Repair And Rectification Contract For Control And Instrumentation Systems Of Main Plant And Offsite Locations
Tender Overview
Project Description
Repair And Rectification Contract For Control And Instrumentation Systems Of Main Plant And Offsite Locations
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 28-May-2020 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 01-Jun-2020 |
BOQ
| Name of Work: Repair & Rectification Contract for C&I Systems of Main Plant & Offsite Locations | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | PART A – Repair & Rectification Jobs of C&I – Main Plant | |||
| 2 | 1.01 | Cleaning of Flame scanners. | M1 | 3000 | No |
| 3 | 1.02 | Calibration of Flame Scanners. | M2 | 600 | No |
| 4 | 1.03 | Checking, Seals changing and calibration of SADC (corner wise). | M3 | 1500 | No |
| 5 | 1.04 | Control valve and its accessories external cleaning/pneumatic damper and its accessories cleaning. | M4 | 700 | No |
| 6 | 1.05 | Removal, servicing, transportation to & from lab, calibration, refixing & adjustment of - (i)Air filter regulators /lubricators/air lock relays (ii)Pressure switches/Temp switches/level switches (iii)Pressure/flow/dp/vaccuum/temp transmitters. | M5 | 500 | OPR |
| 7 | 1.06 | HEA cleaning, spark checking, removal and fixing. | M6 | 1500 | No |
| 8 | 1.07 | CO, SOx, NOx analyser periodic checking and calibration. | M7 | 200 | OPR |
| 9 | 1.08 | Control panel cleaning(without card removal), LIE cleaning, LIR cleaning inclusive of local instruments (Panel wise ,Rack wise). | M8 | 350 | No |
| 10 | 1.09 | Mill & feeder instrument checking. | M9 | 500 | No |
| 11 | 1.1 | Impulse line checking - Flushing/Poking (transmitter wise/Instrument wise). | M10 | 400 | No |
| 12 | 1.11 | Impulse line checking - Leakage arresting. | M11 | 300 | No |
| 13 | 1.12 | Command and Feed back signal checking at Actuators end. | M12 | 200 | No |
| 14 | 1.13 | Field JB termination tightness checking & JB cleaning. | M13 | 600 | No |
| 15 | 1.14 | SWAS maintenance. | M14 | 800 | OPR |
| 16 | 1.15 | Removal, servicing, transportation to & from lab, calibration, refixing & adjustment of - (i)Pneumatic positioner (ii)AFRs (iii)Solenoid Valves (iv) E/P convertors. | M15 | 400 | OPR |
| 17 | 1.16 | Removal, servicing, transportation to & from lab, calibration, refixing & adjustment of -Limit switches/Pressure gauges /temp Gauges/ Proximity switches/ Flow switches etc. | M16 | 800 | No |
| 18 | 1.17 | Firing Elevation - PM. | M17 | 300 | No |
| 19 | 1.18 | Calibration of pneumatic actuators inclusive of PFT. | M18 | 500 | No |
| 20 | 1.19 | O2 Analyser both low / high temp periodic checking and calibration. | M19 | 150 | No |
| 21 | 1.2 | Routine checking of Category 1 jobs. | M20 | 1500 | OPR |
| 22 | 1.21 | Routine checking of Category 2 jobs. | M21 | 1200 | OPR |
| 23 | 1.22 | Routine checking of Category 3 jobs. | M22 | 1000 | OPR |
| 24 | 1.23 | Checking of field instruments. | M23 | 2000 | OPR |
| 25 | 1.24 | Maintenance of actuators (sol operated) - Minor operation. | M24 | 1500 | OPR |
| 26 | 1.25 | Maintenance of actuators (sol operated) - Major operation. | M25 | 400 | OPR |
| 27 | 1.26 | Maintenance of actuators (sol operated) - Large actuators servicing. | M26 | 65 | OPR |
| 28 | 1.27 | Misc. welding & fabrication works. | M27 | 100 | No |
| 29 | 1.28 | Support during interlock/protection checking. | M28 | 300 | OPR |
| 30 | 1.29 | PM for unit lightups. | M29 | 150 | OPR |
| 31 | 1.3 | Support during lightup. | M30 | 100 | OPR |
| 32 | 1.31 | Support during TDBFP rolling. | M31 | 50 | OPR |
| 33 | 1.32 | Vibration probe checking, replacement (probewise). | M32 | 200 | No |
| 34 | 1.33 | (a) Soot Blowing / (b) ID Fan / (c) FD Fan / (d) PA Fan / (e) AUX PRDS/ (f) APHs (g) BCW pump instruments checking. | M33 | 600 | OPR |
| 35 | 1.34 | Copper tubing (Upto 1/2 inch). | M34 | 300 | Mtr |
| 36 | 1.35 | SS tubing (Upto 3/4 inch). | M35 | 300 | Mtr |
| 37 | 1.36 | Laying of GI Pipes1/2\". | M36 | 150 | Mtr |
| 38 | 1.37 | Laying of GI Pipes 1\". | M37 | 100 | Mtr |
| 39 | 1.38 | Running maintenance of hydraulic actuators. | M38 | 60 | No |
| 40 | 1.39 | Breakdown maintenance of hydraulic actuators. | M39 | 30 | No |
| 41 | 1.4 | Checking of Signal Cables. | M40 | 200 | OPR |
| 42 | 1.41 | Checking of Power Cables. | M41 | 150 | OPR |
| 43 | 1.42 | Minor operation (monthly PM). | M42 | 1400 | OPR |
| 44 | 2 | PART B – Repair & Rectification Jobs of C&I – Offsites | |||
| 45 | 2.01 | Cleaning and servicing of Desalination plant pneumatic actuators/Cylinders. | M44 | 600 | No |
| 46 | 2.02 | Checking and calibration of Desalination plant Instruments. | M45 | 800 | No |
| 47 | 2.03 | Checking and calibration of CT fans’ Vibration pickups and instruments. | M46 | 200 | No |
| 48 | 2.04 | Instruments Checking and calibration of CPU regeneration and service vessel. | M47 | 250 | OPR |
| 49 | 2.05 | Servicing of Pneumatic actuators of CPU regeneration and service vessel. | M48 | 200 | No |
| 50 | 2.06 | PM and BD jobs of CWPH C&I instruments. | M49 | 300 | OPR |
| 51 | 2.07 | PM & BD jobs of Makeup water pump house C&I instruments. | M50 | 120 | OPR |
| 52 | 2.08 | Cleaning, Servicing and calibration of Fuel oil unloading system C&I instruments. | M51 | 120 | OPR |
| 53 | 2.09 | Cleaning and servicing of Fuel oil pressurizing Pump house C&I instruments. | M52 | 120 | OPR |
| 54 | 2.1 | Checking of Ash Water pump house instruments. | M53 | 150 | No |
| 55 | 2.11 | Checking of Ash Slurry system C&I instruments. | M54 | 400 | No |
| 56 | 2.12 | Servicing of pneumatic cylinders & SVs of Ash slurry system. | M55 | 200 | No |
| 57 | 2.13 | Cleaning and servicing Bottom ash power cylinder & instruments. | M56 | 200 | No |
| 58 | 2.14 | Servicing of pneumatic cylinders & solenoid valves of Fly ash system. | M57 | 2000 | No |
| 59 | 2.15 | Cleaning and servicing of Bottom ash and Silo local control panel. | M58 | 100 | OPR |
| 60 | 2.16 | Checking /Purging of Vacuum pumps instruments. | M59 | 250 | No |
| 61 | 2.17 | Cleaning and servicing of Ash silo and buffer hopper C&I instruments. | M60 | 250 | OPR |
| 62 | 2.18 | Checking /calibration of IAC & TAC instruments. | M61 | 360 | No |
| 63 | 2.19 | Cleaning and servicing of CHP Crusher instruments. | M62 | 250 | No |
| 64 | 2.2 | Cleaning and servicing of Stacker and Reclaimer instruments and PLC. | M63 | 350 | No |
| 65 | 2.21 | Checking and Cleaning of Fluid coupling (Hydraulic scoop) instruments. | M64 | 660 | No |
| 66 | 2.22 | Servicing and calibration of CHP Miscellaneous instruments. | M65 | 350 | OPR |
| 67 | 2.23 | Cleaning and servicing of Dust suppression system instruments. | M66 | 600 | No |
| 68 | 2.24 | Cleaning and servicing of LWTP, CSSP and AWRS plant instruments. | M67 | 300 | No |
| 69 | 2.25 | Servicing and checking of Chlorination system instruments and valves. | M68 | 300 | No |
| 70 | 2.26 | Checking, cleaning and servicing of Fire alarm system. | M69 | 500 | No |
| 71 | 2.27 | Healthiness checking of Fiber optic communication. | M70 | 150 | No |
| 72 | 2.28 | Cleaning and closing doors of DCS panels. | M71 | 700 | No |
| 73 | 2.29 | Cleaning of LVS, OWS and Printers. | M72 | 200 | OPR |
| 74 | 2.3 | Cleaning of CCTV cameras (Offsite area). | M73 | 500 | No |
| 75 | 2.31 | Fabrication and welding jobs. | M74 | 300 | OPR |
| 76 | 2.32 | Cleaning and checking the status of 24VDC Charger. | M75 | 400 | OPR |
| 77 | 2.33 | Checking of 24VDC charger batteries healthiness. | M76 | 500 | Set |
| 78 | 2.34 | Cleaning and Checking UPS status. | M77 | 150 | OPR |
| 79 | 2.35 | Checking of UPS batteries healthiness. | M78 | 200 | Set |
| 80 | 2.36 | Instrumentation cable Joining, glanding and termination. | M79 | 500 | No |
| 81 | 2.37 | Removal and restoration of Connections for various instruments during maintenance. | M80 | 1200 | OPR |
| 82 | 2.38 | Checking, cleaning and PM jobs of AAQMS. | M81 | 1300 | No |
| 83 | 2.39 | Cleaning and servicing of Flow meters. | M82 | 400 | No |
| 84 | 2.4 | Checking, cleaning and PM jobs of COD/BOD/TSS analyser system | M83 | 400 | No |
| 85 | 2.41 | Checking, cleaning and PM jobs of CSU PLC & local instruments | M84 | 400 | No |
| 86 | 2.42 | Painting of C&I equipment. | M85 | 200 | OPR |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender