}

Ktps-V&Vi Stages-Civil-O&M-I-Modification Of Rooms In Ash Handling Plant To Establish New Panel Room At Ktps-V Stage, Paloncha., BHADRADRI KOTHAGUDEM-Telangana

Telangana Power Generation Corporation Limited has published Ktps-V&Vi Stages-Civil-O&M-I-Modification Of Rooms In Ash Handling Plant To Establish New Panel Room At Ktps-V Stage, Paloncha.. Submission Date for this Tender is 11-05-2020. Civil Work Tenders in BHADRADRI KOTHAGUDEM Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

24210592
Ktps-V&Vi Stages-Civil-O&M-I-Modification Of Rooms In Ash Handling Plant To Establish New Panel Room At Ktps-V Stage, Paloncha.
Open Tender
Indian
Telangana
BHADRADRI KOTHAGUDEM
11-05-2020

Tender Details

Ktps-V&Vi Stages-Civil-O&M-I-Modification Of Rooms In Ash Handling Plant To Establish New Panel Room At Ktps-V Stage, Paloncha.

Key Value

Document Fees
Refer document
EMD
INR 8321.0 /-
Tender Value
INR 5.54 Lakhs /-

BOQ Items

S.No Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)
1 Modification of rooms in AHP Tech Specn 1.00 No 7191.00 7191.00
Supply and fixing of door shutter single leaf door by using 35mm thick BRAND FACTORY MADE MOULDED DOOR SHUTTER consisting of solid core single leaf flush door of 30mm thickness, lipped with 15mm (5mmX3) thick X 30mm width on one stiles and top rails and 10mm (5mmX2) thick X 30mm width on the other stiles and bottom rails. The inner panel laminated with 2mm thick termite proof, water proof and fire resistant moulded Pac sheet with 2,4,6 raised panel design in different panel and / or prelam colours on one side after routing the moulded design on flush door and 2mm prelam Pac sheet on other side using rubber adhesive on flush door and solvent cement adhesive on Pac lipping ,all required fixtures and fitting such as MS Powder coated hinges 100 mm size, MS powder coated Al.drops 300 mm size , MS powder coated tower bolts 250 mm size, MS Powder coated handles 150 mm long , Nylon silencers 40 mm size, Wooden wind cleats , etc.etc. complete at entrance as per direction of Engineer-in-Charge.
2 Modification of rooms in AHP Tech Specn 170.00 M2 934.00 158780.00
Flooring with vitrified tiles with glassy finish with double charged of size 0.75x1.20m of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc.,complete for finished item of work and as directed by the Engineer-in charge. (Cement will be issued by department at free of cost).
3 Modification of rooms in AHP Tech Specn 792.00 M2 112.00 88704.00
"Painting to the walls with 2 coats of acrylic emulsion paint interior grade of approved brand and shade over a base coat of approved cement primer grade I making 3 coats in all to give an even shade after throughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per standard specifications and as directed by the engineer in charge
4 Modification of rooms in AHP Tech Specn 677.00 M2 147.00 99519.00
Providing and applying synthetic plaster putty or plaster of paris putty or lime running of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand over the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife/muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to site, all operational, incidental, labour charges etc. complete for finished item of work for internal walls as per standard specifications and as directed by the Engineer in charge.
5 Modification of rooms in AHP Tech Specn 186.00 M2 357.00 66402.00
"Plastering with cement mortar two coats, 20mm thick, base coat in CM(1:4),12mm thick and top coat in CM(1:3),8mm thick with sponze finish for uneven surfaces of brick masonry walls,side faces of openings etc . in restricted areas including cost and conveyance of all materials,all labour charges with all leads and lifts, scaffolding charges,seigniorage,incidental and operational charges, groove cutting,curing etc, complete for finished item of work as directed by EIC but excluding cost of cement which will be supplied by department at department stores free of cost.
6 Modification of rooms in AHP Tech Specn 24.00 M3 3622.00 86928.00
"Construction of brick masonry in CM (1:5) using fly ash bricks of approved quality having minimum crushing strength of 75Kg/Sq.cm for walls,pillasters etc. in restricted areas including cost and conveyance of all materials, all labour charges, all leads and lifts, scaffolding charges, curing, incidental and operational charges, seigniorage charges etc.,complete for finished item of work as directed by Engineer-in-charge but excluding cost of cement which will be supplied by department at department stores at free of cost."
7 Modification of rooms in AHP Tech Specn 13.00 M3 2443.00 31759.00
Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture for into foundation trench.The rate including cost and conveyance of all materials and all labour charges machine mixing charges curing charges, with all leads and lifts etc., complete for finished item of work (Cement will be supplied by dept at free of cost.)
8 Modification of rooms in AHP Tech Specn 127.00 M3 30.00 3810.00
Dismantling, cleaning & removal of existing tiles and disposing the debris at a specified space and disposing the same outside the premises with a lead of 5kms including all labour charges, all leads and lifts, T&P, levies, any incidental charges etc., complete for the finished item of work and as directed by the Engineer-in-Charge.
9 Modification of rooms in AHP Tech Specn 41.00 M3 284.00 11644.00
Dismantling, cleaning & removal of existing walls & windows and doors and disposing the debris at a specified space and disposing the same outside the premises with a lead of 5kms including all labour charges, all leads and lifts, T&P, levies, any incidental charges etc., complete for the finished item of work and as directed by the Engineer-in-Charge.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail