Department of Cooperation has published Dismantling Fabrication Dismantling Fabrication And Erection Jobs. Submission Date for this Tender is 20-05-2020. Pipe Laying Tenders in The Batala Coop Sugar Mills Ltd Punjab. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 04-May-2020 | Corrigendum1 | Date | 20-05-2020 |
Name of Work: Contract of Dismantling, Fabrication & Erection Jobs | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | MS pipeline up to 12" dia | |||
2 | 1.01 | a) Dismantling | 1 | PID/RFt | |
3 | 1.02 | b) Fabrication | 1 | PID/RFt | |
4 | 1.03 | c) Erection | 1 | PID/RFt | |
5 | 2 | Pipe line above 12" dia including vapour/exhaust pipe | |||
6 | 2.01 | a) Dismantling | 1 | PID/RFt | |
7 | 2.02 | b) Fabrication | 1 | PID/RFt | |
8 | 2.03 | c) Erection | 1 | PID/RFt | |
9 | 3 | Seamless pipeline up to 12" dia | |||
10 | 3.01 | a) Dismantling | 1 | PID/RFt | |
11 | 3.02 | b) Fabrication | 1 | PID/RFt | |
12 | 3.03 | c) Erection | 1 | PID/RFt | |
13 | 4 | Seamless bend upto 12" dia | |||
14 | 4.01 | a) Dismantling | 1 | PID/Pcs | |
15 | 4.02 | b) Fabrication | 1 | PID/Pcs | |
16 | 4.03 | c) Erection | 1 | PID/Pcs | |
17 | 5 | Cross reducer, tee, Nipple upto 12" dia | |||
18 | 5.01 | a) Dismantling | 1 | PID/Pcs | |
19 | 5.02 | b) Fabrication | 1 | PID/Pcs | |
20 | 5.03 | c) Erection | 1 | PID/Pcs | |
21 | 6 | Cross, reducer, tee Nipple above 12" dia | |||
22 | 6.01 | a) Dismantling | 1 | PID/Pcs | |
23 | 6.02 | b) Fabrication | 1 | PID/Pcs | |
24 | 6.03 | c) Erection | 1 | PID/Pcs | |
25 | 7 | A) Valve up to 12" dia | |||
26 | 7.01 | a) Dismantling | 1 | PID/Pcs | |
27 | 7.02 | b) Erection | 1 | PID/Pcs | |
28 | 8 | B) Valve above 12" dia | |||
29 | 8.01 | a) Dismantling | 1 | PID/Pcs | |
30 | 8.02 | b) Erection | 1 | PID/Pcs | |
31 | 9 | Bend upto 12" dia | |||
32 | 9.01 | a) Dismantling | 1 | PID | |
33 | 9.02 | b) Fabrication | 1 | PID | |
34 | 9.03 | c) Erection | 1 | PID | |
35 | 10 | Bend above 12" dia | |||
36 | 10.01 | a) Dismantling | 1 | PID | |
37 | 10.02 | b) Fabrication | 1 | PID | |
38 | 10.03 | c) Erection | 1 | PID | |
39 | 11 | Flange of all size | |||
40 | 11.01 | a) Dismantling | 1 | PID | |
41 | 11.02 | b) Fabrication | 1 | PID | |
42 | 11.03 | c) Erection | 1 | PID | |
43 | 12 | Square & round tanks with flat bottom of any size | |||
44 | 12.01 | a) Dismantling | 1 | PMT | |
45 | 12.02 | b) Fabrication | 1 | PMT | |
46 | 12.03 | c) Erection | 1 | PMT | |
47 | 13 | Round tanks with Conical tank of any size | |||
48 | 13.01 | a) Dismantling | 1 | PMT | |
49 | 13.02 | b) Fabrication | 1 | PMT | |
50 | 13.03 | c) Erection | 1 | PMT | |
51 | 14 | Cone/Saucer of any Size | |||
52 | 14.01 | a) Dismantling | 1 | PMT | |
53 | 14.02 | b) Fabrication | 1 | PMT | |
54 | 14.03 | c) Erection | 1 | PMT | |
55 | 15 | Gutters of MS plate of any size | |||
56 | 15.01 | a) Dismantling | 1 | P sq. Ft | |
57 | 15.02 | b) Fabrication | 1 | P sq. Ft | |
58 | 15.03 | c) Erection | 1 | P sq. Ft | |
59 | 16 | Roof gutter with 3 mm thick plate & 4 ft wide | |||
60 | 16.01 | a) Dismantling | 1 | PRFt | |
61 | 16.02 | b) Fabrication | 1 | PRFt | |
62 | 16.03 | c) Erection | 1 | PRFt | |
63 | 17 | A) Platform of any size | |||
64 | 17.01 | a) Dismantling | 1 | Pft² | |
65 | 17.02 | b) Fabrication & Erection | 1 | Pft² | |
66 | 18 | B) M.S Structure | |||
67 | 18.01 | a) Dismantling | 1 | PMT | |
68 | 18.02 | b) Fabrication & Erection | 1 | PMT | |
69 | 19 | Fabrication of ladder/Stair case from Angle/Channel/Flat/Pipe plate | 1 | PRFt. | |
70 | 20 | Trouses coloumn, beam related to roof | |||
71 | 20.01 | a) Dismantling | 1 | PMT | |
72 | 20.02 | b) Fabrication | 1 | PMT | |
73 | 20.03 | c) Erection | 1 | PMT | |
74 | 21 | Purlin | |||
75 | 21.01 | a) Dismantling | 1 | PRft | |
76 | 21.02 | b) Fabrication | 1 | PRft | |
77 | 21.03 | c) Erection | 1 | PRft | |
78 | 22 | Cutting & Straighting of old scrap plates for erection of platform | 1 | PM | |
79 | 23 | Electric panel shed (including structure) | |||
80 | 23.01 | a) Dismantling | 1 | Psq. Ft | |
81 | 23.02 | b) Fabrication | 1 | Psq. Ft | |
82 | 23.03 | c) Erection | 1 | Psq. Ft | |
83 | 24 | M.S Rubber seated valve/NRV | |||
84 | 24.01 | a) Dismantling | 1 | PID | |
85 | 24.02 | b) Fabrication | 1 | PID | |
86 | 24.03 | c) Erection | 1 | PID | |
87 | 25 | S.S Rubber seated valve | |||
88 | 25.01 | a) Dismantling | 1 | PID | |
89 | 25.02 | b) Fabrication | 1 | PID | |
90 | 25.03 | c) Erection | 1 | PID | |
91 | 26 | M.S patch work max. up to 20 sq. ft at individual station (Above this will be taken in MT) | 1 | Psq. Ft | |
92 | 27 | Mill House | |||
93 | 27.01 | Dismantling and Erection of 2" square bar/old rail on cane unloader brigdge | 1 | PRFt | |
94 | 28 | Complete repair of cane unloader grab | 1 | LS | |
95 | 29 | Dismantling, Fabrication and Erection of cane cutter hood. | 1 | LS | |
96 | 30 | Replacement of Runner flat of cc, RC, Intercarrier, BE, RBC sugar, seed elevator chain. & Cross carrier. | |||
97 | 30.01 | a) Dismantling | 1 | PRM | |
98 | 30.02 | b) Fitting of new | 1 | PRM | |
99 | 31 | Replacement of angle/channel of CC, RC, Intercarrier, BE, RBC sugar, seed elevator chain. & Cross carrier. | |||
100 | 31.01 | a) Dismantling | 1 | PRM | |
101 | 31.02 | b) Fitting of new | 1 | PRM | |
102 | 32 | Repalcement side plate of CC, RC, BE, RBC, Hopper & Cross Car | 1 | Psq. Ft | |
103 | 33 | Replacement of bottom through Hopper, BE, RC. RBC, Cross carr | 1 | Psq. Ft | |
104 | 34 | Dismantling, fabrication and Erection Juice tray of mill | 1 | L/S | |
105 | 35 | Build up of top roller square end as per stand size | 1 | L/S | |
106 | 36 | Build up of crown pinion teeth as per standard | 1 | L/S | |
107 | 37 | Build up Mill roller coupling as per standard size | 1 | L/s | |
108 | 38 | Fabrication mill top roller scrapper assembly | 1 | L/s | |
109 | 39 | Dismantling, Fabrication and Erection of Donnelly chute of mills | 1 | L/s | |
110 | 40 | Replacement of DSM Screen complete | 1 | L/s | |
111 | 41 | DSM screen juice receving Top & Bottom tray | |||
112 | 41.01 | a) Dismantling | 1 | L/S | |
113 | 41.02 | b) Fabrication | 1 | L/S | |
114 | 42 | Dismantling, Fabrication & Erection of any bed of motor, Pump & gear box | |||
115 | 42.01 | a) Below 50 HP | 1 | L/S | |
116 | 42.03 | b) Above 50 HP | 1 | L/S | |
117 | 43 | Replacement of Rack-Carrier Boot | 1 | L/s | |
