| 1 | 1 | Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay. Stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, as per standard specification, etc., complete. | item 1 | 70 | m3 |
|---|
| 2 | 2 | Earth work excavating and depositing on bank with initial lead of 10m and initial llift of 2.0m in soft disintegrated rock, laterite, soft rock (or) kankar not requiring blasting, as per standard specification, etc., complete. | item 2 | 30 | m3 |
|---|
| 3 | 3 | Filling with M- sand for the foundation and floor including cost of M-sand, filling charges, with all leads and lifts, watering, consolidation etc., complete. | item 3 | 5 | m3 |
|---|
| 4 | 4 | Plain cement concrete in CC 1:4:8, using 40mm HBG metal including cost of cement, all materials, labour charges including consolidation, curing, all leads, lifts, as per standard specification etc., complete. | item 4 | 4.5 | m3 |
|---|
| 5 | 5 | Reinforced Cement concrete in C.C. 1:1½:3 mix, using 12 to 20mm HBG machine crushed metal for Gate pillar footing including cost of cement, all materials, labour, curing, all leads and lofts vibrating charges including cost of shuttering as per standard specification, etc., complete. but excluding cost of steel reinforcement. | item 2 | 1 | m3 |
|---|
| 6 | 6 | Reinforced Cement concrete in C.C. 1:1½:3 mix, using 12 to 20mm HBG machine crushed metal for Gate pillar up to FGL including cost of cement, all materials, labour, curing, all leads and lofts vibrating charges including cost of shuttering as per standard specification, etc., complete. but excluding cost of steel reinforcement. | item 3 | 0.5 | m3 |
|---|
| 7 | 7 | Reinforced Cement concrete in C.C. 1:1½:3 mix, using 12 to 20mm HBG machine crushed metal for Gate pillar above GL including cost of cement, all materials, labour, curing, all leads and lofts vibrating charges including cost of shuttering as per standard specification, etc., complete. but excluding cost of steel reinforcement. | item 4 | 1 | m3 |
|---|
| 8 | 8 | Providing steel reinforcement MS/RTS rods upto16mm dia for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, labour charges for cutting, straightening bending as per type design drawing, placing aligning, and tying properly with all leads and lift as per standard specification, etc., complete. | item 3 | 300 | Kg |
|---|
| 9 | 9 | Wall Plastering with CM 1:5 12 mm thick for wall including cost of cement, labour, curing, all leads and lifts etc., complete as per standard specification.. | item 4 | 260 | m2 |
|---|
| 10 | 10 | Fabricating,& supplying and fixing of Main gate using structural steel angles, flats, plates, squares etc., as per specification and as directed and painting with two coats of approved colour enamel paint over one coat of red oxide primer including cost of steel and painting materials, lead, lift, labour, as per standard specification, etc., complete. | item 2 | 500 | Kg |
|---|
| 11 | 11 | Supplying and fixing of 40 mm dia PVC pipe 10 Kg/cm2 (Shell thickness 2 to 3 mm) of appd. Quality for water supply line from water sump and delivery line including cost of pipe, bend, elbow, labour for cutting, threading, and fixing in position, testing all materials, solution, lead, lift etc., complete. | item 3 | 85 | Rm |
|---|
| 12 | 12 | Supplying and fixing of 25 mm dia PVC pipe 10Kg/cm2 (Shell thickness 2 to 3 mm) for water supply line, including cost of pipe, bend, elbow, labour for cutting, threading, and fixing in position, testing all materials, solution, lead, lift etc., complete. | item 4 | 370 | Rm |
|---|
| 13 | 13 | Random rubble masonry in C.M.1:6 for foundation and basement including cost of all materials, lead, lifts, labour and curing charges etc., complete. | item 3 | 29 | m3 |
|---|
| 14 | 14 | Cement solid Block in CM 1:5 using 15 cm cement solid block for super structure including cost of all materials, labour charges, curing,scaffolding charges all leads and lifts etc., complete and as directed by Engineer. | item 4 | 11 | m3 |
|---|
| 15 | 15 | Supplying and fixing of 40 mm dia GM ball valve appd. Quality for water supply line including labour, lead, lift and fixing in position etc., complete. | item 4 | 2 | No |
|---|
| 16 | 16 | Supplying and fixing of 25 mm dia GM ball valve appd. Quality for water supply line including labour, lead, lift and fixing in position etc., complete. | item 13 | 2 | No |
|---|
| 17 | 17 | Pointing with CM 1:3 for R.R. walls including cost of all materials, labour curing charges, all leads & lifts etc., complete. | item 13 | 38 | M2 |
|---|
| 18 | 18 | GST | item 44 | | |
|---|
| 19 | 18.01 | SGST For bidders within Tamilnadu | item 45 | 1 | percentage |
|---|
| 20 | 18.02 | CGST For Bidders within Tamilnadu | item 46 | 1 | percentage |
|---|
| 21 | 18.03 | IGST For Bidders outside of Tamilnadu | item 47 | 1 | percentage |
|---|