Manning And Operation Of Water Supply Installation At Joshimath Under Ge 871 Ews , notes for item sl nos: 1 to 3 ( a ) maintinance of rectification of faults / complaints and replacement of fittings/fixtures and maintaining complaint cell with and including maintenance of necessary records like compliant register , compliant slips , store issue register , iv/rv register , gate pass book , demolition register , scrap register etc complete resposibility of contractor and complete installation with equipments in serviceable condition will be handed over to the contractor for the manning and operation . the as below conditions shall be followed by the contractor while operating the water supply and pump house installations . ( b ) the rate quoted is deemed to be inclusive of the cost of complaint slips , registers and cost of t &p for maint work , area of cleaning and maintenance of pump houses , sub stations , tank and including earth pits and pruning of tree branches and minor consumables such as clips , nut and bolts etc for day to day maintenance . ( c ) the rate quoted is deemed to be inclusive of providing mobile communication system in the complaint cell so that the complaint can be lodged and feed back can be obtained . ( d ) stores/fitting/fixtures shall be issued by the department for replacing unserviceable fittings/fixures viz gi pipes/fittings , gland packing , greese , oil , gate valves chlorination chemical etc where required at no extra cost to the department . to the extent available in the stores . ( e ) the contractor has to supply uniform to their employees for wearing during the working hours . the unit rate is deemed to include for the uniform . the uniform shall be in blue colour pant and shirt . the pattern of the uniform shall be as decided by the engineer-in-charge . ( f ) technician/employees employed by the contractor will not work contineously for 07 days . the employees worked for six days contineously should be given one day off with payment as per the contract labour act as referred in condition 58 of iafw-2249 . ( g ) the contractor is responsible for maintenance of compliant cell the compliants to the individuals under consultation with concerned je e/m . ( h ) the contractor is responsible for submitting the doccuments of qualification/experience certificates of technicians to be employed before comencement of work . ( j ) the operator should be iti qualified from any recognised institute and between 18 yrs to 60yrs of age and shall be responsible for the operation ( k ) operating the control valve of main supply from the receiving source in collection chamber and cleaning the chamber at time to time as directed by engr-in-charge/je e/m and removal the deposite meterial away from the site incl operation of alum dozer . ( l ) checking and watching for leakage break down of receiving pipe from main source/supply/distribution pipe line complete inside the water point complex and inform immediate to engr-in-charge . ( m ) no shift duty person will leave the duty place without releiver . if any person found absent form duty place while checking by the je concerned or any higher authority at any time , absent will be marked in attendance register and penalty should be recovered from the payment as specified . ( n ) the contractor will be responsible for any damage to the installation/plant due to the mishandling of the equipment , he will make good the same at his own risk and cost . decision regarding responsibility of the fault/damage will be decided by ge , his decision will be final and binding . ( o ) the contractor supply and maintain the log book for pump sets/record of water supply system , attendance register , chlorination record register , in take chamber cleaning/wash out record , sedimentation cleaning record filter bed back wash record , pure water tank wash record , break down record register and maintenance register of water source . the cost of stationery shall be quoted while quoting the rates . ( p ) the contractor will ensure general cleanliness of the complete installation , their equipments and installation compound and its surrounding area etc as directed by engr-in-charge . , manning and operation for water supply installation at joshimath area including sunday & holiday by deploying the below mentioned manpower as per the timing given :- ( a ) shift timings are as under :- ( i ) 1st shift : 0500 hrs to 1300 hrs ( ii ) 2nd shift : 1300 hrs to 2100 hrs ( b ) man power to be employed ( by out sourcing ) :- ( i ) valve man - 01 nos , skilled ( 01 no for ist shift . ) ( ii ) mate valve man - 01 nos , semi skilled ( 01 no for 2nd shift . ) , manning and operation of water point/installation at 25 mfvh under ge 871 ews including sunday/holiday by deploying the below mentioned manpower as per timing given :- ( a ) shift timings are as under :- ( i ) 1st shift : 0500 hrs to 1300 hrs ( ii ) 2nd shift : 1300 hrs to 2100 hrs ( b ) man power to be employed ( by out sourcing ) :- ( i ) mate valve man - 02 nos , semi skilled ( 01 no in 1st shift and 01 no in 2nd shift . ) , manning and operation ( by out sourcing man power ) of water supply distribution system in general day shift of 0800 hours continueous duration including sunday and holiday by employing the manpower as mentioned below for entire maintenance of water supply system comprising of gi/ms/pvc/pp-r water supply pipe lines , pump sets , sluice valves , nrvs , gate valves , air vent valves and connected fittings and fixtures by deploying the below mentioned man power as per the timing given :- ( a ) shift timings are as under :- ( i ) general day shift : 0930 hrs to 1800 hrs , with lunch break from 1330 to 1400 hrs . ( b ) man power to be employed ( by out sourcing ) :- ( i ) mate fgm/valve man , semi skilled - 03 nos in general shift . , supply and fix in replacement of gi nipple 15 mm dia 100 mm long suitable for medium grade gi pipe , isi marked . , supply and fix in replacement of gi nipple 20 mm dia 100 mm long suitable for medium grade gi pipe , isi marked . , supply and fix in replacement of gi nipple 25 mm dia 100 mm long suitable for medium grade gi pipe , isi marked . , supply and fix in replacement of gi nipple 40 mm dia 100 mm long , suitable for medium grade gi pipe isi marked , supply and fix in replacement of gi nipple 50 mm dia 100 mm long , suitable for medium grade gi pipe isi marked , supply and fix in replacement of gi nipple 80 mm dia 100 mm long , suitable for medium grade gi pipe isi marked , supply and fix in replacement of gi nipple 100 mm dia 100 mm long , suitable for medium grade gi pipe isi marked , supply and fix in replacement of gi reducer socket 20 mm / 15 mm dia suitable for gi pipe medium grade isi marked . , supply and fix in replacement of gi reducer socket 25 mm / 15 mm dia suitable for gi pipe medium grade isi marked . , supply and fix in replacement of gi reducer socket 25 mm / 20 mm dia suitable for gi pipe medium grade isi marked . , supply and fix in replacement of gi reducer socket 40 mm / 25 mm dia suitable for gi pipe medium grade isi marked . , supply and fix in replacement of gi elbow 15 mm dia suitable for gi pipe medium grade isi marked . , supply and