118 | 44 | Shifting of DC motor cooler as per direction along with air ducting of required size | 1 | L/s | |
119 | 45 | M.S Screw Conveyor | |||
120 | 45.01 | a) Dismantling | 1 | PRMtr | |
121 | 45.02 | b) Fabrication | 1 | PRMtr | |
122 | 45.03 | c) Erection | 1 | PRMtr | |
123 | 46 | Replacement of Cutter/ID Fan motor | 1 | L/s Each | |
124 | 47 | Boiler | |||
125 | 47.01 | Replacement of Worn out ducting | 1 | Per Sq.M | |
126 | 48 | Replacement of worn out casing | |||
127 | 48.01 | a) ID Fan | 1 | L/S Each | |
128 | 48.02 | b) FD Fan | 1 | L/S Each | |
129 | 49 | Repair of worn out casing | |||
130 | 49.01 | a) ID Fan | 1 | Per Sq. ft² | |
131 | 49.02 | b) FD fan | 1 | Per Sq. ft² | |
132 | 50 | Replacement of Boiler Fans | |||
133 | 50.01 | a) ID Fan | 1 | Lumspsum | |
134 | 50.02 | b) FD Fan | 1 | L/s | |
135 | 50.03 | c) SA | 1 | L/s | |
136 | 51 | Dismantling, Fabrication & Erection of Fan Plumber Block bed including fitting & leveling of plumber block | |||
137 | 51.01 | a) ID Fan | 1 | L/s | |
138 | 51.02 | b) FD Fan | 1 | L/s | |
139 | 51.03 | c) SA | 1 | L/s | |
140 | 52 | Boiler refractory M.S plate for side wall | |||
141 | 52.01 | a) Dismantling | 1 | PSQ.M | |
142 | 52.02 | b) Fitting of new/Old | 1 | PSQ.M | |
143 | 53 | Dismantling , Fabrication & Erection of Boiler ID fan damper | 1 | L/s | |
144 | 54 | Dismantling, Repair & Erection of boiler ID fan Damper | 1 | L/s | |
145 | 55 | Dismantling, fabrication and Erection of Worn out portion of wet scrubber | 1 | PSq.Ft | |
146 | 56 | Fitting of New web scrubber internal | 1 | L/s | |
147 | 57 | Replacement/Modification of Venturi | 1 | L/s | |
148 | 58 | M/s frame for ash separator/clarifier of APCD | |||
149 | 58.01 | a) Dismantling of old | 1 | Per PCS | |
150 | 58.02 | b) Fabrication of new with screen and gutter | 1 | Per PCS | |
151 | 58.03 | c) Erection of New with screen and gutter | 1 | Per PCS | |
152 | 59 | Replacement of top round gutter of clarifier of APCD | 1 | L.S | |
153 | 60 | Dismantling, fabrication and erection of | |||
154 | 60.01 | a) Clarifier cone | 1 | L/s Each | |
155 | 60.02 | b) Round portion | 1 | L/s | |
156 | 61 | Replacement of worn out furnace door. | 1 | L/s Each | |
157 | 62 | Dismantling & Erection of Air Heater Tubes (812 Nos) | 1 | Per Tube | |
158 | 63 | Boiling House | |||
159 | 63.01 | Replacement of worn out raw juice/sulphited juice pump. Strainer | 1 | L/s | |
160 | 64 | Replacement of worn out weight juice receiving tank | 1 | L/s | |
161 | 65 | Pan/Evaporator | |||
162 | 65.01 | Replacement of worn out of saveall of Evaporator | 1 | L/s | |
163 | 66 | Replacement of worn out of saveall of Pans | 1 | L/s | |
164 | 67 | Replacement of impeller of Pns & quad | 1 | L/s | |
165 | 68 | Replacement of Top plate/bottom plate/taper plate of pans & quard | 1 | L/s | |
166 | 69 | Replacement of Vapour pipe of Pan to condenser station. | 1 | PID/Rmtr | |
167 | 70 | Patching/Repair work inside Boiling House Equipment Like Pan, Quard & Clarifier | 1 | PSq.Ft | |
168 | 71 | Dismantling, fab, & Erecti. Of Pan Vapour Pipe Bends | |||
169 | 71.01 | a) Full Bend | 1 | L/s | |
170 | 71.02 | b) Half Bend | 1 | L/s | |
171 | 72 | Replacement of Umbrella of Pans. | 1 | L/s | |
172 | 73 | Fabrication & Erection of Steam coils for syrup and molasses tank, at pan station | 1 | PID Ft | |
173 | 74 | Any welding work in the factory. | |||
174 | 74.01 | a) M.S to M.S | 1 | PRft | |
175 | 74.02 | b) S.S to S.S | 1 | PRft | |
176 | 74.03 | c) M.s to S.S | 1 | PRft | |
177 | 75 | Replacement of Umbrella for Evaporator station | 1 | LS | |
178 | 76 | Dismantling, Fabrication & Erection of J-pipe for saveall of any quad | 1 | L/S | |
179 | 77 | Replacement of Tube plate of 4th body of Quad | 1 | L/s | |
180 | 78 | Dismantling, Fabrication & Erection of condensate bottle of any size | 1 | L/s | |
181 | 79 | Fab. & Erection of Side Glass for Pan/Quad | 1 | L/s | |
182 | 80 | Dismantling, Fabrication & Erection of Condensate water receiving pocket for cylindria of pan and quad | 1 | L/s | |
183 | 81 | Replacement of brass/S.S tubes of juice heater/vapour line juice heater | |||
184 | 81.01 | a) Dismantling | 1 | Per Tube | |
185 | 81.02 | b) Fitting | 1 | Per Tube | |
186 | 82 | Replacement of brass/S.S Tubes of Quad/vapour Cell & Pan Station | |||
187 | 82.01 | a) Dismantling | 1 | Per Tube | |
188 | 82.02 | b) Fitting | 1 | Per Tube | |
189 | 82.03 | c) Cutting of brass/ S.S Tube any size | 1 | Per Tube | |
190 | 83 | Juice Heater | |||
191 | 83.01 | a) Replacement of JH partition plate | 1 | PRft | |
192 | 83.02 | b) Replacement of worn out groove out partition plate | 1 | PRft | |
193 | 84 | Dismantling of old juice heater a and dismantled old juice heater to be shifted to scrap yard. | 1 | Lumsum | |
194 | 85 | Dismantling & shifting of juice heater from tarn taran sugar mill to batala sugar mill. (Transport will be provided mills 02 Nos.) | 1 | Lumsum | |
195 | 86 | Erection of juice heater with all connection complete in all respect | 1 | Lumsum | |
196 | 87 | Clarifier | |||
197 | 87.01 | a) Replacement of compartment tray dorr | 1 | L/s | |
198 | 87.02 | b) Replacement of mud boot of juice clarifier (dorr) | 1 | Pft² | |
199 | 88 | Dismantling, & erection of dorr shaft. | 1 | L/s | |
200 | 89 | Replacement of coils in dorr | 1 | PRM | |
201 | 90 | Oliver filter | |||
202 | 90.01 | Dismantling, Fabrication & Erection of Bagacillo cyclone. | 1 | L/s | |
203 | 91 | Replacement of worn out baacillo pipeline made out from GI plain Sheet | 1 | PID/PFT | |
204 | 92 | Dismantling, fabrication & erection of agitator of OC filter | 1 | L/s | |
205 | 93 | Impeller of bagacillo blower | |||
206 | 93.01 | a) Dismantling | 1 | L/s | |
207 | 93.02 | b) Fabrication | 1 | L/s | |
208 | 93.03 | c) Erection with drive system complete | 1 | L/s | |
209 | 94 | M/s casing of Bagacillo blower | |||
210 | 94.01 | a) Dismantling | 1 | L/s | |
211 | 94.02 | b) Fabrication | 1 | L/s | |
212 | 94.03 | c) Erection | 1 | L/s | |
213 | 95 | Bagacillo Screen | |||
214 | 95.01 | a) Dismantling | 1 | L/s | |
215 | 95.02 | b) Replacement of New Screen & Erection | 1 | L/s | |
216 | 95.03 | c) Fabrication Frame | 1 | L/s | |
217 | 96 | Sulphur Furnace | |||
218 | 96.01 | Replacement of cooler of sulphur burners | 1 | L/s Each | |
219 | 97 | Replacement of sulphur cooler burner pipeline | 1 | L/s Each | |
220 | 98 | Replacement of worn out burner of sulphur furnace | 1 | PSq.Ft | |
221 | 99 | Dismantling, fabrication & Erection of sulphur burner melter for sulphur furnace. | 1 | L/s Each | |
222 | 100 | M.S Scrubber of sulphur furnace. | |||
223 | 100.01 | a) Dismantling | 1 | Per Pcs | |
224 | 100.02 | b) Fabrication | 1 | Per Pcs | |
225 | 100.03 | c) Erection along with connecting valves and pipes etc | 1 | Per Pcs | |
226 | 101 | a) Complete fitting of new sulphur furnace blower | 1 | L/s | |
227 | 101.01 | b) Fabrication, Erection of cooling jackets of sulphur furnace. | 1 | L/s | |
228 | 102 | Crystallzer Crystallizer central shaft with ribbon | |||
229 | 102.01 | a) Dismantling | 1 | L/s | |
230 | 102.02 | b) Fabrication | 1 | L/s | |
231 | 102.03 | c) Erection | 1 | L/s | |
232 | 103 | M.S ribbon strip in crystallzer | |||
233 | 103.01 | a) Dismantling | 1 | PRM | |
234 | 103.02 | b) Fabrication | 1 | PRM | |
235 | 103.03 | c) Erection | 1 | PRM | |
236 | 104 | Balancing type arm dismantling by fixing 3"/4" pipeline in crystallizer central tube shaft (stirrer) | 1 | PRM | |
237 | 105 | Dismantling, Fabrication & Erection of Central tube shaft with cooling coil for water cooled crystallizer 40 tonns capacity | 1 | L/s | |
238 | 106 | Worm box for crystallizer | |||
239 | 106.01 | a) Dismantling | 1 | L/s Per Pcs | |
240 | 106.02 | b) Fabrication | 1 | L/s Per Pcs | |
241 | 106.03 | c) Erection | 1 | L/s Per Pcs | |
242 | 107 | a) Dismantling and refiting of big gear of crystallizer | 1 | L/s | |
243 | 107.01 | b) Replacement of bottom partition of crystallizer | 1 | L/s | |
244 | 107.02 | c) Replacement of worn out stirrer arms of ground floor crystalizer | 1 | L/s | |
245 | 108 | Centrifugal Station | |||
246 | 108.01 | Replacement of hopper trough | 1 | PMSq. | |
247 | 109 | Fabrication of various AI/glass/fibre structure. | |||
248 | 109.01 | a) Door | 1 | PSq.ft | |
249 | 109.02 | b) Window | 1 | PSq.ft | |
250 | 109.03 | c) Glass | 1 | PSq.ft | |
251 | 109.04 | d) Roof | 1 | PSq.ft | |
252 | 110 | Fabrication of NHEC/CF machine hood | 1 | L/s Per Pcs | |
253 | 111 | Impeller of Hot/cold air blower | |||
254 | 111.01 | a) Dismantling | 1 | L/s | |
255 | 111.02 | b) Fabrication | 1 | L/s | |
256 | 111.03 | c) Erection with drive system complete | 1 | L/s | |
257 | 112 | M/s casing of Hot/cold air blower | |||
258 | 112.01 | a) Dismantling | 1 | L/s | |
259 | 112.02 | b) Fabrication | 1 | L/s | |
260 | 112.03 | c) Erection | 1 | L/s | |
261 | 113 | Repair of Continuous machine SS Basket | 1 | L/s | |
262 | 114 | Dismantling, fabrication & Erection of batch type C/F machine discharge chute | 1 | L/s/Pcs | |
263 | 115 | Fabrication of M/s bucket for sugar/seed elevator. | 1 | L/s | |
264 | 116 | Arrangement of jail fitment in sugar hopper | |||
265 | 116.01 | a) Dismantling | 1 | L/s | |
266 | 116.02 | b) Fabrication | 1 | L/s | |
267 | 116.03 | c) Erection | 1 | L/s | |
268 | 117 | To replace the worn out shaft holding part of hopper No-1 | 1 | L/s | |
269 | 118 | Magma/Melter/pugmill arms | |||
270 | 118.01 | a) Dismantling | 1 | Per Pcs | |
271 | 118.02 | b) Fabrication | 1 | Per Pcs | |
272 | 118.03 | c) Erection | 1 | Per Pcs | |
273 | 119 | Dismantling & Erection of hot air blower with heat exchange | 1 | L/s | |
274 | 120 | Erection of planetary gear box | |||
275 | 120.01 | a) Pug Mill | 1 | L/s Pcs | |
276 | 120.02 | b) Crystallier | 1 | L/s Pcs | |
277 | 121 | Dismantling, fab, erection of MS chute for grader | 1 | L/s Pcs | |
278 | 122 | Spray pond | |||
279 | 122.01 | Replacement of damaged PVC function box of spray pond | 1 | L/s | |
280 | 123 | Dismantling of M/s/CI/S.S cluster with nozzle & pipe. | 1 | Per Pcs | |
281 | 124 | Dismantling, fabrication and erection of S.S cluster including S.S plate/Flange/Reducer & increasing length by 1 meter | 1 | L/s | |
282 | 125 | Replacement of foot valve of spray pump | |||
283 | 125.01 | a) Dismantling | 1 | PI/Pcs | |
284 | 125.02 | b) Erection | 1 | PI/Pcs | |
285 | 126 | Dismantling, fabrication & erection of spray pump strainer | 1 | L/S/Pcs | |
286 | 127 | A) Rolling of S.S plate for made pipe | 1 | PMT | |
287 | 127.01 | b) Rolling of M/S plate for made pipe | 1 | PMT | |
288 | 128 | Power House | |||
289 | 128.01 | Fabrication & Erection of cable tray | 1 | R/Mtr | |
290 | 129 | Replacement of thimble (any size) | 1 | L/S each | |
291 | 130 | Replacement & Erection of changeover switch 630A/400A/250A | 1 | L/s | |
292 | 131 | Fabrication & Erection of street light four pole tower with suitable platfram & painting Apprx. Height 30 Ft | 1 | L/s | |
293 | 132 | Under feed roller Mills | |||
294 | 132.01 | a) Dismantling | 1 | L/s | |
295 | 132.02 | b) Fabrication | 1 | L/S | |
296 | 133 | Under feeder roller scrapper | |||
297 | 133.01 | a) Dismantling | 1 | L/S | |
298 | 133.02 | b) Fabrication | 1 | L/S | |
299 | 133.03 | c) Erection | 1 | L/S | |
300 | 134 | Fabrication & Erection of man hole with blind cover | 1 | PID/PCs | |
301 | 135 | Dismantling & Erection of Flowmeter | 1 | L/s | |
302 | 136 | Dismantling, Fabrication & Erection of sulphur furnace chamber | 1 | L/s | |
303 | 137 | Dismantling of any structure in the mills & shifting to scrap yard | 1 | PMT | |
304 | 138 | Shifting of any scrap from mill to scrap yard. (Trolley will be provided by Mill) | 1 | PMT | |
305 | 139 | Shfiting & Erection of 2 Nos. Power Turbine Coolers form ground floor to Ist floor | 1 | L/s | |
306 | 140 | Shifting & Erection of 2 Nos. Hot Water Maceration Bottom Tank as per Direction including Dismantling Erection of Pumps, Motor & Pipeline | 1 | L/S | |
307 | 141 | Repair/Build up of any chain sprocked teeth along with girnding as per profile | 1 | Per Teeth | |
308 | 142 | Dismantling & Erection of double beat valve | 1 | L/s | |
309 | 143 | Dismantling, fabrication & erection of sysrup sulphiter | 1 | L/s | |
310 | 144 | Dismantling, Fabrication & erection of downtake of pan, | 1 | L/s | |
311 | 145 | Dismantling, fabrication & Erection of globe valve | 1 | L/s | |
312 | 146 | Dismantling, Fabrication & erection of steam valve (300-600mm) | 1 | L/s | |
313 | 147 | Dismantling, fabrication & erection of washbasin | 1 | L/s |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail