}

Consultancy Services For Authority Engineer For Supervision Of ( I ) Widening /Improvement To 2 Lane With Earthen Shoulder Of Yaingangpokpi-Finch Corner Section From Km 0 . 00 To Km 30 . 970 Of Nh 202 In The State Of Manipur On Epc Mode ., Manipur-Manipur

National Highways and Infrastructure Development Corporation Limited-NHIDCL has published Consultancy Services For Authority Engineer For Supervision Of ( I ) Widening /Improvement To 2 Lane With Earthen Shoulder Of Yaingangpokpi-Finch Corner Section From Km 0 . 00 To Km 30 . 970 Of Nh 202 In The State Of Manipur On Epc Mode .. Submission Date for this Tender is 10-06-2020. Consultancy Service Tenders in Manipur Manipur. Bidders can get complete Tender details and download the document.




Tender Notice

24218751
Consultancy Services For Authority Engineer For Supervision Of ( I ) Widening /Improvement To 2 Lane With Earthen Shoulder Of Yaingangpokpi-Finch Corner Section From Km 0 . 00 To Km 30 . 970 Of Nh 202 In The State Of Manipur On Epc Mode .
Open Tender
Indian
Manipur
Manipur
10-06-2020

Tender Details

Consultancy Services For Authority Engineer For Supervision Of ( I ) Widening /Improvement To 2 Lane With Earthen Shoulder Of Yaingangpokpi-Finch Corner Section From Km 0 . 00 To Km 30 . 970 Of Nh 202 In The State Of Manipur On Epc Mode .

Key Value

Document Fees
INR 5000 /-
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: Consultancy Services for Authority’s Engineer for Supervision of “CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Widening /Improvement to 2 (Two) Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section from km 0.00 to km 16.900 (length 16.900km) of NH 202 in the State of Manipur on EPC mode. (ii) Widening /Improvement to 2 (Two) Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section from km 16.900 to km 30.970 (length 14.070km) of NH 202 in the State of Manipur on EPC mode.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Remuneration for Local Staff (inclusive of per Diem allowance) BI01010001010000000000000515BI0100001112
2 1.01 Team Leader Cum Senior Highway Engineer BI01010001010000000000000515BI0100001113 24 Man Months
3 1.02 Resident cum Highway Engineer \n BI01010001010000000000000515BI0100001114 84 Man Months
4 1.03 Bridge/Structural Engineer BI01010001010000000000000515BI0100001115 24 Man Months
5 1.04 Senior Pavement Specialist BI01010001010000000000000515BI0100001116 24 Man Months
6 1.05 Senior Quality cum Material Expert BI01010001010000000000000515BI0100001117 24 Man Months
7 1.06 Road Safety Expert BI01010001010000000000000515BI0100001118 24 Man Months
8 1.07 Sub-Professional Staff BI01010001010000000000000515BI0100001119
9 1.08 Survey Engineer BI01010001010000000000000515BI0100001120 24 Man Months
10 1.09 Assistant Quality cum Material Engineer BI01010001010000000000000515BI0100001122 54 Man Months
11 1.1 Lab Technician BI01010001010000000000000515BI0100001123 24 Man Months
12 1.11 Quantity Surveyor BI01010001010000000000000515BI0100001124 84 Man Months
13 2 Support Staff (inclusive of per diem allowance) BI01010001010000000000000515BI0100001125
14 2.1 Office Manager cum Accountant BI01010001010000000000000515BI0100001126 84 Man Months
15 2.2 Steno cum Computer Operator BI01010001010000000000000515BI0100001127 84 Man Months
16 2.3 Office Boy BI01010001010000000000000515BI0100001128 84 Man Months
17 3 Transportation (Fixed Costs) BI01010001010000000000000515BI0100001129
18 3.1 Innova/scorpio or equivalent (not more than 2 years old) (2 nos during Construction Period), \n2*24=48\nRate per month BI01010001010000000000000515BI0100001130 48 Months
19 3.2 Innova/scorpio or equivalent (not more than 2 years old) (1 nos during Maintenance period/DLP), \n1*60=60\nRate per month BI01010001010000000000000515BI0100001131 60 Months
20 4 Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare (including Hotel Charges,travel costs etc. complete BI01010001010000000000000515BI0100001132
21 4.1 For 12 round trip to Employer's Head Office BI01010001010000000000000515BI0100001133 12 Nos
22 4.2 For 12 round trip to Employer's regional office. BI01010001010000000000000515BI0100001134 12 Nos
23 5 Office Rent (Fixed Costs) \nThe rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)\n BI01010001010000000000000515BI0100001135
24 5.1 During Construction period \n BI01010001010000000000000515BI0100001136 24 Months
25 5.2 During Maintenance /DLP period \n BI01010001010000000000000515BI0100001137 60 Months
26 6 Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month BI01010001010000000000000515BI0100001138
27 6.1 Office Supplies \n(1*24+1*60)=84 BI01010001010000000000000515BI0100001139 84 Months
28 6.2 Drafting Supplies \n(1*24+1*60)=84 BI01010001010000000000000515BI0100001141 84 Months
29 6.3 Computer Running Costs \n(1*24+1*60)=84 BI01010001010000000000000515BI0100001143 84 Months
30 6.4 Domestic and International Communication \n(1*24+1*60)=84 BI01010001010000000000000515BI0100001145 84 Months
31 7 Office Furniture and Equipment (Rental)\nOffice furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc., BI01010001010000000000000515BI0100001147
32 7.1 During Construction period \n BI01010001010000000000000515BI0100001148 24 Months
33 7.2 During Maintenance /DLP period BI01010001010000000000000515BI0100001149 60 Months
34 8 Reports and Document Printing ( rate as per copy) BI01010001010000000000000515BI0100001150
35 8.1 Monthly reports\n(Design and Construction) BI01010001010000000000000515BI0100001151 252 Copy
36 8.2 Half yearly Reports BI01010001010000000000000515BI0100001152 42 Copy
37 8.3 Various others reports as provided in the Concession Agreement such as Completion Report BI01010001010000000000000515BI0100001153 1 LS
38 9 Road Survey Equipment, Rate per Km BI01010001010000000000000515BI0100001154
39 9.1 Surface defects detection and roughness measurement using Network Survey Vehicle BI01010001010000000000000515BI0100001155 340.67 Km
40 9.2 Pavement strength measurement using FWD BI01010001010000000000000515BI0100001156 154.85 Km
41 9.3 Road signs inspection using Retro Reflectometer BI01010001010000000000000515BI0100001158 340.67 Km
42 10 Contigencies\nA fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. \n(Fixed as Rs. 10,00,000) BI01010001010000000000000515BI0100001159 1 LS
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail