Power Boards / Undertakings / PSU Closing in 0 days TDR #24206022

Design , Fabrication , Supply , Erection , Testing And Commissioning Of Penstocks And Steel In-Liners In Umrong System Of Kopili Hydro Electric Project ( 275 Mw ) , Assam Design , Fabrication , Supply , Erection , Testing And Commissioning Of

Issued by Boards / Undertakings / PSU · Kopili H.E. Project, Umrongso, Assam-, Assam
Tender Value
198.03 Crore
Estimated cost
Bid Submission
09 Jul 2020
0 days left
EMD
3.96 Crore
Bank guarantee accepted
Document Fee
23600
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kopili H.E. Project, Umrongso, Assam- → Assam
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Design , Fabrication , Supply , Erection , Testing And Commissioning Of Penstocks And Steel In-Liners In Umrong System Of Kopili Hydro Electric Project ( 275 Mw ) , Assam Design , Fabrication , Supply , Erection , Testing And Commissioning Of Penstocks And Steel In-Liners In Umrong System Of Kopili Hydro Electric Project ( 275 Mw ) , Assam

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 28-Apr-2020 Corrigendum No. 1 Dated 28-04-2020 Other 21-May-2020
2 19-May-2020 Corrigendum No. 2 Dated 19-05-2020 Date 18-Jun-2020
3 19-May-2020 Pre-Bid Clarifications No. 1 Dtd. 19-05-2020 Technical Bid 18-Jun-2020
4 01-Jun-2020 Pre-Bid Clarifications No. 2 Dated 01-06-2020 Technical Bid 18-Jun-2020
5 11-Jun-2020 Pre-bid Clarifications No. 3 Dtd. 11-06-2020 Technical Bid 09-Jul-2020
6 17-Jun-2020 Pre-bid Clarifications No. 4 Dated 17-06-2020 Technical Bid 09-Jul-2020
7 26-Jun-2020 Pre-bid Clarifications No. 5 Dated 26-06-2020 Technical Bid 09-Jul-2020
8 01-Jul-2020 Pre-bid Clarifications No. 6 Dtd. 01-07-2020 Technical Bid 09-Jul-2020
9 04-Jul-2020 Pre-bid Clarifications No. 7 Dated 04-07-2020 Technical Bid 09-Jul-2020

BOQ

Name of Work: Design, Fabrication, Supply, Erection, Testing & Commissioning of Penstock and Steel In-Liners in Umrong System of Kopili Hydro Electric Project (275 MW), Assam
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11A. PENSTOCK ( D/S OF AB-1 TO U/S OF AB-8 INCLUDING REDUCER BEYOND D-LINE)item1
21.1Design, Fabrication, painting (exterior surface) supply, transportation, handling, site storage, erection and commissioning (including provision for all labour, tools and tackles) of Penstock including bend and stiffeners between d/s OF AB-1 to u/s AB-8 including reducer beyond D-Line on the concrete saddle supports including supply, fabrication and fixing of saddle plates, bearing plates and necessary embedment complete in all respect as per design, drawing and technical specificationitem23060MT
31.2Design, Fabrication, painting (Exterior Surface), supply, transportation, handling, site storage, erection and commissioning (including provision for all labour, tools and tackles) of Expansion Joints and Manholes including supply, fabrication and fixing of flanges, seals, ladders to approach Manhole, nut & Bolts and others complete in all respect as per design, drawing and technical specification.item3100MT
41.3Radiographic testing for welded joint as per specification and as directed complete.item41672RM
51.4Ultrasonic testing for all field welded joints as per specification and as directed complete.item55670RM
61.5Magnetic Particle Test of all field Joints as per specification and as directed completeitem65670RM
71.6Hydro Test of each penstock ferrules, bends and reducer after fabrication as per approved details. Supply, fabrication, transportation, handling, fixing, dismantling, sealing etc. of test jig, flanges, bulkhead, pipes, valves and other necessary arrangement required for satisfactory performance of the test as per design, drawing and specification shall be also be included.item73060MT
82B. STEEL IN-LINER ( IN HRT AND BETWEEN U/S OF AB -8 TO D-LINE)item13
92.1Design, fabrication, supply, transportation, handling, site storage & erection (including provision for all labour, tools and tackles) of in-liners in the existing steel/concrete sections of HRT and Penstocks including provision of grout holes & plugging, Antipercolation rings and back strip for field welding complete as per design, drawing and technical specification.item142100MT
102.2Ultrasonic testing for all field welded joints as per specification and as directed complete.item154940RM
112.3Magnetic Particle Test of all field Joints as per specification and as directed completeitem164940RM

AI Tender Summary

OUR REF NO 24206022
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 198.03 Crore
LAST DATE 09-07-2020
Authority
Authority Name North Eastern Electric Power Corporation Limited
Work Description Design , Fabrication , Supply , Erection , Testing And Commissioning Of Penstocks And Steel In-Liners In Umrong System Of Kopili Hydro Electric Project ( 275 Mw ) , Assam Design , Fabrication , Supply , Erection , Testing And Commissioning Of Penstocks And Steel In-Liners In Umrong System Of Kopili Hydro Electric Project ( 275 Mw ) , Assam
Basic Detail
Tender No NIB No. 353 Dated 23-04-2020
Bidding Type Tender
Location
City Kopili H.E. Project, Umrongso, Assam-
State Assam
Key Dates
Publish Date 04 Jul 2020
Submission Date 09 Jul 2020
Open Date 10 Jul 2020
Finance
Tender Value 198.03 Crore
Tender Fee 23600
EMD 3.96 Crore
Exemption Not Available
Document List
A98101AE-A1BC-435A-AE22-1009EFF9B3D6.html
BOQ_50762.xls
BidDocumentPartI.rar
BidDocumentPartII.rar
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 04, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
May 21, 2020
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 18, 2020
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 18, 2020
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 18, 2020
18:00 IST

Corrigendum-4 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 09, 2020
18:00 IST

Corrigendum-5 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 09, 2020
18:00 IST

Corrigendum-6 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 09, 2020
18:00 IST

Corrigendum-7 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 09, 2020
18:00 IST

Corrigendum-8 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 09, 2020
18:00 IST

Corrigendum-9 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 09, 2020
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jul 10, 2020

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

A98101AE-A1BC-435A-AE22-1009EFF9B3D6.html

xls

BOQ_50762.xls

rar

BidDocumentPartI.rar

rar

BidDocumentPartII.rar

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender