Work Of Attending The Break Down Due To Various Reasons For Providing Uninterrupted Power Supply To Consumers In The Jurisdiction Of Edd-Iv , Iglas .
Tender Value
10 Lakhs
Estimated cost
Bid Submission
27 Apr 2020
0 days left
EMD
10000
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
IGLAS → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Work Of Attending The Break Down Due To Various Reasons For Providing Uninterrupted Power Supply To Consumers In The Jurisdiction Of Edd-Iv , Iglas .
BOQ
| Name of Work: Work of attending the Break down due to various reasons for providing uninterrupted power supply to consumers in the jurisdiction of EDD-IV, Iglas. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Cartage of following PCC/ST poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). | BI01010001010000000000000515BI0100001112 | ||
| 2 | 1.01 | PCC poles 8.5 Mtr. | BI01010001010000000000000515BI0100001113 | 300 | Nos. |
| 3 | 1.02 | ST poles 11 Mtr./13 Mtr. | BI01010001010000000000000515BI0100001113 | 20 | Nos. |
| 4 | 2 | Cartage of line material viz Cable, Weasal Conductor/ GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps, cable & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective end, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). | BI01010001010000000000000515BI0100001116 | 50 | Qtl. |
| 5 | 3 | Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. | BI01010001010000000000000515BI0100001117 | ||
| 6 | 3.01 | PCC poles 8.5 Mtr. | BI01010001010000000000000515BI0100001118 | 300 | Nos. |
| 7 | 3.02 | ST pole 11 Mtr./13 Mtr. | BI01010001010000000000000515BI0100001118 | 20 | Nos. |
| 8 | 4 | Dismentling of old and damaged pole after dismentling of all accessories. | BI01010001010000000000000515BI0100001117 | ||
| 9 | 4.01 | 11 KV line double pole | BI01010001010000000000000515BI0100001118 | 4 | Nos. |
| 10 | 5 | Erection of double pole on PCC pole/ST pole including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. | BI01010001010000000000000515BI0100001117 | ||
| 11 | 5.01 | 11 KV line double pole | BI01010001010000000000000515BI0100001118 | 4 | Nos. |
| 12 | 6 | Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work. | 50 | Nos. | |
| 13 | 6.01 | (b) Providing and fixing of stay insulator. | BI01010001010000000000000515BI0100001118 | 50 | Nos. |
| 14 | 7 | Laying, sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. | BI01010001010000000000000515BI0100001129 | ||
| 15 | 7.01 | ACSR Weasal Conductor. | BI01010001010000000000000515BI0100001128 | 13800 | Mtr. |
| 16 | 7.02 | ACSR Dog Conductor. | BI01010001010000000000000515BI0100001128 | 800 | Mtr. |
| 17 | 7.03 | ABC single/two core of sizes. | BI01010001010000000000000515BI0100001128 | 400 | Mtr. |
| 18 | 7.04 | ABC Conductor 3x50+1x35+1x16 Sq.mm. | BI01010001010000000000000515BI0100001128 | 80 | Mtr. |
| 19 | 7.05 | ABC Conductor 3x95+1x70+1x16 Sq.mm. | BI01010001010000000000000515BI0100001128 | 1000 | Mtr. |
| 20 | 7.06 | ABC Conductor 3x120+1x95+1x16 Sq.mm. | BI01010001010000000000000515BI0100001128 | 1000 | Mtr. |
| 21 | 8 | Grouting | BI01010001010000000000000515BI0100001129 | ||
| 22 | 8.01 | PCC poles 8.5 Mtr. Long as per RESPO norms | BI01010001010000000000000515BI0100001130 | 300 | Nos. |
| 23 | 8.02 | ST poles 11 Mtr. Long as per RESPO norms | BI01010001010000000000000515BI0100001130 | 20 | Nos. |
| 24 | 9 | Making the plinth of Steel poles. | 20 | Nos. | |
| 25 | 10 | Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labour, T&P etc. Required for proper completion of work. | BI01010001010000000000000515BI0100001148 | 50 | Nos. |
| 26 | 11 | Drilling and cutting of tee off channel, V cross arms, Top channel, cross bracing angle, MS garding angle, Dropper chanel as per specification of UPPCL construction manual including including loading and unloading at the both ends. | BI01010001010000000000000515BI0100001142 | 60 | Nos. |
| 27 | 12 | Chopping of tree branches which are touching to HT/LT lines. | BI01010001010000000000000515BI0100001144 | 50 | Nos. |
| 28 | 13 | Retighting of stay complete with nozelling & binding including cost of labour T&P etc required for proper completion of work. | BI01010001010000000000000515BI0100001132 | 25 | Nos. |
| 29 | 14 | Straightening of tilted PCC/Steel pole at various places as per direction of JE. | BI01010001010000000000000515BI0100001130 | 20 | Nos. |
| 30 | 15 | Re-sagging of loose HT/LT line conductor as per direction of superwising engineer. It includes the cost of labour T&P carrier etc. required for proper completion of work. | BI01010001010000000000000515BI0100001129 | ||
| 31 | 15.01 | ACSR Weasal Conductor | BI01010001010000000000000515BI0100001130 | 3500 | Mtr. |
| 32 | 15.02 | ACSR Dog Conductor | BI01010001010000000000000515BI0100001130 | 1000 | Mtr. |
| 33 | 16 | Replacement/Re-fixing of following damaged/ disturbed/de-aligned accessories:- | BI01010001010000000000000515BI0100001129 | ||
| 34 | 16.01 | 33 KV Disc Insulator | BI01010001010000000000000515BI0100001150 | 20 | Nos. |
| 35 | 16.02 | 33 KV Pin Insulator | BI01010001010000000000000515BI0100001151 | 80 | Nos. |
| 36 | 16.03 | 33 KV V-type Cross Arm | BI01010001010000000000000515BI0100001152 | 20 | Nos. |
| 37 | 16.04 | 11 KV Disc Insulator | BI01010001010000000000000515BI0100001150 | 100 | Nos. |
| 38 | 16.05 | 11 KV Pin Insulator | BI01010001010000000000000515BI0100001151 | 250 | Nos. |
| 39 | 16.06 | 11 KV V-type Cross Arm | BI01010001010000000000000515BI0100001152 | 150 | Nos. |
| 40 | 16.07 | F bracket | BI01010001010000000000000515BI0100001152 | 250 | Nos. |
| 41 | 16.08 | Different type of clamps/connectors/fittings. | BI01010001010000000000000515BI0100001152 | 50 | Nos. |
| 42 | 17 | Dismantling and removal of existing conductor from the various area preparing their coils and then stacking in the respective JE’s (Store) as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work. | BI01010001010000000000000515BI0100001129 | ||
| 43 | 17.01 | ACSR Weasal Conductor/GI wire. | 13000 | Mtr. | |
| 44 | 18 | Safe carriage of Old line material viz. Conductor, G.I. Earth wire, ABC conductor, Cross Arm, Angle, Channel, Insulators, Clamps & other line material from any other place or from site of work to the work of its loading & unloading at the respective ends including the cost of labour, T&P and carrier etc. required for proper completion of work. | 2 | Job. | |
| 45 | 19 | Guarding of old 11 KV line damaged due to storm by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P etc. required for proper completion of work. | 200 | Mtr. | |
| 46 | 20 | To attend the breakdown of broken wire of 33KV/11KV/LT line through complete process of re-jointing, re-sagging, & jumpering/binding etc. | |||
| 47 | 20.01 | A. H.T line | item27 | 15 | Nos. |
| 48 | 20.02 | B. L.T line | item28 | 15 | Nos. |
| 49 | 20.03 | Re- Connection of Consumer Service Cable | item29 | 15 | Nos. |
| 50 | 21 | Fixing of 33 KV heat shrinkable terminating & jointing kits for following size 33 KV XLPE cable after removal of damaged cable jointing kit. (Jointing kit shall be provided by contractor) | |||
| 51 | 21.01 | A. Outdoor (3x300 Sq mm ). | 5 | Nos. | |
| 52 | 22 | Fixing of 11 KV heat shrinkable terminating & jointing kits for following size 11 KV XLPE cable after removal of damaged cable jointing kit. (Jointing kit shall be provided by contractor) | |||
| 53 | 22.01 | A. Outdoor (3x300 Sq mm ). | 10 | Nos. | |
| 54 | 22.02 | B. Indoor (3x300 Sq mm ). | 10 | Nos. | |
| 55 | 22.03 | C. Outdoor (3x185 Sq mm ). | 10 | Nos. | |
| 56 | 22.04 | D. Indoor (3x185 Sq mm ). | 10 | Nos. | |
| 57 | 23 | Repairing of 3x70 Sq.mm./3x120/3x185 11 KV under ground cable by Straight Through after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. Spare cable shall be left and buried in the trench in the shape of rings at both ends. All material (except cable), labour, T&P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost. | 300 | Mtr. | |
| 58 | 24 | Providing/Fixing of missing Nut bolts and washer | 70 | Kg. |
AI Tender Summary
Tender Timeline
Apr 22, 2020
11:30 IST
Tender Published
Tender notice published.
CompletedApr 27, 2020
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedApr 27, 2020
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender