Renovation Of Ground Floor With Toilets And Annex Building At Btps Guest House . , Renovation Of Ground Floor With Toilets And Annex Building At Btps Guest House . , Earth Work In Excavation Of Foundation Trenches Or Drains , In All Sorts Of Soil ( Including Mixed Soil Butexcluding Laterite Or Sandstone ) Including Removing , Spreading Or Stacking The Spoils Within A Lead Of 75 M . As Directed . The Item Includes Necessary Trimmingthe Sides Of Trenches , Levelling , Dressing And Ramming The Bottom , Bailing Out Water As Required Complete . , Earth Work In Filling In Foundation Trenches Or Plinthwith Good Earth , In Layers Not Exceeding 150 Mm . Including Watering And Ramming Etc . Layer By Layer Complete . ( Payment To Be Made On The Basis Ofmeasurement Of Finished Quantity Of Work ) ( A ) With Earth Obtained From Excavation Of Foundation . , Dismantling All Types Of Masonry Excepting Cement Concrete Plain Or Reinforced , Stacking Serviceable Materials At Site And Removing Rubbish As Directed Within A Lead Of 75 M . A ) In Ground Floor Including Roof . , Ordinary Cement Concrete ( Mix 1:1 . 5:3 ) With Graded Stone Chips ( 20 Mm Nominal Size ) Excluding Shuttering And Reinforcement If Any , In Ground Floor As Per Relevant Is Codes . ( I ) Pakur Variety , Brick Work With 1St Class Bricks In Cement Mortar ( 1:6 ) ( A ) In Superstructure Gr . Floor . , Plaster ( To Wall , Floor , Ceiling Etc . ) With Sand And Cement Mortar Including Rounding Off Or Chamfering Corners As Directed And Raking Out Joints Including Throating , Nosing And Drip Course , Scaffolding/Staging Where Necessary ( Ground Floor ) . [Excluding Cost Of Chipping Over Concrete Surface] 15 Mm Thick ( 1:6 ) , Reinforcement For Reinforced Concrete Work In All Sorts Of Structures Including Distribution Bars , Stirrups , Binders Etc Initial Straightening And Removal Of Loose Rust ( If Necessary ) , Cutting To Requisite Length , Hooking And Bending To Correct Shape , Placing In Proper Position And Binding With 16 Gauge Black Annealed Wire At Every Intersection , Complete As Per Drawing And Direction . , Supplying And Laying True To Line And Level Vitrified TilesOfapproved Brand ( Size Not Less Than 600 Mm X 600 Mm X 10Mm Thick ) In Floor , Skirting Etc . Set In 20 Mm Sand Cementmortar ( 1:4 ) And 2 Mm Thick Cement Slurry Back Side Of Tiles Using Cement @ 2 . 91Kg . /Sqm Or Using Polymerised Adhesive ( 6 Mm Thick Layer Applied Directly Over Finished Artificial Stone Floor/Mosaic Etc Without Any Backing Course ) Laid After Application Slurry Using 1 . 75 Kg Of Cement Per Sqm Below Mortar Only , Joints Grouted With Admixture Of White Cement And Colouring Pigment To Match With Colour Of Tiles / Epoxy Grout Materials Of Approved Make As Directed And Removal Of Wax Coating Of Top Surface Of Tiles With Warm Water And Polishing The Tiles Using Soft And Dry Cloth Upto Mirror Finish Complete Including The Cost Of Materials , Labour And All Other Incidental Charges Complete True To The Manufacturer S Specification And Direction Of Engineer-In-Charge . ( White Cement , Synthetic Adhesive And Grout Material To Be Supplied By The Contra Conc . ( Ii ) With Polymerised Adhesive [6 Mm Thick] & Epoxy Grouting Materials For Filling Joints Including Spacer-2 Mm [Applied Directly Over Finished Artificial Stone Floor/ Mosaic Etc . ] ( B ) Light Colour , Supplying , Fitting & Fixing 1St Quality Ceramic Tiles In Walls And Floors To Match With The Existing Work & 4 Nos . Of Key Stones ( 10Mm ) Fixed With Araldite At The Back Of Each Tile & Finishing The Joints With White Cement Mixed With Colouring Oxide If Required To Match The Colour Of Tiles Including Roughening Of Concrete Surface , If Necessary Or By Synthetic Adhesive & Grout Materials Etc . ( B ) WallWith Sand Cement Mortar ( 1:3 ) 15 Mm Thick & 2 Mm Thick Cement Slurry At Back Side Of Tiles Using Cement @ 2 . 91 Kg/Sq . M& Joint Filling Using White Cement Slurry @ 0 . 20Kg/Sq . M . ( A ) Area Of Each Tile Upto 0 . 09 Sq . M ( Ii ) Other Than Coloured Decorative Including White , Supplying , Fitting & Fixing Granite Slab 15Mm To 18Mm Thick Infloor , Lobby , Stair , Landing And Treads Etc . Over 20Mm ( Avg ) Thick Base Of Cement Morter ( 1:2 ) Laid With White Cement Slurry@ 4 . 40Kg Per Square Meter Before Placing Of Granite Andjointed With White Cement Slurry @ 2 . 0 Kg Per Square MeterWith Necessary Pigments And Complete As Per DirectionOfengineer-In-Charge Including Cost Of All Materials , Labours , Curing And Roughening Of Concrete Surface Complete . In Ground Floor ( A ) Area Of Each Granite Slab Upto 0 . 60 Square Meter . , Single Brick Flat Soling Of Picked Jhama Bricks Including Ramming And Dressing Bed To Proper Level And Filling Joints With Local Sand . , Labour For Laying Single Brick Flat Soling Including Ramming And Dressing Bed To Proper Level And Filling Joints With Powdered Earth . , 125 Mm . Thick Brick Work With 1St Class Bricks In Cement Mortar ( 1:4 ) In Ground Floor . , Neat Cement Punning About 1 . 5Mm Thick In Wall , Dado , Window , Sill , Floor Etc . Note:Cement 0 . 152 Cu . M Per100 Sq . M . , Stripping Off Worn Out Plaster And Raking Out Joints Of Walls , Celings Etc . Upto Any Height And In Any Floor Including Removing Rubbish Within A Lead Of 75M As Directed . , Dismantling All Types Of Plain Cement Concrete Works , Stacking Serviceable Materials At Site And Removing Rubbish As Directed Within A Lead Of 75 M In Ground Floor Including Roof . ( A ) Upto 150 Mm . Thick , Hire And Labour Charges For Shuttering With Centering And Necessary Staging Upto 4 M Using Approved Stout Props And Thick Hard Wood Planks Of Approved Thickness With Required Bracing For Concrete Slabs , Beams And Columns , Lintels Curved Or Straight Including Fitting , Fixing And Striking Out After Completion Of Works ( Upto Roof Of Ground Floor ) A ) 25 Mm To 30 Mm Thick Wooden Shuttering As Per Decision &Direction Of Engineer-In-Charge . , Wood Work In Door And Window Frame Fitted And Fixed In Position Complete Including A Protective Coat Of Painting At The Contact Surface Of The Frame Excluding Cost Of Concrete , Iron Butt Hinges And M . S Clamps . ( The Quantum Should Be Corrected Upto Three Decimals ) :Sal: Local . , Priming One Coat On Timber Or Plastered Surface With Synthetic Oil Bound Primer Of Approved Quality Including Smoothening Surfaces By Sand Papering Etc . , ( A ) Painting With Best Quality Synthetic Enamel Paint Of Approved Make And Brand Including Smoothening Surface By Sand Papering Etc . Including Using Of Approved Putty Etc . On The Surface , If Necessary : ( A ) On Timber Or Plastered Surface : With Super Gloss ( Hi-Gloss ) - ( Iv ) Two Coats ( With Any Shade Except White ) , ( A ) Priming One Coat On Steel Or Other Metal Surface With Synthetic Oil Bound Primer Of Approved Quality Including Smoothening Surfaces By Sand Papering Etc . , P