---|
| 267 | 116.03 | c) Erection | | 1 | L/s |
|---|
| 268 | 117 | To replace the worn out shaft holding part of hopper No-1 | | 1 | L/s |
|---|
| 269 | 118 | Magma/Melter/pugmill arms | | | |
|---|
| 270 | 118.01 | a) Dismantling | | 1 | Per Pcs |
|---|
| 271 | 118.02 | b) Fabrication | | 1 | Per Pcs |
|---|
| 272 | 118.03 | c) Erection | | 1 | Per Pcs |
|---|
| 273 | 119 | Dismantling & Erection of hot air blower with heat exchange | | 1 | L/s |
|---|
| 274 | 120 | Erection of planetary gear box | | | |
|---|
| 275 | 120.01 | a) Pug Mill | | 1 | L/s Pcs |
|---|
| 276 | 120.02 | b) Crystallier | | 1 | L/s Pcs |
|---|
| 277 | 121 | Dismantling, fab, erection of MS chute for grader | | 1 | L/s Pcs |
|---|
| 278 | 122 | Spray pond | | | |
|---|
| 279 | 122.01 | Replacement of damaged PVC function box of spray pond | | 1 | L/s |
|---|
| 280 | 123 | Dismantling of M/s/CI/S.S cluster with nozzle & pipe. | | 1 | Per Pcs |
|---|
| 281 | 124 | Dismantling, fabrication and erection of S.S cluster including S.S plate/Flange/Reducer & increasing length by 1 meter | | 1 | L/s |
|---|
| 282 | 125 | Replacement of foot valve of spray pump | | | |
|---|
| 283 | 125.01 | a) Dismantling | | 1 | PI/Pcs |
|---|
| 284 | 125.02 | b) Erection | | 1 | PI/Pcs |
|---|
| 285 | 126 | Dismantling, fabrication & erection of spray pump strainer | | 1 | L/S/Pcs |
|---|
| 286 | 127 | A) Rolling of S.S plate for made pipe | | 1 | PMT |
|---|
| 287 | 127.01 | b) Rolling of M/S plate for made pipe | | 1 | PMT |
|---|
| 288 | 128 | Power House | | | |
|---|
| 289 | 128.01 | Fabrication & Erection of cable tray | | 1 | R/Mtr |
|---|
| 290 | 129 | Replacement of thimble (any size) | | 1 | L/S each |
|---|
| 291 | 130 | Replacement & Erection of changeover switch 630A/400A/250A | | 1 | L/s |
|---|
| 292 | 131 | Fabrication & Erection of street light four pole tower with suitable platfram & painting Apprx. Height 30 Ft | | 1 | L/s |
|---|
| 293 | 132 | Under feed roller Mills | | | |
|---|
| 294 | 132.01 | a) Dismantling | | 1 | L/s |
|---|
| 295 | 132.02 | b) Fabrication | | 1 | L/S |
|---|
| 296 | 133 | Under feeder roller scrapper | | | |
|---|
| 297 | 133.01 | a) Dismantling | | 1 | L/S |
|---|
| 298 | 133.02 | b) Fabrication | | 1 | L/S |
|---|
| 299 | 133.03 | c) Erection | | 1 | L/S |
|---|
| 300 | 134 | Fabrication & Erection of man hole with blind cover | | 1 | PID/PCs |
|---|
| 301 | 135 | Dismantling & Erection of Flowmeter | | 1 | L/s |
|---|
| 302 | 136 | Dismantling, Fabrication & Erection of sulphur furnace chamber | | 1 | L/s |
|---|
| 303 | 137 | Dismantling of any structure in the mills & shifting to scrap yard | | 1 | PMT |
|---|
| 304 | 138 | Shifting of any scrap from mill to scrap yard. (Trolley will be provided by Mill) | | 1 | PMT |
|---|
| 305 | 139 | Shfiting & Erection of 2 Nos. Power Turbine Coolers form ground floor to Ist floor | | 1 | L/s |
|---|
| 306 | 140 | Shifting & Erection of 2 Nos. Hot Water Maceration Bottom Tank as per Direction including Dismantling Erection of Pumps, Motor & Pipeline | | 1 | L/S |
|---|
| 307 | 141 | Repair/Build up of any chain sprocked teeth along with girnding as per profile | | 1 | Per Teeth |
|---|
| 308 | 142 | Dismantling & Erection of double beat valve | | 1 | L/s |
|---|
| 309 | 143 | Dismantling, fabrication & erection of sysrup sulphiter | | 1 | L/s |
|---|
| 310 | 144 | Dismantling, Fabrication & erection of downtake of pan, | | 1 | L/s |
|---|
| 311 | 145 | Dismantling, fabrication & Erection of globe valve | | 1 | L/s |
|---|
| 312 | 146 | Dismantling, Fabrication & erection of steam valve (300-600mm) | | 1 | L/s |
|---|
| 313 | 147 | Dismantling, fabrication & erection of washbasin | | 1 | L/s |
|---|