| 1 | 1 | Operation, Maintenance & Repair for a period of 5 (five) years of Bisalpur Jaipur Water Supply Project (Transmission System) from Raw water Intake at Bisalpur dam to Clear water inlet at Balawala CWR. The work includes O & M of Intake Pumping Stations at Bisalpur Dam, Raw water pipeline upto Surajpura, WTP of sludge blanket technology of 600 MLD, CWRs & pump houses at Surajpura, clear water rising main upto Balawala with CP stations, SCADA & Electric lines, GSS, Surge Protection System, all civil structures including buildings and all associated work. It also includes cost of all material, spare parts, labour, consumables, lubricants etc with all related electrical, mechanical ,instrumentation, chlorination and dosing of PAC and Poly Electrolyte. \n(Excluding cost of power charges, PAC, chlorine, Poly electrolyte and Major spares as listed in special conditions of contract). The bidder shall quote only lump sump price for O & M for entire period of 5 years of O & M. The approved total cost for 5 year O&M shall be paid to the contractor in increasing trend in subsequent years, keeping yearly rate of increasing as 5%. | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | Total amount for Five years O&M | BI01010001010000000000000515BI0100001113 | 5 | LS |
|---|
| 3 | 2 | Add extra for Operation for a period of 1 year of defect liability period of new work of augmentation of Pumping machinery at Intake to increase flow from 630 MLD to 820 MLD, construction of 216 MLD outlet capacity WTP extendable upto 360 MLD, clear water Pump house at Surajpura, Construction of 60 ML capacity CWR and Intermediate Pumping Station at Renwal, Electrical works at Intake, Surajpura & Renwal and other misc. works such as surge protection design & providing appropriate protection, construction of residential quarters at Renwal, refurbishment works, SCADA, instrumentation works. \n(Excluding cost of power charges, PAC, chlorine, Poly electrolyte and Major spares as listed in special conditions of contract). The bidder shall quote only lump sump price for operation for entire period of 1 year of Defect Liability period of new work. | BI01010001010000000000000515BI0100001124 | | |
|---|
| 4 | 2.01 | Total amount for One year Operation in DLP of New works | BI01010001010000000000000515BI0100001125 | 1 | LS |
|---|
| 5 | 3 | Add extra for Operation and maintenance for a period of 20 months after defect liability period of new work of augmentation of Pumping machinery at Intake to increase flow from 630 MLD to 820 MLD, construction of 216 MLD outlet capacity WTP extendable upto 360 MLD, clear water Pump house at Surajpura, Construction of 60 ML capacity CWR and Intermediate Pumping Station at Renwal, Electrical works at Intake, Surajpura & Renwal and other misc. works such as surge protection design & providing appropriate protection, construction of residential quarters at Renwal, refurbishment works, SCADA, instrumentation works. \n(Excluding cost of power charges, PAC, chlorine, Poly electrolyte and Major spares as listed in special conditions of contract). | BI01010001010000000000000515BI0100001126 | 20 | Months |
|---|
| 6 | 4 | Providing and mixing of Poly Electrolyte of Anionic Poly acrylamide (High molecular weight polymer with anionic charge, used for potable water treatment) at WTP Surajpura including transportation, loading, unloading including all taxes. | BI01010001010000000000000515BI0100001127 | 32850 | KG |
|---|