Power Boards / Undertakings / PSU Closing in 0 days TDR #24231223

Capital Work - Renewing Existing 110Kv Bus Double Kundah Conductor With Acsr Bersimis Triple Conductor And Polymer Insulator At 220Kv Substation Nallalam, Phase1 Of Part D Of Nrhtls

Issued by Boards / Undertakings / PSU · Nallalam, Kerala
Tender Value
12.64 Lakhs
Estimated cost
Bid Submission
15 May 2020
0 days left
EMD
37500
Bank guarantee accepted
Document Fee
5950
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Nallalam → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Capital work - Renewing existing 110kV Bus double kundah conductor with ACSR Bersimis triple conductor and polymer insulator at 220kV Substation Nallalam, Phase1 of Part D of NRHTLS

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 12-May-2020 Corrigendum1 Tme extention Date 15-May-2020

BOQ

Name of Work: Capital work - Renewing existing 110kV Bus double kundah conductor with ACSR Bersimis triple conductor and polymer insulator at 220kV Substation Nallalam, Phase1 of Part D of NRHTLS
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Dismantling,unstringing and coiling of bus bar of ACSR Kundah / Moose single conductor for one phase of 110KV bus of span up to 30M by losening the bolts on both ends, dismantling and stacking of the insulator discs, dismantling the conductors from the yard structure with suitable tool and tackles and dismantling bolted hardwares and arching horns etc from conductor including transportation of materials from the site to the stockyard under the supervision and direction of department staff at site:dismantling upto 30m span30set
22Dismantling,unstringing , paving in and coiling of bus bar of ACSR Kundah / Moose Double conductor for one phase of 110KV bus of span up to 35M by losening the bolts on both ends, dismantling and stacking of the insulator discs, dismantling the conductors from the yard structure with suitable tool and tackles and dismantling bolted hardwares and arching horns etc from conductor including transportation of materials from the site to the stockyard under the supervision and direction of department staff at site.dismantling upto 30m span45No.
33Stringing and fixing earth wire of size 7/9, 7/10 or 7/3.15 between top of the columns and to terminal tower at 33/66/110/220KV substations with compressed / bolted ends at proper tension including uncoiling and cutting of conductor , jumpering, giving earth bond connections by drawing the end of the conductor through the columns, jointing where ever necessary providing back stays at the time of stringing etc. as per the direction of the departmental officers.28No.
44Unstringing and dismantling earth wire of size 7/9, 7/10 or 7/3.15 between top of the columns and to terminal tower at 33/66/110/220KV substations by cutting compressed or loosening bolted ends and lowering with suitable tool and tackles including coiling and cutting of conductor , dismantling jumber and earth bond connections where ever necessary providing back stays at the time of unstringing etc. as per the direction of the departmental officers: Dismantling earth wire28No
55Dismantling interconnection between equipments using ACSR Moose/ Kundah/ wolf Single conductor at both endsby loosening bolted ends including coiling and cutting of conductor as per the direction of departmental officers.12No
66Disconnecting to lines / equipments or jumper between two buses and Dismantling droppers without suspension insulators using ACSR Moose/ Kundah/ wolf Single conductor at both ends by removing bolted ends including coiling and cutting of conductor as per the direction of departmental officers. (For one phase)108No
77Dismantling interconnection between equipments using ACSR Moose/ Kundah/ wolf Double conductor at both ends by removing bolted ends , dismantling spacers as directed, including coiling and cutting of conductor as per the direction of departmental officers. (For one phase)12No
88Disconnecting from lines / equipments or jumper between two buses and Dismantling droppers without suspension insulators using ACSR Moose/ Kundah/ wolf Double conductor at both endsby removing bolted ends ,dismantling spacers as directed, including coiling and cutting of conductor as per the direction of departmental officers. (For one phase)36No
99Dismantling droppers and disconnecting from lines /equipments or jumper between two buses and dismantling&stacking of suspension insulators for 33kV/66kV/110kV/220kV using ACSR Moose/ Kundah/ wolf Double conductor at both endsby removing bolted ends, dismantling spacedrs as directed, including coiling and cutting of conductor as per the direction of departmental officers. (For one phase)42No
1010Uncoiling, paving out, stringing and fixing of bus bar using ACSR Bersimis single conductor for one phase of 66/110KV bus of span up to 30M by cutting the conductor to sufficient length, crimping using compressor / bolting the two ends, washing, cleaning and drying the Polymer insulator, fixing the conductors to the yard structure with sufficient tension using double string of polymer insulators and hardware complete. at both ends, fixing of arcing hornes including transportation of materials from the stockyard to the site under the supervision and direction of department staff at site. (All materials will be supplied departmentally at free of cost).30Set
1111Uncoiling, paving out, stringing and fixing of bus bar using ACSR Bersimis Triple conductor for one phase of 110KV bus of span up to 35M by cutting the conductor to sufficient length, crimping using compressor / bolting the four ends, washing, cleaning and drying the polymer insulator, fixing the conductors to the 110kV yard structure with sufficient tension using string of double/single tension polymer insulators and hardware's complete. at four ends, fixing of arcing hornes at both ends, fixing of spacers between two conductors at regular intervals as specified by the dept. staff at site, including transportation of materials from the stockyard to the site under the supervision and direction of department staff at site. (All materials will be supplied departmentally at free of cost).45No
1212Providing interconnection between equipments using ACSR Bersimis Single conductor at both ends with compressed/ bolted ends including uncoiling and cutting of conductor as per the direction of departmental officers.33No
1313Providing droppers and connecting to lines / equipments or jumper between two buses from a tripple/ quad formation of bus without suspension insulators using ACSR Bersimis Single conductor at both ends with compressed/ bolted ends fixing of spacers between two conductors at regular intervals as specified by the dept. staff at site including uncoiling and cutting of conductor as per the direction of departmental officers. (For one phase)6No
1414Providing interconnection between equipments using ACSR Bersimis Double conductor at both ends with compressed/ bolted ends fixing of spacers between two conductors at regular intervals as specified by the dept. staff at site including uncoiling and cutting of conductor as per the direction of departmental officers.3No
1515Providing interconnection between equipments using ACSR Bersimis triple conductor at both ends with compressed/ bolted ends fixing of spacers between two conductors at regular intervals as specified by the dept. staff at site including uncoiling and cutting of conductor as per the direction of departmental officers.9No
1616Providing droppers and connecting to lines / equipments or jumper between two buses without suspension insulators from Double /Tripple/Quad bus formation using ACSR bersimis Double conductor at both ends with compressed/ bolted ends , fixing spacers at regular intervals as directed, including uncoiling and cutting of conductor as per the direction of departmental officers. (For one phase)84No
1717Providing droppers and connecting to lines / equipments or jumper between two buses without suspension insulators from Tripple/Quad bus formation using ACSR Bersimis Triple conductor at both ends with compressed/ bolted ends fixing of spacers between two conductors at regular intervals as specified by the dept. staff at site including uncoiling and cutting of conductor as per the direction of departmental officers. (For one phase)6No
1818Providing droppers and connecting to lines / equipments or jumper between two buses with necessary suspension insulators from Tripple/Quad bus formation for 33kV/66kV/110kV/220kV using ACSR Bersimis Triple conductor at both ends with compressed/ bolted ends, fixing spacedrs at regular intervals as directed, including uncoiling and cutting of conductor as per the direction of departmental officers. (For one phase)45No
1919Drilling holes in yard structure800Hole
2020Cutting of steel angle in yard structure erection350Cut

AI Tender Summary

OUR REF NO 24231223
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 12.64 Lakhs
LAST DATE 15-05-2020
Authority
Authority Name Kerala State Electricity Board
Work Description Capital work - Renewing existing 110kV Bus double kundah conductor with ACSR Bersimis triple conductor and polymer insulator at 220kV Substation Nallalam, Phase1 of Part D of NRHTLS
Basic Detail
Tender No SSDN-01/20-21
Bidding Type Tender
Location
City Nallalam
State Kerala
Key Dates
Publish Date 12 May 2020
Submission Date 15 May 2020
Open Date 20 May 2020
Finance
Tender Value 12.64 Lakhs
Tender Fee 5950
EMD 37500
Exemption Not Available
Document List
7201AE9F-5F8C-44D8-AB1D-3BC76703C0EE.html
BOQ_498217.xls
gst.pdf
Tendercondition.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

May 12, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
May 15, 2020
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 15, 2020
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
May 20, 2020

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

7201AE9F-5F8C-44D8-AB1D-3BC76703C0EE.html

xls

BOQ_498217.xls

pdf

gst.pdf

pdf

Tendercondition.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders