| 1 | 1 | Dismantling reinforced cement concrete with cleaning and straightening and cutting of bars if required.(HSR item 8.6 e) | | 109.12 | Cum |
|---|
| 2 | 2 | Dismantling cement concrete plain 1:2:4.(HSR item 8.6 d) | | 14.56 | Cum |
|---|
| 3 | 3 | Dismantling of brick masonary (HSR No.8.5 (b) | | 365.28 | Cum |
|---|
| 4 | 4 | Dismantling cement concrete plain 1:3:6.(HSR item 8.6 b) | | 58.82 | Cum |
|---|
| 5 | 5 | Earth Work excavation undressed in all kind of soil with a average lead of 22.5 mtr. | | 3754.67 | %cum |
|---|
| 6 | 6 | Earth Work excavation in all kind of soils in foundation and trenches.(HSR item 6.6) | | 1240.64 | %cum |
|---|
| 7 | 7 | Re-handling of earth as per HSR note II. | | 3379 | %cum |
|---|
| 8 | 8 | Earth Work excavation in all kind of soil with a lead of 180 mtr. (HSR item 6.2 C(i) & (v) | | 6782 | %cum |
|---|
| 9 | 9 | Earth Work excavation in all kind of soil with a lead of 45 mtr. | | 6103 | %cum |
|---|
| 10 | 10 | Laying of RCC pipe I/C supply and carriage 4' dia (1200mm) NP2.(HSR item 28.60) | | 197.5 | Mtr. |
|---|
| 11 | 11 | Cement concrete 1 : 3 : 6 with stone aggregate 20 mm Nominal size in a foundation and plinth.(HSR item 10.40) | | 92.54 | Cum |
|---|
| 12 | 12 | First class brick work laid in cement, stone dust (from crusher) mortar 1:7 in foundation and plinth.(HSR item 11.21) | | 23.25 | Cum |
|---|
| 13 | 13 | First class brick work laid in cement stone dust(from crusher) mortar 1:3 in foundation and plinth.(HSR item 11.25) | | 239.23 | Cum |
|---|
| 14 | 14 | Design mix cement concrete of grade M-15 with minimum cement contents 315 kg/cum in foundation and plinth.(HSR item 10.64) | | 400 | Cum |
|---|
| 15 | 15 | Design mix cement concrete of grade M-25 with minimum cement contents 405 kg/cum in foundation and plinth.(HSR item 10.66) with pumping. | | 513 | Cum |
|---|
| 16 | 16 | Design mix cement concrete of grade M-25 with minimum cement contents 405 kg/cum in first storey upto 4 metres above plinth level.(HSR item 10.73). | | 414.44 | Cum |
|---|
| 17 | 17 | Centering and shuttering for Slab exceeding 3m to 6m span.(HSR item 9.18 b+Note No.5). | | 220.72 | Sqmt. |
|---|
| 18 | 18 | Shuttering for faces of concrete foundations and foundations beams (vertical or battering).(HSR item 9.13) | | 31.75 | Sqmt. |
|---|
| 19 | 19 | Shuttering for sides and soffits of beams haunchings, girders, bressumers and lintels.(HSR item 9.7) | | 181.69 | Sqmt. |
|---|
| 20 | 20 | Shuttering for faces of walls, partitions, retaining walls, well steining and the like (vertical or battering) including attached pilasters, buttresses etc.(HSR item 9.6) | | 419.75 | Sqmt. |
|---|
| 21 | 21 | Providing and fixing premoulded bituminous joint filler, for expansion joints, including the cost of sealing compound and primer coat 25mm Wide. (HSR item 24.35 b). | | 2232.7 | Per Mtr./cm/depth |
|---|
| 22 | 22 | Sand filling behind abutment F.O. wall and wall along section-C I/c s/o & c/o sand complete in all respect (HSR No.14.83 (b) (ii). | | 122.11 | Cum |
|---|
| 23 | 23 | Painting two coats with ready-mixed exterior paint in all shades on newly plastered or concrete surfaces of walls. (HSR Item 16.26) | | 189 | Sqmt. |
|---|
| 24 | 24 | Laying EC Bags filled with earth Above Water i/c Sewing (HSR item 23.26) | | 31692 | Each |
|---|
| 25 | 25 | Extra for Profile Wall (HSR item 11.45(a) | | 9.82 | Cum |
|---|
| 26 | 26 | Cement pointing 1:3 deep variety on brick or tile work (HSR No. 15.61) | | 1077 | Sqmt. |
|---|
| 27 | 27 | Sign Board (N.S.) | | 2 | Each |
|---|
| 28 | 28 | TMT steel bars Fe 500 of the company Tisco SAIL RINL or IISCO for R.C.C. works, where not included in the complete rate of R.C.C including bending, binding and placing in positon complete.(HSR item 18.22) | | 637.66 | Qtl. |
|---|
| 29 | 29 | Providing and fixing weep holes complete in all respect. | | 36 | Each |
|---|
| 30 | 30 | Preparation of sub grade for concrete for M-15 in lining of bed & side slope (HSR No. 10.122) (i) (b). | | 1200.95 | Sqmt. |
|---|
| 31 | 31 | Putting 1:3 cement sand slurry under lining of bed & side slope (HSR No. 19.12). | | 740.7 | Sqmt. |
|---|
| 32 | 32 | Credit for RCC Hume Pipes. | | 138.25 | Mtr. |
|---|
| 33 | 33 | Credit for steel of Old Slab | | 30 | Qtl. |
|---|
| 34 | 34 | Credit of Old Brick work. | | 365.28 | Cum |
|---|